Green and environment-friendly building wall
By introducing locking and reinforcing components, adjustment components, and correction components into the building walls, the problems of wall tilt and fixed position cannot be changed, thus achieving stable correction and flexible fixation of the walls and improving the assembly effect.
Patent Information
- Application Number
- CN202411134880.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The lack of corrective structures in existing building walls makes them prone to tilting after prolonged use, and their fixed positions cannot be changed, affecting stability and fixation effectiveness.
The system employs an installation base, locking and reinforcing components, adjustment components, correction components, and fixing units. Through structures such as locking blocks, rotating correction rods, and fixing screws, it achieves the correction and position adjustment of the wall panels, enhancing assembly stability and fixing effect.
It enables the correction of skewed wall panels and flexible adjustment of their fixed positions, improving assembly quality and stability, preventing gaps, and enhancing the overall stability and fixation of the wall.
Smart Images

Figure CN118933212A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building walls, in particular to a green and environmentally friendly building wall. Background Art
[0002] Partition walls are used to separate the interior space of a building. Generally, partition walls do not need to bear weight, so they are relatively light and thin, and are suitable for assembly using prefabricated technology. They are not only beautiful in appearance and environmentally friendly, but also easy to construct and low in cost.
[0003] For example, the publication number CN221321380U discloses a stable assembled partition wall, including an installation base, a wall panel unit and a connecting mechanism, wherein installation cavities are opened on the side surfaces of both ends of the wall panel unit, and the connecting mechanism is slidably installed in the installation cavity of the wall panel unit. Specifically, the connecting mechanism includes a connecting arm and a hook claw, the connecting arm is slidably connected to the wall panel unit, the hook claw is rotationally connected to the end close to the connecting arm, the hook claw is rotated to interlock with another hook claw on the adjacent wall panel unit, and the opening width of the installation cavity is equal to the overall width when the two connecting mechanisms are interlocked; thereby, the connecting mechanism can be hidden in the installation cavity, and the side wall of the installation cavity can be used to make the connecting mechanism difficult to loosen the connection, which is not only beneficial to improving the appearance of the assembled partition wall, but also beneficial to enabling the assembled wall panels to maintain a stable connection for a long time.
[0004] Based on the solution of the above patent and the existing related technologies, the inventors found that the walls currently used still have the following problems: 1. There is usually a lack of correction structure. When the wall becomes slightly skewed after long-term use, it is inconvenient for the staff to correct the skewed wall; 2. The screws on the mounting base are always in the same position, and it is difficult to change the fixing position of the wall, resulting in poor wall fixing effect. Summary of the invention
[0005] The purpose of the present invention is to make up for the shortcomings of the prior art and provide a green and environmentally friendly building wall, which has the advantages of conveniently correcting the tilted prefabricated wall panels and conveniently changing the fixed position of the prefabricated wall panels, solving the problem that it is inconvenient for workers to correct the crooked wall and cannot change the fixed position of the wall.
[0006] In order to solve the above technical problems, the present invention provides the following technical solutions: a green and environmentally friendly building wall, specifically comprising a mounting base, a prefabricated building wall panel, a locking and reinforcing component, an adjusting component, a correcting component and a fixing unit; Two rows of positioning circular holes are provided on the installation base; two prefabricated building wall panels are provided in total, and the two prefabricated building wall panels are slidably installed on the installation base; an assembly connection protrusion is provided on the left prefabricated building wall panel, and an assembly connection groove A is provided on the right prefabricated building wall panel, and the assembly connection protrusion is inserted into the assembly connection groove A; locking grooves B are respectively provided on the tops of the two prefabricated building wall panels; The locking and reinforcing assembly is installed on the top of two prefabricated building wall panels, and the locking and reinforcing assembly is used to connect the two prefabricated building wall panels; the adjusting assembly is installed on the top of the locking and reinforcing assembly, and the adjusting assembly is used to adjust the locking and reinforcing assembly; There are two groups of correction components, which are installed on the top of the mounting base, and the two groups of correction components are used to correct two prefabricated building wall panels; there are two groups of fixing units, which are installed on the mounting base, and the two groups of fixing units are used to fix two prefabricated building wall panels.
[0007] Furthermore, the locking and reinforcing assembly includes: a rectangular top plate; the rectangular top plate is installed on the top of two prefabricated building wall panels, and two rectangular correction slots are provided on the rectangular top plate.
