Lattice column positioning device suitable for subway deep foundation pit in soft soil area

CN118933375AActive Publication Date: 2024-11-12NINGBO METRO GRP +2

Patent Information

Application Number
CN202411179927.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-12
Estimated Expiration
2044-08-27

AI Technical Summary

Technical Problem

In the construction of deep foundation pits in subways, the verticality and position deviation of the lattice columns are too large, resulting in safety hazards of the support structure. An accurate positioning device is needed to ensure the accuracy of the verticality of the lattice columns and the position of the center point. .

Method used

A positioning device including a lattice column body, a steel casing, a positioning adjustment platform, a guide positioning assembly and a support positioning assembly is designed. Through components such as cross positioning frame, axial positioning cylinder, a Y-shaped positioning rod and a adjustment positioning sleeve, Achieve accurate positioning and verticality control of lattice columns, and improve installation efficiency through batch mounting frames.

Benefits of technology

It realizes more precise positioning of lattice columns, reduces verticality deviation, improves construction safety, and greatly saves installation time and improves installation efficiency through batch mounting frames.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933375A_ABST
    Figure CN118933375A_ABST
Patent Text Reader

Abstract

The invention provides a latticed column positioning device suitable for a subway deep foundation pit in a soft soil area, and belongs to the technical field of building construction. Comprising a latticed column body, a steel casing arranged outside the latticed column body, a positioning adjusting platform arranged at the upper end of a subway foundation pit, a guiding positioning assembly arranged at the bottom end of the positioning adjusting platform and a supporting positioning assembly arranged between the steel casing and the latticed column body. The reference line of the position of the axis positioning barrel can be adjusted according to the positioning adjusting platform, then the axis positioning barrel is used for positioning the latticed column body, the perpendicularity of the latticed column body is guaranteed, the more accurate positioning effect is achieved, the interior of the latticed column body is positioned and supported through the axis positioning barrel and the Y-shaped positioning rod, and the positioning accuracy is improved. The position of the latticed column body is indirectly adjusted through the axis positioning barrel, it is guaranteed that the latticed column body, the axis positioning barrel and the subway foundation pit are kept coaxial, then the perpendicularity and axis positioning of the latticed column body are achieved, the perpendicularity deviation of the latticed column body is reduced, and construction safety is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular is a lattice column positioning device suitable for a subway deep foundation pit in a soft soil area. Background Art

[0002] Subway foundation pit refers to the underground space that needs to be excavated when building subway stations or other underground facilities. Due to the depth of subway foundation pit, support measures are generally required to prevent foundation pit collapse or damage to surrounding buildings. Common subway foundation pit support methods include steel sheet piles, concrete support, steel support, soil nail wall, grouting wall, etc. In addition, in order to ensure the safety and construction efficiency of subway foundation pit, foundation pit support design and foundation pit excavation plan design are also required.

[0003] Lattice columns are a commonly used vertical support structure for foundation pits and are also widely used in subway foundation pits. Lattice columns are composed of limbs and tie materials, and their main application forms include tie bar type, plate type and angle steel welding type.

[0004] As the bearing structure of the internal support system, the lattice column has excessive verticality and position deviation, which will inevitably cause eccentric compression of the lattice column components and cause safety hazards to the support structure. In order to ensure the verticality and accurate center point position of the lattice column, a lattice column positioning device for deep subway foundation pits is urgently needed during its installation. Summary of the invention

[0005] In view of the above-mentioned problems, the present invention provides a lattice column positioning device suitable for a subway deep foundation pit in a soft soil area.

[0006] The technical solution of the present invention is: a lattice column positioning device suitable for a subway deep foundation pit in a soft soil area, comprising a lattice column body, a steel casing arranged outside the lattice column body, a positioning adjustment platform arranged at the upper end of the subway foundation pit, a guide positioning component arranged at the bottom end of the positioning adjustment platform, and a support positioning component arranged between the steel casing and the lattice column body;

[0007] The guide positioning assembly includes a cross positioning frame arranged at the bottom end of the positioning and adjusting platform, an axis positioning cylinder arranged at the bottom end of the cross positioning frame and having its axis coincident with the center of the cross positioning frame, and a plurality of Y-shaped positioning rods arranged circumferentially on the outer wall of the axis positioning cylinder, the axis positioning cylinder is located inside the steel casing and connected to the inside of the steel casing through the Y-shaped positioning rods, one end of the Y-shaped positioning rod is connected to the outer wall of the axis positioning cylinder, and the other two ends are respectively connected to the inner walls of two gusset plates located at the same height and adjacently distributed on the lattice column body;

