Shield segment through seam assembling method
By calculating the stroke difference of propulsion cylinder and shield tail clearance, selecting wedge-shaped pipe segment rings and installing through the joints, the problems of low tunnel expansion construction efficiency and pipe segment damage in the existing technology are solved, and continuous and efficient construction of tunnel boreholes is achieved and good molding quality.
Patent Information
- Application Number
- CN202411130727.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-12
AI Technical Summary
The existing shield pipe sheet assembly method is difficult to continuously remove pipe sheets in the construction environment, resulting in low efficiency of tunnel expansion and excavation, and prone to problems such as pipe sheet damage, leakage and shield tail brush damage, affecting the quality of tunnel forming.
The shield pipe sheet is used to calculate the stroke difference of the propulsion cylinder and the shield tail clearance, reserve assembly space, select wedge-shaped pipe sheet rings, and install wedge-shaped pipe sheet rings in sequence along the tunnel design line to ensure the propulsion cylinder The matching of stroke and shield tail clearance prevents squeezing and friction, and the use of steel pipe pieces is easy to remove to meet the installation size of the switch machine.
Continuous and efficient construction of tunnel boreholes is achieved, the quality of tunnel forming is ensured, the pipe segment cracking and shield tail brush damage is avoided, and construction safety and finished product quality are improved.
Smart Images

Figure CN118933853A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of shield tunnel segment assembly, and in particular to a method for through-seam assembly of shield tunnel segments. Background Art
[0002] With the large-scale development of urban underground space, super-large shield tunnels have become an important part of modern urban transportation construction. Super-large shield tunnels often use single-hole double-line to achieve the interaction between the main line and the parking line. The line interaction is achieved through the switch installed in the tunnel. However, in the actual construction environment, the diameter of some tunnel sections is small and cannot meet the size and space requirements for the installation of the switch, so the section of the tunnel must be expanded. Before the expansion, multiple segments located at the same circumferential position of multiple segment rings must be removed, and then the section can be expanded to achieve the purpose of expanding the tunnel section to meet the installation size of the switch.
[0003] Since multiple segments of multiple segment rings need to be removed continuously, the commonly used segment staggered assembly method can no longer meet the segment removal needs. This is because after the segment staggered assembly, after the segments of the previous segment ring are removed, the segments in the same circumferential direction of the next segment ring will be blocked by the end faces of the previous segment ring, and the purpose of continuous segment removal cannot be achieved, which greatly reduces the efficiency of segment removal and thus affects the progress of excavation expansion. Therefore, in order to achieve the purpose of continuous segment removal, the segment through-seam assembly method needs to be adopted. When the segments are through-seam assembled, the end faces of each segment along the tunnel direction are in the same straight line. After removing any ring of segments, the end faces of the ring seams of the segments of the adjacent rings are unobstructed, which is convenient for segment removal and thus convenient for excavation expansion of the tunnel section.
[0004] However, the segment assembly method is not conducive to the control of the thrust cylinder stroke, shield tail gap and tunnel forming quality of the shield machine. When the shield machine is advancing, it is very easy for the segments to be closely attached to the shield body, the segments to be damaged, and the segments to leak. Therefore, a segment assembly method that is easy to construct and has good tunnel forming quality is urgently needed to solve the above problems.
[0005] The information disclosed in this background technology section is only used to deepen the understanding of the background technology of the present disclosure, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art known to those skilled in the art. Summary of the invention
[0006] In view of the above problems, a method for assembling shield segments through the seams is provided, which can prevent the segments from cracking and avoid extrusion and friction between the shield tail and the segments that may cause segment breakage, leakage, misalignment and damage to the shield tail brush, thereby achieving continuous and efficient tunnel excavation, a safe and controllable process, and good quality of the formed tunnel.
[0007] Specifically, the present application provides a method for assembling shield segments through seams, comprising the following steps: (1) Determine the segment assembly position before the segment through-seam assembly, calculate the thrust cylinder stroke difference and shield tail gap at the corresponding assembly position during the segment through-seam assembly, and reserve the segment through-seam assembly space according to the thrust cylinder stroke difference and shield tail gap; (2) Select the wedge-shaped segment ring and determine the assembly position of the capping segment of the wedge-shaped segment ring according to the tunnel design line, thrust cylinder stroke and shield tail gap; (3) Assemble the segments of the wedge-shaped segment ring symmetrically from the bottom of the tunnel section to both sides along the circumference of the tunnel section, wherein the two adjacent segments located at the corresponding switch machine installation position of the tunnel section are steel segments; (4) Install the wedge-shaped segment ring in sequence along the tunnel design line direction.
