Multiple step-by-step combined supporting system and supporting method for underground engineering TBM tunneling

By designing a multi-step joint support system in underground engineering TBM excavation, the combination of base, mobile adjustment structure and support structure is used to solve the problems of roof plate crushing and de-layering, achieving rapid support and stability, and improving excavation speed and security.

CN118933922APending Publication Date: 2024-11-12CHINA RAILWAY ELEVENTH BUREAU GROUP FIFTH ENGINEERING CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411089757.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the TBM excavation process of underground engineering, the complexity and low strength and low adhesion of the top slab rock layer lead to the top slab breaking, destratification and falling, causing support difficulties and hindering the improvement of the excavation speed and monthly induction scale.

Method used

Design a multi-step joint support system, including base, mobile adjustment structure, support structure and connection structure. Through the combination of mobile adjustment structure and support structure, rapid support for the tunnel is achieved, stable support is provided, and according to Demand to adjust the support area.

Benefits of technology

Effectively prevent tunnel collapse, improve excavation speed and safety, enhance the support effect of excavation tunnels, and adapt to different roof shapes and lithologic changes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933922A_ABST
    Figure CN118933922A_ABST
Patent Text Reader

Abstract

The multiple step-by-step combined supporting system for underground engineering TBM tunneling comprises a base, moving adjusting structures are arranged on the two sides of the base correspondingly, and a supporting structure is installed at the top of the base; the technical scheme relates to the field of underground engineering TBM tunneling, the base is adopted as a main body, supporting force in the vertical direction can be provided for the device, then the base is matched with the moving adjusting structure, the connecting structure and the supporting structure, and after a tunneling machine runs, the device can be supported by the moving adjusting structure, the connecting structure and the supporting structure. The tunneling tunnel is rapidly supported, the follow-up tunnel collapse condition is prevented, meanwhile, supporting can be carried out according to a rock plate at the top of the tunnel, the supporting area can be changed according to the use requirement, and therefore the tunneling tunnel supporting effect is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underground engineering TBM excavation, in particular to a multiple step-by-step combined support system and a support method for underground engineering TBM excavation. Background Art

[0002] With the improvement of the production capacity and advancement speed of the comprehensive excavation working face, the excavation area is increasingly expanding, and the rapid support of the excavation tunnel has become one of the key technologies for high-yield, high-efficiency and safe production in mines. The rock strata of the roof of coal mine tunnels in my country are relatively complex, and the lithology of the roof often changes. Especially when the strength of the roof surrounding rock is low and the adhesion is poor, the roof is prone to varying degrees of crushing, delamination and falling in the early stage of excavation, causing support difficulties, thereby hindering the improvement of the excavation speed and the average monthly advance of the excavation. Summary of the invention

[0003] The purpose of the present invention is to solve the above problems and to design a multi-step combined support system and support method for TBM excavation in underground engineering to increase the support effect of tunnel excavation.

[0004] The technical solution of the present invention to achieve the above-mentioned purpose is: a multi-step combined support system for underground engineering TBM excavation, comprising a base, both sides of the base are provided with a movable adjustment structure, a support structure is installed on the top of the base, and a connecting structure is provided between the movable adjustment structure and the base;

[0005] The movable adjustment structure includes a base frame, which is arranged on one side of the base, and vertical plates are installed on both sides of the bottom of the base frame, and moving wheels are rotatably connected on the inner sides of the vertical plates. An assembly warehouse is installed on the top of the base frame, and a protective frame is installed on the top of the assembly warehouse. The interior of the assembly warehouse is set to be hollow, and a driving member is embedded in the inner wall of the bottom of the assembly warehouse. The driving end of the driving member is connected with a lifting screw, and the top of the lifting screw passes through the connection between the assembly warehouse and the protective frame, and the top of the lifting screw is threadedly connected with a lifting rod, a synchronous wheel is provided at the connection between the driving member and the lifting screw, and the synchronous wheel is connected with a synchronous belt, and the top of the lifting rod is connected with a horizontal plate, and concave seats are provided on both sides of the top of the horizontal plate, and an arc top is inserted at the top of the concave seat, and a positioning bolt is inserted at the connection between the arc top and the concave seat, and the positioning bolt is connected with a positioning nut.