[0008] The support positioning assembly includes an adjustment positioning sleeve sleeved on the outer wall of the lattice column body, a positioning rod that crosses the outer wall of the steel casing and is connected to the adjustment positioning sleeve, the adjustment positioning sleeve includes positioning angle irons arranged at the four corners of the lattice column body, a positioning adjustment rod arranged between two adjacent positioning angle irons, and a fixed sleeve arranged on the outer wall of each positioning angle iron, the positioning adjustment rod includes two threaded sleeves on the side wall of the same positioning angle iron, and an adjustment threaded rod arranged between the two threaded sleeves corresponding to the side walls of two adjacent positioning angle irons, one end of the positioning rod is provided with an arc-shaped limit plate, and the other end crosses the outer wall of the steel casing and is threadedly connected to the fixed sleeve.

[0009] Furthermore, the positioning and adjustment platform includes two bottom-layer mounting bars which are arranged on the front and rear sides of the upper end of the subway foundation pit and have a first strip sliding groove along the length of the upper end, two middle-layer mounting bars which are slidably connected to the two first strip sliding grooves on the left and right sides through a first limiting sliding block and have a second strip sliding groove along the length of the upper end, and a top-layer mounting bar which is slidably connected to the two second strip sliding grooves on the left and right sides through a second limiting sliding block.

[0010] Description: When the positioning and adjustment platform is in use, its size can be adjusted according to the size of the subway foundation pit, and the guide positioning assembly can be installed at the lower end of the positioning and adjustment platform of the corresponding size to meet different usage requirements. At the same time, it is also used to adjust the reference line of the position of the axial positioning cylinder. The specific process is: according to the size of the pit opening at the upper end of the subway foundation pit, the two middle-layer mounting strips are pushed and the first limit sliding block at their bottom slides in the corresponding first strip sliding groove, so that the distance between the two middle-layer mounting strips is the same as the width of the left and right sides of the upper end of the subway foundation pit. Then, according to the width of the front and rear sides of the subway foundation pit, the two top-layer mounting strips are pushed and the second limit sliding block at their bottom slides in the corresponding second strip sliding groove, so that the distance between the two top-layer mounting strips is the same as the width of the front and rear sides of the subway foundation pit. After the adjustment is completed, the cross positioning frame can be installed between the two top-layer mounting strips, thereby ensuring the stable installation of the guide positioning assembly in subway foundation pits of various sizes, so as to realize the internal positioning of the lattice column body, and ensure the verticality of the lattice column body, so as to achieve a more precise positioning effect.

[0011] Furthermore, the first strip sliding groove and the first position-limiting sliding block, as well as the second strip sliding groove and the second position-limiting sliding block are connected via fixing bolts.

[0012] Note: When the two middle-layer mounting bars are adjusted to their positions on the bottom-layer mounting bars, and at the same time, the two top-layer mounting bars are adjusted to their positions on the middle-layer mounting bars, they are fixed by fixing bolts, which greatly increases the connection stability between the bottom-layer mounting bars and the middle-layer mounting bars, and between the middle-layer mounting bars and the top-layer mounting bars, improves the connection compactness between the various components inside the positioning and adjustment platform, and ensures that the mechanical properties of the positioning and adjustment platform meet the requirements.

[0013] Furthermore, it also includes a batch installation frame, which includes a central positioning sleeve with an annular adjustment groove circumferentially provided on the side wall, an annular rotating sleeve sleeved outside the annular adjustment groove, and a plurality of movable adjustment sleeves distributed circumferentially along the outer wall of the annular rotating sleeve and connected to the outer wall of the annular rotating sleeve through adjusting connecting rods, and the bottom end of the central positioning sleeve is connected to the positioning adjustment platform.

[0014] Description: When it is necessary to install the lattice column body and the positioning and adjusting platform in the subway foundation pit, the installation position of a lattice column body in the subway foundation pit is taken as the center position through the batch installation frame, and the center positioning sleeve is installed on the upper end of the subway foundation pit. Then, the annular rotating sleeve is rotated to rotate in the annular adjustment groove, and the movable adjustment sleeve is moved near the remaining installation positions in the subway foundation pit. Then, by changing the length of the adjusting connecting rod, each movable adjustment sleeve is moved to each installation position away from the center positioning sleeve. Then, the lattice column body is installed in batches in each movable adjustment sleeve and the center positioning sleeve to complete the internal positioning of each lattice column body, thereby realizing the batch installation of multiple lattice column bodies, which greatly saves the installation time and improves the installation efficiency.

