Control method and system for opening and closing gate of desilting hole of hydropower station

By introducing the steps of static water closed doors, static water closed doors, static water closed doors and static water opened doors in the opening and closing process of the sand discharge hole gate, and using data acquisition mechanism and PLC to achieve automated control, the sand discharge in the existing technology is solved The problem of unreasonable opening and closing of the gate during the process and lack of monitoring has improved the safety of sand discharge and equipment life of Gaoshuitou Hydropower Station.

CN118932950APending Publication Date: 2024-11-12CHINA YANGTZE POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411152598.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing sand drainage hole gate opening and closing process lacks reasonable planning and control, especially in Gaoshuitou hydropower stations, which leads to high impact force of the water flow, causing damage to the gate, runner and dam body, and lacks a real-time monitoring system to prevent manual operation errors.

Method used

A control method is designed, including four steps: static water closed door, dynamic water open door, dynamic water closed door and static water open door. Automatic control is realized through data acquisition mechanism and PLC to ensure the reasonable opening and closing order and status monitoring of the gate. Prevent damage and use the oil pump motor and vents in the step to perform a boost operation to slow down the water flow shock.

Benefits of technology

Improve the rationality and safety of sand discharge operations, slow down the impact of water flow, extend the service life of gates and runners, avoid losses caused by manual operation errors, and realize real-time monitoring and automated control of sand discharge processes. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932950A_ABST
    Figure CN118932950A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of gate opening and closing, in particular to a control method and system for opening and closing a desilting hole gate of a hydropower station, before desilting operation, whether the water level of a reservoir area allows desilting is checked, and after the water level allows desilting, the following steps are executed: still water door closing, and after the water level of the reservoir area allows desilting, the still water door closing process is started; a flowing water door is opened, and after the flowing water door opening mark is set to be 1, the flowing water door opening process is executed; a flowing water door closing process is executed after the flowing water door closing mark is set to be 1; and still water door opening is conducted, and after the still water door opening mark is set to be 1, the still water door opening process is executed. And after each step is executed, the operation of the next step can be carried out. According to the control method and system, the gate opening and closing logic in the desilting process is designed, so that the whole desilting operation process is more reasonable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of gate opening and closing control, and in particular relates to a control method and system for opening and closing a sand discharge hole gate of a hydropower station. Background Art

[0002] The sand discharge hole is an important part of the flood discharge facilities of the hydropower station. It can not only effectively discharge the sediment deposited upstream of the hydropower station dam to prevent it from occupying the flood control storage capacity, reducing the reservoir regulation capacity and affecting power generation, but also cooperate with the upstream and downstream reservoirs to carry out sand flushing operations on the entire river. For high-head hydropower stations, the high water level causes the impact of the water flow to be too large. If the sand discharge hole gate is opened directly to discharge sand, there will be certain damage to the sand discharge hole gate, sand discharge flow channel and dam body, affecting the service life of the dam building. Therefore, it is necessary to reasonably plan and design the sand discharge process, and on this basis, establish a special control system to control the entire process and monitor the real-time status of the gate and its ancillary systems.

[0003] The existing opening and closing process of the sand discharge hole gate only directly opens or closes the gate when sand discharge is needed, without reasonable planning and research on the entire process, and without a dedicated control system to monitor the real-time status of the gate. The existing solution is to directly open or close the sand discharge hole gate only when sand discharge is needed. For low-head hydropower stations, the impact value of the water flow is small, and sand discharge operations can be performed directly. However, the impact of the water flow in high-head hydropower stations is large, which will cause damage to the sand discharge hole gate, sand discharge flow channel and dam body, affecting the service life of the dam building body. In addition, there is no dedicated control system to control the opening and closing process, and losses caused by manual operation errors cannot be avoided. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a control method and system for opening and closing the gate of a hydropower station desilting hole, and to design the logic of opening and closing the gate during the desilting process, so as to make the entire desilting operation process more reasonable.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a control method for opening and closing the gate of the sand discharge hole of a hydropower station. Before the sand discharge operation, it is first necessary to check whether the water level in the reservoir area allows sand discharge. After the water level allows sand discharge, the following steps are performed: Step 1: Still water gate closing: After the water level in the reservoir area allows for sand discharge, the still water gate closing process starts; Step 2: Water-driven door opening: After the water-driven door opening flag is set to 1, the water-driven door opening process is executed; Step 3: Water-operated closing door: After the water-operated closing door flag is set to 1, the water-operated closing door process is executed; Step 4: Still water door opening: After the still water door opening flag is set to 1, the still water door opening process is executed.