[0008] Furthermore, the locking reinforcement assembly also includes: a circular locking block and a limiting ring; there are two circular locking blocks in total, and the two circular locking blocks are slidably installed on the rectangular top plate, and the bottoms of the two circular locking blocks are inserted into two locking grooves B; there are two limiting rings in total, and the two limiting rings are fixedly installed on the outside of the two circular locking blocks, and the two limiting rings are also slidably connected to the rectangular top plate.
[0009] Furthermore, the adjustment component includes: a rectangular mounting block and an adjusting screw; there are two rectangular mounting blocks in total, and the two rectangular mounting blocks are fixedly mounted on the top of the rectangular top plate; the adjusting screw is rotatably mounted on the two rectangular top plates, and two ends of the adjusting screw are provided with bidirectional threads, and the adjusting screw is also threadedly connected to two circular locking blocks.
[0010] Furthermore, the adjustment component also includes: a limit clamp and a hexagonal block; there are two limit clamps in total, and the two limit clamps are fixedly installed on the outside of the adjustment screw, and the outer sides of the two limit clamps are in contact with two rectangular top plates; the hexagonal block is fixedly installed on the outside of the adjustment screw.
[0011] Furthermore, the correction assembly includes: a U-shaped mounting seat, a connecting shaft and a rotating correction rod; the U-shaped mounting seat is fixedly mounted on the top of the mounting base; the connecting shaft is rotatably mounted on the U-shaped mounting seat; and the rotating correction rod is fixedly mounted on the outside of the connecting shaft.
[0012] Furthermore, the correction component also includes: a positioning ball and a support spring; there are two positioning balls in total, and the two positioning balls are slidably installed inside the rotating correction rod; the support spring is installed between the two positioning balls.
[0013] Furthermore, the width of the rectangular correction slot is the same as the width of the rotation correction rod, and the rectangular correction slot and the rotation correction rod are located in the same center plane; when the rotation correction rod rotates ninety degrees, the rotation correction rod is inserted into the rectangular correction slot, and the outer walls of the two positioning balls contact the top of the rectangular correction slot.
[0014] Furthermore, the fixing unit includes: a rectangular slider and a limit pin; the rectangular slider is slidably mounted on the mounting base; the limit pin is inserted into the middle positioning circular hole, and the bottom of the limit pin is inserted into the rectangular slider.
[0015] Furthermore, the fixing unit also includes: a fixed screw and a connecting gear; there are two fixed screws in total, and the two fixed screws are threadedly connected to the rectangular slider, and the front sides of the two fixed screws are respectively provided with hexagonal tightening grooves; there are two connecting gears in total, and the two connecting gears are fixedly installed on the outside of the two fixed screws, and the two connecting gears are meshingly connected.
[0016] Compared with the existing technology, the green environmental protection building wall has the following beneficial effects: 1. The present invention has a limiting effect on the two circular locking blocks, so that the two circular locking blocks can only slide left and right; when the staff rotates the hexagonal block with a wrench, the adjusting screw drives the two circular locking blocks to move, which has a locking effect on the two prefabricated building wall panels, avoiding the generation of gaps after the two prefabricated building wall panels are assembled, and improving the assembly effect of the two prefabricated building wall panels.
[0017] 2. According to the present invention, when two prefabricated building wall panels become slightly skewed after a long time, the staff can correct the two skewed prefabricated building wall panels through two rotating correction rods. When the two rotating correction rods are inserted into the two rectangular correction slots, the rectangular top plate is directly above the mounting base, which corrects the two prefabricated building wall panels. When the two rotating correction rods are rotated ninety degrees, the outer walls of the four positioning balls contact the tops of the two rectangular correction slots, which positions the two rotating correction rods, making the two rotating correction rods more stable after being flipped upward.
[0018] 3. According to the present invention, when the staff rotates the fixed screw rod on the right side clockwise through the hexagonal wrench, the fixed screw rod on the right side rotates clockwise and the fixed screw rod on the left side rotates counterclockwise, thereby ensuring that the fixed screw rod on the right side contacts the prefabricated wall panel. After the prefabricated wall panel is calibrated, the staff can rotate the fixed screw rod on the left side clockwise through the hexagonal wrench. At this time, the fixed screw rod on the right side rotates counterclockwise, thereby changing the fixed position of the prefabricated wall panel. The staff can adjust the position of the rectangular slider appropriately to change the six fixed positions of the prefabricated wall panel, thereby improving the fixing effect of the prefabricated wall panel.
