On-site-welding-free internally-inserted steel pipe type anchor group type spiral anchor foundation and construction method thereof
By interpolated steel pipes, the anchor rod and the steel bearing are connected by simulated connection using graph paper or three-dimensional software, factory processing is realized, and the on-site welding problem of spiral anchor foundation is solved, and the construction quality and efficiency are improved.
Patent Information
- Application Number
- CN202411291810.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-11-12
AI Technical Summary
The existing spiral anchor foundation requires on-site welding, and there is a deviation in the anchor positioning, the welding workload is large and the quality is difficult to guarantee, which limits the promotion and application of spiral anchor foundation.
Use interpolated steel pipes to connect the anchor rods and the steel bearing tables. The connection between the anchor rods and the steel bearing tables is simulated through grid paper or three-dimensional software. All components are processed in the factory to avoid on-site welding. Use interpolated steel pipes and bolts to realize the anchor rods and circles. Connection of steel pipes.
The construction process is simplified, mechanized efficiency is improved, construction difficulty and on-site welding are reduced, and the construction quality of spiral anchor foundation is improved.
Smart Images

Figure CN118933064A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of power transmission and transformation engineering, and specifically relates to an on-site welding-free internally inserted steel pipe group anchor type spiral anchor foundation and a construction method thereof. The invention is suitable for sites with good traffic conditions and convenient for mechanical equipment to enter and operate, and can be used for other soil types except rock and gravel soil. Background Art
[0002] The spiral anchor foundation is an anchor structure composed of spiral anchors and upper caps, which mainly uses deep soil to resist the force of the upper structure. The foundation is mainly made of steel components and is prefabricated in factories, so the foundation quality is stable. The foundation is mechanized, with fewer construction processes and simple construction, which can significantly reduce or avoid the use of concrete materials, thereby greatly shortening the construction period. At the same time, there is no need for large-scale excavation during spiral anchor construction, the scope of surface damage is relatively small, and the environmental protection benefits are obvious. In addition, the spiral anchor has little disturbance to the soil, which can give full play to the inherent strength of the original soil and save foundation materials.
[0003] During the construction of the spiral anchor foundation, it is difficult to accurately control the position of the anchor rod screwed into the soil. After being driven into the soil, there is often a certain deviation between the actual position and the designed position. Therefore, during the current spiral anchor construction at home and abroad, the anchor rod and the steel cap are often connected by on-site welding. However, during on-site welding, the space between the anchor rod and the steel cap is very small, and overhead welding is required in some places, which can only be welded from the outside. The welding is difficult, the weld is difficult to penetrate, the welding process is required to be high, and the welding quality is difficult to guarantee. In addition, for the group-anchor type spiral anchor foundation, there are several spiral anchors under each foundation, and the welding workload is huge, which further increases the difficulty of welding and seriously restricts the promotion and application of spiral anchor foundations.
[0004] CN 218933194U discloses a group-anchor type spiral anchor foundation using flange connection, comprising a steel cap, an upper tower leg is connected to the upper part of the steel cap, and a plurality of round steel pipes are fixed below the steel cap, each round steel pipe is connected to an anchor rod through a flange, and a plurality of spiral anchor plates are arranged on the anchor rod. Although this scheme proposes a scheme that can avoid on-site welding, this scheme adopts flange installation, and the flange connection has very high requirements on the flatness of the flange surface, and the factory welding is mostly hot welding, which is difficult to process. In addition, when the flange is connected, each flange has 8 or more bolts, and the steps are cumbersome during construction, requiring more human resources, which further limits the large-scale promotion and application of the group-anchor type spiral anchor foundation using flange connection. Summary of the invention
[0005] The technical problem to be solved by the present invention is: how to solve the problems that the existing spiral anchor foundation requires on-site welding, there is deviation in the positioning of the anchor rods driven into the soil, the welding workload is large, and the welding quality is difficult to ensure, and to provide an inserted steel pipe group anchor type spiral anchor foundation that does not require on-site welding and a construction method thereof.
[0006] The on-site welding-free inserted steel pipe group anchor type spiral anchor foundation includes a steel cap, the upper part of the steel cap is connected to the upper tower leg, and a number of round steel pipes are fixed below the steel cap. Each round steel pipe is connected to the anchor rod through the inserted steel pipe. A number of spiral anchor plates are arranged on each anchor rod. The spiral anchor plates are welded to the anchor rods at fixed intervals along the axial direction of each anchor rod.