[0008] Optionally, the total stroke difference between the outer thrust cylinder and the inner thrust cylinder is L=W×α+∑Δ; wherein W is the working face width of the shield machine, α is the turning arc of the shield machine, and ∑Δ is the sum of the wedge amounts of each wedge-shaped segment ring when the shield machine turns through an arc of α.
[0009] Optionally, in step (2), when selecting the wedge-shaped segment ring, the deflection angle of the wedge-shaped segment ring satisfies: θ=2arctgσ / D; wherein σ is half of the wedge amount of the wedge-shaped segment ring, and D is the outer diameter of the wedge-shaped segment ring.
[0010] Optionally, in step (2), the wedge amount of the wedge segment ring is Δ=D×B / R min ; Where D is the outer diameter of the wedge-shaped segment ring, B is the width of the wedge-shaped segment ring, and R min Minimum curve radius for tunnel design alignment.
[0011] Optionally, in step (1), the segment assembly position is determined by the distance of 7 to 10 segment rings before the segment is assembled through the seams.
[0012] Optionally, the steel pipe segment is formed by connecting a plurality of sub-segments by bolts.
[0013] Optionally, the inner curved surface of the steel pipe segment is connected with a curved steel plate through bolts for correspondingly fitting and adsorbing with a suction cup of an assembling machine, and the curved steel plate has the same curvature as that of the steel pipe segment.
[0014] Optionally, each of the propulsion cylinders abuts against a corresponding longitudinal seam of the wedge-shaped segment ring.
[0015] Optionally, adjacent segments of the wedge-shaped segment ring are connected by annular connecting bolts; all the annular connecting bolts on the wedge-shaped segment ring are retightened once after the assembly of the ring segments is completed; and after each set distance of assembly forward along the designed line of the tunnel, all the annular connecting bolts on all the wedge-shaped segment rings are retightened again, and the retightening shall be performed at least 3 times.
[0016] Optionally, a sealing gasket and a water-swellable rubber water stop strip adhered to the outer surface of the sealing gasket are provided at the assembly position of the steel pipe segment and the adjacent pipe segment; the sealing gasket is a composite EPDM rubber member; Putty sheets are pasted at the corner positions of the water-swelling rubber waterstop strips; and two layers of nitrile cork pads are arranged at the annular seams between adjacent steel pipe segments.
[0017] In the shield segment through-seam assembly method of the present application, firstly, by determining the segment assembly position before the segment through-seam assembly, calculating and determining the thrust cylinder stroke difference and the shield tail gap, and reserving the segment through-seam assembly space, not only the thrust cylinder stroke is easy to control during the segment through-seam assembly, avoiding a large difference in the oil pressure of the thrust cylinder, and preventing the segment from cracking, but also the extrusion friction between the shield tail and the segment can be avoided, and the segment breakage, leakage, misalignment and shield tail brush damage can be avoided. Secondly, by selecting the segment and determining the assembly position of the capping segment, the requirements of the tunnel design line, thrust cylinder stroke and shield tail gap can be met, thereby ensuring the normal construction of the tunnel and the quality of the formed tunnel. Finally, due to the through-seam assembly of the steel segment, it is convenient for the subsequent removal of the steel segment, and then it is convenient to expand the tunnel section to meet the installation size of the switch machine. Therefore, the shield segment through-seam assembly method of the present application can achieve continuous and efficient tunnel excavation, safe and controllable process, and good quality of the formed tunnel.
[0018] Based on the detailed description of the specific embodiments of the present application in combination with the accompanying drawings below, those skilled in the art will become more aware of the above and other objects, advantages and features of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a flow chart of the shield segment through-seam assembly method in an embodiment of the present application.
[0020] Figure 2 This is a schematic structural diagram of the shield machine during excavation in an embodiment of the present application.
[0021] Figure 3 Schematic diagram of the calculation of the wedge amount of the wedge-shaped segment ring in the embodiment of the present application.
[0022] Figure 4 It is a schematic structural diagram of the assembly of wedge-shaped segment rings in an embodiment of the present application.
[0023] Figure 5 It is a schematic structural diagram of the wedge-shaped segment ring in an embodiment of the present application.
[0024] Figure 6 This is a schematic structural diagram of a wedge-shaped segment ring in another embodiment of the present application.
[0025] Figure 7 This is a schematic structural diagram of the steel pipe segment in the embodiment of the present application.
[0026] Figure 8 This is a schematic structural diagram of a steel pipe segment in another embodiment of the present application.