[0006] In the preferred solution, in step 1, the operation process of the static water closed door process is: First check whether the working gate of the sand discharge hole is in the unlocked state. If not, unlock the working gate first. After the working gate is in the unlocked state, start the oil pump motor, and the static water door closing flag is automatically set to 1. After the oil pump motor is started, boost the pressure to close the door. After the working gate reaches the fully closed position, the static water door closing process ends, and the dynamic water door opening flag is automatically set to 1.

[0007] In the preferred solution, in step 2, the operation process of the dynamic water valve opening process is: First, open the water retaining emergency gate upstream of the sand discharge hole. After the upstream water retaining emergency gate is fully opened, control the opening of the vent hole. After the vent hole is fully opened, open the working gate. Then start the oil pump motor to increase the pressure and open the gate. When the working gate is opened to 4000mm, start to close the vent hole. The vent hole must be fully closed before the working gate is opened to 4500mm. After the working gate is opened to the fully open position, the dynamic water closing flag is automatically set to 1.

[0008] In the preferred solution, in step 2, after the gate is opened by water movement, the upstream sediment is discharged to the downstream through the sediment discharge channel. If the working gate slides down during the sediment discharge, when the sliding distance exceeds the set value, the gate is automatically opened again until the working gate is in the fully open position.

[0009] In the preferred solution, the judgment logic of the working gate sliding down and lifting is: the gate sliding height , where L0 is the initial position of the gate after lifting, and L1 is the real-time position of the gate after lifting. When the difference between the two is greater than the set value, the gate will be lifted to the original height L0.

[0010] In the preferred solution, in step 3, the operation process of the dynamic water closing process is: After waiting for the sand discharge to be completed, the control system sends a door closing command, the oil pump motor starts to increase the pressure and close the door, and when the working gate is closed to 4500mm, the vent begins to open. The vent must be fully opened before closing the door to 4000mm. After the working gate is closed to the fully closed position, the vent will also be closed to the fully closed position. At this time, the still water door opening flag is automatically set to 1.

[0011] In the preferred solution, in step 4, the operation process of the static water door opening process is: Close the upstream water retaining emergency gate, then send a gate opening command, start the oil pump motor to increase the pressure to open the gate, wait for the working gate to open to the upper limit position and then lock the working gate. At this time, all opening and closing gate signs will be cleared and the gate will return to the state before sand discharge.

[0012] The present invention also provides a control system for opening and closing a gate of a hydropower station for discharging sand, comprising: A data acquisition mechanism, the data acquisition mechanism includes an opening meter for acquiring the position of the working gate and a switch quantity sensor for acquiring the switch status of each control valve on the oil pressure system pipeline and the switch status of the vent hole; PLC, the PLC adopts the above-mentioned control method for opening and closing of the sand discharge hole gate of a hydropower station to perform the opening and closing operation of the sand discharge hole gate.

[0013] The present invention provides a control method and system for opening and closing a sluice gate of a hydropower station, which has the following beneficial effects: 1. The whole process of sand discharge from the sand discharge hole includes four steps: closing the door with static water, opening the door with dynamic water, closing the door with dynamic water and opening the door with static water, as well as the operation sequence of the gate, motor and exhaust hole in these steps. The sand discharge process for high head hydropower station is more reasonable.

[0014] 2. When the sand discharge hole is in standby state, the water retaining gate of the upstream flow channel is in the falling state, and the sand and water from the upstream cannot flow down. Therefore, the water retaining gate must be opened first after the working gate is dropped. When the working gate is fully closed to 4000mm, the flow velocity in the flow channel gradually increases or decreases, and the gate will vibrate and cavitation will occur during the process. During the opening or closing process of the working gate, open a vent hole between the gate height of 0-4000mm to introduce outside air into the gate panel to alleviate the phenomenon.