[0007] The anchor rods are arranged with different or equal inclination angles.
[0008] A first stiffening rib is arranged between the steel cap and the upper tower leg, and a second stiffening rib is arranged at the connection position between the steel cap and the round steel pipe.
[0009] At least two bolt holes are symmetrically arranged on the anchor rod, and through nails are arranged in the oppositely arranged bolt holes. The through nails pass through the center of the anchor rod from the bolt holes, and the sharp points at both ends of the through nails respectively pass through the same length of the anchor rod.
[0010] A construction method of an on-site welding-free internally inserted steel pipe group anchor type spiral anchor foundation comprises the following steps: S1: screwing the anchor rods in sequence according to the spatial position and angle required by the design until all the anchor rods are screwed to the designed depth; S2: using a square paper tube a to simulate the circular steel pipe and fixing it on the top of the anchor rod, determining the elevation of the bottom surface of the steel cap by on-site measurement and setting out, using a square paper b to simulate the bottom surface of the steel cap, and cutting the square paper tube a at this plane, marking the shape, position and size of the intersection surface of the square paper tube a and the square paper b on the square paper b, and determining the center of the intersection surface according to the geometric relationship; repeating the above steps for each anchor rod and numbering them respectively; S3: returning the square paper tube a and the square paper b to the factory, processing the round steel tube according to the shape and size of the square paper tube a, opening a small hole on the steel cap according to the center position of the intersection surface in the square paper b, then welding the round steel tube to the bottom surface of the steel cap according to the shape, position and size of the intersection surface, and then welding the upper tower leg, the second stiffening rib plate, and the first stiffening rib plate to the steel cap in sequence. After the welding is completed, galvanizing the structure; S4: Determine the length, thickness and size and position of the matching bolts of the inserted steel pipe according to calculation. If the length of the inserted steel pipe is short, embed the inserted steel pipe in the round steel pipe. If the length of the inserted steel pipe is long, embed the inserted steel pipe in the anchor rod. Reserve a thin wire in the inserted steel pipe and use bolts to fix the inserted steel pipe on the anchor rod or round steel pipe. S5: transport the structure to the site, hook the reserved thin wire in the inserted steel pipe to the outside of the small hole on the steel cap, and align the anchor rod and the round steel pipe; after the upper structure is in place, remove the fixing bolts described in S4, use the thin wire to pull and slide the inserted steel pipe, align it with the hole, and use bolts to connect the inserted steel pipe with the round steel pipe and the anchor rod; according to the site conditions, use structural adhesive, concrete or other materials to seal the small hole on the steel cap; if there is earth excavation, after the installation of the steel cap is completed, backfill and compact the earth to complete the construction of the inserted steel pipe type group anchor type spiral anchor foundation that does not require on-site welding.
[0011] A construction method of an on-site welding-free internally inserted steel pipe group anchor type spiral anchor foundation comprises the following steps: S1: screwing the anchor rods in sequence according to the spatial position and angle required by the design until all the anchor rods are screwed to the designed depth; S2: Lofting according to the on-site position, setting at least two through-penetration nails on each anchor rod, using a total station to measure the coordinates of the sharp points of the two ends of the through-penetration nails in the bolt hole on the anchor rod, calculating the coordinates of the midpoint of the sharp point according to the coordinates of the sharp point, and establishing the axis of the anchor rod through the two midpoint coordinates; after the measurement is completed, taking out the through-penetration nails; then, calculating and determining the length and thickness of the inserted steel pipe and the size and position of the matching bolts; S3: According to the coordinates and the size and thickness of the interpolated steel pipe, a three-dimensional model is established for the anchor rod, the interpolated steel pipe and the round steel pipe in the three-dimensional software; the spatial position inclination angle of the round steel pipe and the interpolated steel pipe is the same as that of the anchor rod, and the inner diameter of the anchor rod and the round steel pipe is slightly larger than the outer diameter of the interpolated steel pipe; according to the relative position of the upper tower legs, the steel cap is modeled; in the three-dimensional model, the excess part of the round steel pipe exceeding the bottom surface of the steel cap is cut off, and at this time, the size and spatial position of the round steel pipe are the actual positions obtained by setting out and modeling according to the actual situation on site, and the contact surface between the