Prefabricated composite column assembly, fabricated building and fabricated building construction method
Through prefabricated stacked column components and prefabricated building construction methods, the factory processing and production of spiral stirrup connectors are used to solve the problems of complicated construction of traditional columns and environmental impact, and efficient and low-cost column components installation and concrete pouring are achieved. , improve construction efficiency and quality.
Patent Information
- Application Number
- CN202310524478.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-11
- Publication Date
- 2024-11-12
AI Technical Summary
Traditional column construction methods are complex, low efficiency, long construction period, and are easily affected by the external environment, resulting in construction cost and quality problems.
Prefabricated stacked column components, including concrete components, reinforced frames and stirrups, are used to process and produce factories to reduce on-site construction steps, and use spiral stirrups and sleeve connectors to achieve rapid connection and cast concrete.
Shorten the construction period, improve efficiency, reduce labor and material costs, improve building quality and construction speed, simplify construction processes, and reduce on-site labor intensity and environmental impact.
Smart Images

Figure CN118933269A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of building technology, and in particular to a prefabricated composite column assembly, an assembled building and an assembled building construction method. Background Art
[0002] Buildings play a pivotal role in people's lives and are an important carrier for people's work, study, leisure and other activities. With the continuous improvement of people's living standards, people's demand for buildings is growing, and the requirements for buildings are also increasing. Low-rise buildings mostly use frame structure systems, especially public buildings and industrial buildings and underground projects, including schools, underground garages, commercial and industrial plants. The frame system is composed of beams and columns to form a spatial force transmission system, which bears vertical and horizontal loads.
[0003] As a vertical load-bearing component of the frame system, the column plays the role of bearing the weight of the building and supporting the building. It is one of the important parts of the building. Traditional columns are mostly constructed on-site. The traditional construction method of columns often requires on-site tying of steel bars, setting up formwork, pouring concrete, etc. The construction steps are complicated and inefficient, and the on-site curing time of concrete is long, resulting in a long construction period.
[0004] On-site construction also requires concrete processing sites and material yards, which temporarily occupy a large area. In addition, on-site construction is easily affected by the external environment, especially rain and snow, which seriously affects the construction progress and has a great impact on the construction quality.
[0005] At the same time, traditional columns often require a large amount of bundled steel bars during construction. The bundling of steel bars has high requirements and complicated procedures. It also requires high labor construction skills of workers and has high labor and material costs. Summary of the invention
[0006] In view of the above problems, the purpose of the present invention is to provide a prefabricated composite column assembly, an assembled building and an assembled building construction method, wherein the prefabricated composite column assembly transfers a large amount of on-site work in traditional column construction to the factory, reduces multiple on-site construction processes, shortens the construction period, reduces labor costs, and improves construction efficiency. At the same time, the prefabricated composite column assembly is not easily affected by the external environment, so that the building quality and construction speed are guaranteed.
[0007] In order to achieve the above object, the technical solution provided by the present invention is as follows:
[0008] A prefabricated composite column assembly includes at least one composite column, wherein the composite column includes a concrete member, a steel skeleton and stirrups;
[0009] The steel bar skeleton comprises a connecting steel bar group and a structural steel bar, a group of the connecting steel bar group is provided with at least one connecting steel bar, and the connecting steel bar group, the structural steel bar and the stirrups are buried in the concrete member along the length direction of the concrete member;
[0010] The stirrups include a first stirrup and a second stirrup, which are embedded in the concrete member and respectively sleeved outside the connecting steel bar group and the structural steel bar;
[0011] A connecting piece is arranged at one end of the stacking column and is suitable for connecting and fixing another stacking column.
[0012] In some embodiments, the stirrups are in a spiral structure.
[0013] In some embodiments, the outer contour of the concrete member is polygonal, and the first stirrups are arranged at the corners of the outer contour of the concrete member;
[0014] The concrete member is provided with a cavity along the length direction of the concrete member, and the second stirrup is provided at the center of the concrete member and sleeved outside the cavity;
[0015] The second stirrup has an overlapping portion with the first stirrup, and the first stirrup and the second stirrup are fixedly connected to each other through the overlapping portion.