[0015] Furthermore, the adjusting connecting rod includes a plurality of first mounting seats circumferentially arranged on the outer wall of the annular rotating sleeve, a second mounting seat arranged on the side wall of each movable adjusting sleeve and on the opposite side of the corresponding first mounting seat, an inserted connecting cross rod for connecting the relatively distributed second mounting seats and the first mounting seats, and a hydraulic cylinder arranged in the first mounting seat and the second mounting seat and respectively connected to the inserted connecting cross rod.

[0016] Description: When adjusting the distance between the movable adjustment sleeve and the center positioning sleeve by using the adjusting connecting rod, start the simultaneous compression and extension action of the hydraulic cylinder in the second mounting seat on the movable adjustment sleeve and the hydraulic cylinder of the first mounting seat directly opposite to the second mounting seat, and adjust the overall length of the adjusting connecting rod in turn, so as to meet the installation of the lattice column body at different positions in the subway foundation pit and improve the applicability of the batch installation frame.

[0017] Furthermore, the inserted connecting cross bar includes two sub-cross bars, and the two sub-cross bars are respectively plugged into the first mounting seat and the second mounting seat which are relatively distributed. The two sub-cross bars are connected by a mounting vertical cylinder, and a sliding clamping groove is provided on the side wall of the mounting vertical cylinder and close to the second mounting seat. The sub-cross bar connected to the second mounting seat is provided with an arc-shaped sliding block which is slidably connected to the sliding clamping groove, and the arc-shaped sliding block is connected to the sliding clamping groove by a fixing bolt.

[0018] Description: When it is necessary to install the lattice column body at different terrain heights in the subway foundation pit, push the sub-cross bar with the arc-shaped sliding block up and down so that the arc-shaped sliding block connected to its end slides up and down in the corresponding sliding slot, thereby achieving the purpose of adjusting the height of the movable adjustment sleeve, meeting the installation requirements of the lattice column body at different terrain heights in the subway foundation pit, and further improving the applicability of the batch installation frame.

[0019] Furthermore, an annular limiting bottom ring is provided at the bottom end of the mounting vertical cylinder, and a plurality of plug-in columns are evenly provided at the bottom end of the annular limiting bottom ring.

[0020] Description: When the vertical cylinder is installed in contact with the ground, the contact area between the vertical cylinder and the ground is increased by the annular limiting bottom ring. The plug-in column at the bottom end of the annular limiting bottom ring is used to provide multi-point grip. Through the setting of the above structure, the installation stability of the vertical cylinder is greatly improved.

[0021] Furthermore, among the multiple Y-shaped positioning rods, every four Y-shaped positioning rods form a group and are divided into an array, each group of Y-shaped positioning rods is evenly distributed from top to bottom, and each group of Y-shaped positioning rods is circumferentially arranged on the outer wall of the axial positioning tube.

[0022] Description: Each set of Y-shaped positioning rods can provide connecting support force between the axis positioning cylinder and the inner wall of the lattice column body, so that the axis positioning cylinder and the lattice column body are restrained from each other, thereby improving the installation stability of the axis positioning cylinder, thereby improving the accuracy of the vertical positioning of the lattice column body.

[0023] Furthermore, the three ends of the Y-shaped positioning rod are respectively formed by splicing a plurality of splicing rods end to end, and one end of each splicing rod is provided with a plurality of plug-in strips, and the other end is provided with a plug-in interface which corresponds to and is plugged into adjacent plug-in strips one by one.

[0024] Note: When it is necessary to provide connection support force between the axial positioning tube and the lattice column bodies of different sizes, it can be completed by adjusting the lengths of the three ends of the Y-shaped positioning rod. Specifically, one of the ends of the Y-shaped positioning rod is connected to the outer wall of the axial positioning tube, and the remaining two ends are connected to the plug-in interfaces on the adjacent splicing rods through the plug-in strips according to the length from the lattice column body to increase the length of the remaining two ends of the Y-shaped positioning rod to meet the usage requirements.

[0025] The present invention also discloses a method for using a lattice column positioning device, based on the above-mentioned lattice column positioning device suitable for a subway deep foundation pit in a soft soil area, comprising the following steps:

[0026] S1. The lattice column body is processed and manufactured in an off-site steel structure processing factory. Before the lattice column body is hoisted in the subway foundation pit, the lattice column body is welded to the center of the steel casing, and positioning angle irons are respectively installed from top to bottom at the four corners of the outer wall of the lattice column body, and the height of the threaded rod is adjusted according to the distance between two adjacent positioning angle irons at the same height. Then, the positioning rod is inserted through the outer wall of the steel casing and corresponding to the position of each positioning angle iron, and the steel casing and the lattice column body are positioned and installed through the positioning rod;