round steel pipe and the steel cap in the three-dimensional model is the actual connection surface between the steel cap and the round steel pipe; S4: Record the parameters such as the size, spatial position, and contact surface position of the round steel pipe at this time, and determine the center of the contact surface according to the geometric relationship; convert the above three-dimensional model into a two-dimensional drawing, and deliver the two-dimensional drawing to the factory for processing the entire upper structure of the foundation. According to the center position of the contact surface, a small hole is opened on the steel cap. The round steel pipe and the steel cap are welded in the factory, and the upper tower leg and the steel cap are welded in the factory. After all welding is completed, all components are galvanized in the factory; S5: transport the structure to the site, reserve a thin wire in the inserted steel pipe, and use bolts to fix the inserted steel pipe to the anchor rod or round steel pipe; manually hook the reserved thin wire in the inserted steel pipe to the outside of the small hole on the steel cap, and align the anchor rod and the round steel pipe; after the upper structure is in place, remove the fixed bolts, use the thin wire to pull the inserted steel pipe to slide, and position it according to the position and length of the inserted steel pipe calculated in step S2. After aligning the hole position, use bolts to connect the inserted steel pipe to the round steel pipe and the anchor rod; according to the site conditions, use structural adhesive, concrete or other materials to seal the small hole on the steel cap; if there is earth excavation, after the steel cap is installed, backfill and compact the earth to complete the construction of the inserted steel pipe type group anchor type spiral anchor foundation without on-site welding.
[0012] The present invention adopts the above technical solution. The inserted steel pipe group anchor type spiral anchor foundation that does not require on-site welding has a simple structure. It can simulate the connection between the anchor rod and the steel cap by on-site layout and on-site measurement using graph paper or three-dimensional software, so as to produce different superstructures according to local conditions, realize that all components are processed in the factory, improve mechanization efficiency, do not require on-site welding and on-site anti-corrosion, and is easy to construct. It can effectively reduce the difficulty of spiral anchor foundation construction and improve the construction quality of the spiral anchor foundation. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 A schematic diagram of the foundation of the internally inserted steel pipe group anchor type spiral anchor provided by the present invention without on-site welding; Figure 2 for Figure 1 Schematic diagram of section 1-1; Figure 3 for Figure 1 Sectional view 2-2; Figure 4 for Figure 1 A schematic diagram of the connection between the round steel pipe, the inserted steel pipe and the anchor rod in the illustrated embodiment; Figure 5 for Figure 1 A schematic diagram of the connection between the through nail and the anchor rod in the embodiment described in the figure; Figure 6 (a) Schematic diagram of the square paper tube a simulating a round steel pipe in construction method 1; Figure 6 (b) is a schematic diagram of the bottom surface of the steel cap simulated by the grid paper b in construction method 1; Figure 6 (c) is a schematic diagram of marking the intersection position on the graph paper b in construction method 1; Figure 7 (a) is a schematic diagram of modeling based on spatial position in construction method 2; Figure 7 (b) Schematic diagram of modeling the steel cap and cutting the round steel pipe in construction method 2; Figure 7 (c) Schematic diagram of the intersection position marked by 3D software in construction method 2. DETAILED DESCRIPTION
[0014] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described implementation is a part of the implementation of the present invention, not all implementations. Based on the implementation of the present invention, all other implementations obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0015] like Figure 1 —— Figure 4 As shown, an inserted steel pipe group anchor type spiral anchor foundation that does not require on-site welding includes a steel cap 3, an upper tower leg 7 is connected to the top of the steel cap 3, and a plurality of round steel pipes 4 are fixed below the steel cap 3. Each round steel pipe 4 is connected to an anchor rod 1 through an inserted steel pipe 5. A plurality of spiral anchor plates 2 are arranged on each anchor rod 1. The spiral anchor plates 2 are welded to the anchor rod 1 at a fixed interval along the axial direction of each anchor rod 1.
[0016] The present invention adds a section of round steel pipe 4 between the top of the anchor rod 1 and the steel cap 3. Since each round steel pipe 4 and the anchor rod 1 are in an eight-shaped shape, the round steel pipe 4 cannot be directly inserted into the anchor rod 1. The present invention proposes to use an inserted steel pipe 5 to connect the round steel pipe 4 and the anchor rod 1. The anchor rod 1 and the round steel pipe 4 are connected by the inserted steel pipe 5, and the size of the inserted steel pipe 5 is slightly smaller than the anchor rod 1 and the round steel pipe 4.
