Net rack sphere node positioning system and positioning method based on BIM technology
Through the mesh ball node positioning system based on BIM technology, the hemispherical magnetic positioning shell and the division of the weft and latitude lines is used to realize the accurate positioning of the ball nodes and rods, and solve the problem of net structure deviation caused by traditional positioning methods. Improve construction quality and safety.
Patent Information
- Application Number
- CN202410974228.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-08
AI Technical Summary
The traditional ball nodes and rod member positioning methods cannot accurately locate the ball center and rod member center, resulting in deviations in the installation accuracy and calculation model of the grid structure, affecting structural safety.
Using the mesh ball node positioning system based on BIM technology, the mesh ball node BIM model is established to provide a magnetic positioning shell with a hemispherical structure, and divide the flange lines on its outer surface, and install the mesh balls by magnetic adsorption and Rod members ensure accurate positioning.
The force accuracy and construction quality of the grid structure are improved, and the deviation between the stress and design calculation caused by construction positioning is avoided.
Smart Images

Figure CN118913229A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of grid structure construction, and in particular to a grid ball node positioning system and a positioning method based on BIM technology. Background Art
[0002] The grid structure is an efficient and lightweight building support system with a wide range of applications in the field of modern engineering. Large public buildings such as large stadiums, airport terminals, and maintenance hangars mostly use grid structures. Ball nodes and rods are important components of grid structures. The accuracy of their position during construction directly affects the safety of the structure. Traditional ball nodes and rods are mostly positioned using total stations or RTK positioning, which cannot accurately locate the center of the ball node and the center of the rod. There are deviations between the grid installation accuracy and the calculation model during the construction process, affecting the safety of the structure. Summary of the invention
[0003] In order to overcome the defects existing in the prior art, the present invention provides a grid ball node positioning system and positioning method based on BIM technology, which avoids the deviation between the force of the grid structure and the design calculation due to the problem of construction positioning, and improves the force accuracy and construction quality of the grid structure.
[0004] In order to achieve the above object, the present invention provides a grid ball node positioning system based on BIM technology, comprising:
[0005] A grid ball node BIM model, including a grid ball and a plurality of rods connected to the grid ball;
[0006] A positioning device for connecting the grid ball and the plurality of rods, comprising a positioning shell and a plurality of longitudinal lines and a plurality of latitudinal lines marked on the outer surface of the positioning shell and arranged corresponding to the installation positions of the plurality of rods;
[0007] The positioning shell is a hemispherical structure, and a positioning opening is formed at the bottom of the positioning shell for the mesh ball to be embedded and connected. The positioning shell is a magnetic structure, and part of the mesh ball is embedded and adsorbed in the positioning opening.
[0008] Preferably, a centering device is provided at the center position of the top of the positioning shell.
[0009] Preferably, the inner diameter of the positioning shell is the same as the outer diameter of the grid ball.
[0010] A grid ball node positioning method based on BIM technology, characterized in that it is used to realize the positioning connection between a grid ball and a plurality of rods in the grid ball node positioning system based on BIM technology, and the positioning method comprises the following steps:
[0011] Establish a grid ball node BIM model, and provide a positioning shell with a hemispherical structure and a magnetic structure according to the grid ball in the BIM model;
[0012] Using the installation positions of the rods in the BIM model, the positioning shell is divided into longitude and latitude lines, and a number of longitude lines and a number of latitude lines are marked on the outer surface of the positioning shell;
[0013] The grid ball is installed by magnetic adsorption, so that part of the grid ball is embedded and adsorbed in the positioning opening at the bottom of the positioning shell;
[0014] According to the installation position of the rods in the grid ball BIM model, the rods are installed at the intersection of the corresponding meridian lines and weft lines.
[0015] Due to the adoption of the above technical solution, the present invention has the following beneficial effects:
[0016] By establishing a BIM model of the grid ball node, which includes the grid ball and several rods connected to the grid ball, the positioning shell is divided into longitude and latitude lines based on the installation position of the rods in the BIM model, so that the actual installation position of the rods can be accurately located, avoiding the deviation of the grid structure force and design calculation due to construction positioning problems, and improving the grid construction quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0018] Figure 1 It is a stereogram of the positioning device in the present invention.
[0019] Figure 2 It is a top view of the positioning device in the present invention.