[0019] Other advantages, objectives and features of the present invention will be set forth in part in the following description and, in part, will be apparent to those skilled in the art based on an examination of the following or may be taught from the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a three-dimensional structural schematic diagram of the present invention.
[0021] Figure 2 The present invention Figure 1 Schematic diagram of the rear side perspective structure.
[0022] Figure 3 It is a structural schematic diagram of the mounting base and two prefabricated building wall panels of the present invention.
[0023] Figure 4 The present invention Figure 3 Schematic diagram of the local enlarged structure of area A in the middle.
[0024] Figure 5 It is a schematic diagram of the structure of the locking reinforcement component and the adjustment component of the present invention.
[0025] Figure 6 The present invention Figure 5 Schematic diagram of the local enlarged structure of area B in the middle.
[0026] Figure 7 The present invention Figure 5 Schematic diagram of the local enlarged structure of the C area in the middle.
[0027] Figure 8 It is a structural schematic diagram of the correction component of the present invention.
[0028] Fig. 9 The present invention Figure 8 Schematic diagram of the local enlarged structure of area D in the middle.
[0029] Fig.10 It is a structural schematic diagram of the fixing unit of the present invention.
[0030] Fig.11The present invention Figure 1 Schematic diagram of the local enlarged structure of area E in the middle.
[0031] In the figure: 1. Install the base; 101. Position the circular hole; 2. Prefabricated building wall panel; 201. Assembly connection protrusion; 202. Assembly connection groove A; 203. Locking groove B; 3. Locking reinforcement assembly; 301. Rectangular top plate; 3011. Rectangular correction slot; 302. Circular locking block; 303. Limiting ring; 4. Adjustment assembly; 401. Rectangular mounting block; 402. Adjustment screw; 403. Limiting collar; 404. Hexagonal block; 5. Correction assembly; 501. U-shaped mounting seat; 502. Connecting shaft; 503. Rotating correction rod; 504. Positioning ball; 505. Support spring; 6. Fixed unit; 601. Rectangular slider; 602. Limiting pin; 603. Fixed screw rod; 6031. Hexagonal tightening groove; 604. Connecting gear. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] See also Figure 1-11 , the present invention provides a technical solution: a green and environmentally friendly building wall, comprising a mounting base 1, a prefabricated building wall panel 2, a locking and reinforcing component 3, an adjusting component 4, a correction component 5 and a fixing unit 6; Two rows of positioning circular holes 101 are provided on the mounting base 1; two prefabricated building wall panels 2 are provided in total, and the two prefabricated building wall panels 2 are slidably installed on the mounting base 1; an assembly connection protrusion 201 is provided on the left prefabricated building wall panel 2, and an assembly connection groove A202 is provided on the right prefabricated building wall panel 2, and the assembly connection protrusion 201 is inserted into the assembly connection groove A202; locking grooves B203 are respectively provided on the tops of the two prefabricated building wall panels 2; The locking and reinforcing assembly 3 is installed on the top of the two prefabricated building wall panels 2, and the locking and reinforcing assembly 3 is used to connect the two prefabricated building wall panels 2; the adjusting assembly 4 is installed on the top of the locking and reinforcing assembly 3, and the adjusting assembly 4 is used to adjust the locking and reinforcing assembly 3; There are two sets of correction components 5, and the two sets of correction components 5 are installed on the top of the mounting base 1, and the two sets of correction components 5 are used to correct two prefabricated building wall panels 2; there are two sets of fixing units 6, and the two sets of fixing units 6 are installed on the mounting base 1, and the two sets of fixing units 6 are used to fix two prefabricated building wall panels 2.