[0017] As an improvement of the technical solution, the field-free welding-free internally inserted steel pipe group anchor type spiral anchor foundation has multiple anchor rods 1. When each anchor rod is driven into the soil, there is an error and the inclination angles are different. During field implementation, the inclination angle of each anchor rod should be measured separately, and they should be numbered and the upper structures should be made separately. Figure 2 A schematic diagram of the planar layout of three anchor rods is provided for reference; in addition, the anchor rod 1 can be arranged with different inclination angles or equal inclination angles. In view of this, any modification or variation of the number and inclination angle of the anchor rods is deemed to be within the protection scope of the patent of this invention.
[0018] As an improvement of the technical solution, in order to improve the stress performance of the upper structure and increase the bearing capacity of the connection plane, a first stiffening rib 8 is arranged between the steel cap 3 and the upper tower leg 7, and a second stiffening rib 6 is arranged at the connection position between the steel cap 3 and the round steel pipe 4.
[0019] During assembly, the round steel pipe 4, the upper tower leg 7, the steel cap 3, the first stiffening rib plate 8 and the second stiffening rib plate 6 can all be welded and galvanized for corrosion protection in the factory. On site, it is only necessary to use the inserted steel pipe 5 to install the welded upper structure on the anchor rod 1.
[0020] Further, the inserted steel pipe 5 and the anchor rod 1, and the inserted steel pipe 5 and the round steel pipe 4 are fixed by bolts 10. Necessarily, bolt holes are provided on the inserted steel pipe 5, the anchor rod 1 and the round steel pipe 4.
[0021] Furthermore, holes are reserved on the steel cap 3, and thin wires are reserved in the inserted steel pipe 5, which are used to slide the inserted steel pipe 5 and align the bolt holes during the construction phase.
[0022] like Figure 5 As shown, further, at least two bolt holes are symmetrically arranged on the anchor rod 1, and a through nail is arranged in the oppositely arranged bolt holes, and the through nail 9 passes through the anchor rod 1 from the bolt hole through the center, and the two ends of the through nail 9 respectively pass through the anchor rod 1 by the same length, so as to facilitate the on-site measurement of the coordinates of the sharp points. After the measurement is completed, the through nail 9 is taken out. Preferably, at least two through nails 9 are arranged on each anchor rod 1.
[0023] The inserted steel pipe group anchor type spiral anchor foundation adopts the field-free welding. The round steel pipe 4 is a non-standard part. In order to avoid field welding, the coordinates of the connection surface between the round steel pipe 4 and the steel cap 3 need to be determined. Therefore, the key point of implementation is to determine the spatial position and shape of the connection between the round steel pipe 4 and the anchor rod 1 and the steel cap 3. The present invention provides two construction methods for simulating the connection between the round steel pipe 4 and the anchor rod 1 and the steel cap 3, which are the graph paper method and the three-dimensional modeling method. In actual construction, different construction methods can be selected according to specific conditions.
[0024] As an improvement of the technical solution, during on-site construction, in order to reduce workload and avoid earth excavation, the inserted steel pipe 5 should be arranged upward as much as possible while meeting the design requirements.
[0025] The present invention also provides two construction methods of the on-site welding-free internally inserted steel pipe group anchor type spiral anchor foundation.
[0026] like Figure 6 As shown, the construction method of the internally inserted steel pipe type group anchor type spiral anchor foundation without on-site welding includes the following steps: S1: screwing the anchor rods 1 in sequence according to the spatial position and angle required by the design until each anchor rod 1 is screwed to the designed depth; S2: Use the square paper tube a11 to simulate the circular steel pipe 4 and fix it on the top of the anchor rod 1, determine the bottom elevation of the steel cap 3 by on-site measurement and setting out, use the square paper b12 to simulate the bottom surface of the steel cap 3, and cut the square paper tube a at this plane, mark the shape, position and size of the intersection surface of the square paper tube a and the square paper b on the square paper b, and determine the center of the intersection surface 13 according to the geometric relationship. Repeat the above steps for each anchor rod 1 and number them respectively.
[0027] S3: Return the grid paper tube a11 and grid paper b12 to the factory, process the round steel tube 4 according to the shape and size of the grid paper tube a11, open a small hole on the steel cap 3 according to the center of the intersection surface in the grid paper b12, then weld the round steel tube 4 to the bottom surface of the steel cap 3 according to the shape, position and size of the intersection surface, and then weld the upper tower leg 7, the second stiffening rib plate 6, and the first stiffening rib plate 8 to the steel cap 3 in turn. After welding, galvanize the structure.