[0016] In some embodiments, the cross-section of the concrete component is square outside and circular inside.
[0017] In some embodiments, the number of the connecting steel bar groups is four;
[0018] A group of connecting steel bars is inserted into each of the first stirrups and respectively arranged at the four corners of the cross section of the concrete member;
[0019] Both ends of the connecting steel bar are located outside the concrete member, the connecting steel bar is in contact with the first stirrup and is fixedly connected at the contact point;
[0020] The structural steel bar is arranged in the second stirrup, the structural steel bar is in contact with the second stirrup, and is connected and fixed at the contact point.
[0021] In some embodiments, the connecting member is a sleeve, the sleeve is sleeved on one end of the connecting steel bar, the sleeve is configured to be conical and is the first end;
[0022] The middle part of the sleeve is set as a transition section, and the end of the sleeve away from the first end is the second end. The second end is also set to a cone, so that the inner diameter of the sleeve gradually decreases from the transition section to both ends, and the second end is sleeved on the connecting steel bars of the adjacent composite columns.
[0023] In some embodiments, one end of the connecting steel bar away from the sleeve is upset to form a pier head, and the pier head is conical, so as to clamp the connecting steel bar into the second end of the sleeve;
[0024] The diameter of the pier head is smaller than the inner diameter of the second end of the sleeve, and the diameter of the pier head gradually increases in the direction from the second end to the first end of the sleeve.
[0025] In some embodiments, the inner diameter of the first end of the sleeve is smaller than the inner diameter of the second end.
[0026] An assembled building, used for a prefabricated composite column assembly provided by any one of the above items, further comprising a floor slab and prefabricated beams, wherein adjacent composite columns are connected by the connecting piece.
[0027] A method for constructing an assembled building, used for the assembled building provided above, comprising:
[0028] Install the floor slabs and precast beams and tie the steel bars for the nth floor;
[0029] Grouting the sleeves of the prefabricated composite column assemblies of the n-1th floor;
[0030] The prefabricated composite column assembly of the nth layer is hoisted to the beam node area, and the connecting steel bar group is inserted into the sleeve of the prefabricated composite column assembly of the n-1th layer;
[0031] Connect and tie the steel bars in the node area of precast beams;
[0032] Concrete is poured into the cavities of the nth floor slab and the n-1th floor precast composite column assemblies.
[0033] The present invention provides a prefabricated composite column assembly, an assembled building and an assembled building construction method.
[0034] It has the following beneficial effects:
[0035] 1. The present invention provides a prefabricated composite column assembly, an assembled building and an assembled building construction method. A steel skeleton and stirrups are arranged in the concrete component. A connecting piece is arranged at one end of the composite column. The composite column does not require on-site formwork, on-site steel bar bundling, concrete pouring, etc., and the concrete maintenance can be completed in the factory, which greatly shortens the construction period and improves the construction efficiency. Two adjacent composite columns can be connected by a connecting piece. The connection method is simple and reliable, and has good promotion and application value.
[0036] 2. The present invention provides a prefabricated composite column assembly, an assembled building and an assembled building construction method. The stirrups have a spiral structure and can be processed by mechanical equipment. They are highly automated, convenient and quick. There is no need to tie the steel bars at the construction site, which shortens the tying time and avoids the occurrence of problems such as loose manual tying of steel bars. At the same time, the spiral stirrups are more evenly stressed, can generate stronger lateral restraints, and effectively control internal concrete shrinkage and creep problems.
[0037] 3. The present invention provides a prefabricated composite column assembly, an assembled building and an assembled building construction method. The cross-section of the concrete member is square outside and round inside, which is convenient for realizing core extraction and concrete centrifugal process, reduces the weight of the composite column, and reduces the transportation cost. At the same time, the first hoop reinforcement is arranged at the four corners of the concrete member to facilitate the connection and fixation of two adjacent composite columns.