[0027] Fig. 9 It is a schematic structural diagram of the steel pipe segment and the curved steel plate in the embodiment of the present application.
[0028] In the above figures, 100 is a shield machine, 110 is a thrust cylinder, 200 is a wedge-shaped segment ring, 210 is a steel segment, 211 is a sub-segment, and 300 is an arc-shaped steel plate. DETAILED DESCRIPTION
[0029] In the description of this application, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", "vertical", "horizontal", "clockwise", "counterclockwise", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing this application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on this application. The "connection" and "coupling" involved in this application, unless otherwise specified, include direct and indirect connections (couplings).
[0030] Figure 1 Flow chart of the shield segment through-seam assembly method in the embodiment of the present application, as shown in FIG. Figure 1 As shown, and refer to Figures 2 to 9 The present application embodiment provides a method for assembling shield segments through seams, comprising the following steps: S1. Determine the segment assembly position before the segment through-seam assembly, calculate the stroke difference of the propulsion cylinder 110 and the shield tail clearance at the corresponding assembly position during the segment through-seam assembly, and reserve the segment through-seam assembly space according to the stroke difference of the propulsion cylinder 110 and the shield tail clearance; S2, selecting the wedge-shaped segment ring 200 and determining the assembly position of the capping segment of the wedge-shaped segment ring 200 according to the tunnel design route, the stroke of the propulsion cylinder 110 and the shield tail gap; S3, symmetrically assembling the segments of the wedge-shaped segment ring 200 from the bottom of the tunnel section along the circumference of the tunnel section to both sides, wherein the two adjacent segments located at the tunnel section corresponding to the switch installation position are steel segments; S4. Install the wedge-shaped segment rings 200 in sequence along the designed tunnel route.
[0031] In the embodiment of the present application, the tunnel adopts wedge-shaped segment ring 200 for through-seam assembly. The ring widths of the wedge-shaped segment ring 200 are different at different locations. The difference between the maximum ring width and the minimum ring width is the wedge amount of the wedge-shaped segment ring 200. When the wedge-shaped segment ring 200 is assembled, the assembly point refers to the position of the capping segment (i.e., the F-block segment). The F-block segment is at the position with the minimum ring width, and the segment on the opposite side of the F-block segment is at the position with the maximum ring width. Since through-seam assembly is adopted between the wedge-shaped segment rings 200, the installation position of the F-block segment is fixed at the same assembly point, so that the sum of the ring widths at this position becomes smaller and smaller. In order to tighten the segment at this position, the stroke of the propulsion cylinder 110 at this position will continue to increase. On the contrary, the stroke of the propulsion cylinder 110 on the opposite side of this position will continue to decrease, resulting in a gradual increase in the stroke difference of the propulsion cylinders 110 at the two positions, which in turn makes the oil pressure of the propulsion cylinder 110 differ greatly, causing the segment to crack. Moreover, since the installation position of the F-block segment is fixed at the same assembly point, the shield tail gap at this location will continue to decrease. If the shield gap is too small, it will cause extrusion and friction between the shield tail and the segment, causing the outer arc surface of the segment to break or the segment to deform, which will lead to segment damage, leakage, misalignment and damage to the shield tail brush.
[0032] In order to avoid the above situation, in the embodiment of the present application, if the stroke of the propulsion cylinder 110 at any segment position is short, the F segment is selected to be installed at the position, which can extend the stroke of the propulsion cylinder 110 and thus supplement the stroke of the propulsion cylinder 110 at the position. On the contrary, if the stroke of the propulsion cylinder 110 at any segment position is long, the F segment is selected to be installed at the opposite side position, which can supplement the stroke of the propulsion cylinder 110 at the opposite side position, and thus reduce the stroke difference of the propulsion cylinders 110 on both sides. Similarly, if the shield tail gap at any position is large, the F segment is selected to be installed at the position, and the segment ring will move closer to the shield tail at the position, which can reduce the shield tail gap at the position and increase the shield tail gap on the opposite side. On the contrary, if the shield tail gap at any position is small, the F segment is selected to be installed at the opposite side position, and the segment ring will move closer to the shield tail at the opposite side position, which can increase the shield tail gap at the position and reduce the shield tail gap on the opposite side.