[0027] S2. Insert the lattice column body and the steel casing into the subway foundation pit by a crane, and temporarily fix the lattice column body by an external matrix, install a cross positioning frame in the positioning and adjustment platform, and fix the positioning and adjustment platform at the outer periphery of the upper end of the subway foundation pit, so that the center of the cross positioning frame, the center of the positioning and adjustment platform and the center of the subway foundation pit coincide with each other, and then connect the upper end of the axis positioning tube to the cross positioning frame, and extend the lower end into the subway foundation pit, and at the same time, make the axis of the axis positioning tube coincide with the center of the cross positioning frame;

[0028] S3. Remove the temporarily fixed external matrix, fine-tune the position of the lattice column body and install a Y-shaped positioning rod between the axis positioning cylinder and each gusset plate on the lattice column body, so that the axis of the lattice column body coincides with the axis of the axis positioning cylinder, and complete the positioning and installation of the lattice column body.

[0029] Compared with the prior art, the beneficial effects of the present invention are:

[0030] When the lattice column positioning device of the present invention is in use, the size of the positioning adjustment platform can be adjusted according to the size of the subway foundation pit, and the reference line of the position of the axial positioning cylinder can be adjusted according to the positioning adjustment platform. Then, the lattice column body is positioned by using the axial positioning cylinder to ensure the verticality of the lattice column body and achieve a more accurate positioning effect. The interior of the lattice column body is positioned and supported by the axial positioning cylinder and the Y-shaped positioning rod. The position of the lattice column body is indirectly adjusted by the axial positioning cylinder to ensure that the lattice column body, the axial positioning cylinder and the subway foundation pit maintain the same axis, thereby achieving the verticality and axis positioning of the lattice column body, reducing the verticality deviation of the lattice column body, and ensuring construction safety. The lattice column body and the steel casing are connected and positioned by adjusting the positioning sleeve and the positioning rod, so that the two are mutually restrained, thereby improving the installation stability and reliability of the axial positioning cylinder, thereby further improving the accuracy of the verticality positioning of the lattice column body; the batch installation frame can realize the batch installation of the lattice column body in the subway foundation pit, which greatly saves the installation time and improves the installation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0032] Figure 2It is a top view of the installation of the positioning and adjusting platform of the present invention;

[0033] Figure 3 It is a top view of the positioning and adjusting platform when the cross positioning frame of the present invention is installed;

[0034] Figure 4 is a top view of the positioning and adjusting platform when the cross positioning frame of the present invention is not installed;

[0035] Figure 5 is a top view of the adjustment and positioning sleeve of the present invention;

[0036] Figure 6 It is a structural schematic diagram of a Y-shaped positioning rod of the present invention;

[0037] Figure 7 is a top view of a batch mounting rack of the present invention;

[0038] Figure 8 is a structural schematic diagram of the adjusting connecting rod of the present invention;

[0039] Fig. 9 It is a schematic diagram of the connection between the sub-crossbar and the mounting vertical cylinder of the present invention.

[0040] Among them, 1-lattice column body, 2-steel casing, 3-positioning adjustment platform, 30-bottom layer installation strip, 300-first strip sliding groove, 31-middle layer installation strip, 310-first limit sliding block, 311-second strip sliding groove, 32-top layer installation strip, 320-second limit sliding block, 4-guide positioning assembly, 40-cross positioning frame, 41-axis positioning cylinder, 42-Y-type positioning rod, 420-splicing rod, 421-plug strip, 422-plug interface, 5-support positioning assembly, 50-adjustment positioning sleeve, 500-positioning angle iron, 501-positioning adjustment rod, 502-fixed sleeve, 503-threaded sleeve, 504-adjusting threaded rod, 51-positioning rod, 510-arc-shaped limit plate, 6-batch mounting frame, 60-center positioning sleeve, 600-annular adjustment groove, 61-annular rotating sleeve, 62-movable adjustment sleeve, 620-adjusting connecting rod, 621-first mounting seat, 622-second mounting seat, 623-inserting connecting cross bar, 6230-sub-cross bar, 6231-mounting vertical cylinder, 6232-sliding card slot, 6233-arc-shaped sliding block, 6234-annular limit bottom ring, 6235-plug-in column, 624-hydraulic cylinder. DETAILED DESCRIPTION

[0041] In order to further understand the content of the present invention, the present invention is described in detail by way of examples below.

