Construction method of air shaft combined wall of large-storey-height logistics warehouse
By adopting a combined structure of autoclaved aerated concrete blocks and light steel keel silicate plates in a large-story high-level logistics warehouse, the construction difficulties in narrow spaces are solved, and a safe, economical and efficient air well combination wall is achieved. The construction of the body meets the fire protection requirements.
Patent Information
- Application Number
- CN202411175677.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-12
AI Technical Summary
In the construction of large-story high-rise logistics warehouse air shaft combination walls, construction difficulties are caused by narrow space and high-rise heights, and traditional masonry masonry methods have safety hazards and increased costs.
The autoclaved aerated concrete block wall is combined with the light steel keel silicate plate partition structure, and the steel plate and square steel pipe are fixed through chemical anchors, the heaven and earth keel and the primary and secondary keels are installed, and the fireproof rock wool is filled between the keels, and the Installation and plastering treatment of silicate plates.
It reduces construction costs, improves construction efficiency, reduces safety hazards, and meets fire prevention requirements, solving the problem of inability to work in narrow spaces.
Smart Images

Figure CN118933232A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building construction, in particular to a construction method for a combined wall of an air shaft of a large-storey high logistics warehouse. Background Art
[0002] At present, logistics warehouse buildings generally have high floor heights, and the wind tunnels in the warehouse area are usually narrow openings. The walls of such openings need to be built after the construction of the air ducts and air duct insulation is completed.
[0003] For this type of wall, if the traditional masonry method is used for construction, there are the following difficulties: (1) The floor height of logistics warehouses is generally more than 8 meters, and wind tunnels are usually close to the edge of the warehouse area. Therefore, the construction of the wind tunnel wall requires the erection of a high construction scaffolding. Such scaffolding is a sub-project with a high risk of exceeding a certain scale and requires expert demonstration, which increases costs and poses safety hazards; (2) Due to the narrow size of the wind tunnel, there is insufficient remaining operating space after the construction of the air duct and insulation is completed, and construction personnel are unable to enter the inner side of the wall to carry out operations, including steel bar binding of structural columns, concrete pouring and vibration, and plastering operations. Summary of the invention
[0004] The present invention aims to overcome the defects of the prior art and provide a construction method for a large-storey high logistics warehouse air shaft combined wall, which solves the problem of being unable to operate and difficult to construct in a narrow space.
[0005] In order to solve the above-mentioned technical problems, the present invention is achieved as follows: A construction method for a large-storey logistics warehouse air shaft combined wall, characterized in that it comprises the following steps: Step 1: Build masonry walls and set structural columns at the four corners; Step 2: Use chemical anchor bolts to fix the steel plate on the upper surface of the structural column, and weld four square steel pipes as corner columns of the upper light steel keel wall to the steel plate; Step 3: Weld a square steel pipe at half the longitudinal height of each side of the wall; Step 4: Install the top and bottom keels, primary and secondary keels; Step 5: Install vertical keels and horizontal keels; Step 6: Install the thick silicate board on the inner side of the keel as the inner side board of the wall; Step 7: Install the fireproof rock wool board to fill the keel space, and then install and fix the outer silicate board on the main keel; Step 8: If the project has design requirements for wall decoration, the wall surface will be plastered with anti-cracking mortar and alkali-resistant glass fiber mesh, and then the paint finishing will be carried out.
[0006] The construction method of the combined wall of the air shaft of a large-storey logistics warehouse is characterized in that: step one is specifically: building a masonry wall with a height of 1200mm and a thickness of 200mm, and constructing in the order of 150mm high concrete guide wall, 900mm high autoclaved aerated concrete blocks, and 120mm high concrete top, and setting 200mm*240mm structural columns at the four corners.
[0007] The construction method of the combined wall of the air shaft of a large-storey logistics warehouse is characterized in that: step two is specifically: 8mm thick galvanized steel plates are fixed on the upper surface positions of the structural columns at the four corners of the wall with 2*14mm inverted cone chemical anchors, four 150mm*150mm square steel pipes are welded to the steel plates at the four corners, and the steel pipes and steel plates are fully welded all around.
[0008] The construction method of the combined wall of the air shaft of a large-height logistics warehouse is characterized in that: step three is specifically: a square steel pipe is horizontally welded in the longitudinal height direction of the wall, 4200mm above the masonry wall or half the height of the partition wall, and the horizontal steel pipe and the vertical steel pipe are welded by circular argon arc welding at the joint.