[0038] 4. The present invention provides a prefabricated composite column assembly, an assembled building and an assembled building construction method. When the connection between two adjacent composite columns is located in the core area of the cast-in-place beam-column node, that is, the bottom of the composite column is located below the floor elevation, it is convenient for workers to perform construction operations and quality inspections, and it is easy to control the quality of the composite column connection. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] The preferred implementation scheme will be described below in a clear and understandable manner with reference to the accompanying drawings to further illustrate the above-mentioned characteristics, technical features, advantages and implementation methods of the present solution.
[0040] Figure 1 It is a front view of a prefabricated composite column assembly provided by the present invention;
[0041] Figure 2 It is a top view of a prefabricated composite column assembly provided by the present invention;
[0042] Figure 3 It is a structural diagram of an embodiment of a prefabricated composite column assembly and an assembled building provided by the present invention;
[0043] Figure 4 It is a sleeve structure diagram of a prefabricated composite column assembly provided by the present invention;
[0044] Figure 5 It is a structural diagram of another embodiment of a prefabricated composite column assembly and an assembled building provided by the present invention.
[0045] Description of Figure Numbers:
[0046] Composite column 1000, concrete member 1100, connecting steel bar 1200, pier head 1210, structural steel bar 1300, first stirrup 1400, second stirrup 1500, sleeve 1600, first end 1610, transition section 1620, second end 1630, precast beam 1700. DETAILED DESCRIPTION
[0047] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the specific implementation methods of the present invention will be described below with reference to the accompanying drawings. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings and other implementation methods can be obtained based on these drawings without creative work.
[0048] In order to simplify the drawings, only the parts related to the present invention are schematically shown in each figure, and they do not represent the actual structure of the product. In addition, in order to simplify the drawings and facilitate understanding, in some figures, only one of the parts with the same structure or function is schematically drawn or marked. In this article, "one" not only means "only one", but also means "more than one".
[0049] It should be further understood that the term “and / or” used in the specification and appended claims refers to any combination and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0050] In this document, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0051] In addition, in the description of the present application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0052] In one embodiment, referring to the accompanying drawings Figures 1 to 4 A prefabricated composite column assembly is described, which can be processed and produced in a factory without the need for on-site formwork and concrete pouring at the construction site, thereby greatly saving labor and construction period and improving construction efficiency.
[0053] In this embodiment, a prefabricated composite column assembly includes at least one composite column 1000 , and the composite column 1000 includes a concrete component 1100 , a steel skeleton and stirrups, wherein the steel skeleton and stirrups are arranged in the concrete component 1100 .
[0054] Specifically, see the accompanying drawings of the specification Figures 1 to 4 , the steel bar skeleton includes a connecting steel bar group and a structural steel bar 1300, and each connecting steel bar group includes at least one connecting steel bar 1200. The connecting steel bar group, the structural steel bar 1300 and the stirrups are respectively arranged along the longitudinal direction of the concrete member 1100 and buried in the concrete member 1100. Accordingly, the arrangement of the connecting steel bar group and the structural steel bar 1300 can improve the bearing capacity of the composite column 1000. It is worth noting that the stirrups include a first stirrup 1400 and a second stirrup 1500, and are buried in the concrete member 1100, and the length extension direction of the stirrups and the concrete member 1100 is consistent. The first stirrup 1400 is sleeved on the outside of each connecting steel bar group, and correspondingly, the second stirrup 1500 is sleeved on the outside of the structural steel bar 1300.
[0055] Furthermore, a prefabricated composite column assembly also includes a connecting piece, wherein the connecting piece is arranged at one end of the composite column 1000 and is suitable for being connected and fixed to another composite column 1000 .