[0042] Example 1

[0043] like Figure 1As shown, a lattice column positioning device suitable for a subway deep foundation pit in a soft soil area comprises a lattice column body 1, a steel casing 2 arranged outside the lattice column body 1, a positioning adjustment platform 3 arranged at the upper end of the subway foundation pit, a guide positioning component 4 arranged at the bottom end of the positioning adjustment platform 3, and a support positioning component 5 arranged between the steel casing 2 and the lattice column body 1;

[0044] like Figure 2 , 3 4, the guide positioning assembly 4 includes a cross positioning frame 40 arranged at the bottom end of the positioning and adjusting platform 3, an axis positioning cylinder 41 arranged at the bottom end of the cross positioning frame 40 and having its axis coincident with the center of the cross positioning frame 40, and 20 Y-shaped positioning rods 42 arranged on the outer wall of the axis positioning cylinder 41 along the circumferential direction. The axis positioning cylinder 41 is located inside the steel casing 2 and connected to the inside of the steel casing 2 through the Y-shaped positioning rods 42. One end of the Y-shaped positioning rod 42 is connected to the outer wall of the axis positioning cylinder 41, and the other two ends are respectively connected to the inner walls of two gusset plates 10 located at the same height and adjacently distributed on the lattice column body 1;

[0045] like Figure 5 As shown, the support positioning assembly 5 includes an adjustment positioning sleeve 50 sleeved on the outer wall of the lattice column body 1, a positioning rod 51 that crosses the outer wall of the steel casing 2 and is connected to the adjustment positioning sleeve 50, the adjustment positioning sleeve 50 includes positioning angle irons 500 arranged at the four corners of the lattice column body 1, a positioning adjustment rod 501 arranged between two adjacent positioning angle irons 500, and a fixing sleeve 502 arranged on the outer wall of each positioning angle iron 500, the positioning adjustment rod 501 includes two threaded sleeves 503 on the side wall of the same positioning angle iron 500, and an adjustment threaded rod 504 arranged between two threaded sleeves 503 corresponding to the side walls of two adjacent positioning angle irons 500, one end of the positioning rod 51 is provided with an arc-shaped limiting plate 510, and the other end crosses the outer wall of the steel casing 2 and is threadedly connected to the fixing sleeve 502;

[0046] The positioning and adjusting platform 3 includes two bottom-layer mounting bars 30 arranged at the front and rear sides of the upper end of the subway foundation pit and having a first strip sliding groove 300 along the length of the upper end, two middle-layer mounting bars 31 respectively connected to the two first strip sliding grooves 300 by a first limiting sliding block 310 on the left and right sides and having a second strip sliding groove 311 along the length of the upper end, and a top-layer mounting bar 32 respectively connected to the two second strip sliding grooves 311 by a second limiting sliding block 320 on the left and right sides;

[0047] The first strip sliding groove 300 and the first position-limiting sliding block 310 as well as the second strip sliding groove 311 and the second position-limiting sliding block 320 are connected by fixing bolts;

[0048] Among the 20 Y-shaped positioning rods 42 , every four Y-shaped positioning rods 42 form a group and are divided into an array. Each group of Y-shaped positioning rods 42 is evenly distributed from top to bottom, and each group of Y-shaped positioning rods 42 is circumferentially arranged on the outer wall of the axial positioning tube 41 .

[0049] Example 2

[0050] This embodiment discloses a lattice column positioning method, based on a lattice column positioning device suitable for a subway deep foundation pit in a soft soil area in Embodiment 1, comprising the following steps:

[0051] S1. The lattice column body 1 is processed and manufactured in an off-site steel structure processing factory. Before the lattice column body 1 is suspended in the subway foundation pit, the lattice column body 1 is welded to the center of the steel casing 2, and positioning angle irons 500 are respectively installed from top to bottom at the four corners of the outer wall of the lattice column body 1, and the height of the threaded rod 504 is adjusted according to the distance between two adjacent positioning angle irons 500 at the same height. Then, the positioning rod 51 is inserted through the outer wall of the steel casing 2 and at the position corresponding to each positioning angle iron 500, and the steel casing 2 and the lattice column body 1 are positioned and installed through the positioning rod 51;

[0052] S2, insert the lattice column body 1 and the steel casing 2 into the subway foundation pit by a crane, and temporarily fix the lattice column body 1 by an external matrix, install the cross positioning frame 40 in the positioning and adjusting platform 3, fix the positioning and adjusting platform 3 at the outer periphery of the upper end of the subway foundation pit, so that the center of the cross positioning frame 40, the center of the positioning and adjusting platform 3 and the center of the subway foundation pit coincide with each other, then connect the upper end of the axis positioning cylinder 41 to the cross positioning frame 40, and extend the lower end into the subway foundation pit, and at the same time, make the axis of the axis positioning cylinder 41 coincide with the center of the cross positioning frame 40;

