Fabricated factory building machine matching system for concrete factory building
Through the prefabricated factory building machine supporting system, the grid layout and split design by piece are used to reduce the construction support height, solve the safety and efficiency of high-supported formwork, realize low-supported formwork, and improve construction Safety and efficiency.
Patent Information
- Application Number
- CN202411420521.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-12
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-10-12
AI Technical Summary
In construction, higher full-house scaffolding is required during construction of high-supported forms to ensure safety, but it is troublesome to build and has many consumables, which affects construction efficiency.
The supporting system of concrete factory building machine is adopted, including side wall column mold frame system, early dismantling support system, truss platform system, lifting system and transfer truck system. The support is reduced through grid layout and split-sheet design height, improve construction efficiency.
Effectively converting high-supported molds into low-supported molds to improve construction safety and efficiency, and reduce construction costs and time.
Smart Images

Figure CN118933368A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of building construction, and in particular to a concrete plant assembly machine supporting system. Background Art
[0002] For example, Chinese invention patent application publication number CN 109610816 A discloses an aluminum alloy rapid formwork system comprising a formwork system, a support system, and a connection system. The formwork system comprises multiple interconnected quick-release formworks, each with corner bars at its four corners. The support system includes support assemblies connected to the corner bars at the four corners of the quick-release formworks, and an early-release head connecting two adjacent quick-release formworks. The construction method for the aluminum alloy rapid formwork system includes the following steps: a. After the wall reinforcement is tied, the wall panels, beams, and corner members are installed; b. A single support is assembled with a first wall side support, a second wall side support, a first formwork edge support, a second formwork edge support, and an early-release head; c. A single support is installed at an appropriate location and equipped with a first wall side support, a second wall side support, and either a first formwork edge support or a second formwork edge support. This system utilizes relatively high supports. When constructing taller factory buildings, a taller full-height scaffolding is required for safety. However, full-height scaffolding is difficult to construct and consumes a lot of materials. Summary of the Invention
[0003] The purpose of the present invention is to provide a concrete plant assembly machine supporting system, which can transform high-support formwork into low-support formwork construction, effectively ensure construction safety, and improve construction efficiency.
[0004] In order to achieve the above purpose, a concrete plant assembly machine system is adopted, which includes: The side wall and side column formwork system is erected along the outer edge of the grid, and the side lifting point embedded parts are installed along the outer grid points and lines; The early demolition support system is divided into an early demolition support column base system and an early demolition support column system installed on the early demolition support column base system; the early demolition support column base system is arranged according to grid points, and inner corbels are installed on the early demolition support column system along the grid line direction; so that corbels are relatively spaced in pairs along the longitudinal and transverse directions of the grid line; A truss platform system is laid along the longitudinal and transverse directions of the grid and between relatively spaced corbels, and can be divided into single-piece truss platforms; A lifting system, which is mounted on the corbels and has hooks attached to the truss platform system; The roof formwork system is supported on the truss platform system after it is lifted and spliced with the corbels; The transfer trolley system is divided into multiple parts and is used to be assembled at the bottom of the disassembled truss platform system.
[0005] The present invention can transform high-support formwork into low-support formwork construction, effectively ensuring construction safety and improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0006] Figure 1 This is a schematic diagram of the plan layout of the corbel.
[0007] Figure 2 This is a schematic diagram of the splicing structure of the early dismantling support system.
[0008] Figure 3 This is a top view of the steel column.
[0009] Figure 4 This is a structural diagram of an early-removal support column base system.
[0010] Figure 5 for Figure 4 Schematic diagram of the structure of the early dismantling support column base system without the pad.
[0011] Figure 6 A schematic diagram of the structure of a triangular block.
[0012] Figure 7 This is a structural diagram of the early dismantling support column system.
[0013] Figure 8 Schematic diagram of lifting and dismantling steel columns.
[0014] Figure 9 Schematic diagram of the column top node.
[0015] Figure 10 This is a structural diagram of the corbel.
[0016] Figure 11 Schematic diagram of the installation structure of the tension screw assembly.
[0017] Figure 12 Schematic diagram of the connection relationship between the tension screw assembly and the first base plate.
[0018] Figure 13 Schematic diagram of the partition installation structure.
[0019] Figure 14 The figure is a schematic diagram of the installation structure of a clamp and an ear plate.
[0020] Figure 15 Schematic diagram of the installation structure of the second base plate.
[0021] Figure 16 Schematic diagram of the truss platform system splicing structure.
[0022] Figure 17 Schematic diagram of the main truss structure.
[0023] Figure 18 Schematic diagram of the local structure of the secondary truss.
[0024] Figure 19 This is a structural diagram of the transfer vehicle system.
[0025] Figure 20 This is a schematic diagram of the partially enlarged structure of the axle position.
[0026] Figure 21 This is a structural diagram of the screw lift.
[0027] Figure 22 Schematic diagram of the structure of the second screw.
[0028] Figure 23 Schematic diagram of the installation of brackets and purlins.
[0029] Figure 24 To enhance the basic principle diagram of the system.
[0030] Figure 25 Schematic diagram of the truss platform disassembly process.
[0031] Figure 26 This is a schematic diagram of the disassembly process for the early disassembly support system.
[0032] Figure 27 Install plans for truss platforms.
[0033] Figure numerals: 1. Early dismantling support system; 101. Early dismantling support column base system; 10101. Horizontal I-beam; 10102. Longitudinal I-beam; 10103. Cross-shaped I-beam; 10104. Triangular plate; 10105. Shim; 10106. First bolt and nut assembly; 10107. Positioning rib; 10108. First rib; 10109. First ear plate; 10110. Tie rod; 10111. Triangular block; 10112. Tie screw; 10113. First nut; 10114. Shim; 10115. Track; 10116. Rib; 10117. Groove; 10118. Side rib; 10119. Middle rib; 10120. U-shaped groove; 10121. Slot; 10122. Roller; 102. Early dismantling support column system; 10201. Steel column; 10202. Flange; 10203. Reinforcement plate; 10204. Corbel; 102401. Upper chord; 102402. Lower chord; 102403. Vertical web member; 102404. Diagonal web member; 102405. First base plate; 102406. Second base plate; 102407. Second lifting ring; 1024 08. Rib plate; 10205. Second bolt and nut assembly; 10206. First clamp; 10207. Second ear plate; 10208. First lifting ring; 10209. Sealing ring; 10210. Tension screw assembly; 10211. Partition plate; 10212. First screw; 10213. Second nut; 10214. Horizontal plate; 10215. Vertical plate; 10216. Cover plate.