[0056] In this embodiment, the pouring, curing, and molding of the concrete component 1100 of a prefabricated composite column assembly are all completed in the factory. The constructor does not need a concrete processing site, which reduces the generation of dust and is beneficial to environmental protection. At the same time, when using this prefabricated composite column assembly, the constructor only needs to transport it to the construction site, and then hoist, connect, and install it with other building components, which greatly shortens the construction period and improves construction efficiency. Accordingly, the production and processing of the prefabricated composite column assembly are all completed in the factory, which is conducive to ensuring the strength and quality of the composite column 1000 and reducing the potential safety hazards of buildings caused by quality problems. The constructor can customize the required composite column 1000 from the manufacturer according to the needs of his own project, which meets the market demand for the diversification and quality of the composite column 1000 and is easy to promote.
[0057] In one embodiment, referring to the accompanying drawings, Figure 2 , Figure 3 Specifically, the spiral stirrups are embedded in the concrete member 1100 along the length direction of the concrete member 1100, and the connecting steel bar group and the structural steel bar 1300 are arranged in the spiral stirrups.
[0058] It is worth noting that the spiral stirrups can be automatically processed by machines in the factory without much manual operation. Compared with other stirrup forms, the production of spiral stirrups can be more convenient. The first stirrup 1400 can be directly mounted on the outside of the connecting steel bar group, and the second stirrup 1500 can be directly mounted on the outside of the structural steel bar 1300, which reduces the workload of workers in tying steel bars at the construction site, requires lower labor skills of workers, saves manpower and steel raw materials, and saves construction time. At the same time, the stirrups are spiral, which can effectively control the shrinkage creep problem of the internal concrete component 1100, provide a constraint effect for the concrete component 1100, and significantly improve the mechanical properties of the concrete component 1100.
[0059] In practical applications, there are many forms of stirrups. Constructors can choose different forms of stirrups according to their own project requirements to meet the quality requirements of the project. The specific forms can be flexibly changed according to the situation of their own projects. They will not be described here one by one, and they are all within the protection scope of the present invention.
[0060] In one embodiment, referring to the accompanying drawings, Figure 2 , Figure 3 , this embodiment provides a form in which stirrups are buried in a concrete member 1100. The outer contour of the concrete member 1100 is polygonal, and the first stirrup 1400 is buried at the corner of the outer contour of the concrete member 1100. It is worth noting that the concrete member 1100 is provided with a cavity, and the cavity is arranged in the length direction of the concrete member 1100. The second stirrup 1500 is buried in the center of the concrete member 1100 and is sleeved on the outside of the cavity. In this embodiment, the setting of the cavity can effectively reduce the weight of the concrete member 1100, facilitate transportation, and reduce transportation costs.
[0061] Further, each first stirrup 1400 is embedded at the corner of the concrete member 1100 and intersects with the second stirrup 1500 located in the center in parallel, so that the first stirrup 1400 and the second stirrup 1500 have an overlapping portion. Accordingly, in order to improve the connection strength of the overlapping portion, the overlapping portion can be tied and fixed by wire tying.
[0062] Preferably, the overlapping parts can be directly welded together, which is more convenient to operate and has a higher local strength of the composite column 1000 than fixing the overlapping parts by tying with metal wires.
[0063] In production applications, the outer contour of the concrete component 1100 can be set according to actual building requirements, and can be set to a quadrilateral, pentagon, hexagon, etc. Correspondingly, the first stirrups 1400 are set at the corners of the concrete component 1100, and the number of the first stirrups 1400 can be set according to the building form to meet the strength requirements of the building. They are not elaborated here one by one, and they are all within the scope of protection of the present invention.
[0064] In one embodiment, referring to the accompanying drawings, Figure 2 , Figure 3 The cavity of the concrete component 1100 is cylindrical, and the cross section of the outer wall of the concrete component 1100 is square, so that the cross section of the concrete component 1100 is square outside and round inside. When the composite column 1000 is poured with concrete, the cross section of the concrete component 1100 is set to be square outside and round inside, which is convenient for concrete to realize core extraction and centrifugal process.