[0053] S3, remove the temporarily fixed external matrix, fine-tune the position of the lattice column body 1 and install a Y-shaped positioning rod 42 between the axis positioning cylinder 41 and each gusset plate 10 on the lattice column body 1, so that the axis of the lattice column body 1 coincides with the axis of the axis positioning cylinder 41, and complete the positioning and installation of the lattice column body 1;

[0054] S4. When the positioning and adjusting platform 3 is in use, according to the size of the pit opening at the upper end of the subway foundation pit, the two middle-layer mounting bars 31 are pushed and the first limiting sliding block 310 at the bottom thereof slides in the corresponding first strip sliding groove 300, so that the distance between the two middle-layer mounting bars 31 is the same as the width of the left and right sides of the upper end of the subway foundation pit. Then, according to the width of the front and rear sides of the subway foundation pit, the two top-layer mounting bars 32 are pushed and the second limiting sliding block 320 at the bottom thereof slides in the corresponding second strip sliding groove 311, so that the distance between the two top-layer mounting bars 32 is the same as the width of the front and rear sides of the subway foundation pit. After the adjustment is completed, the cross positioning frame 40 can be installed between the two top-layer mounting bars 32.

[0055] Example 3

[0056] The difference between this embodiment and embodiment 1 is that:

[0057] like Figure 7 , 8 9, it also includes a batch mounting frame 6, the batch mounting frame 6 includes a central positioning sleeve 60 with a circular adjustment groove 600 provided in the circumferential direction of the side wall, an annular rotating sleeve 61 sleeved outside the annular adjustment groove 600, and four movable adjustment sleeves 62 distributed in the circumferential direction along the outer wall of the annular rotating sleeve 61 and connected to the outer wall of the annular rotating sleeve 61 through an adjustment connecting rod 620, and the bottom end of the central positioning sleeve 60 is connected to the positioning adjustment platform 3;

[0058] The adjusting connecting rod 620 includes four first mounting seats 621 arranged on the outer wall of the annular rotating sleeve 61 along the circumferential direction, a second mounting seat 622 arranged on the side wall of each movable adjusting sleeve 62 and opposite to the corresponding first mounting seat 621, an insert connecting cross bar 623 for connecting the relatively distributed second mounting seats 622 and the first mounting seats 621, and a hydraulic cylinder 624 arranged in the first mounting seat 621 and the second mounting seat 622 and connected to the insert connecting cross bar 623 respectively;

[0059] The insertion connection cross bar 623 includes two sub-cross bars 6230, which are respectively plugged into the first mounting seat 621 and the second mounting seat 622 that are relatively distributed. The two sub-cross bars 6230 are connected by a mounting vertical cylinder 6231, and a sliding clamping groove 6232 is provided on the side wall of the mounting vertical cylinder 6231 and the side wall close to the second mounting seat 622. The sub-cross bar 6230 connected to the second mounting seat 622 is provided with an arc-shaped sliding block 6233 that is slidably connected to the sliding clamping groove 6232, and the arc-shaped sliding block 6233 is connected to the sliding clamping groove 6232 by fixing bolts.

[0060] An annular limiting bottom ring 6234 is provided at the bottom end of the installation vertical cylinder 6231, and 10 plug-in columns 6235 are evenly arranged at the bottom end of the annular limiting bottom ring 6234, wherein the hydraulic cylinder 624 adopts the existing technology.

[0061] Example 4

[0062] The difference between this embodiment and embodiment 2 is that:

[0063] When it is necessary to simultaneously install the lattice column body 1 and the positioning and adjusting platform 3 in the subway foundation pit, the installation position of a lattice column body 1 in the subway foundation pit is taken as the central position through the batch installation frame 6, and the central positioning sleeve 60 is installed at the upper end of the subway foundation pit, and then the annular rotating sleeve 61 is rotated to rotate in the annular adjustment groove 600, and the movable adjustment sleeve 62 is moved near the remaining installation positions in the subway foundation pit, and then, by changing the length of the adjusting connecting rod 620, each movable adjustment sleeve 62 is moved to each installation position away from the central positioning sleeve 60, and then, the lattice column body 1 is installed at each movable adjustment sleeve 62 and the central positioning sleeve 60, and the internal positioning of each lattice column body 1 is completed, so as to realize the batch installation of multiple lattice column bodies 1;

[0064] When the distance between the movable adjustment sleeve 62 and the central positioning sleeve 60 is adjusted by using the adjusting connecting rod 620, the hydraulic cylinder 624 in the second mounting seat 622 on the movable adjustment sleeve 62 and the hydraulic cylinder 624 of the first mounting seat 621 directly facing the second mounting seat 622 are activated to compress and extend at the same time, and the overall length of the adjusting connecting rod 620 is adjusted in turn, so as to meet the requirements of the installation of the lattice column body 1 and the positioning adjustment platform 3 in the subway foundation pit at different positions;