[0020] The corresponding relationship of the numbers in the accompanying drawings is as follows:
[0021] 1-positioning shell; 11-positioning port; 2-centering device; 3-meridian line; 4-weft line. DETAILED DESCRIPTION
[0022] The specific embodiments of the present invention are further described below in conjunction with the accompanying drawings. It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0023] See also Figure 1 to Figure 2 As shown, an embodiment of the present invention provides a grid ball node positioning system based on BIM technology, including a grid ball node BIM model, the grid ball node BIM model includes a grid ball and a plurality of rods connected to the grid ball, and also includes a positioning device for connecting the grid ball and the plurality of rods, the positioning device includes a positioning shell 1 and a plurality of longitudinal lines 3 and a plurality of latitudinal lines 4 marked on the outer surface of the positioning shell 1 and arranged corresponding to the installation positions of the plurality of rods.
[0024] Furthermore, the positioning shell 1 is a hemispherical structure, and a positioning port 11 is formed at the bottom of the positioning shell 1 for the mesh ball to be embedded and connected, and the positioning shell 1 is a magnetic structure, and the inner diameter of the positioning shell 1 is the same as the outer diameter of the mesh ball, so that part of the mesh ball is embedded and adsorbed and connected in the positioning port 11. Preferably, in this embodiment, a centering device 2 is provided at the center position of the top of the positioning shell 1, and the centering device 2 is used to correspond to the direction of the column of the mesh structure when the positioning shell 1 is connected to the mesh ball, so that the positioning device is set in the center.
[0025] The present invention also provides a grid ball node positioning method based on BIM technology, which is used to realize the positioning connection between the grid ball and a plurality of rods in the grid ball node positioning system based on BIM technology. The positioning method comprises the following steps:
[0026] Establish a grid ball node BIM model, and provide a positioning shell with a hemispherical structure and a magnetic structure according to the grid ball in the BIM model;
[0027] Using the installation positions of the rods in the BIM model, the positioning shell is divided into longitude and latitude lines, and a number of longitude lines and a number of latitude lines are marked on the outer surface of the positioning shell;
[0028] The grid ball is installed by magnetic adsorption, so that part of the grid ball is embedded and adsorbed in the positioning opening at the bottom of the positioning shell;
[0029] According to the installation position of the rods in the grid ball BIM model, the rods are installed at the intersection of the corresponding meridian lines and weft lines.
[0030] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the described embodiments. For those skilled in the art, various changes, modifications, substitutions and variations of these embodiments are made without departing from the principles and spirit of the present invention, and still fall within the scope of protection of the present invention.
Claims
1. A grid ball node positioning system based on BIM technology, characterized in that: include: A grid ball node BIM model, including a grid ball and a plurality of rods connected to the grid ball; A positioning device for connecting the grid ball and the plurality of rods, comprising a positioning shell and a plurality of longitudinal lines and a plurality of latitudinal lines marked on the outer surface of the positioning shell and arranged corresponding to the installation positions of the plurality of rods; The positioning shell is a hemispherical structure, and a positioning opening is formed at the bottom of the positioning shell for the mesh ball to be embedded and connected. The positioning shell is a magnetic structure, and part of the mesh ball is embedded and adsorbed in the positioning opening.
2. The grid ball node positioning system based on BIM technology according to claim 1, characterized in that: A centering device is provided at the center position of the top of the positioning shell.
3. The grid ball node positioning system based on BIM technology according to claim 1, characterized in that: The inner diameter of the positioning shell is the same as the outer diameter of the grid ball.
4. A grid ball node positioning method based on BIM technology, characterized in that: Used to realize the positioning connection between the grid ball and a plurality of rods in the grid ball node positioning system based on BIM technology as claimed in claim 1, the positioning method comprises the following steps: Establish a grid ball node BIM model, and provide a positioning shell with a hemispherical structure and a magnetic structure according to the grid ball in the BIM model; Using the installation positions of the rods in the BIM model, the positioning shell is divided into longitude and latitude lines, and a number of longitude lines and a number of latitude lines are marked on the outer surface of the positioning shell; The grid ball is installed by magnetic adsorption, so that part of the grid ball is embedded and adsorbed in the positioning opening at the bottom of the positioning shell; According to the installation position of the rods in the grid ball BIM model, the rods are installed at the intersection of the corresponding meridian lines and weft lines.