[0009] The construction method of the combined wall of the air shaft of a large-story logistics warehouse is characterized by: step four is specifically: installing the top keel at the bottom of the beam above the wall, installing the ground keel above the masonry top, and then installing the vertical main keel, the upper and lower parts are respectively connected to the square steel pipe and the top and bottom keels, fixed by self-tapping screws, and the gaps are filled with sealant.
[0010] The construction method of the combined wall of the air shaft of a large-storey logistics warehouse is characterized in that: step five is specifically: the vertical keel is a C75 light steel keel with a horizontal spacing of 400mm; the horizontal secondary keel is installed and fixed on the main keel, the secondary keel is a C50 light steel keel, and the spacing is 3m.
[0011] The beneficial effects of the present invention are as follows: It can be seen from the above technical scheme that the present application provides a construction method for a combined wall of a wind shaft in a large-storey logistics warehouse, the wall height of which is no more than 9.6 meters, and the main structural form is a 1200mm high autoclaved aerated concrete block wall + 8400mm high double-layer light steel keel silicate board wall, and the panels are filled with fireproof rock wool. The plane form of this type of wind tunnel wall is generally rectangular. During the construction process, a circle of block walls should be built first, and structural columns should be set at the four corners; thereafter, the steel plate is fixed to the upper surface of the structural column with chemical anchor bolts, and four square steel pipes are welded to the steel plate as the corner columns of the upper light steel keel wall, and a square steel pipe is welded at half the longitudinal height of each side of the wall. Thereafter, the top and bottom keels, primary and secondary keels are installed in sequence. The two layers of silicate boards are installed on the inside and outside of the keel by self-tapping screws. If this wall has fire protection requirements, it is necessary to fill the keels with fireproof rock wool before installing the outer silicate board.
[0012] The present invention replaces the traditional brick wall with a structure of autoclaved aerated concrete block wall combined with a light steel keel silicate board partition wall by changing the wall material, thereby solving the construction inconvenience while saving costs, and at the same time improving the construction efficiency and reducing safety hazards.
[0013] Compared with the traditional masonry wall, the combined wall of the present invention saves the cost of setting up an operating frame during masonry construction due to the high floor height, and solves the problem of being unable to work and difficult to construct in a narrow space. In addition, the light steel keel silicate board wall in the combined wall of the present invention is fully filled with fireproof rock wool, which has sufficient fire resistance. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments: Figure 1 This is a schematic diagram of a masonry wall; Figure 2 It is a schematic diagram of the connection nodes between the vertical square steel pipes and the masonry wall at the four corners of the light steel keel silicate board wall in the upper half of the composite wall of the present invention; Figure 3 It is a schematic diagram of the connection nodes of the horizontal square steel pipes and the vertical square steel pipes of the light steel keel silicate board wall in the upper part of the composite wall of the present invention; Figure 4 It is a schematic diagram of the connection nodes between the light steel frame silicate board wall top and bottom keel and the beam and masonry wall in the upper part of the composite wall of the present invention; Figure 5 It is a schematic diagram of the arrangement of the main and secondary keels of the light steel keel silicate board wall in the upper part of the combined wall of the present invention. DETAILED DESCRIPTION
[0015] The technical solutions of the embodiments of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field without creative work based on the embodiments in the embodiments of the present application are within the scope of protection requested by the present application. like Figure 1 Shown: A construction method for a combined wall of a ventilation shaft in a large-storey logistics warehouse, the specific steps are as follows: Step 1: Build a 1200mm high and 200mm thick masonry wall in the order of 150mm high concrete guide wall, 900mm high autoclaved aerated concrete blocks, and 120mm high concrete top, and set 200mm*240mm structural columns at the four corners. For specific dimensions, see the attached Figure 1 .