[0065] When it is necessary to install the lattice column body 1 at different terrain heights in the subway foundation pit, the sub-crossbar 6230 provided with the arc-shaped sliding block 6233 is pushed up and down, so that the arc-shaped sliding block 6233 connected to its end slides up and down in the corresponding sliding clamping groove 6232, thereby achieving the purpose of adjusting the height of the movable adjustment sleeve 62, and meeting the installation requirements of the lattice column body 1 at different terrain heights in the subway foundation pit;

[0066] When the installation column 6231 contacts the ground, the contact area between the installation column 6231 and the ground is increased by the annular limiting bottom ring 6234. The plug-in column 6235 at the bottom end of the annular limiting bottom ring 6234 is used to provide multi-point grip.

[0067] Example 5

[0068] The difference between this embodiment and embodiment 3 is that:

[0069] like Figure 6 As shown, the three ends of the Y-shaped positioning rod 42 are respectively formed by eight splicing rods 420 spliced ​​end to end, and one end of each splicing rod 420 is provided with eight plug-in strips 421, and the other end is provided with a plug-in interface 422 that corresponds to and is plugged into adjacent plug-in strips 421 one by one.

[0070] Example 6

[0071] The difference between this embodiment and embodiment 4 is that:

[0072] When it is necessary to provide a connecting support force between the axial positioning tube 41 and the lattice column body 1 of different sizes, it can be completed by adjusting the length of the three ends of the Y-shaped positioning rod 42. Specifically, one of the ends of the Y-shaped positioning rod 42 is connected to the outer wall of the axial positioning tube 41, and the remaining two ends are connected to the plug-in interface 422 on the adjacent splicing rod 420 through the plug-in strip 421 according to the length from the lattice column body 1, thereby increasing the length of the remaining two ends of the Y-shaped positioning rod 42 to meet the usage requirements.

Claims

1. A lattice column positioning device suitable for deep foundation pits of subways in soft soil areas, characterized in that: It comprises a lattice column body (1), a steel casing (2) arranged outside the lattice column body (1), a positioning and adjusting platform (3) arranged at the upper end of a subway foundation pit, a guiding and positioning component (4) arranged at the bottom end of the positioning and adjusting platform (3), and a supporting and positioning component (5) arranged between the steel casing (2) and the lattice column body (1); The guide positioning assembly (4) comprises a cross positioning frame (40) arranged at the bottom end of the positioning adjustment platform (3), an axial positioning cylinder (41) arranged at the bottom end of the cross positioning frame (40) and having its axis coincident with the center of the cross positioning frame (40), and a plurality of Y-shaped positioning rods (42) arranged along the circumferential direction on the outer wall of the axial positioning cylinder (41), the axial positioning cylinder (41) being located inside the steel casing (2) and connected to the inside of the steel casing (2) through the Y-shaped positioning rods (42), one end of the Y-shaped positioning rod (42) being connected to the outer wall of the axial positioning cylinder (41), and the other two ends being respectively connected to the inner walls of two adjacently arranged gusset plates (10) on the lattice column body (1) at the same height. The support positioning assembly (5) comprises an adjustment positioning sleeve (50) sleeved on the outer wall of the lattice column body (1), a positioning rod (51) that crosses the outer wall of the steel casing (2) and is connected to the adjustment positioning sleeve (50); the adjustment positioning sleeve (50) comprises positioning angle irons (500) arranged at the four corners of the lattice column body (1), a positioning adjustment rod (501) arranged between two adjacent positioning angle irons (500), and a fixing sleeve (502) arranged on the outer wall of each positioning angle iron (500); the positioning adjustment rod (501) comprises two threaded sleeves (503) on the side wall of the same positioning angle iron (500), and an adjustment threaded rod (504) arranged between two threaded sleeves (503) corresponding to the side walls of two adjacent positioning angle irons (500); one end of the positioning rod (51) is provided with an arc-shaped limit plate (510), and the other end crosses the outer wall of the steel casing (2) and is threadedly connected to the fixing sleeve (502).