[0033] In S2 of this embodiment, the segment selection should be adapted to the tunnel design line, the shield machine posture (shield tail gap) and the stroke of the thrust cylinder, and the three complement each other. When adapting to the stroke of the thrust cylinder, the length of the thrust cylinder and the linear advance of the tunnel should be considered. In S3 of this embodiment, the two adjacent segments at the tunnel section corresponding to the switch installation position are steel segments 210, and through-seam assembly is adopted, that is, the end faces of each steel segment 210 along the tunnel direction are in the same straight line. After only two steel segments 210 of any ring are removed, the end faces of the steel segments 210 at the ring seams of the adjacent rings are unobstructed, which is convenient for the removal of the steel segments 210, and then it is convenient to expand the tunnel section to install the switch, reducing the unsafe factors caused by the removal of the concrete segments with larger size, thicker segments and heavier weight. Concrete segments can be used for the remaining positions that do not need to be removed as permanent supports for the tunnel, and concrete segments have the advantages of strong compressive bearing capacity, prefabrication and low cost.
[0034] In the shield segment through-seam assembly method of the embodiment of the present application, first, by determining the segment assembly position before the segment through-seam assembly, calculating and determining the stroke difference of the thrust cylinder 110 and the shield tail gap, and reserving the segment through-seam assembly space, not only the stroke of the thrust cylinder 110 is easy to control during the segment through-seam assembly, avoiding a large difference in the oil pressure of the thrust cylinder 110 and preventing the segment from cracking, but also avoiding extrusion and friction between the shield tail and the segment, avoiding segment breakage, leakage, misalignment and shield tail brush damage. Secondly, by selecting the segment and determining the assembly position of the capping segment, the requirements of the tunnel design line, the stroke of the thrust cylinder 110 and the shield tail gap can be met, thereby ensuring the normal construction of the tunnel and the quality of the formed tunnel. Finally, due to the through-seam assembly of the steel segment 210, it is convenient for the subsequent removal of the steel segment 210, and then it is convenient to expand the tunnel section to meet the installation size of the switch machine. Therefore, the shield segment through-seam assembly method of the present application can achieve continuous and efficient tunnel excavation, a safe and controllable process, and good quality of the formed tunnel.
[0035] In some embodiments of the present application, the segment assembly position is determined by the distance of 7 to 10 segment rings before the segment through-seam assembly in S1, and of course the distance can be adjusted according to actual needs. In S2, the segment selection and assembly position of the capping segment are determined by the length of 7 to 10 segment rings in advance, so as to reserve space in advance for the subsequent continuous through-seam assembly of steel segments 210.
[0036] In some embodiments of the present application, after the steel segments 210 are assembled through the seams, a switch needs to be installed in the tunnel to meet the line exchange requirements, and the existing tunnel section size cannot meet the installation size requirements of the switch, so the tunnel section needs to be expanded. Specifically, the freezing method is often used to reinforce the soil outside the segment ring, and then multiple steel segments 210 are continuously removed, and then the tunnel section can be expanded at the removed position by dark excavation. After the dark excavation is completed, the primary support and secondary lining structures are constructed and connected to the existing tunnel concrete segments to achieve the purpose of expanding the tunnel section to meet the installation size of the switch.
[0037] In some embodiments of the present application, three switch machines are designed in the tunnel, and the segment rings are installed through the seams only at the three switch machine locations, and staggered installation is used at the remaining tunnel locations. The maximum length of the switch machine is about 20m, and the three switch machines are respectively installed at the 5th to 11th segment rings (7 rings in total), the 21st to 27th segment rings (7 rings in total), and the 45th to 54th segment rings (10 rings in total). Steel segments 210 are installed continuously through the seams at the switch machine locations. The tunnel excavation diameter is 14.31m, and the minimum turning radius is 900m. The inner diameter of the segment ring is 12.6m, the outer diameter is 13.8m, the thickness is 0.6m, and the ring width is 2m.
[0038] In some embodiments of the present application, Figure 2 As shown, when the shield machine 100 is turning, the propulsion cylinder 110 located inside the tunnel is the inner propulsion cylinder 110, and the propulsion cylinder 110 located outside the tunnel is the outer propulsion cylinder 110. The total stroke difference between the outer propulsion cylinder 110 and the inner propulsion cylinder 110 can be calculated by the following steps: (1) Determine the turning radius of the shield machine 100 (i.e., the radius of the inner side of the shield machine 100 or the radius of the inner thrust cylinder 110), which is represented by R; determine the turning angle of the shield machine 100, which is represented by α (radians); determine the strokes of the inner thrust cylinder 110 and the outer thrust cylinder 110 caused by the shield body of the shield machine 100 during the turning process, which are represented by d in and d out ; (2) Stroke d of the inner thrust cylinder 110 in =R×α, the stroke d of the outer thrust cylinder 110 out = (R + W) × α; wherein W represents the working face distance of the shield machine 100 (i.e., the diameter of the shield machine 100); (3) Calculate the travel difference of the thrust cylinder 110 caused by the turning of the shield machine 100, that is, d = d out -d in =W×α; where d represents the travel difference caused by the shield machine 100 during the turning process; (4) The total stroke difference between the outer thrust cylinder 110 and the inner thrust cylinder 110 is calculated: L = d + ∑Δ = W × α + ∑Δ; wherein L is the total stroke difference between the outer thrust cylinder 110 and the inner thrust cylinder 110, and ∑Δ is the sum of the wedge amounts of each wedge segment ring 200 when the shield machine 100 rotates through an arc of α.