[0034] Please pay attention to Figures 5 to 7 As shown, the locking and reinforcing component 3 includes: a rectangular top plate 301; the rectangular top plate 301 is installed on the top of two prefabricated building wall panels 2, and two rectangular correction slots 3011 are opened on the rectangular top plate 301; the locking and reinforcing component 3 also includes: a circular locking block 302 and a limiting ring 303; there are two circular locking blocks 302, and the two circular locking blocks 302 are slidably installed on the rectangular top plate 301, and the bottoms of the two circular locking blocks 302 are inserted into the two locking grooves B203; there are two limiting rings 303, and the two limiting rings 303 are fixedly installed on the outside of the two circular locking blocks 302, and the two limiting rings 303 are also slidably connected to the rectangular top plate 301; The adjusting assembly 4 includes: a rectangular mounting block 401 and an adjusting screw 402; there are two rectangular mounting blocks 401, and the two rectangular mounting blocks 401 are fixedly mounted on the top of the rectangular top plate 301; the adjusting screw 402 is rotatably mounted on the two rectangular top plates 301, and two ends of the adjusting screw 402 are provided with bidirectional threads, and the adjusting screw 402 is also threadedly connected with the two circular locking blocks 302; the adjusting assembly 4 also includes: a limiting collar 403 and a hexagonal block 404; there are two limiting collars 403, and the two limiting collars 403 are fixedly mounted on the outside of the adjusting screw 402, and the outer sides of the two limiting collars 403 are in contact with the two rectangular top plates 301; the hexagonal block 404 is fixedly mounted on the outside of the adjusting screw 402; Because the two limiting rings 303 are fixedly installed on the outside of the two circular locking blocks 302, and the two limiting rings 303 are also slidably connected to the rectangular top plate 301, the two circular locking blocks 302 are limited, so that the two circular locking blocks 302 can only slide left and right. Because the bottoms of the two circular locking blocks 302 are inserted into the two locking grooves B203, and the two ends of the adjusting screw 402 are provided with bidirectional threads, and the adjusting screw 402 is also threadedly connected to the two circular locking blocks 302, when the staff rotates the hexagonal block 404 with a wrench, the adjusting screw 402 drives the two circular locking blocks 302 to move, which has a locking effect on the two prefabricated wall panels 2, avoiding the generation of gaps between the two prefabricated wall panels 2 after assembly, and improving the assembly effect of the two prefabricated wall panels 2.
[0035] Please pay attention to Figure 8 and Fig. 9As shown, the correction component 5 includes: a U-shaped mounting seat 501, a connecting shaft 502 and a rotating correction rod 503; the U-shaped mounting seat 501 is fixedly mounted on the top of the mounting base 1; the connecting shaft 502 is rotatably mounted on the U-shaped mounting seat 501; the rotating correction rod 503 is fixedly mounted on the outside of the connecting shaft 502; the correction component 5 also includes: a positioning ball 504 and a support spring 505; there are two positioning balls 504, and the two positioning balls 504 are slidably mounted inside the rotating correction rod 503; the support spring 505 is installed between the two positioning balls 504; the width of the rectangular correction slot 3011 is the same as the width of the rotating correction rod 503, and the rectangular correction slot 3011 and the rotating correction rod 503 are located in the same central plane; when the rotating correction rod 503 rotates ninety degrees, the rotating correction rod 503 is inserted into the rectangular correction slot 3011, and the outer walls of the two positioning balls 504 contact the top of the rectangular correction slot 3011; When the two prefabricated building wall panels 2 become slightly skewed after a long time, the staff can correct the two skewed prefabricated building wall panels 2 through the two rotating correction rods 503. When the two rotating correction rods 503 are inserted into the two rectangular correction slots 3011, the rectangular top plate 301 is directly above the mounting base 1, which corrects the two prefabricated building wall panels 2. Because the four positioning balls 504 are slidably installed inside the two rotating correction rods 503, and the two supporting springs 505 are installed between the four positioning balls 504, when the two rotating correction rods 503 rotate ninety degrees, the outer walls of the four positioning balls 504 contact the tops of the two rectangular correction slots 3011, which positions the two rotating correction rods 503, making the two rotating correction rods 503 more stable after being flipped upward.