[0034] 2. Transfer trolley system; 201. Truss platform; 202. Axle seat; 203. Axle; 204. Wheel; 205. First turbine reduction gearbox; 206. First motor; 207. Screw lift; 20701. Middle support; 208. Slipper; 20801. Housing; 20802. Limit roller; 209. Connecting rod; 2010. Internal threaded sleeve; 2011. Second screw; 2012. Second turbine reduction gearbox; 2013. Second motor; 2014. Arc track; 2015. Third turbine reduction gearbox; 2016. Third motor.
[0035] 3. Truss platform system; 301. Main truss; 302. Secondary truss; 30201. Positioning sleeve; 303. First splicing plate; 304. Second clamp; 30401. Second splicing plate; 305. Third bolt and nut assembly; 306. Fourth bolt and nut assembly; 307. Lifting lug; 308. Angle steel; 309. Fifth bolt and nut assembly; 3010. Bolt; 3011. Second rib; 3012. End plate.
[0036] 4. Improve the system; 5. Side walls and columns; 6. Roof. DETAILED DESCRIPTION
[0037] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making any creative efforts shall fall within the scope of protection of the present invention.
[0038] In the description of the present invention, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer" and the like, indicating positions or locations, are based on the positions or locations shown in the accompanying drawings and are intended solely to facilitate description and simplify the present invention. They are not intended to indicate or imply that the devices or components referred to must have a specific orientation, be constructed, or operate in a specific orientation, and therefore should not be construed as limiting the present invention. The terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance. Furthermore, unless otherwise expressly specified or limited, the terms "mounted," "connected," and "connected" should be broadly interpreted, for example, to refer to fixed, detachable, or integral connections; mechanical or electrical connections; direct or indirect connections through an intermediate medium; or internal communication between two components. Those skilled in the art will appreciate the specific meanings of the above terms in the present invention.
[0039] Example 1 like Figure 1-Figure 27 As shown, a concrete plant assembly machine supporting system includes: The side wall and side column formwork system is erected along the outer edge of the grid, and the side lifting point embedded parts are installed along the outer grid points and lines; An early demolition support system 1 is divided into an early demolition support column base system 101 and an early demolition support column system 102 installed on the early demolition support column base system 101; the early demolition support column base system 101 is arranged according to grid points, and inner corbels are installed on the early demolition support column system 102 along the grid line direction; so that corbels are formed in pairs along the grid line longitudinally and transversely. The truss platform system 3 is laid along the longitudinal and transverse directions of the grid and between relatively spaced corbels, and can be divided into single-piece truss platforms; A lifting system 4 is mounted on the bracket, and its hook is connected to the truss platform system 3; The roof formwork system is supported on the truss platform system 3 after it is lifted and spliced with the corbels; The transfer trolley system 2 is divided into multiple parts and is used to be assembled at the bottom of the disassembled truss platform system 3.
[0040] Example 2 like Figure 1-Figure 27 As shown, a construction method of a concrete plant assembly plant supporting system includes the following steps: S1: Use the side wall and side column formwork system to construct the side wall and side columns 5 around the workshop along the outer edge of the grid. After removing the formwork, reserve door openings on the side walls, install the side lifting point embedded parts along the outer grid points and lines, and install the side brackets along the grid lines perpendicular to the side wall and side columns. S2: Installing the early demolition support system 1, which is divided into an early demolition support column base system 101 and an early demolition support column system 102 installed on the early demolition support column base system 101; the early demolition support column base system 101 is arranged according to grid points, and inner corbels are installed on the early demolition support column system 102 along the grid lines, so that the corbels are relatively spaced in pairs along the longitudinal and transverse directions of the grid lines; S3: Install the truss platform system 3, laying the split single-piece truss platform on the ground between the relatively spaced corbels along the longitudinal and transverse directions of the grid; S4: Install lifting system 4 on the corbel, and use the lifting system to lift the single truss platform. After the single truss platform is lifted to the height of the corbel, it is spliced with the corbel to form the truss platform of this workstation; S5: Set up the roof formwork system on the truss platform, and remove the formwork after constructing the roof of the factory building at this station; S6: Place the components of the transfer trolley system 2 under the monolithic truss platform, disassemble the monolithic truss platform piece by piece, lower the monolithic truss platform to the installation position of the transfer trolley system 2, install the transfer trolley system 2 on the bottom of the monolithic truss platform, and transport it to the next workstation or doorway by the transfer trolley system 2; S7: After completing the construction of all workstation roofs 6, the early dismantling support system 1 is dismantled.
[0041] The early removal support column base system 101 includes: Transverse I-beams 10101 are laid in parallel intervals; The longitudinal I-beams 10102 are laid in parallel at intervals and fixed vertically between two adjacent parallel transverse I-beams 1, and form a closed area with the transverse I-beams 1; Cross-shaped I-beam 10103, which is arranged inside the closed area, and its ends are fixed to the transverse I-beam 10101 and the longitudinal I-beam 10102; The triangle plate 10104 is welded to the corner of the upper flange of the middle portion of the cross-shaped I-beam 10103. Spaces are reserved between the triangle plate 10104 and the transverse I-beam 10101, as well as between the triangle plate 10104 and the longitudinal I-beam 10102. The backing plate 10105 is placed in the middle of the cross-shaped I-beam 10103 and covers the triangular plate 10104, with a gap reserved between it and the transverse I-beam 10101 and between it and the longitudinal I-beam 10102; The first bolt and nut assembly 10106 passes through the backing plate 10105 and the triangular plate 10104 and is tightened, with the bolt head at the upper end and the nut at the lower end.