[0065] In one embodiment, referring to the accompanying drawings, Figure 2 , Figure 3 In this embodiment, the cross section of the concrete member 1100 perpendicular to the length direction is in a combination shape of an outer square and an inner circle, and the number of connecting steel bar groups is set to four groups. Accordingly, the first stirrups 1400 and the connecting steel bar groups are in a one-to-one correspondence, and each first stirrup 1400 is penetrated by a group of connecting steel bar groups. Then, the first stirrups 1400 are buried at the four corners of the concrete member 1100 along the longitudinal direction of the concrete member 1100, and the two ends of the connecting steel bar group are located outside the concrete member 1100.
[0066] Furthermore, the connecting steel bar 1200 of the connecting steel bar group is in contact with the first stirrup 1400, and the contact point can be connected and fixed by welding or wire binding.
[0067] The steel bar 1300 is further constructed to be buried in the second stirrup 1500 along the length direction of the concrete member 1100 and in contact with the second stirrup 1500, and is fixed by welding or wire binding at the contact point.
[0068] In one embodiment, referring to the accompanying drawings, Figure 4 This embodiment provides a specific form of a connector. Specifically, the connector is a sleeve 1600, one end of the sleeve 1600 is set to be conical, and the end of the sleeve 1600 set to be conical is a first end 1610. The first end 1610 of the sleeve 1600 is sleeved on one end of the connecting steel bar 1200, and the sleeve 1600 plays a role in connecting two adjacent composite columns 1000.
[0069] Furthermore, the end of the sleeve 1600 away from the first end 1610 is the second end 1630, and the second end 1630 is set to be tapered. The middle part of the sleeve 1600 is set to be a transition section 1620, so that the first end 1610 and the second end 1630 are connected through the transition section 1620, and the inner diameter of the sleeve 1600 gradually decreases from the transition section 1620 to both ends, and the second end 1630 is sleeved on the connecting steel bars 1200 of the adjacent composite columns 1000.
[0070] Specifically, for the convenience of explanation, there are two composite columns 1000, namely a lower composite column and an upper composite column. The first end 1610 of the sleeve 1600 is sleeved on one end of the connecting steel bar 1200 of the lower composite column, and the second end 1630 of the sleeve 1600 is inserted into one end of the connecting steel bar 1200 of the upper composite column to achieve the snap-fitting of two adjacent composite columns 1000.
[0071] Furthermore, concrete can be poured into the sleeve 1600, and one end of the connecting steel bar 1200 of the upper composite column can be inserted into the sleeve 1600. After the concrete is set, the connecting steel bar 1200 can be clamped in the sleeve 1600 to achieve the connection and fixation of two adjacent composite columns 1000.
[0072] Preferably, a sealing ring is provided at the first end 1610 of the sleeve 1600, and the sealing gasket is sleeved on the connecting steel bar 1200 at the first end 1610, so that the connecting steel bar 1200, the sealing gasket and the sleeve 1600 form a sealing structure, and when the sleeve 1600 is grouted, concrete is not easy to flow out from the first end 1610.
[0073] It is worth noting that, in addition to the connection through the sleeve 1600, the purpose of connecting and fixing two adjacent composite columns 1000 can also be achieved by welding, mechanical connection, etc. Moreover, the structure of the sleeve 1600 is not limited to the form in which both ends are set to be tapered. For example, the sleeve 1600 is formed by connecting the first end 1610 and the transition section 1620, and the first end 1610 and the transition section 1620 are respectively inserted with connecting steel bars 1200. Users can choose the connecting parts according to their own conditions, and they are not described one by one here, and they are all within the protection scope of the present invention.
[0074] In one embodiment, see the attached specification Figure 4 A sleeve 1600 is provided at one end of the connecting steel bar group of a composite column 1000, and an end of the connecting steel bar 1200 away from the sleeve 1600 is upset so that a pier head 1210 is formed at one end of the connecting steel bar 1200.
[0075] Furthermore, the pier head 1210 is tapered, and the diameter of the pier head 1210 gradually increases in the direction from the second end 1630 to the first end 1610 of the sleeve 1600 .