[0028] S4: Determine the length, thickness and size and position of the matching bolts of the inserted steel pipe 5 by calculation. If the length of the inserted steel pipe 5 is short, the inserted steel pipe 5 can be pre-buried in the round steel pipe 4. If the length of the inserted steel pipe 5 is long, the inserted steel pipe 5 can be pre-buried in the anchor rod 1. Reserve a thin wire in the inserted steel pipe 5 and use bolts to fix the inserted steel pipe 5 on the anchor rod 1 or the round steel pipe 4.
[0029] S5: transport the structure to the site, hook the reserved fine wire in the inserted steel pipe 5 out of the small hole on the steel cap 3, and align the anchor rod 1 with the round steel pipe 4. After the upper structure is in place, remove the fixing bolts described in S4, use the fine wire to pull and slide the inserted steel pipe 5, align it with the hole, and use bolts to connect the inserted steel pipe 5 with the round steel pipe 4 and the anchor rod 1. According to the on-site conditions, seal the small holes on the steel cap 3 with structural adhesive, concrete or other materials. If there is earth excavation, after the installation of the steel cap is completed, the earth will be backfilled and compacted to complete the construction of the inserted steel pipe type group anchor type spiral anchor foundation that does not require on-site welding.
[0030] like Figure 7 As shown, the second construction method of the on-site welding-free internally inserted steel pipe group anchor type spiral anchor foundation includes the following steps: S1: screwing the anchor rods 1 in sequence according to the spatial position and angle required by the design until each anchor rod 1 is screwed to the designed depth; S2: Layout according to the on-site position, set at least two through nails 9 on each anchor rod 1, use a total station to measure the coordinates of the tips of the through nails 9 at both ends of the bolt hole on the anchor rod 1, calculate the midpoint coordinates of the tip based on the tip coordinates, and establish the axis of the anchor rod through the two midpoint coordinates; after the measurement, take out the through nails 9; then, calculate and determine the length, thickness and matching bolt size and position of the inserted steel pipe 5; it should be noted that the calculation of the inserted steel pipe 5 is based on the existing steel structure design standards, and is calculated based on the bending moment, shear force, axial force and other parameters transmitted from the superstructure, which is the existing calculation content.
[0031] S3: According to the coordinates and the size and thickness of the interpolated steel pipe, a three-dimensional model is established for the anchor rod 1, the interpolated steel pipe 5, and the round steel pipe 4 in the three-dimensional software; the spatial position inclination angle of the round steel pipe 4 and the interpolated steel pipe 5 is the same as that of the anchor rod 1, and the inner diameter of the anchor rod 1 and the round steel pipe 4 is slightly larger than the outer diameter of the interpolated steel pipe 5; according to the relative position of the upper tower leg 7, the steel cap 3 is modeled; in the three-dimensional model, the excess portion 14 of the round steel pipe 4 exceeding the bottom surface of the steel cap 3 is cut off, and at this time, the size and spatial position of the round steel pipe 4 are the actual positions obtained by setting out and modeling according to the actual situation on site, and the contact surface between the round steel pipe 4 and the steel cap 3 in the three-dimensional model is the actual connection surface 15 between the steel cap 3 and the round steel pipe 4; S4: Record the parameters such as the size, spatial position, and contact surface position of the round steel tube 4 with the steel cap 3, and determine the center of the contact surface according to the geometric relationship; convert the above three-dimensional model into a two-dimensional drawing, and deliver the two-dimensional drawing to the factory for processing the entire upper structure of the foundation. According to the center of the contact surface, a small hole is opened on the steel cap 3, and the round steel tube 4 is welded to the steel cap 3 in the factory. At the same time, in order to simplify the tower foot connection structure and facilitate on-site construction, the upper tower leg 7 can also be welded to the steel cap 3 in the factory; after all welding is completed, all components are galvanized in the factory; S5: The structure is transported to the site, a thin wire is reserved in the inserted steel pipe 5, and the inserted steel pipe 5 is fixed to the anchor rod 1 or the round steel pipe 4 with bolts 10. This step is only for initial fixation, not alignment and positioning. Manually use tools to hook the reserved thin wire in the inserted steel pipe 5 out of the small hole on the steel cap 3, and align the anchor rod 1 and the round steel pipe 4. After the upper structure is in place, remove the fixed bolts 10, use the thin wire to pull the inserted steel pipe 5 to slide, and position it according to the position and length of the inserted steel pipe 5 calculated in step S2. After aligning the hole position, use bolts to connect the inserted steel pipe 5 with the round steel pipe 4 and the anchor rod 1. According to the on-site conditions, the small holes on the steel cap 3 are sealed with structural adhesive, concrete or other materials. If there is earth excavation, after the installation of the steel cap is completed, the earth will be backfilled and compacted to complete the construction of the inserted steel pipe type group anchor type spiral anchor foundation that does not require on-site welding.