[0015] 3. The upstream water retaining gate cannot be closed when the sand discharge hole is discharging sand, which will cause damage to the water retaining gate. In step 3, after closing the working gate, the water in the flow channel is in a static state. At this time, the conditions for closing the water retaining gate are met. First close the upstream water retaining accident gate and then increase the pressure to open the gate to prevent the closing of the water retaining gate from causing damage to the gate body. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 is an operation flow chart of the present invention; Figure 2 It is a structural schematic diagram of the control system of the present invention. DETAILED DESCRIPTION

[0017] Embodiment 1: The sand discharge hole structure of the hydropower station consists of an upstream water retaining emergency gate, a flow channel, a working gate and a tailwater gate from top to bottom. Only the working gate can be operated by a hydraulic hoist. There is a vent behind the working gate to reduce cavitation. The movable range of the working gate has three position nodes from top to bottom: upper limit, fully open and fully closed.

[0018] The invention designs a control method for opening and closing the gate of the sand discharge hole of a hydropower station, which mainly arranges the different positions of the above-mentioned accident gate, working gate, vent hole and working gate in the sand discharge process, so as to make the sand discharge process of the hydropower station more reasonable. The whole process has four steps: closing the gate with static water, opening the gate with dynamic water, closing the gate with dynamic water and opening the gate with static water. The next step can be performed only after the execution of this step.

[0019] like Figure 1 As shown, a control method for opening and closing the gate of the sand discharge hole of a hydropower station is provided. Before the sand discharge operation is performed, it is first necessary to check whether the water level in the reservoir area allows sand discharge. If the water level allows sand discharge, the following steps are performed: Step 1: Still water gate closing: After the water level in the reservoir allows for sand discharge, the still water gate closing process is initiated.

[0020] The operation process of the static water closed door process is: First check whether the working gate of the sand discharge hole is in the unlocked state. If not, unlock the working gate first. After the working gate is in the unlocked state, start the oil pump motor, and the static water door closing flag is automatically set to 1. After the oil pump motor is started, boost the pressure to close the door. After the working gate reaches the fully closed position, the static water door closing process ends, and the dynamic water door opening flag is automatically set to 1.

[0021] Step 2: Water-driven door opening: After the water-driven door opening flag is set to 1, the water-driven door opening process is executed.

[0022] The operation process of the dynamic water opening process is: First, open the water retaining emergency gate upstream of the sand discharge hole. After the upstream water retaining emergency gate is fully opened, control the opening of the vent hole. After the vent hole is fully opened, open the working gate. Then start the oil pump motor to increase the pressure and open the gate. When the working gate is opened to 4000mm, start to close the vent hole. The vent hole must be fully closed before the working gate is opened to 4500mm. After the working gate is opened to the fully open position, the dynamic water closing flag is automatically set to 1.

[0023] After the gate is opened by water, the upstream sediment is discharged to the downstream through the sediment discharge channel. If the working gate slides down during the sediment discharge, when the sliding distance exceeds 100mm, the gate will automatically open again until the working gate is in the fully open position.

[0024] The judgment logic of the working gate's downward movement is: the gate's downward movement height , where L0 is the initial position of the gate after lifting, and L1 is the real-time position of the gate after lifting. When the difference between the two is greater than the set value, the gate is lifted to the original height L0. In this embodiment, the gate sliding height setting value is 100mm.

[0025] Step 3: Dynamic water closing: After the dynamic water closing flag is set to 1, the dynamic water closing process is executed.

[0026] The operation process of the dynamic water closed door process is: After waiting for the sand discharge to be completed, the control system sends a door closing command, the oil pump motor starts to increase the pressure and close the door, and when the working gate is closed to 4500mm, the vent begins to open. The vent must be fully opened before closing the door to 4000mm. After the working gate is closed to the fully closed position, the vent will also be closed to the fully closed position. At this time, the still water door opening flag is automatically set to 1.

[0027] Step 4: Still water door opening: After the still water door opening flag is set to 1, the still water door opening process is executed.

[0028] The operation process of the static water door opening process is: Close the upstream water retaining emergency gate, then send a gate opening command, start the oil pump motor to increase the pressure to open the gate, wait for the working gate to open to the upper limit position and then lock the working gate. At this time, all opening and closing gate signs will be cleared and the gate will return to the state before sand discharge.