[0036] Please pay attention to Fig.10 and Fig.11 As shown, the fixing unit 6 includes: a rectangular slider 601 and a limit pin 602; the rectangular slider 601 is slidably mounted on the mounting base 1; the limit pin 602 is inserted into the middle positioning circular hole 101, and the bottom of the limit pin 602 is inserted into the rectangular slider 601; the fixing unit 6 also includes: a fixed screw rod 603 and a connecting gear 604; there are two fixed screw rods 603, and the two fixed screw rods 603 are threadedly connected to the rectangular slider 601, and the front sides of the two fixed screw rods 603 are respectively provided with hexagonal tightening grooves 6031; there are two connecting gears 604, and the two connecting gears 604 are fixedly mounted on the outside of the two fixed screw rods 603, and the two connecting gears 604 are meshed and connected; Because the two fixed screw rods 603 are threadedly connected to the rectangular slider 601, and the two connecting gears 604 are fixedly installed on the outside of the two fixed screw rods 603, and the two connecting gears 604 are meshed and connected, when the staff rotates the fixed screw rod 603 on the right clockwise with the hexagonal wrench, the fixed screw rod 603 on the right rotates clockwise, and the fixed screw rod 603 on the left rotates counterclockwise, ensuring that the fixed screw rod 603 on the right is in contact with the building prefabricated wall panel 2. When the building prefabricated wall panel 2 is calibrated, the staff can use the hexagonal wrench to rotate the fixed screw rod 603 on the right clockwise. The wrench rotates the fixed screw rod 603 on the left side clockwise, and at this time, the fixed screw rod 603 on the right side rotates counterclockwise, changing the fixed position of the prefabricated wall panel 2. Because the rectangular slider 601 is slidably installed on the mounting base 1, and two rows of positioning circular holes 101 are provided on the mounting base 1, and the limit pin 602 is inserted into the middle positioning circular hole 101, it is convenient for the staff to properly adjust the position of the rectangular slider 601, and the six fixed positions of the prefabricated wall panel 2 can be changed, thereby improving the fixing effect of the prefabricated wall panel 2.
[0037] Working principle: First, the staff installs the installation base 1 at the appropriate position inside the building through the expansion bolts, and then slides the two prefabricated building wall panels 2 onto the installation base 1, so that the assembly connection protrusion 201 is inserted into the assembly connection groove A202, and then the bottoms of the two circular locking blocks 302 are inserted into the two locking grooves B203, and then the hexagonal block 404 is rotated by a wrench. When the staff rotates the hexagonal block 404 by the wrench, the adjustment screw rod 402 drives the two circular locking blocks 302 to move, which plays a locking role on the two prefabricated building wall panels 2, avoiding the generation of gaps between the two prefabricated building wall panels 2 after assembly, and improving the assembly effect of the two prefabricated building wall panels 2; then the staff rotates the fixed screw rod 603 on the right side clockwise through the hexagonal wrench. At this time, the fixed screw rod 603 on the right side rotates clockwise, and the fixed screw rod 603 on the left side rotates counterclockwise, ensuring that the fixed screw rod 603 on the right side is in contact with the prefabricated building wall panel 2; When the two prefabricated building wall panels 2 need to be corrected, the staff can correct the two skewed prefabricated building wall panels 2 through the two rotating correction rods 503. When the two rotating correction rods 503 are inserted into the two rectangular correction slots 3011, the rectangular top plate 301 is located directly above the mounting base 1, which corrects the two prefabricated building wall panels 2. When the two rotating correction rods 503 are rotated ninety degrees, the outer walls of the four positioning balls 504 contact the tops of the two rectangular correction slots 3011, correcting the two rotating correction rods 503. It plays a positioning role, making the two rotating correction rods 503 more stable after flipping upward; when the prefabricated wall panel 2 is corrected, the staff can use a hexagonal wrench to rotate the fixed screw rod 603 on the left clockwise, at this time, the fixed screw rod 603 on the right rotates counterclockwise, changing the fixed position of the prefabricated wall panel 2; then the staff can appropriately adjust the position of the rectangular slider 601 through the limit pin 602 and the positioning circular hole 101, which can change the six fixed positions of the prefabricated wall panel 2, thereby improving the fixing effect of the prefabricated wall panel 2.
[0038] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be considered exemplary and non-restrictive in all respects, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention.
Claims
1. A green and environmentally friendly building wall, comprising a mounting base (1), a prefabricated building wall panel (2), a locking and reinforcing component (3), an adjusting component (4), a correction component (5) and a fixing unit (6); The mounting base (1) is provided with two rows of positioning circular holes (101); It is characterized in that There are two prefabricated building wall panels (2) in total, and the two prefabricated building wall panels (2) are slidably mounted on the mounting base (1); an assembly connection protrusion (201) is provided on the left prefabricated building wall panel (2), and an assembly connection groove A (202) is provided on the right prefabricated building wall panel (2), and the assembly connection protrusion (201) is inserted into the assembly connection groove A (202); locking grooves B (203) are respectively provided on the tops of the two prefabricated building wall panels (2); The locking and reinforcing component (3) is installed on the top of the two prefabricated building wall panels (2), and the locking and reinforcing component (3) is used to connect the two prefabricated building wall panels (2); the adjusting component (4) is installed on the top of the locking and reinforcing component (3), and the adjusting component (4) is used to adjust the locking and reinforcing component (3); The correction components (5) are provided in two groups, and the two groups of correction components (5) are installed on the top of the installation base (1), and the two groups of correction components (5) are used to correct the two prefabricated building wall panels (2); the fixing units (6) are provided in two groups, and the two groups of fixing units (6) are installed on the installation base (1), and the two groups of fixing units (6) are used to fix the two prefabricated building wall panels (2).