[0032] Compared with the existing on-site welded spiral anchor construction method, the inserted steel pipe group anchor type spiral anchor foundation that does not require on-site welding has a simple structure. It can simulate the connection between the anchor rod and the steel cap by on-site layout and on-site measurement using graph paper or three-dimensional software, so as to produce different superstructures according to local conditions, realize that all components are processed in the factory, improve mechanization efficiency, do not require on-site welding and on-site anti-corrosion, and is easy to construct. It can effectively reduce the difficulty of spiral anchor foundation construction and improve the quality of spiral anchor foundation construction.
[0033] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. Internally inserted steel pipe group anchor type spiral anchor foundation without on-site welding, Features: The invention comprises a steel cap (3), the upper part of the steel cap (3) is connected to an upper tower leg (7), a plurality of round steel pipes (4) are fixed to the lower part of the steel cap (3), each round steel pipe (4) is connected to an anchor rod (1) via an inserted steel pipe (5), and a plurality of spiral anchor plates (2) are arranged on each anchor rod (1), and the spiral anchor plates (2) are welded to the anchor rod (1) at a fixed interval along the axial direction of each anchor rod (1).
2. The on-site welding-free internally inserted steel pipe group anchor type spiral anchor foundation according to claim 1, Features: The anchor rods (1) are arranged at different inclination angles or equal inclination angles.
3. The on-site welding-free internally inserted steel pipe group anchor type spiral anchor foundation according to claim 1, Features: A first stiffening rib plate (8) is provided between the steel cap (3) and the upper tower leg (7), and a second stiffening rib plate (6) is provided at the connection portion between the steel cap (3) and the round steel pipe (4).
4. The on-site welding-free internally inserted steel pipe group anchor type spiral anchor foundation according to claim 1, Features: At least two bolt holes are symmetrically arranged on the anchor rod (1), and through nails are arranged in the bolt holes arranged opposite to each other. The through nails (9) pass through the center of the bolt holes and penetrate the anchor rod (1). The two end points of the through nails (9) respectively penetrate the anchor rod (1) by the same length.
5. A construction method for an internally inserted steel pipe group anchor type spiral anchor foundation without on-site welding. Features: The steps include: S1: screwing the anchor rods (1) in sequence according to the spatial position and angle required by the design, until each anchor rod (1) is screwed to the designed depth; S2: using a square paper tube a (11) to simulate the circular steel pipe (4), and fixing it on the top of the anchor rod (1), determining the elevation of the bottom surface of the steel cap (3) by on-site measurement and setting out, using a square paper b (12) to simulate the bottom surface of the steel cap (3), and cutting the square paper tube a at this plane, marking the shape, position and size of the intersection surface of the square paper tube a and the square paper b on the square paper b, and determining the center of the intersection surface (13) according to the geometric relationship; repeating the above steps for each anchor rod (1) and numbering them respectively; S3: returning the square paper tube a (11) and the square paper b (12) to the factory, processing the round steel tube (4) according to the shape and size of the square paper tube a (11), opening a small hole on the steel cap (3) according to the center position of the intersection surface in the square paper b (12), then welding the round steel tube (4) to the bottom surface of the steel cap (3) according to the shape, position and size of the intersection surface, and then welding the upper tower leg (7), the second stiffening rib plate (6) and the first stiffening rib plate (8) to the steel cap (3) in sequence. After the welding is completed, galvanizing the structure; S4: Determine the length, thickness and size and position of the matching bolts of the inserted steel pipe (5) by calculation. If the length of the inserted steel pipe (5) is short, pre-embed the inserted steel pipe (5) in the round steel pipe (4). If the length of the inserted steel pipe (5) is long, pre-embed the inserted steel pipe (5) in the anchor rod (1). Reserve a thin wire in the inserted steel pipe (5) and use bolts to fix the inserted steel pipe (5) to the anchor rod (1) or the round steel pipe (4). S5: The structure is transported to the site, and the reserved fine wire in the inserted steel pipe (5) is hooked out to the outside of the small hole on the steel cap (3), and the anchor rod (1) and the round steel pipe (4) are aligned; after the upper structure is in place, the fixing bolts described in S4 are removed, and the inserted steel pipe (5) is pulled and slid by the fine wire to align the hole position, and the inserted steel pipe (5) is connected with the round steel pipe (4) and the anchor rod (1) by bolts; according to the site conditions, the small hole on the steel cap (3) is sealed with structural adhesive, concrete or other materials; if there is earth excavation, after the steel cap is installed, the earth is backfilled and compacted, and the construction of the inserted steel pipe type group anchor type spiral anchor foundation without on-site welding is completed.