[0029] The whole process of sand discharge from the sand discharge hole includes four steps of closing the door with static water, opening the door with dynamic water, closing the door with dynamic water and opening the door with static water, as well as the operation sequence of the gate, motor and exhaust hole in these steps. The sand discharge process for high head hydropower station is relatively reasonable.

[0030] The order of arrangement of the gates in the sand discharge hole flow channel from the upstream high water level to the downstream low water level is: accident water retaining gate, working gate, and tailwater gate. The four steps are distinguished according to the different positions of the working gates. Since the sand discharge hole working gate cannot retain water for a long time during design and use, the accident water retaining gate upstream of the sand discharge hole is in the fully closed position under normal circumstances, and the accident water retaining gate cannot be leak-free. In order to prevent water accumulation in the flow channel, the sand discharge hole working gate needs to be in the fully open position.

[0031] Embodiment 2: A control system for opening and closing the gate of a hydropower station's sand discharge hole, such as Figure 2 As shown, it includes: a data acquisition mechanism, which includes an opening meter for collecting the position of the working gate, a pressure sensor for detecting the pressure of the oil pump and the oil pressure pipeline, a voltage and current transformer for detecting the power supply voltage and current, and a switch quantity sensor for collecting the switch status of each control valve or the switch status of the vent hole on the oil pressure system pipeline.

[0032] The data acquisition mechanism collects analog and switching signals of the sand discharge hole gate and its affiliated oil pressure system. The analog sensors mainly include the opening meter for detecting the position of the sand discharge hole gate, the temperature sensor and liquid level sensor for detecting the oil temperature and oil level of the oil tank of the sand discharge hole oil pressure system, the pressure sensor for detecting the pressure of the oil pump and the oil pressure pipeline, and the voltage and current transformer for detecting the power supply voltage and current. The switching sensor mainly collects the switching status of each control valve on the oil pressure system pipeline, the switching status of the vent hole, etc.

[0033] PLC, the PLC is used to execute a control method for opening and closing the gate of the hydropower station's sand discharge hole described in Example 1. PLC is the core of the control system, which collects the switch quantity and analog signal collected by the external on-site sensor, accepts commands from the host computer and on-site operators, controls the oil pump motor, the oil pressure system valve group, the vent motor and other automation components, automatically executes the gate opening and closing operation process, and automatically determines whether the next execution condition is met during the process execution and stops the process immediately in case of a fault, and also sends the execution result and fault alarm signal to the touch screen and the host computer for monitoring by the operation operator.

[0034] In the specific implementation, it also includes an auxiliary system for the touch screen to power the control system. The touch screen receives signals from the PLC, displays the status of the gate and the oil pressure system more intuitively, and displays the fault signals of the system in a timely manner. The auxiliary power supply system mainly provides power to the sensor, PLC, touch screen and oil pump motor.

[0035] In addition to automatically executing the gate opening and closing operation process, the control system also has protective functions such as gate sliding and lifting judgment, gate opening and closing speed and pressure abnormality judgment, and oil pressure system oil temperature and oil level abnormality judgment.

[0036] Gate downslope lifting judgment logic: Gate downslope height , where L0 is the initial position of the gate after lifting, and L1 is the real-time position of the gate after lifting. Due to gravity and poor sealing, L1 is always lower than L0. When the difference between the two is greater than the set value, the PLC lifting logic will be triggered to lift the gate to the original height L0.

[0037] Gate opening and closing speed and pressure abnormality judgment: First, calculate the real-time gate speed based on the gate opening and gate lifting time ,in For the gate The change in altitude within a certain period of time is compared with the preset value to determine whether the speed is abnormal.

[0038] Pressure abnormalities are judged through pressure sensors installed in the oil pressure system pipeline and the oil pump outlet. When speed and pressure abnormalities occur, the valve and pump should be stopped in time for inspection and processing.

[0039] When the oil temperature and oil level are abnormal, the temperature and liquid level sensors installed in the oil tank of the hydraulic system send the collected values ​​to the PLC for judgment. When the oil temperature is abnormal, the oil tank temperature should be heated or cooled in time, and when the oil level is abnormal, add oil or drain oil in time.