[0042] The positioning ribs 10107 are fixedly arranged on the pad 10105 at an annular spacing angle.
[0043] With such a structure, the positioning rib 10107 facilitates the positioning of the early-removal support column. The lower end of the early-removal support column has a flange plate connected to the positioning rib. The triangular plate 10104 can prevent the first bolt and nut assembly 10106 from drilling holes in the cross-shaped I-beam 10103, thereby preventing the cross-shaped I-beam 10103 from reducing the bearing capacity of the cross-shaped I-beam 10103. Spacing is reserved between the triangular plate 10104 and the horizontal I-beam 10101, as well as between the triangular plate 10104 and the longitudinal I-beam 10102, so as to reserve sufficient space for the installation and removal of the first bolt and nut assembly 10106. The positioning rib 10107 positions the early-removal support column and is also convenient for welding with the early-removal support column.
[0044] In this embodiment, a first rib 10108 is provided in the transverse I-beam 10101 and the longitudinal I-beam 10102 .
[0045] With such a structure, the first rib 10108 strengthens and supports the transverse I-beam 10101 and the longitudinal I-beam 10102 .
[0046] In this embodiment, a first ear plate 10109 is provided on the transverse I-beam 10101 and the longitudinal I-beam 10102 .
[0047] With such a structure, the inclined pull rod 10110 can be easily supported on the first ear plate 10109 .
[0048] In this embodiment, a pull rod 10110 is hinged on the first ear plate 10109 .
[0049] With such a structure, the pull rod 10110 is convenient for hinged connection and early dismantling of the base of the support column.
[0050] In this embodiment, a triangular block 10111 is arranged between the cross-shaped I-beam 10103 and the pad 10105. The triangular block 10111 is located on the two coaxial branches of the cross-shaped I-beam 10103. A pair of triangular blocks 10111 are connected by tension screws 10112 and tightened with a first nut 10113 and a gasket 10114; the pad 10105 abuts against the inclined surface of the triangular block 10111.
[0051] Adopting such a structure makes it easier to remove the root of the early-removal support column during subsequent disassembly, so that the root of the early-removal support column can be removed to improve the disassembly efficiency.
[0052] In this embodiment, rails 10115 are provided on both sides of the triangular block 10111 , and the rails 10115 are welded to the branches of the cross-shaped I-beam 10103 .
[0053] Such a structure makes it easy for the triangular block 10111 to retreat along a predetermined route when the supporting column is removed early.
[0054] In this embodiment, the triangular blocks 10111 are plugged into the ribs 16 , and the ribs 10116 pass through a pair of triangular blocks 10111 and are placed under the pad 10105 .
[0055] With such a structure, when dismantling the early dismantling support column, first pull out the rib 10116 and then remove the early dismantling support column, and the rib 10116 facilitates supporting the middle part of the pad 10105.
[0056] In this embodiment, a groove 10117 is provided on the outer side of the rib 10116 to insert the side rib 10118 .
[0057] With such a structure, the side ribs 10118 are placed on the side of the pad 10105 to better support the pad 10105 , and the grooves 10117 facilitate positioning of the side ribs 10118 .
[0058] In this embodiment, a middle rib 10119 is arranged between the two ribs 10116 , and a U-shaped groove 10120 is provided on the upper surface of the middle rib 10119 for the tension screw 10112 to pass through, and the upper surface of the middle rib 10119 is spaced from the lower surface of the pad 10105 .
[0059] With such a structure, after the pad 10105 is removed, it is supported by the middle rib 10119.
[0060] In this embodiment, a groove 10121 is formed on the bottom surface of the triangular block 10111 , and rollers 10122 are distributed in the groove 10121 .
[0061] With such a structure, the bottom surface of the triangular block 10111 is easy to slide, reducing the friction during unloading.
[0062] First, the early dismantling support column base system 101 is removed, and then the early dismantling support column system 102 and the early dismantling support column base system 101 are removed from bottom to top. The specific steps are as follows: When dismantling the early-removal support column in sections, the flanges of the middle and top steel columns are first unbolted, and then the early-removal support column base system 101 is used to complete the removal operation, leaving a gap between the middle and top steel columns. The bolts between the middle and bottom steel columns are then unbolted, and the middle steel column is lifted out, followed by the removal of the top and bottom steel columns. Leaving a gap in place prevents the middle and top steel columns from getting stuck, preventing the middle steel column from pushing up against the top steel column during removal, which could damage the roof bottom surface or cause the top steel column to sway, impacting construction safety. Alternatively, if the base is removed first, the lower section of the middle steel column is free, making it prone to swinging in the wind. The longer the length, the greater the swing, which can put construction workers in danger during dismantling. Dismantling the middle steel column first results in each section being shorter, less swaying in the wind, and safer during dismantling.
[0063] The early dismantling support column system 102 of this embodiment includes: The multi-section steel column 10201 is provided in upper and lower sections and spliced together; A flange 10202 is fixedly mounted on the end of the single-section steel column 10201; Reinforcement plate 10203, which is welded between steel column 10201 and flange 10202; Corbels 10204 are fixed on both sides of the top steel column 10201; Bolt and nut assembly 10205, which is fastened to adjacent spliced flanges 10202; The first clamp 10206 is fixed to the bottom steel column 10201; The second ear plate 10207 is arranged on the first clamp 10206.
[0064] With this structure, multiple sections of steel columns 10201 are connected up and down through flanges 10202 and bolt and nut assemblies 10205, which is convenient for assembly and disassembly. The first hoop 10206 is fastened to the bottom steel column 10201. In this embodiment, a first hanging ring 10208 is distributed on the steel column 10201.