[0016] Step 2: Use 2*14mm inverted cone chemical anchor bolts to fix the 8mm thick galvanized steel plate on the upper surface of the structural column at the four corners of the wall. Weld four 150mm*150mm square steel pipes to the steel plates at the four corners. The steel pipes and steel plates are fully welded around. The schematic diagram of the connection nodes between the square steel pipes and the top and bottom is as follows: Figure 2 ; Step 3: In the longitudinal height direction of the wall, a square steel pipe is horizontally welded at 4200mm above the masonry wall (or half the height of the partition wall). The horizontal steel pipe and the vertical steel pipe are welded by circular argon arc welding. The schematic diagram of the connection nodes of the longitudinal and transverse square steel pipes and the connection nodes of the primary and secondary keels is shown in the figure. Figure 3 ; Step 4: Install the ceiling keel at the bottom of the beam above the wall, install the ground keel above the masonry top, and then install the vertical main keel. The upper and lower parts are connected to the square steel pipe and the ceiling (ground) keel respectively, fixed with self-tapping screws, and the gaps are filled with sealant. The schematic diagram of the connection node between the top and bottom of the light steel keel and the ceiling and floor keels is shown as follows Figure 4 ; Step 5: The vertical keel is a C75 light steel keel with a horizontal spacing of 400mm; install and fix the horizontal secondary keel on the main keel. The secondary keel is a C50 light steel keel with a spacing of 3m. The plan, elevation and section diagrams of the combined wall are as follows: Figure 5 ; Step 6: To facilitate construction, the 12mm thick silicate board can be processed into a size of 600mm*600mm and installed on the inside of the keel as the inner wall board; Step 7: Process the fireproof rock wool board into appropriate size and install it to fill the keel space. Then install and fix the outer silicate board on the main keel.
[0017] Step 8: If the project has design requirements for wall decoration, the wall surface can be plastered with anti-cracking mortar and alkali-resistant glass fiber mesh, and then the paint finish can be applied.
[0018] The above are only embodiments provided for the present application and are not intended to limit the present application. Although the present application is described in detail with reference to the embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. However, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A construction method for the combined wall of the ventilation shaft of a large-storey logistics warehouse. Features It includes the following steps: Step 1: Build masonry walls and set structural columns at the four corners; Step 2: Use chemical anchor bolts to fix the steel plate on the upper surface of the structural column, and weld four square steel pipes as corner columns of the upper light steel keel wall to the steel plate; Step 3: Weld a square steel pipe at half the longitudinal height of each side of the wall; Step 4: Install the top and bottom keels, primary and secondary keels; Step 5: Install vertical keels and horizontal keels; Step 6: Install the thick silicate board on the inner side of the keel as the inner side board of the wall; Step 7: Install the fireproof rock wool board to fill the keel space, and then install and fix the outer silicate board on the main keel; Step 8: If the project has design requirements for wall decoration, the wall surface will be plastered with anti-cracking mortar and alkali-resistant glass fiber mesh, and then the paint finishing will be carried out.
2. The construction method of the combined wall of the ventilation shaft of a large-storey logistics warehouse according to claim 1, Features: Step one is as follows: build a 1200mm high and 200mm thick masonry wall in the order of 150mm high concrete guide wall, 900mm high autoclaved aerated concrete blocks, and 120mm high concrete top, and set 200mm*240mm structural columns at the four corners.
3. The construction method of the combined wall of the ventilation shaft of a large-storey logistics warehouse according to claim 1, Features: Step 2 is as follows: fix the 8mm thick galvanized steel plate on the upper surface of the structural columns at the four corners of the wall with 2*14mm inverted cone chemical anchors, weld four 150mm*150mm square steel pipes to the steel plates at the four corners, and fully weld the steel pipes and steel plates all around.
4. The construction method of the combined wall of the ventilation shaft of a large-storey logistics warehouse according to claim 1, Features: Step three is as follows: In the longitudinal height direction of the wall, a square steel pipe is horizontally welded at a position 4200mm above the masonry wall or half the height of the partition wall, and the joint between the horizontal steel pipe and the vertical steel pipe is welded by circular argon arc welding.
5. The construction method of the combined wall of the ventilation shaft of a large-storey logistics warehouse according to claim 1, Features: Step four is as follows: install the top purlin at the bottom of the beam above the wall, install the ground purlin above the masonry top, and then install the vertical main purlin. The upper and lower parts are respectively connected to the square steel pipe and the top and bottom purlins, fixed with self-tapping screws, and the gaps are filled with sealant.
6. The construction method of the combined wall of the ventilation shaft of a large-storey logistics warehouse according to claim 1, Features: Step five is as follows: the vertical keel is a C75 light steel keel with a horizontal spacing of 400mm; the horizontal secondary keel is installed and fixed on the main keel, the secondary keel is a C50 light steel keel with a spacing of 3m.
Citation Information
Patent Citations
Dry-wet combined secondary wall structure
CN218990548U
Constructional column and keel switching joint for mixed segmented wall
CN219364951U