[0006] Preferably, the supporting structure includes an adjusting groove, which is opened at the top of the base, and the adjusting groove is slidably connected to an adjusting seat, the top of the adjusting seat is rotatably connected to a first support rod, the top of the first support rod is plugged with a first connecting rod, the inner side of the protective frame is rotatably connected to a second support rod, and one end of the second support rod is plugged with a second connecting rod, sliding grooves are provided on the front and rear sides of the first support rod, a moving ring is sleeved on the outer side of the first support rod, a sliding block corresponding to the sliding groove is provided on the inner side of the moving block, the sliding block is slidably connected to the sliding groove, and the moving ring is threadedly connected with fastening bolts on the front and rear sides.

[0007] Preferably, the connecting structure includes a threaded seat, which is embedded in the top of the base, and one side of the base frame is rotatably connected to a rotating rod, the lower side of the rotating rod is provided with an external thread, the lower side of the rotating rod is threadedly connected to the top of the threaded seat, and the top of the rotating rod is connected to a rotating handle.

[0008] Preferably, a plurality of positioning pin holes are provided on one side of the first connecting rod and the second connecting rod, and pins are inserted at the joints between the first connecting rod and the first supporting rod and at the joints between the second connecting rod and the second supporting rod.

[0009] Preferably, a rough layer is embedded inside the sliding groove.

[0010] Preferably, a row of threaded holes are provided on both sides of the adjustment groove, and both sides of the adjustment seat are threadedly connected to the threaded holes through screws.

[0011] Preferably, reinforcing rods are provided on both sides of the bottom of the arc-shaped top, and limiting plates are provided on both sides of the upper and lower sides of the first support rod.

[0012] Preferably, a limiting slider is provided on the lower side of the lifting rod, a limiting slot corresponding to the limiting slider is provided on the inner wall of the protective frame, the limiting slider is slidably connected to the limiting slot, and a limiting strip is provided on the upper side of the protective frame.

[0013] Preferably, the four corners of the bottom of the horizontal plate are each provided with a fixing rod, one end of the fixing rod is threadedly connected with an adjusting screw, and the middle part of the adjusting screw is provided with a rotating wheel.

[0014] The technical solution also discloses a multi-step joint support method for underground engineering TBM excavation, and a multi-step joint support system for underground engineering TBM excavation based on the tree top, comprising the following steps:

[0015] Step S1: moving the entire support system by means of the moving wheels so that the support system moves to a designated position;

[0016] Step S2: After moving to the designated position, the base is pushed down by the connection structure and contacts the bottom wall of the tunnel, so as to fix the support system and provide a stable support force in the vertical direction for the device through the base;

[0017] Step S3: After the support system is fixed, different arc-shaped tops are installed on the top of the cross plate according to the top shape of the tunnel, and the height of the support system is adjusted by moving the adjustment structure so that the arc-shaped top is connected to the top ground of the tunnel;

[0018] Step S4: The support system is kept stable by the support structure and the movable adjustment structure, and a stable supporting force is provided for the inside of the tunnel;

[0019] Step S5: The two support systems can be connected according to usage requirements to increase the support area and further improve the support effect.

[0020] Beneficial effects of the invention: The technical solution adopts the base as the main body, which can provide vertical support force for the device, and then cooperates with the movable adjustment structure, the connecting structure and the supporting structure to quickly support the tunnel after the tunnel boring machine is running, so as to prevent the subsequent tunnel from collapsing. At the same time, it can also support the rock slab on the top of the tunnel, and can change the support area according to the use requirements, so as to further increase the support effect of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a front view of the multi-step combined support system for underground engineering TBM excavation according to the present invention.

[0022] Figure 2 It is a side view of the present invention.

[0023] Figure 3 It is a top view of the base of the present invention.

[0024] Figure 4 It is a bottom view of the horizontal plate of the present invention.

[0025] Figure 5 It is a top view of the protective frame of the present invention.

[0026] Figure 6 This is a cross-sectional view of the first support rod of the present invention.