[0076] Furthermore, the diameter of the pier head 1210 is smaller than the inner diameter of the second end 1630 of the sleeve 1600 , and the end of the connecting steel bar 1200 with the pier head 1210 is inserted into the second end 1630 of the sleeve 1600 .
[0077] Specifically, for the convenience of explanation, there are two composite columns 1000, namely an upper composite column and a lower composite column. The first end 1610 of the sleeve 1600 is sleeved on one end of the connecting steel bar group of the lower composite column. Then, one end of the connecting steel bar 1200 of the upper composite column with the pier head 1210 is inserted into the second end 1630 of the sleeve 1600 of the lower composite column to realize the connection between the upper and lower composite columns.
[0078] Further, concrete can be poured into the sleeve 1600, and one end of the connecting steel bar 1200 of the upper composite column with the pier head 1210 is inserted into the sleeve 1600, so that the grouting material overflows and automatically overflows to form a reliable connection. After the concrete is set, the connecting steel bar 1200 is clamped in the sleeve 1600 to achieve the connection and fixation of two adjacent composite columns 1000. In this embodiment, the end of the connecting steel bar 1200 away from the sleeve 1600 is provided with the pier head 1210, which can ensure the connection performance of the connecting steel bar 1200 and the sleeve 1600 and improve the connection strength. In the event of an earthquake, when the composite columns 1000 are damaged by external forces, the pier head 1210 of the connecting steel bar 1200 will be affected by the concrete in the sleeve 1600, and the connecting steel bar 1200 is not easy to be separated from the sleeve 1600, thereby improving the safety of the building and protecting the lives and property of the people.
[0079] In one embodiment, referring to the accompanying drawings, Figure 4 The inner diameter of the first end 1610 of the sleeve 1600 is smaller than the inner diameter of the second end 1630 , so that when the sleeve 1600 is poured with grouting material, the grouting material is easily distributed in the sleeve 1600 under the action of gravity.
[0080] The present invention also provides an assembled building, comprising: a prefabricated composite column assembly provided by any of the above items, and also comprising a floor slab and a prefabricated beam 1700. In this embodiment, a prefabricated composite column assembly is transported to the construction site and connected with building components such as the floor slab and the prefabricated beam 1700. Specifically, the prefabricated beam 1700 is arranged at the connection between two adjacent composite columns 1000, the floor slab is laid on the prefabricated beam 1700, and the adjacent prefabricated composite column assemblies are connected and fixed by sleeves 1600. The assembled building has the characteristics of simple construction process, saving construction site, and little influence by the external environment, which can shorten the construction period, improve construction efficiency, and reduce construction costs.
[0081] It is worth noting that a method for preparing a prefabricated composite column assembly is as follows:
[0082] Preparing molds and cores for prefabricated composite columns in the factory;
[0083] The connecting steel bar 1200 is tied, and the sleeve 1600 is sleeved on one end of the connecting steel bar 1200;
[0084] Processing the first stirrup 1400 and the second stirrup 1500 so that the first stirrup 1400 and the second stirrup 1500 present a spiral structure;
[0085] The first stirrup 1400 is fixedly connected to the connecting steel bar 1200, and the second stirrup 1500 is fixedly connected to the structural steel bar 1300;
[0086] Place the first stirrup 1400 and the second stirrup 1500 at the four corners and the center of the cross section of the mold respectively, and place the core mold in the center of the mold;
[0087] Concrete is poured into the mold. After the concrete component 1100 is formed by casting or rotation by a centrifugal device, the concrete component 1100 is cured and the mold and the core mold are removed.
[0088] In the preparation method of the prefabricated composite column assembly, the processing and production of the prefabricated composite columns are all completed in the factory, which is not affected by the external environment, and the concrete curing and molding of the prefabricated composite columns are all under the supervision of the staff. Once there is a defective product, it can be discovered at the first time, and the product quality is guaranteed. At the same time, the processing of stirrups can be completed by mechanical equipment, and the production efficiency is high.