[0040] The above-mentioned embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The embodiments and features in the embodiments of the present application can be arbitrarily combined with each other without conflict. The protection scope of the present invention shall be the technical solutions recorded in the claims, including the equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A control method for opening and closing the gate of a hydropower station's sand discharge hole, It is characterized in that Before performing sand discharge operations, you first need to check whether the water level in the reservoir area allows sand discharge. If the water level allows sand discharge, perform the following steps: Step 1: Still water gate closing: After the water level in the reservoir area allows for sand discharge, the still water gate closing process starts; Step 2: Water-driven door opening: After the water-driven door opening flag is set to 1, the water-driven door opening process is executed; Step 3: Water-operated closing door: After the water-operated closing door flag is set to 1, the water-operated closing door process is executed; Step 4: Still water door opening: After the still water door opening flag is set to 1, the still water door opening process is executed.

2. A control method for opening and closing a sluice gate of a hydropower station according to claim 1, It is characterized in that In step 1, the operation process of the static water closed door process is: First check whether the working gate of the sand discharge hole is in the unlocked state. If not, unlock the working gate first. After the working gate is in the unlocked state, start the oil pump motor, and the static water door closing flag is automatically set to 1. After the oil pump motor is started, boost the pressure to close the door. After the working gate reaches the fully closed position, the static water door closing process ends, and the dynamic water door opening flag is automatically set to 1.

3. A control method for opening and closing a sluice gate of a hydropower station according to claim 1, It is characterized in that In step 2, the operation process of the dynamic water valve opening process is: First, open the water retaining emergency gate upstream of the sand discharge hole. After the upstream water retaining emergency gate is fully opened, control the opening of the vent hole. After the vent hole is fully opened, open the working gate. Then start the oil pump motor to increase the pressure and open the gate. When the working gate is opened to 4000mm, start to close the vent hole. The vent hole must be fully closed before the working gate is opened to 4500mm. After the working gate is opened to the fully open position, the dynamic water closing flag is automatically set to 1.

4. A control method for opening and closing a sluice gate of a hydropower station according to claim 3, It is characterized in that In the step 2, after the gate is opened by water movement, the upstream sediment is discharged to the downstream through the sediment discharge channel. If the working gate slides down during the sediment discharge, when the sliding distance exceeds the set value, the gate is automatically opened again until the working gate is in the fully open position.

5. A control method for opening and closing a sluice gate of a hydropower station according to claim 4, It is characterized in that The judgment logic of the working gate sliding down and lifting is: the gate sliding height , where L 0 is the initial position of the gate after lifting, L 1 The real-time position of the gate after lifting. When the difference between the two is greater than the set value, the gate will be lifted to the original height L 0 .

6. A control method for opening and closing a sluice gate of a hydropower station according to claim 1, It is characterized in that In step 3, the operation process of the dynamic water closing process is as follows: After waiting for the sand discharge to be completed, the control system sends a door closing command, the oil pump motor starts to increase the pressure and close the door, and when the working gate is closed to 4500mm, the vent begins to open. The vent must be fully opened before closing the door to 4000mm. After the working gate is closed to the fully closed position, the vent will also be closed to the fully closed position. At this time, the still water door opening flag is automatically set to 1.

7. A control method for opening and closing a sluice gate of a hydropower station according to claim 1, It is characterized in that In step 4, the operation process of the static water door opening process is: Close the upstream water retaining emergency gate, then send a gate opening command, start the oil pump motor to increase the pressure to open the gate, wait for the working gate to open to the upper limit position and then lock the working gate. At this time, all opening and closing gate signs will be cleared and the gate will return to the state before sand discharge.

8. A control system for opening and closing the gate of the sand discharge hole of a hydropower station. It is characterized in that include: A data acquisition mechanism, the data acquisition mechanism includes an opening meter for acquiring the position of the working gate and a switch quantity sensor for acquiring the switch status of each control valve on the oil pressure system pipeline and the switch status of the vent hole; PLC, the PLC adopts a control method for opening and closing of a sand discharge hole gate of a hydropower station as described in any one of claims 1 to 6 to perform opening and closing operations of the sand discharge hole gate.