[0039] In this embodiment, through the calculation of the above formula and combined with the stroke difference caused by the micro-adjustment of the shield posture on site, the assembly points are selected in advance, and the stroke of the thrust cylinder 110 required for the assembly position of the steel pipe segment 210 is reserved, thereby reserving space in advance for the continuous through-seam assembly of the steel pipe segment 210.
[0040] In some embodiments of the present application, during the advancement of the axis with a small radius of curvature, adjusting the difference in left and right oil pressures is the main method to complete the left and right deviation correction. In the specific deviation correction process, the stroke difference between the left and right thrust cylinders 110 (i.e., the outer thrust cylinder 110 and the inner thrust cylinder 110) can be used to judge whether the current status of the shield will complete the expected deviation correction (based on the report of the previous ring, the left and right stroke difference of the thrust cylinder 110, and the design axis change of the current thrust ring). When the shield cut just enters the curved section from the straight section (the transition curve section into the circular arc curve section), since the shield tail segment has not yet been assembled with the curved section segment, that is, the segment has not yet been adjusted in advance, the shield should be placed at the tangent position of the design axis of the curved section by increasing the difference in the stroke of the left and right thrust cylinders 110. When advancing in the same curved section, the advance adjustment of the segment just plays a role in adjusting the advancement direction of the shield. If the shield is in good posture, maintaining the original stroke difference of the thrust cylinder 110 can keep the shield in good posture.
[0041] In some embodiments of the present application, the wedge-shaped segment ring 200 is assembled through the seam at the same point continuously. The control of the shield tail gap (i.e., the gap between the tail of the shield machine 100 and the segment) will not only affect the assembly quality of the segment, but also affect the control of the shield axis. When the gaps in each area of the shield tail are evenly distributed, the difference in the shield tail gap is small, and the formed segment will not be damaged. Therefore, the gap amount of the entire circle of the shield tail must be considered. Measures to prevent segment damage are as follows: the amount of correction at one time should not be too large, and the shield should be prevented from gradually deviating from the axis. Therefore, the amount of correction should be moderate, "frequent correction, less correction", avoid large-scale correction, reduce the amount of soil over-excavation caused by axis correction, and avoid soil loss and excessive settlement caused by excessive over-excavation, and even cause segment damage and leakage.
[0042] In some embodiments of the present application, Figure 3 As shown, in step S2, when the wedge-shaped segment ring is selected, the deflection angle of the wedge-shaped segment ring satisfies θ=2γ=2arctgσ / D, wherein σ is half of the wedge amount of the wedge-shaped segment ring 200, and D is the outer diameter of the wedge-shaped segment ring 200.
[0043] In this embodiment, the tunnel design route has been determined in the early stage, and the deflection angle of the wedge-shaped segment ring 200 must conform to the tunnel design route. The double-sided wedge amount of the wedge-shaped segment ring 200 is 52mm. Through the segment selection, the capping segments (F-block segments) are rotated and assembled in order at different positions to achieve the effects of straight tunnel, left turn, right turn and vertical curve. For example, if the F-block segments are continuously assembled on the right side of the tunnel excavation direction, the tunnel as a whole can achieve a right turn, and the rest are similar. This fully reflects the principle that the segment selection must conform to the tunnel design route.
[0044] In some embodiments of the present application, Figure 4 As shown, the wedge amount of the wedge segment ring 200 is calculated by a similar through-slit method, and the wedge amount of the wedge segment ring 200 is Δ=D×B / R min , where D is the outer diameter of the wedge-shaped segment ring 200, B is the width of the wedge-shaped segment ring 200, and R min It is the minimum curve radius of the tunnel design line. The above units are all mm. Figure 4 In the figure, U1 is the first universal wedge ring, and U2 is the second universal wedge ring. The difference between the first universal wedge ring and the second universal wedge ring is that the segment has a wedge amount. Due to different assembly points, the width of the segment ring at this location is different. The width of the segment ring at this location refers to a width of 2000mm.