2. A green and environmentally friendly building wall according to claim 1, It is characterized in that The locking and reinforcing assembly (3) comprises: a rectangular top plate (301); the rectangular top plate (301) is installed on the top of two prefabricated building wall panels (2), and two rectangular correction slots (3011) are provided on the rectangular top plate (301).
3. A green and environmentally friendly building wall according to claim 2, It is characterized in that The locking reinforcement assembly (3) further comprises: a circular locking block (302) and a limiting circular ring (303); two circular locking blocks (302) are provided in total, and the two circular locking blocks (302) are slidably mounted on the rectangular top plate (301), and the bottoms of the two circular locking blocks (302) are inserted into the two locking grooves B (203); two limiting circular rings (303) are provided in total, and the two limiting circular rings (303) are fixedly mounted on the outside of the two circular locking blocks (302), and the two limiting circular rings (303) are also slidably connected to the rectangular top plate (301).
4. A green and environmentally friendly building wall according to claim 3, It is characterized in that The adjustment assembly (4) comprises: a rectangular mounting block (401) and an adjustment screw (402); two rectangular mounting blocks (401) are provided, and the two rectangular mounting blocks (401) are fixedly mounted on the top of the rectangular top plate (301); the adjustment screw (402) is rotatably mounted on the two rectangular top plates (301), and two ends of the adjustment screw (402) are provided with bidirectional threads, and the adjustment screw (402) is also threadedly connected to the two circular locking blocks (302).
5. A green and environmentally friendly building wall according to claim 4, It is characterized in that The adjustment component (4) further comprises: a limit collar (403) and a hexagonal block (404); two limit collars (403) are provided, and the two limit collars (403) are fixedly mounted on the outside of the adjustment screw (402), and the outer sides of the two limit collars (403) are in contact with the two rectangular top plates (301); the hexagonal block (404) is fixedly mounted on the outside of the adjustment screw (402).
6. A green and environmentally friendly building wall according to claim 2, It is characterized in that The correction assembly (5) comprises: a U-shaped mounting seat (501), a connecting shaft (502) and a rotating correction rod (503); the U-shaped mounting seat (501) is fixedly mounted on the top of the mounting base (1); the connecting shaft (502) is rotatably mounted on the U-shaped mounting seat (501); and the rotating correction rod (503) is fixedly mounted on the outside of the connecting shaft (502).
7. A green and environmentally friendly building wall according to claim 6, It is characterized in that The correction component (5) further comprises: a positioning ball (504) and a support spring (505); two positioning balls (504) are provided, and the two positioning balls (504) are slidably mounted inside the rotating correction rod (503); and the support spring (505) is mounted between the two positioning balls (504).
8. A green and environmentally friendly building wall according to claim 7, It is characterized in that The width of the rectangular correction slot (3011) is the same as that of the rotation correction rod (503), and the rectangular correction slot (3011) and the rotation correction rod (503) are located on the same central plane; when the rotation correction rod (503) rotates ninety degrees, the rotation correction rod (503) is inserted into the rectangular correction slot (3011), and the outer walls of the two positioning balls (504) are in contact with the top of the rectangular correction slot (3011).
9. The green and environmentally friendly building wall according to claim 1, It is characterized in that The fixing unit (6) comprises: a rectangular slider (601) and a limit pin (602); the rectangular slider (601) is slidably mounted on the mounting base (1); the limit pin (602) is inserted into the central positioning circular hole (101), and the bottom of the limit pin (602) is inserted into the rectangular slider (601).
10. A green and environmentally friendly building wall according to claim 9, It is characterized in that The fixing unit (6) further comprises: a fixing screw (603) and a connecting gear (604); two fixing screws (603) are provided in total, and the two fixing screws (603) are threadedly connected to the rectangular slider (601), and the front sides of the two fixing screws (603) are respectively provided with a hexagonal tightening groove (6031); two connecting gears (604) are provided in total, and the two connecting gears (604) are fixedly mounted on the outside of the two fixing screws (603), and the two connecting gears (604) are meshingly connected.
Citation Information
Cited By
Fence fixing structure for civil construction
CN119373363A