[0027] In the figure: 1, base, 2, bottom frame, 3, vertical plate, 4, moving wheel, 5, assembly bin, 6, protective frame, 7, driving part, 8, lifting screw, 9, lifting rod, 10, synchronous wheel, 11, synchronous belt, 12, horizontal plate, 13, concave seat, 14, arc top, 15, adjustment groove, 16, adjustment seat, 17, first support rod, 18, first connecting rod, 19, second support rod, 20, second connecting rod, 21, sliding groove, 22, moving ring, 23, slider, 24, fastening bolt, 25, threaded seat, 26, rotating rod, 27, rotating handle, 28, rough layer, 29, reinforcing rod, 30, limit plate, 31, limit slider, 32, limit slide groove, 33, limit strip, 34, fixing rod, 35, adjusting screw. DETAILED DESCRIPTION

[0028] The present invention will be described in detail below in conjunction with the accompanying drawings. Figure 1-6 As shown, a multi-step combined support system for TBM excavation in underground engineering includes a base 1, movable adjustment structures are arranged on both sides of the base 1, a supporting structure is installed on the top of the base 1, and a connecting structure is arranged between the movable adjustment structure and the base 1.

[0029] The movable adjustment structure includes a base frame 2, which is arranged on one side of the base 1. Vertical plates 3 are installed on both sides of the bottom of the base frame 2. Moving wheels 4 are rotatably connected to the inner sides of the vertical plates 3. An assembly bin 5 is installed on the top of the base frame 2. A protective frame 6 is installed on the top of the assembly bin 5. The interior of the assembly bin 5 is set to be hollow. A driving member 7 is embedded in the inner wall of the bottom of the assembly bin 5. The driving end of the driving member 7 is connected to a lifting screw 8. The top of the lifting screw 8 passes through the connection between the assembly bin 5 and the protective frame 6. The top of the lifting screw 8 is threadedly connected to a lifting rod 9. A synchronous wheel 10 is provided at the connection between the driving member 7 and the lifting screw 8. The synchronous wheel 10 is connected to a synchronous belt 11. The top of the lifting rod 9 is connected to a horizontal plate 12. Concave seats 13 are provided on both sides of the top of the horizontal plate 12. An arc-shaped top 14 is inserted at the top of the concave seat 13. A positioning bolt is inserted at the connection between the arc-shaped top 14 and the concave seat 13, and the positioning bolt is connected with a positioning nut.

[0030] The supporting structure includes an adjusting groove 15, which is opened on the top of the base 1. The adjusting groove 15 is slidably connected to an adjusting seat 16. A first supporting rod 17 is rotatably connected to the top of the adjusting seat 16. A first connecting rod 18 is inserted into the top of the first supporting rod 17. A second supporting rod 19 is rotatably connected to the inner side of the protective frame 6. A second connecting rod 20 is inserted into one end of the second supporting rod 19. Sliding grooves 21 are provided on both the front and rear sides of the first supporting rod 17. A moving ring 22 is sleeved on the outer side of the first supporting rod 17. A sliding block 23 corresponding to the sliding groove 21 is provided on the inner side of the moving block. The sliding block 23 is slidably connected to the sliding groove 21. The moving ring 22 is threadedly connected to the front and rear sides. Fastening bolts 24 are threadedly connected.

[0031] The connection structure includes a threaded seat 25, which is embedded in the top of the base 1. A rotating rod 26 is rotatably connected to one side of the base frame 2. An external thread is arranged on the lower side of the rotating rod 26. The lower side of the rotating rod 26 is threadedly connected to the top of the threaded seat 25. A rotating handle 27 is connected to the top of the rotating rod 26.

[0032] It should be noted that during the operation of the tunnel boring machine, the rock properties of the tunnel roof often change, and for this reason it is necessary to support the inside of the tunnel. At this time, the support system can be moved as a whole through the cooperation of the base frame 2 and the moving wheels 4 fixed to the bottom of the base frame 2 by the vertical plate 3. After moving to the specified position, the operator rotates the handle 27 and drives the rotating rod 26 to rotate. Since the lower side of the rotating rod 26 is provided with an external thread, the threaded seat 25 can be used to drive the base 1 to descend, and the base 1 can be tightly attached to the bottom wall of the tunnel, thereby providing a stable supporting force for the support system and fixing the lower position of the support device.