[0045] In this embodiment, the wedge-shaped segment ring 200 is assembled into a shield tunnel through orderly rotation and combination, which can be applied to tunnels with different curvature radii and can be used in straight sections, left-turn sections, right-turn sections, vertical curve sections, etc. When the wedge-shaped segment ring 200 is assembled, the capping segments are located at different assembly points, and the leading amount of the left, right, upper and lower parts, that is, the difference between the length of the segment along the longitudinal section direction and the length of the two center points of the front and rear end faces of the segment, also changes accordingly.
[0046] Similar to the through-seam method, when calculating the wedge amount of the wedge-shaped segment ring 200, the influence of the staggered assembly of the segment ring is not considered, and the wedge amount of the segment ring required for through-seam assembly can be satisfied. Through the formula calculation, the wedge amount required for the assembly position of the steel segment 210 is reserved in advance by selecting the assembly point. Usually, a tunnel is composed of several or even multiple curves with different turning radii. If the wedge amount is designed according to each curve radius, more engineering work will be added to the design, segment production, and tunnel construction. Therefore, the minimum curve radius is used here to meet the required amount of all curve radii in this tunnel.
[0047] In some embodiments of the present application, Figure 5 and Figure 6As shown, each wedge-shaped segment ring 200 includes 7 standard segments, 2 temporary segments and 1 capping segment. The capping segment is installed at the top of the tunnel section, the 2 temporary segments are respectively installed at the corresponding two side ends of the capping segment, and the 7 standard segments are respectively installed at the corresponding circumference of the tunnel section between the 2 temporary segments. Specifically, 1 capping segment is an F segment, the 2 temporary segments include an L1 temporary segment and an L2 temporary segment, and the 7 standard segments include a B1 standard segment, a B2 standard segment, a B3 standard segment, a B4 standard segment, a B5 standard segment, a B6 standard segment, and a B7 standard segment. Figure 5 As shown in the figure, when the right side of the tunnel is expanded, the B2 standard segments and the B3 standard segments are steel segments 210, and the remaining segments are concrete segments. Figure 6 As shown, when the left side of the tunnel is excavated, the B5 standard segment and the B6 standard segment are steel segments 210, and the remaining segments are concrete segments. The area excavated on the right side of the tunnel is the 5th to 11th segment rings, and the assembly point (that is, the location of the F block segment) is between 19 and 20 (a total of 20 points). The area excavated on the left side of the tunnel is the 21st to 27th segment rings and the 45th to 54th segment rings, and the assembly point (that is, the location of the F block segment) is between 1 and 2 (a total of 20 points). Figure 5 and Figure 6 In the diagram, 1# to 20# represent the numbers of the thrust cylinder 110, and 1 to 20 o'clock represent the installation points of the segments. Each assembly point is rotated 9° according to the position of the thrust cylinder 110, for a total of 20 points.
[0048] In this embodiment, before assembling the segments, the assembly area is first cleaned, and then a standard segment on the opposite side of the F segment is installed at the bottom of the tunnel section. Then, the remaining standard segments are assembled in sequence from both sides of the standard segment along the circumference of the tunnel section, and then two temporary segments are assembled again, and finally the capping segment (i.e., the F segment) is assembled.
[0049] In some embodiments of the present application, Figure 7 and Figure 8 As shown, the steel pipe segment 210 is formed by connecting a plurality of sub-segments 211 by bolts. This arrangement makes the steel pipe segment 210 easy to transport, install and disassemble, and facilitates construction. Figure 7 As shown, the steel pipe segment 210 is formed by connecting four sub-segments 211 by bolts. The four sub-segments include K1 sub-segment, J2 sub-segment, K2 sub-segment and T2 sub-segment. The four sub-segments are connected by bolts in the manner of K1 sub-segment, J2 sub-segment, K2 sub-segment and T2 sub-segment in sequence to form a whole steel pipe segment 210, and then assembled as a whole. When dismantling, the sub-segments K1, J2, K2 and T2 are dismantled in sequence. Figure 8As shown, the steel pipe segment 210 is formed by connecting 7 sub-segments 211 by bolts, and the 7 sub-segments include J3 sub-segment, K3 sub-segment, T3 sub-segment, J4 sub-segment, K4 sub-segment, T4 sub-segment, and K5 sub-segment. The 7 sub-segments are connected by bolts in the manner of K5 sub-segment, J4 sub-segment, K4 sub-segment, T4 sub-segment, J3 sub-segment, K3 sub-segment, and T3 sub-segment to form a whole steel pipe segment 210, and then assembled as a whole. When dismantling, the sub-segments are dismantled in the manner of J3 sub-segment, K3 sub-segment, T3 sub-segment, J4 sub-segment, K4 sub-segment, T4 sub-segment, and K5 sub-segment.