[0065] With such a structure, when the steel column 10201 is disassembled in sections, the first lifting ring 10214 cooperates with the lifting rope to facilitate the disassembly and lowering of the segmented steel column 10201.
[0066] In this embodiment, the corbel 10204 includes an upper chord 102401, a lower chord 102402, a vertical web 102403 and a diagonal web 102404. The upper chord 102401 and the lower chord 102402 are fixed with a first base plate 102405 at one end close to the steel column 10201, and a second base plate 102406 at the end away from the steel column 10201. The first base plate 102405 is fixed to the steel column 10201.
[0067] With such a structure, the first base plate 102405 and the second base plate 102406 are used to splice the steel column 10201 and the truss respectively.
[0068] In this embodiment, a sealing ring 10209 is provided between adjacent flanges 10202 .
[0069] Adopting such a structure is beneficial to waterproofing the interior of steel column 10201.
[0070] In this embodiment, the lower chord 102402 is shorter than the upper chord 102401 , and a second suspension ring 102407 is fixed to the portion of the upper chord 102401 that extends beyond the lower chord 102402 .
[0071] With such a structure, the second lifting ring 102407 facilitates lifting the truss, and the lower chord 102402 being shorter than the upper chord 102401 does not affect the verticality of the pull rope during the lifting process.
[0072] In this embodiment, the rib plate 102408 is welded to the first bottom plate 102405 and the second bottom plate 102406, and the rib plate 102408 is fixed to the first bottom plate 102405 and the upper chord 102401, and the rib plate 102408 is also fixed to the first bottom plate 102405 and the lower chord 102402; the rib plate 102408 is also fixed to the second bottom plate 102406 and the upper chord 102401, and the rib plate 102408 is again fixed to the second bottom plate 102406 and the lower chord 102402.
[0073] With such a structure, the ribs are welded to the first bottom plate and the upper chord, and the ribs are also welded to the first bottom plate and the lower chord to stabilize the corbel.
[0074] With such a structure, the rib plate 102408 is welded to the first bottom plate 102405 and the upper chord 102401 and then to the steel column 10201. The rib plate 102408 is also welded to the first bottom plate 102405 and the lower chord 102402 and then to the steel column 10201 to stabilize the corbel 10204.
[0075] In this embodiment, the tensioning screw assembly 10210 is connected to the first base plate 102405, and the tensioning screw assembly 10210 is connected to the steel column 10201 and the first base plates 102405 on both sides thereof.
[0076] By adopting such a structure, the bearing capacity of the upper corbel of steel column 10201 is increased.
[0077] In this embodiment, a partition 10211 is set in the top steel column 10201. The partition 10211 is welded in layers in the top steel column 10211 and is located below and above the tension screw assembly 10210. The upper partition 10211 is opened and poured with concrete to make it dense.
[0078] With such a structure, the deformation of concrete due to thermal expansion and contraction is small, and after pouring, the tension screw assembly 10210 is further strengthened to prevent it from loosening.
[0079] In this embodiment, the first clamps 10206 are arranged in layers, and the first screw 10212 is fixed between the upper and lower first clamps 10206. The first screw 10212 slides through the second ear plate 10207, and the upper and lower sides of the second ear plate 10207 are threadedly connected to the second nut 10213.
[0080] With such a structure, the tightness of the pull rod can be adjusted to ensure that it is in a tight state during use.
[0081] In this embodiment, a horizontal plate 10214 is set inside the column head of the top section steel column 1, a vertical plate 10215 is fixed to the horizontal plate 10214, a cover plate 10216 is fixed to the vertical plate 10215, and concrete is poured densely between the horizontal plate 10214 and the cover plate 10216.
[0082] With such a structure, it is easy to install the bracket on the cover plate 10216, and the vertical plate 10215 prevents the cover plate 10216 from being concave, so that the deformation is smaller after pouring concrete.
[0083] In this embodiment, the bottom section of the steel pipe column is convenient for connection with the base, and it is convenient to pre-fix the bottom section of the steel pipe column before welding or bolting it, which is beneficial to improve construction efficiency, improve the quality of welding or bolting, ensure that the steel column is vertical during the fixing process, and prevent tilting.
[0084] The truss platform system 3 used in this embodiment includes: The main trusses 301 are arranged in parallel at intervals; The secondary truss 302 is arranged perpendicularly to the main truss 301. Its upper and lower chords are made of square steel tubes. Positioning sleeves 30201 are fixed in the ends of the square steel tubes. The positioning sleeves 30201 press against the upper and lower sides of the ends of the square steel tubes. The third bolt and nut assemblies 305 are passed through the positioning sleeves and tightened on the upper and lower sides of the ends of the square steel tubes. The first splicing plate 303 is fixed to both ends of the upper and lower chords of the secondary truss 302, one end of which is embedded in the square steel tube and is tightened by the side of the positioning sleeve 30201; The second clamp 304 is fixed at intervals on the upper chord and the lower chord of the main truss 301 , and a second splicing plate 30401 is provided on its side and fixed to the first splicing plate 303 through a fourth bolt and nut assembly 306 .
[0085] With such a structure, the position of the second clamp 304 on the main truss 301 can be adjusted and then tightened. The second clamp 304 is used to splice with the secondary truss 302, so as to facilitate the adjustment of the position of the secondary truss 302. After the side of the positioning sleeve 30201 is pressed against the first splicing plate 303, it is convenient for the welding and fixation of the first splicing plate 303. After the first splicing plate 303 and the second splicing plate 30401 are fixed, the cross-splicing of the main truss 301 and the secondary truss 302 is realized.
[0086] In this embodiment, end plates 3012 are fixed at both ends of the upper chord and the lower chord of the main truss 301 , and bolt holes are provided on the end plates 3012 .
[0087] With such a structure, the end plate 3012 is easy to be spliced with the corbel.
[0088] In this embodiment, both ends of the lower chord of the main truss 301 extend beyond both ends of the upper chord, and lifting ears 307 are fixed to the extending portions.
[0089] Such a structure makes it easy to lift the entire truss and to assemble it.