[0033] After the fixation is completed, the driving member 7 inside the assembly bin 5 is controlled to operate. The driving member 7 cooperates with the synchronous wheel 10 and the synchronous belt 11 to drive the two lifting screws 8 to rotate at the same time, so that the horizontal plate 12 can be driven to rise through the lifting rod 9, and the arc top 14 on the top of the horizontal plate 12 can contact the tunnel roof, thereby increasing the tunnel internal support effect; at the same time, a limit slider 31 is set on the lower side of the lifting rod 9, and a limit slide 32 corresponding to the limit slider 31 is set on the inner wall of the protective frame 6. The limit slider 31 is slidably connected with the limit slide 32, and a limit strip 33 is set on the upper side of the protective frame 6, which can increase the stability of the lifting rod 9 during the lifting process, thereby increasing the stability of the support system during the vertical adjustment process. Since the arc top 14 is installed on the top of the horizontal plate 12 through the concave seat 13, the positioning bolt and the positioning nut, the operator can adjust the arc top 14 of different shapes according to the shape of the tunnel roof, thereby increasing the support effect, and the limit strip 33 is used to prevent the lifting rod 9 from falling off from the protective frame 6.

[0034] After the arc top 14 contacts the tunnel roof, the operator can slide the adjustment seat 16 and the lower side of the first support rod 17 along the adjustment groove 15, so that the first support rod 17, the first connecting rod 18, the cross plate 12, the protective frame 6 and the lifting rod 9 form a stable triangle. After the adjustment is completed, the adjustment seat 16 and the lower side of the first support rod 17 are fixed by connecting them with screws and threaded holes. At this time, the first support rod 17 and the first connecting rod 18 are fixed by plugging the pin into the positioning pin hole, and then the position of the movable ring 22 is adjusted along the sliding groove 21 by the slider 23, and the position of the movable ring 22 can be fixed by the fastening bolt 24, and then the second support rod 19 and the second connecting rod 20 are fixed by plugging the pin into the positioning pin hole again. The first support rod 17 and the first connecting rod 18 can cooperate to provide firm support for the cross plate 12 and the arc-shaped top 14, and the second support rod 19 and the second connecting rod 20 can cooperate to increase the stability of the support, thereby increasing the excavation support effect, and finally achieving the purpose of TBM excavation support for underground engineering.

[0035] A rough layer 28 is embedded inside the sliding groove 21 to increase the fixing effect of the fastening bolts 24 on the movable ring 22. Reinforcing rods 29 are provided on both sides of the bottom of the arc-shaped top 14 to further increase the supporting effect of the arc-shaped top 14. Limiting plates 30 are provided on both sides of the upper and lower sides of the first support rod 17 to limit the position of the movable ring 22.

[0036] At the same time, the operator can connect multiple support systems by using the adjusting screw 35 and the fixing rod 34 according to the use requirements, and can also rotate the adjusting screw 35 through the rotating wheel to adjust the distance between the multiple support systems, so as to meet different support areas and increase the support effect.

[0037] The technical solution also discloses a support method of a multi-step combined support system for underground engineering TBM excavation, comprising the following steps:

[0038] Step S1: Move the entire support system by the moving wheel 4 to move the support system to a designated position;

[0039] Step S2: After moving to the designated position, the base 1 is pushed down by the connection structure and contacts the bottom wall of the tunnel, so as to fix the support system and provide a stable support force in the vertical direction for the device through the base 1;

[0040] Step S3: After the support system is fixed, different arc tops 14 are installed on the top of the horizontal plate 12 according to the top shape of the tunnel, and the height of the support system is adjusted by moving the adjustment structure so that the arc top 14 is connected to the top ground of the tunnel;

[0041] Step S4: The support system is kept stable by the support structure and the movable adjustment structure, and a stable supporting force is provided for the inside of the tunnel;

[0042] Step S5: The two support systems can be connected according to usage requirements to increase the support area and further improve the support effect.

[0043] The above technical solutions only reflect the preferred technical solutions of the technical solutions of the present invention. Some changes that may be made to certain parts thereof by technicians in this technical field all reflect the principles of the present invention and fall within the protection scope of the present invention.