6. A construction method for an internally inserted steel pipe group anchor type spiral anchor foundation without on-site welding. Features: The steps include: S1: screwing the anchor rods (1) in sequence according to the spatial position and angle required by the design, until each anchor rod (1) is screwed to the designed depth; S2: Lofting is performed according to the on-site position, at least two through-pins (9) are arranged on each anchor rod (1), and the coordinates of the sharp points of the through-pins (9) at both ends of the bolt hole on the anchor rod (1) are measured by a total station, and the coordinates of the midpoints of the sharp points are calculated based on the coordinates of the sharp points, and the axis of the anchor rod is established through the two midpoint coordinates; after the measurement is completed, the through-pins (9) are taken out; then, the length and thickness of the inserted steel pipe (5) and the size and position of the matching bolts are calculated and determined; S3: A three-dimensional model is established for the anchor rod (1), the inserted steel pipe (5) and the round steel pipe (4) in a three-dimensional software according to the coordinates and the size and thickness of the inserted steel pipe; the spatial position inclination angle of the round steel pipe (4) and the inserted steel pipe (5) is the same as that of the anchor rod (1), and the inner diameter of the anchor rod (1) and the round steel pipe (4) is slightly larger than the outer diameter of the inserted steel pipe (5); the steel cap (3) is modeled according to the relative position of the upper tower leg (7); in the three-dimensional model, the portion (14) of the round steel pipe (4) that exceeds the bottom surface of the steel cap (3) is cut off, and at this time, the size and spatial position of the round steel pipe (4) are the actual positions obtained by setting out and modeling according to the actual situation on site, and the contact surface between the round steel pipe (4) and the steel cap (3) in the three-dimensional model is the actual connection surface (15) between the steel cap (3) and the round steel pipe (4); S4: Record the parameters such as the size, spatial position, and contact surface position of the round steel tube (4) with the steel cap (3), and determine the center of the contact surface according to the geometric relationship; convert the above three-dimensional model into a two-dimensional drawing, and deliver the two-dimensional drawing to the factory for processing the entire upper structure of the foundation; open a small hole on the steel cap (3) according to the center of the contact surface, weld the round steel tube (4) and the steel cap (3) in the factory, and weld the upper tower leg (7) and the steel cap (3) in the factory; after all welding is completed, all components are galvanized in the factory; S5: transport the structure to the site, reserve a thin wire in the inserted steel pipe (5), and use bolts (10) to fix the inserted steel pipe (5) to the anchor rod (1) or the round steel pipe (4); manually hook the reserved thin wire in the inserted steel pipe (5) to the outside of the small hole on the steel cap (3), and align the anchor rod (1) and the round steel pipe (4); after the upper structure is in place, remove the fixed bolts (10), use the thin wire to pull the inserted steel pipe (5) to slide, and position it according to the position and length of the inserted steel pipe (5) calculated in step S2. After aligning the hole position, use bolts to connect the inserted steel pipe (5) to the round steel pipe (4) and the anchor rod (1); according to the site conditions, use structural adhesive, concrete or other materials to seal the small hole on the steel cap (3); if there is earth excavation, after the steel cap is installed, the earth is backfilled and compacted to complete the construction of the inserted steel pipe type group anchor type spiral anchor foundation without on-site welding.
Citation Information
Cited By
Method for determining construction and installation parameters of spiral anchor foundation
CN120384513A
Method for determining construction installation parameters of a screw anchor foundation
CN120384513B