[0090] In this embodiment, the first splicing plate 303 is U-shaped, with the positioning sleeve 30201 passing through the middle space. The second splicing plate 30401 is pressed against the positioning sleeve 30201 and then spliced with the first splicing plate 303 by the fourth bolt and nut assembly 306.
[0091] With such a structure, the U-shaped first splicing plate 303 is more compatible with the positioning sleeve 30201, and after the second splicing plate 30401 is pressed against the positioning sleeve 30201 and then spliced with the first splicing plate 303, the first splicing plate 303, the second splicing plate 30401 and the positioning sleeve 30201 form a self-locking structure, and can be fastened without welding.
[0092] In this embodiment, an angle steel 308 is fixed between the second splicing plate 30401 and the side of the second clamp 304. One leg of the angle steel 308 is tightened to the second splicing plate 30401 through the fourth bolt and nut assembly 306, and the other leg is tightened to the side of the second clamp 304 through the bolt 3010.
[0093] Such a structure facilitates strengthening and fixing the second splicing plate 30401 and the second clamp 304 .
[0094] In this embodiment, a second rib 3011 is welded to the angle steel 308 .
[0095] With such a structure, the second rib 3011 further strengthens the angle steel 308 .
[0096] The transfer vehicle system 2 used in this embodiment includes: Truss platform 201; Axle seat 202, which is installed at the bottom of the truss platform 201; an axle 203 rotatably connected to the axle seat 202 , with a worm gear disposed in the center thereof; Wheels 204 are coaxially fixed to both ends of the axle 203; The first turbine reduction box 205 is connected to the middle part of the axle 203 through a worm gear; The first motor 206 has an output end extending into the first turbine reduction box 205 for transmission connection; a screw lift 207 spaced forward and backward from the axle 203 and having a central support 20701 secured to the lower chord of the truss platform 201; Sliding shoe 208, which is fixed to the lower output end of the screw elevator 207; Connecting rod 209, which is hinged on one side of the sliding shoe 206 An internally threaded sleeve 2010, which is hinged to one side of the connecting rod 207; A second screw 2011, one end of which is threadedly connected to the internal threaded sleeve 2010, and the other end of which is coaxially provided with a worm; A second turbine reduction box 2012, which is connected to the worm gear at the other end of the second screw 2011; The second motor 2013 has an output end extending into the second turbine reduction box 2012 for transmission connection; The arc track 2014 is slidably mounted on the sliding shoe 208 and is installed on the lower side of the second turbine reduction box 2012.
[0097] With such a structure, when the trolley is moving, the screw lift 207 lifts the curved track 2014. When turning, the curved track 2014 is lowered and driven by the second motor 2013 and the second turbine reducer 2012; the second screw 2011 and the internal threaded sleeve 2010 can realize the telescopic function, so that the sliding shoe 208 can move along the curved track 2014, thereby realizing the in-situ horizontal turning function. When the turn is completed, the curved track 2014 is lifted again and the sliding shoe 208 is reset.
[0098] In this embodiment, the axle seat 202 , the axle 203 , the wheel 204 , the first turbine reduction box 205 and the first motor 206 are arranged in parallel in multiple groups at intervals on the bottom surface of the truss platform 201 .
[0099] Such a structure can ensure that the truss platform 201 is transported smoothly.
[0100] In this embodiment, the screw lifts 207 are arranged in a row of two and are linked by a transmission rod. The transmission rod is driven by a third turbine reducer 2015. The third turbine reducer 2015 is arranged between the two screw lifts 207. The third turbine reducer 2015 is connected to the output end of the third motor 2016. The third motor 2016 is installed on the truss platform 201.
[0101] With such a structure, two screw lifts 207 in a row are linked together, and the truss platform 201 is raised and lowered more smoothly.
[0102] In this embodiment, the sliding shoe 208 includes a shell 20801, in which two rows of upper and lower limiting rollers 20802 are installed. The arc track 2014 is made of I-beams, and the two ends of the upper row of limiting rollers 20802 are respectively mounted on the two side walls of the shell 20801 and pressed against the upper flange of the arc track 2014; one end of the lower row of limiting rollers 20802 is mounted on the side wall of the shell 20801, and the other end faces the web of the arc track 2014, and the upper side of the lower row of limiting rollers 20802 presses against the lower side of the upper flange of the arc track 2014.
[0103] With such a structure, the limiting roller 20802 can easily move along the arc track 2014 and drive the arc track 2014 to move up and down.
[0104] In this embodiment, the second turbine reducer 2012 is connected to the second screw rods 2011 on both sides, and the transmission method is that when the second screw rod 2011 on one side is retracted into the internal threaded sleeve 2010, the second screw rod 2011 on the other side is extended from the internal threaded sleeve 2010 on the other side.
[0105] Such a structure is adopted to ensure the translation and rotation of the entire truss platform.
[0106] In this embodiment, the screw lift 207, sliding shoe 208, connecting rod 209, internal threaded sleeve 2010, second screw 2011, second turbine reducer 2012, second motor 2013 and arc track 2014 are arranged in groups, and each two groups are paired and distributed in the form of concentric circles on the front and rear sides of the truss platform 201.
[0107] With such a structure, the components are distributed in concentric circles, and when rotating, the centers of the circles are the same, so the rotation is more stable.
[0108] The truss platform 201 includes a plurality of rows of main trusses 301 arranged at intervals, and secondary trusses 302 arranged vertically and crosswise between adjacent main trusses 301 .
[0109] In this embodiment, a bracket is installed on the truss platform and the bracket. The lower end of the bracket is a U-shaped plate. Both sides of the U-shaped plate are fastened to the truss platform and the upper chord of the bracket by bolts and other fasteners. The upper end of the bracket is a U-shaped support with adjustable height to set up the purlins required by the roof formwork system, such as Figure 7 and Figure 23 shown.