[0089] The present invention also provides a method for constructing an assembled building, which is used for the assembled building provided above, comprising:
[0090] Install the floor slab and precast beam 1700 of the nth floor and tie the steel bars;
[0091] Grouting the sleeve 1600 of the prefabricated composite column assembly of the n-1th floor;
[0092] The prefabricated composite column assembly of the nth layer is hoisted to the beam node area, and the connecting steel bar group is inserted into the sleeve 1600 of the prefabricated composite column assembly of the n-1th layer;
[0093] Connect and tie the steel bars in the node area of precast beams;
[0094] Concrete is poured into the cavities of the nth floor slab and the n-1th floor precast composite column assemblies.
[0095] In this embodiment, see the accompanying drawings Figure 4The bottom of the prefabricated composite column is located in the beam node area. During construction, the floor slab and prefabricated beam 1700 of the nth layer are first installed and the steel bars are tied. Then the sleeve 1600 of the prefabricated composite column assembly of the n-1th layer is grouted. The nth layer composite column assembly is hoisted to the beam node area as required, that is, the lower end of the nth layer composite column assembly is located in the beam node area, the connecting steel bar group is inserted into the sleeve 1600 of the prefabricated composite column assembly of the n-1th layer, and the steel bars in the prefabricated beam node area are connected and tied, so that the prefabricated composite column assembly, the prefabricated beam 1700 and the floor slab form a whole, and then concrete is poured into the cavity of the nth layer slab and the n-1th layer prefabricated composite column assembly. Repeat this step to finally complete the construction of the prefabricated building.
[0096] Further, see the accompanying drawings of the specification Figure 5 When the bottom of the prefabricated composite column is located above the beam node area, the present invention provides another prefabricated building construction method, which is used for the prefabricated building provided above, comprising:
[0097] The prefabricated composite column assembly of the nth layer is hoisted above the beam node area, and the connecting steel bar group is inserted into the sleeve 1600 of the prefabricated composite column assembly of the n-1th layer;
[0098] Install the floor slab and precast beam 1700 of the n+1th floor and tie the steel bars;
[0099] Connect and tie the steel bars in the node area of precast beams;
[0100] Concrete is poured into the cavities and sleeves 1600 of the n+1th floor slab and the nth floor prefabricated composite column assembly.
[0101] In this embodiment, the prefabricated composite columns of the nth layer are first hoisted above the beam node area, that is, the prefabricated composite columns of the nth layer are located above the nth floor slab, and the connecting steel bar group is inserted into the sleeve 1600 of the prefabricated composite column assembly of the n-1th layer, and then the floor slab and prefabricated beams 1700 of the n+1th layer are installed and the steel bars are tied, and then the steel bars in the node area of the prefabricated beams are connected and tied, so that the prefabricated composite column assembly forms a whole with the prefabricated beams 1700 and the floor slab, and concrete is poured into the cavities of the n+1th floor slab and the nth layer prefabricated composite columns and the sleeve 1600, and this step is repeated to finally complete the construction of the prefabricated building.
[0102] This embodiment provides a method for constructing an assembled building. The prefabricated composite column components do not need to be processed on the construction site. The assembled building avoids the disadvantages of a large number of steel bar tying and complex processes in traditional construction sites, and is convenient for quality control of assembled buildings. At the same time, the assembled building does not require a large number of steel bar tying and formwork, which can greatly reduce the construction site, simplify the construction process, shorten the construction period, reduce construction costs, and improve construction efficiency.
[0103] It should be noted that the above embodiments can be freely combined as needed. The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications should also be considered as the protection scope of the present invention.