[0050] In some embodiments of the present application, Fig. 9 As shown, the inner curved surface of the steel pipe segment 210 is connected by bolts with a curved steel plate 300 for correspondingly fitting and adsorbing with the suction cup of the assembling machine, and the curved steel plate 300 has the same curvature as the steel pipe segment 210. The pressure holding time for the suction cup of the assembling machine to adsorb the curved steel plate 300 is not less than 20 minutes. Since the inner curved surface of the steel pipe segment 210 is a grid structure, it is not conducive to the direct adsorption of the suction cup of the assembling machine. In this embodiment, a curved steel plate 300 is installed on the inner curved surface of the steel pipe segment 210, providing an adsorption surface for the suction cup of the assembling machine, which is convenient for the assembling machine to drive the rotation to complete the assembly purpose. And by setting a pressure holding time of not less than 20 minutes for the suction cup of the assembling machine to adsorb the curved steel plate 300, it can prevent the steel pipe segment 210 and the curved steel plate 300 from being loosely connected and the curved steel plate 300 and the suction cup of the assembling machine from being not tightly adsorbed to cause pressure relief.
[0051] In some embodiments of the present application, the assembly machine further includes a suction cup positioning pin, which can not only withstand lateral shear force, but also make the assembly machine suction cup located in the middle of the steel pipe segment 210 when assembling the steel pipe segment 210, so as to avoid a large deviation of the assembly machine suction cup when adsorbing the steel pipe segment 210, and avoid the assembly machine suction cup from falling off the reserved groove area of the steel pipe segment 210 or being located in the bolt hole area, causing the assembly machine suction cup to release pressure and causing the pipe segment to fall. The suction cup positioning pin has been removed when installing the steel pipe segment 210.
[0052] In some embodiments of the present application, each thrust cylinder 110 is respectively pressed against the corresponding longitudinal seam of the wedge-shaped segment ring 200. That is, the adjacent segments are pushed forward by riding the seam to prevent leakage and water seepage from the longitudinal seam between the segments, so that the assembly quality is better. In particular, for the two segments of different materials, steel segments 210 and concrete segments, their assembly quality can be guaranteed.
[0053] In some embodiments of the present application, adjacent segments of the wedge-shaped segment ring 200 are connected by annular connecting bolts. All annular connecting bolts on the wedge-shaped segment ring 200 are retightened once after the segment ring is assembled. And after each set distance of assembly forward along the tunnel design line, all annular connecting bolts on all wedge-shaped segment rings 200 are retightened once, at least 3 times.
[0054] In this embodiment, if the bolts are not tightened or are loose, it is easy to cause the adjacent segments to be partially misaligned. Therefore, when assembling the segments, all the bolts of each segment are tightened after assembling each segment before assembling the next segment. After all the segments of this ring are assembled, all the bolts of this ring are re-tightened again. During the excavation process, the bolts are still strictly tightened three times, once every 500mm of excavation, that is, once at 1300mm, 1800mm, and 2300mm. Through this arrangement, the connection between the segments is firmer, misalignment is avoided, and the assembly quality is better.
[0055] In some embodiments of the present application, a sealing gasket and a water-swelling rubber waterstop strip pasted on the outer surface of the sealing gasket are provided at the assembly position of the steel pipe segment 210 and the adjacent pipe segment. The sealing gasket is a composite EPDM rubber member. The width of the water-swelling rubber waterstop strip is 35 mm and the thickness is 3 mm. Two layers of putty sheets are pasted at the corner positions of the water-swelling rubber waterstop strip. The thickness of each layer of putty sheet is 3 mm. Two layers of nitrile cork pads are provided at the annular seam between two adjacent steel pipe segments 210. The thickness of the nitrile cork pad is 3 mm. In this embodiment, by such a setting, the waterproof effect of the pipe segment is enhanced, water leakage of the pipe segment is prevented, and the assembly quality of the pipe segment is better.