2. The lattice column positioning device suitable for subway deep foundation pits in soft soil areas according to claim 1 is characterized in that: The positioning and adjusting platform (3) comprises two bottom-layer mounting bars (30) arranged at the front and rear sides of the upper end of the subway foundation pit and having a first strip-shaped sliding groove (300) arranged along the length of the upper end, two middle-layer mounting bars (31) respectively connected to the two first strip-shaped sliding grooves (300) in a sliding manner on the left and right sides through a first limiting sliding block (310) and having a second strip-shaped sliding groove (311) arranged along the length of the upper end, and a top-layer mounting bar (32) respectively connected to the two second strip-shaped sliding grooves (311) in a sliding manner on the left and right sides through a second limiting sliding block (320).

3. The lattice column positioning device suitable for subway deep foundation pits in soft soil areas according to claim 2 is characterized in that: The first strip-shaped sliding groove (300) and the first position-limiting sliding block (310) as well as the second strip-shaped sliding groove (311) and the second position-limiting sliding block (320) are both connected via fixing bolts.

4. The lattice column positioning device suitable for subway deep foundation pits in soft soil areas according to claim 1 is characterized in that: The batch mounting frame (6) further comprises a central positioning sleeve (60) having a side wall provided with an annular adjustment groove (600) in the circumferential direction, an annular rotating sleeve (61) sleeved outside the annular adjustment groove (600), and a plurality of movable adjustment sleeves (62) distributed in the circumferential direction along the outer wall of the annular rotating sleeve (61) and connected to the outer wall of the annular rotating sleeve (61) via an adjustment connecting rod (620), and the central positioning sleeve (60) is connected to the positioning adjustment platform (3).

5. The lattice column positioning device suitable for subway deep foundation pits in soft soil areas according to claim 4, characterized in that: The adjusting connecting rod (620) comprises a plurality of first mounting seats (621) circumferentially arranged on the outer wall of the annular rotating sleeve (61), a second mounting seat (622) arranged on the side wall of each movable adjusting sleeve (62) and on the opposite side of the corresponding first mounting seat (621), an insert connecting cross bar (623) for connecting the relatively distributed second mounting seats (622) and the first mounting seats (621), and a hydraulic cylinder (624) arranged in the first mounting seat (621) and the second mounting seat (622) and connected to the insert connecting cross bar (623) respectively.

6. The lattice column positioning device suitable for subway deep foundation pits in soft soil areas according to claim 4, characterized in that: The inserted connecting cross bar (623) includes two sub-cross bars (6230), and the two sub-cross bars (6230) are respectively plugged into the first mounting seat (621) and the second mounting seat (622) which are relatively distributed. The two sub-cross bars (6230) are connected by a mounting vertical cylinder (6231), and a sliding clamping groove (6232) is provided on the side wall of the mounting vertical cylinder (6231) and the side wall close to the second mounting seat (622). The sub-cross bar (6230) connected to the second mounting seat (622) is provided with an arc-shaped sliding block (6233) which is slidably connected to the sliding clamping groove (6232), and the arc-shaped sliding block (6233) is connected to the sliding clamping groove (6232) by a fixing bolt.

7. The lattice column positioning device suitable for subway deep foundation pits in soft soil areas according to claim 6, characterized in that: An annular limiting bottom ring (6234) is provided at the bottom end of the installation vertical cylinder (6231), and a plurality of plug-in columns (6235) are evenly provided at the bottom end of the annular limiting bottom ring (6234).

8. The lattice column positioning device suitable for subway deep foundation pits in soft soil areas according to claim 1, characterized in that: Among the plurality of Y-shaped positioning rods (42), each group of four Y-shaped positioning rods (42) is divided into an array, each group of Y-shaped positioning rods (42) is evenly distributed from top to bottom, and each group of Y-shaped positioning rods (42) is circumferentially arranged on the outer wall of the axial positioning cylinder (41).

9. The lattice column positioning device suitable for subway deep foundation pits in soft soil areas according to claim 1, characterized in that: The three ends of the Y-shaped positioning rod (42) are respectively formed by splicing a plurality of splicing rods (420) end to end, and each splicing rod (420) is provided with a plurality of plug-in strips (421) at one end, and a plug-in interface (422) corresponding to and plugged into adjacent plug-in strips (421) at the other end.

Citation Information

Patent Citations

  • Auxiliary system for positioning and mounting latticed column and construction method of auxiliary system

    CN116537192A

  • Mounting and positioning device for latticed column in deep foundation pit engineering

    CN215331599U

  • Erection and adjustment device for structural center column

    JP1996209718A

  • Corner angle brace strut erecting device for slide type strut timbering

    JP2002081069A

  • Column base hardware and column base structure using the same

    JP2015048575A

Cited By

  • Positioning guide frame for vertical supporting latticed column of deep foundation pit

    CN119686338A

  • Positioning and guiding frame for deep foundation vertical support lattice column

    CN119686338B