Claims

1. A multi-step combined support system for underground engineering TBM excavation, comprising a base, characterized in that: Both sides of the base are provided with movable adjustment structures, a supporting structure is installed on the top of the base, and a connecting structure is provided between the movable adjustment structure and the base; The movable adjustment structure includes a base frame, which is arranged on one side of the base, and vertical plates are installed on both sides of the bottom of the base frame, and moving wheels are rotatably connected on the inner sides of the vertical plates. An assembly warehouse is installed on the top of the base frame, and a protective frame is installed on the top of the assembly warehouse. The interior of the assembly warehouse is set to be hollow, and a driving member is embedded in the inner wall of the bottom of the assembly warehouse. The driving end of the driving member is connected with a lifting screw, and the top of the lifting screw passes through the connection between the assembly warehouse and the protective frame, and the top of the lifting screw is threadedly connected with a lifting rod, a synchronous wheel is provided at the connection between the driving member and the lifting screw, and the synchronous wheel is connected with a synchronous belt, and the top of the lifting rod is connected with a horizontal plate, and concave seats are provided on both sides of the top of the horizontal plate, and an arc top is inserted at the top of the concave seat, and a positioning bolt is inserted at the connection between the arc top and the concave seat, and the positioning bolt is connected with a positioning nut.

2. The multi-step combined support system for underground engineering TBM excavation according to claim 1 is characterized in that: The supporting structure includes an adjusting slot, which is opened at the top of the base, and the adjusting slot is slidably connected with an adjusting seat, the top of the adjusting seat is rotatably connected with a first support rod, the top of the first support rod is plugged with a first connecting rod, the inner side of the protective frame is rotatably connected with a second support rod, and one end of the second support rod is plugged with a second connecting rod, sliding slots are provided on the front and rear sides of the first support rod, a moving ring is sleeved on the outer side of the first support rod, a sliding block corresponding to the sliding slot is provided on the inner side of the moving block, the sliding block is slidably connected to the sliding slot, and the moving ring is threadedly connected with fastening bolts on the front and rear sides.

3. The multi-step combined support system for underground engineering TBM excavation according to claim 2 is characterized in that: The connection structure includes a threaded seat, which is embedded in the top of the base. A rotating rod is rotatably connected to one side of the base frame. An external thread is arranged on the lower side of the rotating rod. The lower side of the rotating rod is threadedly connected to the top of the threaded seat. A rotating handle is connected to the top of the rotating rod.

4. The multi-step combined support system for underground engineering TBM excavation according to claim 3 is characterized in that: A plurality of positioning pin holes are provided on one side of the first connecting rod and the second connecting rod, and pins are inserted at the joints between the first connecting rod and the first supporting rod and at the joints between the second connecting rod and the second supporting rod.

5. The multi-step combined support system for underground engineering TBM excavation according to claim 2 is characterized in that: A rough layer is embedded in the sliding grooves.

6. The multi-step combined support system for underground engineering TBM excavation according to claim 2 is characterized in that: A row of threaded holes are arranged on both sides of the adjustment groove, and both sides of the adjustment seat are threadedly connected with the threaded holes through screws.

7. The multi-step combined support system for underground engineering TBM excavation according to claim 2 is characterized in that: Reinforcement rods are arranged on both sides of the bottom of the arc-shaped top, and limiting plates are arranged on both sides of the upper and lower sides of the first support rod.

8. The multi-step combined support system for underground engineering TBM excavation according to claim 1 is characterized in that: A limiting slider is arranged at the lower side of the lifting rod, a limiting sliding groove corresponding to the limiting slider is arranged on the inner wall of the protection frame, the limiting slider is slidably connected to the limiting sliding groove, and a limiting strip is arranged at the upper side of the protection frame.

9. The multi-step combined support system for underground engineering TBM excavation according to claim 1, characterized in that: The four corners of the bottom of the horizontal plate are all provided with fixing rods, one end of the fixing rod is threadedly connected with an adjusting screw, and the middle part of the adjusting screw is provided with a rotating wheel.

10. A multi-step combined support method for underground engineering TBM excavation, characterized in that: The multi-step combined support system for underground engineering TBM excavation according to claim 9 comprises the following steps: Step S1: Move the entire support system by moving the moving wheels to move the support system to the specified position Step S2: After moving to the designated position, the base is pushed down by the connection structure and contacts the bottom wall of the tunnel, so as to fix the support system and provide a stable support force in the vertical direction for the device through the base; Step S3: After the support system is fixed, different arc-shaped tops are installed on the top of the cross plate according to the top shape of the tunnel, and the height of the support system is adjusted by moving the adjustment structure so that the arc-shaped top is connected to the top ground of the tunnel; Step S4: The support system is kept stable by the support structure and the movable adjustment structure, and a stable supporting force is provided for the inside of the tunnel; Step S5: The two support systems can be connected according to usage requirements to increase the support area and further improve the support effect.