[0056] In some embodiments of the present application, in order to prevent water leakage at the joints of the steel pipe segments 210 and ensure the quality of the formed tunnel, the following control measures may also be taken: (1) Accurately process the steel pipe segment 210 and strengthen the size review of the steel pipe segment 210 upon on-site acceptance to avoid misalignment with the concrete segment ring joint during continuous assembly, which may result in the waterproof joint not being able to be tightly attached, causing water leakage and damage; (2) Check the welding conditions of all welding points of steel pipe segment 210 to avoid slag inclusion, false welding and leaking welding, which may cause water leakage in the weld; (3) Avoid bumping during the hoisting, transportation and assembly process to prevent the steel pipe segment 210 from deformation; strictly control the assembly accuracy during the assembly process to strictly avoid misalignment of more than 3mm; tighten each bolt of each pipe segment after the assembly is completed before assembling the next pipe segment; apply glycerin to reduce friction and lubricate when inserting the capping block longitudinally; (4) Appropriately increase the amount of synchronous grouting at the steel pipe segment 210 position to increase the density of the back and prevent water leakage; (5) Double liquid slurry is used to carry out secondary grouting in time at the position 210 of the formed steel pipe segment.
[0057] Although some preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present application.
[0058] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the application concept. Thus, if these modifications and variations to the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A method for assembling shield segments through seams, characterized in that: The following steps are involved: (1) Determine the segment assembly position before segment through-seam assembly, calculate the thrust cylinder stroke difference and shield tail clearance at the corresponding assembly position during segment through-seam assembly, and reserve segment through-seam assembly space based on the thrust cylinder stroke difference and shield tail clearance; (2) selecting a wedge-shaped segment ring and determining the assembly position of the capping segment of the wedge-shaped segment ring according to the tunnel design route, thrust cylinder stroke and shield tail clearance; (3) assembling the segments of the wedge-shaped segment ring symmetrically from the bottom of the tunnel section to both sides along the circumference of the tunnel section, wherein the two adjacent segments located at the tunnel section corresponding to the switch installation position are steel segments; (4) The wedge-shaped segment rings are installed sequentially through the seams along the designed tunnel route.
2. The shield segment through-seam assembly method according to claim 1 is characterized in that: The total stroke difference between the outer thrust cylinder and the inner thrust cylinder is L=W×α+∑Δ; Where W is the working face width of the shield machine, α is the turning arc of the shield machine, and ∑Δ is the sum of the wedge amounts of each wedge segment ring when the shield machine turns through an arc of α.
3. The shield segment through-seam assembly method according to claim 1, characterized in that: In step (2), when selecting the wedge-shaped segment ring, the deflection angle of the wedge-shaped segment ring satisfies: θ = 2arctgσ / D; Wherein, σ is half of the wedge amount of the wedge segment ring, and D is the outer diameter of the wedge segment ring.
4. The shield segment through-seam assembly method according to claim 3 is characterized in that: In step (2), the wedge amount of the wedge segment ring is Δ=D×B / R min ; Where D is the outer diameter of the wedge-shaped segment ring, B is the width of the wedge-shaped segment ring, and R min Minimum curve radius for tunnel design alignment.
5. The shield segment through-seam assembly method according to claim 1, characterized in that: In the step (1), the segment assembly position is determined by the distance of 7 to 10 segment rings before the segment is assembled through the seam.
6. The shield segment through-seam assembly method according to claim 1, characterized in that: The steel pipe segment is formed by connecting a plurality of sub-segments through bolts.
7. The shield segment through-seam assembly method according to claim 1, characterized in that: The inner curved surface of the steel pipe segment is connected with a curved steel plate through bolts for correspondingly fitting and adsorbing with the suction cup of the assembling machine, and the curved steel plate has the same curvature as that of the steel pipe segment.
8. The shield segment through-seam assembly method according to claim 1, characterized in that: Each of the propulsion cylinders is respectively against the corresponding longitudinal seam of the wedge-shaped segment ring.
9. The shield segment through-seam assembly method according to claim 1, characterized in that: Adjacent segments of the wedge-shaped segment ring are connected by annular connecting bolts; All the annular connecting bolts on the wedge-shaped segment ring are retightened once after the assembly of the ring segment is completed; and after each set distance of assembly forward along the designed tunnel line, all the annular connecting bolts on all the wedge-shaped segment rings are retightened again, and at least retightened 3 times.
10. The shield segment through-seam assembly method according to claim 1, characterized in that: A sealing gasket and a water-swellable rubber water stop strip adhered to the outer surface of the sealing gasket are provided at the assembly position of the steel pipe segment and the adjacent pipe segment; the sealing gasket is a composite EPDM rubber part; Putty sheets are pasted at the corner positions of the water-swelling rubber waterstop strips; and two layers of nitrile cork pads are arranged at the annular seams between adjacent steel pipe segments.