[0110] The lifting system used in this embodiment is: 1. Lifting principle The lifting system of this embodiment uses an electric hoist as the lifting power. The upper hook of the electric hoist is installed on the upper end of the support column removed early on the inner side of the wall column, and the lower hook of the electric hoist is hooked on the lifting point of the lower chord of the main truss of the truss platform. The electric hoist drives the chain to make the truss platform move up and down relative to each other, thereby realizing the lifting function. After each lifting is completed, the electric hoist is transferred to the next lifting platform unit to prepare for the next lifting.
[0111] The lifting system 4 in this embodiment includes: The intelligent master control box is connected to the main power line, and is connected to the power output line and the communication line. The power output line is connected to the surrounding branch cable, and multiple extension power lines are configured on the surrounding branch cable. Multiple branch communication lines are configured on the communication line. Intelligent extension, which is connected to the extension power line and branch communication line, and is connected to the hoist power line; Electric hoist, which is connected to the hoist power line and installed on the bracket; The gravity sensor is arranged on the lifting point of the electric hoist and is electrically connected to the intelligent extension.
[0112] Among them, there is one intelligent master control box, which issues commands such as raising, lowering and stopping to the intelligent extensions.
[0113] Intelligent extension: n units (Note: n represents the number of aircraft positions, and a maximum of 100 intelligent extension units can be controlled). Real-time load data collected from each aircraft position is comprehensively analyzed to identify various faults and make corresponding automated operations in a timely manner, such as early warning and shutdown.
[0114] Gravity sensor: n sets (Note: n represents the number of camera positions) With 5-core shielded cable and 5-core aviation socket: It is the direct bearer of the aircraft suspension point load. It measures the load in real time and generates corresponding analog signals for collection by the single-chip microcomputer of the intelligent extension.
[0115] Surround branch cable: It adopts bus control mode, connects multiple communication lines, connects each intelligent extension together, and surrounds one branch cable.
[0116] The lifting system is also equipped with an alarm device Alarm mode: buzzer alarm, color-changing light displays three alarm colors: red, yellow, and blue.
[0117] When the load value collected at a certain position exceeds the design value by 15%, an automatic alarm should be given in the form of sound and light. When it exceeds 30%, the electric hoist should be able to automatically stop.
[0118] Unload value alarm (SR1): When the load value collected in each position is less than the unload value, the intelligent extension and the intelligent main control box will emit intermittent alarm sounds (short sounds) and display the weight of the heavy object on the corresponding display.
[0119] Overload value alarm (SR2): When the maximum load value collected by each position reaches the overload value, the intelligent extension and the intelligent main control box will emit intermittent alarm sounds (long sounds) and display the weight of the heavy object.
[0120] Overload limit alarm (SR3): When the load value collected by any machine position reaches the overload limit value, the intelligent extension and the intelligent master control box will issue a continuous alarm sound, and within 1 second, the relay output switch signal of the intelligent master control box will cut off the main control circuit, and the status of each machine position at the time of cut-off will be displayed on the PC.
[0121] The overall construction process of this embodiment: 1) Use a small lifting platform to hoist the bracket to the designed elevation, and then connect and fix it with the pre-buried anchor bolts of the wall column; at the same time, use a crane to hoist the steel column into place, and hoist the segmented truss platform between the steel columns into place; after the steel column is installed in place, use a guy rope to fix it.
[0122] 2) Assemble the first truss platform on the ground.
[0123] 3) Use the electric hoist to lift the first truss platform.
[0124] 4) Assemble the second truss platform on the ground.
[0125] 5) Use the electric hoist to lift the second truss platform.
[0126] 6) Assemble the third truss platform on the ground.
[0127] 7) Use the electric hoist to lift the third truss platform.
[0128] When the roof concrete strength reaches 75%, the first, second and third truss platforms and corbels are removed in sequence using the lifting system.
[0129] The first, second, and third truss platforms are moved to the next construction station using the transfer trolley system (2). At the same time, the lifting system is used to precisely adjust the lifting position of the truss platforms to ensure the accuracy of the lifting position. The above steps are repeated until the construction of the unit structure roof is completed; the transfer trolley system 2 is then used to move to the next unit and continue the above steps for construction.
[0130] After the roof concrete strength reaches 100%, the steel columns and truss platforms are removed in sequence.
[0131] First dismantle the early dismantling support column base system 101, and then dismantle the early dismantling support column system 102 from bottom to top. The dismantling steps are as follows: 1) Use a small lifting platform to weld hooks on the embedded parts at the bottom of the roof truss.
[0132] 2) Remove the truss platform between steel columns.
[0133] 3) Use the fall chain to dismantle the early dismantling support column base system 101, and then dismantle the steel column from bottom to top; The present invention effectively solves the problem of high-support formwork construction for a full floor, converts high-support formwork into low-support formwork construction, and effectively ensures construction safety.
[0134] The above is a further detailed description of the present invention in conjunction with specific preferred embodiments, and the specific implementation of the present invention should not be considered to be limited to these descriptions. Those skilled in the art will recognize that several equivalent substitutions or obvious modifications can be made without departing from the scope of the present invention, and that any equivalent performance or application should be considered to fall within the scope of protection of the present invention.
Claims
1. A concrete plant assembly plant machine supporting system, characterized in that include: The side wall and side column formwork system is erected along the outer edge of the grid, and the side lifting point embedded parts are installed along the outer grid points and lines; An early demolition support system (1), the early demolition support system (1) being divided into an early demolition support column base system (101) and an early demolition support column system (102) installed on the early demolition support column base system (101); the early demolition support column base system (101) being arranged according to grid points, and inner corbels being installed on the early demolition support column system (102) along the grid line direction; so that corbels relatively spaced in pairs are formed along the grid line longitudinally and transversely; A truss platform system (3) is laid along the longitudinal and transverse directions of the grid and between relatively spaced corbels, and can be divided into a single truss platform split into pieces; A lifting system (4) mounted on the bracket, the hook of which is connected to the truss platform system (3); A roof formwork system, which is supported on the truss platform system (3) after being lifted and spliced with the corbels; The transfer trolley system (2) is divided into a plurality of parts and components, which are used to be assembled on the bottom of the disassembled truss platform system (3).