Claims
1. A prefabricated composite column assembly, characterized in that: The method comprises at least one composite column, wherein the composite column comprises a concrete member, a steel skeleton and stirrups; The steel bar skeleton comprises a connecting steel bar group and a structural steel bar, a group of the connecting steel bar group is provided with at least one connecting steel bar, and the connecting steel bar group, the structural steel bar and the stirrups are buried in the concrete member along the length direction of the concrete member; The stirrups include a first stirrup and a second stirrup, which are embedded in the concrete member and respectively sleeved outside the connecting steel bar group and the structural steel bar; A connecting piece is arranged at one end of the stacking column and is suitable for connecting and fixing another stacking column.
2. A prefabricated composite column assembly according to claim 1, characterized in that: The stirrups are in a spiral structure.
3. A prefabricated composite column assembly according to claim 1 or 2, characterized in that: The outer contour of the concrete member is polygonal, and the first stirrups are arranged at the corners of the outer contour of the concrete member; The concrete member is provided with a cavity along the length direction of the concrete member, and the second stirrup is provided at the center of the concrete member and sleeved outside the cavity; The second stirrup has an overlapping portion with the first stirrup, and the first stirrup and the second stirrup are fixedly connected to each other through the overlapping portion.
4. A prefabricated composite column assembly according to claim 3, characterized in that: The cross section of the concrete component is square outside and circular inside.
5. A prefabricated composite column assembly according to claim 4, characterized in that: The number of the connecting steel bar groups is four; A group of connecting steel bars is inserted into each of the first stirrups and respectively arranged at the four corners of the cross section of the concrete member; Both ends of the connecting steel bar are located outside the concrete member, the connecting steel bar is in contact with the first stirrup and is fixedly connected at the contact point; The structural steel bar is arranged in the second stirrup, the structural steel bar is in contact with the second stirrup, and is connected and fixed at the contact point.
6. The prefabricated composite column assembly according to claim 1, characterized in that: The connecting member is a sleeve, which is sleeved on one end of the connecting steel bar, and the sleeve is configured to be conical and is the first end; The middle part of the sleeve is set as a transition section, and the end of the sleeve away from the first end is the second end. The second end is also set to a cone, so that the inner diameter of the sleeve gradually decreases from the transition section to both ends, and the second end is sleeved on the connecting steel bars of the adjacent composite columns.
7. A prefabricated composite column assembly according to claim 6, characterized in that: One end of the connecting steel bar away from the sleeve is upset to form a pier head, and the pier head is conical and used to clamp the connecting steel bar into the second end of the sleeve; The diameter of the pier head is smaller than the inner diameter of the second end of the sleeve, and the diameter of the pier head gradually increases in the direction from the second end to the first end of the sleeve.
8. A prefabricated composite column assembly according to claim 6 or 7, characterized in that: The inner diameter of the first end of the sleeve is smaller than the inner diameter of the second end.
9. An assembled building, characterized in that: include: The prefabricated composite column assembly according to any one of claims 1 to 8 further comprises a floor slab and a prefabricated beam, wherein the adjacent composite columns are connected by the connecting member.
10. A method for constructing an assembled building, characterized in that: An assembled building as claimed in claim 9, comprising: Install the floor slabs and precast beams and tie the steel bars for the nth floor; Grouting the sleeves of the prefabricated composite column assemblies of the n-1th floor; The prefabricated composite column assembly of the nth layer is hoisted to the beam node area, and the connecting steel bar group is inserted into the sleeve of the prefabricated composite column assembly of the n-1th layer; Connect and tie the steel bars in the node area of precast beams; Concrete is poured into the cavities of the nth floor slab and the n-1th floor precast composite column assemblies.
Citation Information
Patent Citations
Connection joint structure, construction method of connection joint structure and fabricated building
CN110093978A
Prefabricated concrete-filled steel tube composite column and building thereof
CN113216515A
Hollow PC column for saving construction period, SRC column with the hollow PC, joint structure of SRC and beam and method for constructing frame of buildings
KR101612637B1
Connection structure, concrete-encased concrete-filled steel tube column and construction method
US20200392732A1
Prefabricated column / beam and connection structure thereof and construction method thereof
WO2019206192A1