2. According to claim 1, the concrete plant assembly type plant construction machine supporting system is characterized in that The early removal support column base system (101) comprises: Transverse I-beams (10101), which are laid in parallel intervals; Longitudinal I-beams (10102) are laid in parallel at intervals and are vertically fixed between two adjacent parallel transverse I-beams (10101), and together with the transverse I-beams (10101) form a closed area; A cross-shaped I-beam (10103) is arranged inside the closed area, and its ends are fixed to the transverse I-beam (10101) and the longitudinal I-beam (10102); A triangular plate (10104) is welded to the corner of the upper flange in the middle of the cross-shaped I-beam (10103), with a reserved gap between the triangular plate (10104) and the transverse I-beam (10101), and between the triangular plate (10104) and the longitudinal I-beam (10102); A pad (10105) is placed in the middle of the cross-shaped I-beam (10103) and covers the triangular plate (10104), with a space reserved between the pad and the transverse I-beam (10101) and between the pad and the longitudinal I-beam (10102); A first bolt and nut assembly (10106) is inserted through the backing plate (10105) and the triangular plate (10104) and tightened, with the bolt head at the upper end and the nut at the lower end; Positioning ribs (10107) are fixedly arranged on the backing plate (10105) at an annular spacing angle; A first rib (10108) is provided in the transverse I-beam (10101) and the longitudinal I-beam (10102); A first ear plate (10109) is provided on the transverse I-beam (10101) and the longitudinal I-beam (10102); The first ear plate (10109) is hinged on a pull rod (10110); A triangular block (10111) is arranged between the cross-shaped I-beam (10103) and the pad (10105); the triangular block (10111) is located on two coaxial branches of the cross-shaped I-beam (10103); a pair of triangular blocks (10111) are connected by tensioning screws (10112) and are tightened by a first nut (10113) and a gasket (10114); the pad (10105) abuts against the inclined surface of the triangular block (10111); Tracks (10115) are arranged on both sides of the triangular block (10111), and the tracks (10115) are welded to the branches of the cross-shaped I-beam (10103); The triangular blocks (10111) are inserted into the ribs (10116), and the ribs (10116) pass through a pair of triangular blocks (10111) and are placed under the pad (10105); A groove (10117) is provided on the outer side of the rib (10116) for inserting the side rib block (10118); A middle rib block (10119) is arranged between the two ribs (10116), a U-shaped groove (10120) is provided on the upper surface of the middle rib block (10119) for the tension screw (10112) to pass through, and the upper surface of the middle rib block (10119) is spaced from the lower surface of the pad (10105); A groove (10121) is provided on the bottom surface of the triangular block (10111), and rollers (10122) are distributed in the groove (10121).
3. According to claim 1, the concrete plant assembly machine supporting system is characterized in that The early removal support column system (102) comprises: Multiple steel columns (10201) are arranged in upper and lower sections and spliced together; A flange (10202) is fixedly mounted on the end of the single-section steel column (10201); A reinforcing plate (10203) welded between the steel column (10201) and the flange (10202); Corbels (10204) are fixedly connected to both sides of the top steel column (10201); A second bolt and nut assembly (10205) fastened to the adjacent spliced flange (10202); A first clamp (10206) fixed on the bottom steel column (10201); A second ear plate (10207), which is arranged on the first clamp (10206); The steel column (10201) is provided with a first lifting ring (10208); The corbel (10204) comprises an upper chord (102401), a lower chord (102402), a vertical web member (102403) and an oblique web member (102404); a first bottom plate (102405) is fixed to one end of the upper chord (102401) and the lower chord (102402) close to the steel column (10201), and a second bottom plate (102406) is fixed to one end away from the steel column (10201); and the first bottom plate (102405) is fixed to the steel column (10201); A sealing ring (10209) is provided between adjacent flanges (10202); The lower chord (102402) is shorter than the upper chord (102401), and a second suspension ring (102407) is fixedly connected to the portion of the upper chord (102401) that exceeds the lower chord (102402); A rib plate (102408) is welded to the first bottom plate (102405) and the second bottom plate (102406); the rib plate (102408) is fixedly connected to the first bottom plate (102405) and the upper chord rod (102401); the rib plate (102408) is also fixedly connected to the first bottom plate (102405) and the lower chord rod (102402); the rib plate (102408) is also fixedly connected to the second bottom plate (102406) and the upper chord rod (102401); and the rib plate (102408) is also fixedly connected to the second bottom plate (102406) and the lower chord rod (102402); The first bottom plate (102405) is connected to a tension screw assembly (10210), and the tension screw assembly (10210) is connected to a steel column (10201) and the first bottom plates (102405) on both sides thereof; A partition (10211) is provided in the top section steel column (10201), the partition (10211) is welded in layers in the top section steel column (10201), and is located below and above the tension screw assembly (10210), and a hole is opened in the upper layer of the partition (10211), and concrete is poured to make it dense; The first clamps (10206) are arranged in layers, a first screw (10212) is fixedly connected between the upper and lower first clamps (10206), a second ear plate (10207) is slidably connected to the first screw (10212), and the upper and lower sides of the second ear plate (10207) are threadedly connected to the second nut (10213); A horizontal plate (10214) is arranged inside the column head of the top section steel column (10201), a vertical plate (10215) is fixedly connected to the horizontal plate (10214), and a cover plate (10216) is fixedly connected to the vertical plate (10215).
4. The concrete plant assembly machine system according to claim 1 is characterized in that The truss platform system (3) comprises: The main trusses (301) are arranged in parallel at intervals; The secondary truss (302) is arranged vertically and crosswise with the main truss (301), and its upper chord and lower chord are made of square steel tubes. Positioning sleeves (30201) are fixed in the ends of the square steel tubes. The positioning sleeves (30201) are pressed against the upper and lower sides of the ends of the square steel tubes. A third bolt and nut assembly (305) is passed through the positioning sleeves. The third bolt and nut assembly (305) is tightened on the upper and lower sides of the ends of the square steel tubes. A first splicing plate (303) is fixed to both ends of the upper chord and the lower chord of the secondary truss (302), one end of which is embedded in the square steel tube and is pressed against the side of the positioning sleeve (30201); A second hoop (304) is fixed at intervals on the upper chord and the lower chord of the main truss (301), and a second splicing plate (30401) is arranged on the side thereof and is fixed to the first splicing plate (303) via a fourth bolt and nut assembly (306); End plates (3012) are fixed at both ends of the upper chord and the lower chord of the main truss 1, and bolt holes are provided on the end plates (3012); The two ends of the lower chord of the main truss 1 extend beyond the two ends of the upper chord, and lifting ears (307) are fixed to the extending parts; The first splicing plate (303) is U-shaped, with a positioning sleeve (30201) passing through its middle space, and the second splicing plate (30401) is pressed against the positioning sleeve (30201) and then spliced with the first splicing plate (303) via a fourth bolt and nut assembly (306); An angle steel (308) is fixedly arranged between the second splicing plate (30401) and the side surface of the second clamp (304); one limb of the angle steel (308) is tightened to the second splicing plate (30401) via a fifth bolt and nut assembly (309), and the other limb is tightened to the side surface of the second clamp (304) via a bolt (3010); A second rib plate (3011) is welded to the angle steel (308).
5. The concrete plant assembly machine system according to claim 1 is characterized in that The transfer vehicle system (2) comprises: Truss platform (201); An axle seat (202) is mounted on the bottom of the truss platform (201); An axle (203) is rotatably connected to the axle seat (202), and a worm is arranged in the middle thereof; Wheels (204) are coaxially fixed to both ends of the axle (203); A first turbine reduction box (205) which is connected to a worm gear in the middle of the axle (203); A first motor (206), an output end of which extends into the first turbine reduction box (205) for transmission connection; A screw lift (207) is spaced apart from the axle (203) in front and rear, and has a middle support (20701), wherein the middle support (20701) is fixed on the lower chord of the truss platform (201); A sliding shoe (208) fixed to the output end of the lower end of the lead screw lift (207); A connecting rod (209), one end of which is hinged to one side of the sliding shoe (206); An internal threaded sleeve (2010) hinged to the other end of the connecting rod (207); A second screw (2011), one end of which is threadedly connected to the internal threaded sleeve (10), and the other end of which is coaxially provided with a worm; A second turbine reduction box (2012) is connected to the worm gear at the other end of the second screw (2011); The second motor (2013) has an output end extending into the second turbine reduction box (2012) for transmission connection; An arc-shaped track (2014) on which the sliding shoe (208) is slidably mounted and which is mounted on the lower side of the second turbine reduction box (2012); The axle seat (202), the axle (203), the wheel (204), the first turbine reduction box (205) and the first motor (206) are arranged in parallel in multiple groups at intervals on the bottom surface of the truss platform (1); The screw lifts (207) are arranged in a row of two and are linked by a transmission rod, the transmission rod is driven by a third turbine reduction box (2015), the third turbine reduction box (2015) is arranged between the two screw lifts (207), the third turbine reduction box (2015) is transmission-connected to the output end of a third motor (2016), and the third motor (2016) is installed on the truss platform (201); The sliding shoe (208) comprises a shell (20801), in which two upper and lower rows of limiting rollers (20802) are installed, and the arc track (2014) is made of I-beams, and the two ends of the upper row of limiting rollers (20802) are respectively mounted on the two side walls of the shell (20801) and pressed against the upper flange of the arc track (2014); one end of the lower row of limiting rollers (20802) is mounted on the side wall of the shell (20801), and the other end faces the web of the arc track (2014), and the upper side of the lower row of limiting rollers (20802) presses against the lower side of the upper flange of the arc track (2014); The second turbine reduction box (2012) is transmission-connected to the second screw rods (2011) on both sides, and the transmission method is such that when the second screw rod (2011) on one side is retracted into the internal threaded sleeve (2010), the second screw rod (2011) on the other side is extended from the internal threaded sleeve (2010) on the other side; The screw lift (207), the sliding shoe (208), the connecting rod (209), the internal threaded sleeve (2010), the second screw (2011), the second turbine reducer (2012), the second motor (2013) and the arc track (2014) are arranged in groups, and every two groups are paired and distributed on the front and rear sides of the truss platform (201) in the form of concentric circles; The truss platform (201) comprises a plurality of rows of main trusses (301) arranged at intervals, and secondary trusses (302) arranged crosswise and vertically between adjacent main trusses (301).
6. The concrete plant assembly machine system according to claim 1 is characterized in that The lifting system (4) comprises: The intelligent master control box is connected to the main power line, and the power output line and the communication line are connected. The power output line is connected to the surrounding branch cable, and multiple extension power lines are configured on the surrounding branch cable, and multiple branch communication lines are configured on the communication line; Intelligent extension, which is connected to the extension power line and branch communication line, and connected to the hoist power line; Electric hoist, which is connected to the hoist power line and installed on the corbel; The gravity sensor is arranged on the hanging point of the electric hoist and is electrically connected to the intelligent extension.
7. The concrete plant assembly machine system according to claim 1 is characterized in that The intelligent master control box and the intelligent extension are also electrically connected with an alarm device.
Citation Information
Patent Citations
Supporting system for conical concrete roof of squat silo and mounting method of supporting system
CN112012389A
Curtain wall installation tool and method for roof steel structure cantilever
CN112814396A
Bulk grain horizontal warehouse construction method
CN118639913A
Restriction of inserted lift scaffold load and high heterochronous automatic control system
CN205000626U
Expandable gantry crane hoisting system layout of assembly type prefabricated field
CN211776196U
Cited By
Quick release platform for cast-in-place floor slab of high-speed rail station building
CN119711742A