Cast-in-situ bored pile construction method under karst cave extreme development geology
By adopting a combination of inner and outer casing and back cover concrete under strong karst development geological conditions, the problems of hole leakage and collapse are solved, ensuring the quality and safety of pile foundation construction, and improving construction efficiency and economy are achieved.
Patent Information
- Application Number
- CN202411158423.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-15
AI Technical Summary
Under the geological conditions of strongly developing karst, the problem of hole leakage and collapse in construction is often faced, which affects the quality of pile holes and construction safety. Especially in the treatment of super-large caves or beaded caves, the existing methods are difficult to effectively prevent weakness. Layer collapse and cave backfilling.
Protective measures to form a double-layer guard casing with inner and outer guard casings. The outer guard casing prevents the collapse of weak layers. The inner guard casing and the backfilling concrete are used to isolate the pile holes and the peri-hole cave backfill area. The method of combining rotary drilling rig and impact drilling rig , gradually break through the cave and pour the bottom seal concrete to ensure the quality of the pile foundation casting.
Effectively prevent weak layers from collapse and cave backfill, ensure the quality of pile foundation casting, reduce the occurrence of hammer and tilted hole problems, improve construction efficiency and safety, and take into account construction quality and economic benefits.
Smart Images

Figure CN118958278A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building construction, and in particular to a bored cast-in-place pile construction method under extremely developed karst cave geology. Background Art
[0002] A karst cave is a natural cave formed by the dissolution and corrosion of limestone by flowing water containing carbon dioxide. This type of cave is an underground space formed by soluble rocks, and its formation is the result of long-term dissolution of groundwater in limestone areas. The main component of a karst cave is calcium carbonate (CaCO3), which will be converted into soluble calcium bicarbonate [Ca(HCO3)2] when it encounters water containing carbon dioxide. The formation process of a karst cave involves a series of chemical reactions and physical processes. Specifically, the insoluble calcium carbonate in the limestone is converted into soluble calcium bicarbonate by the action of water and carbon dioxide. Since the limestone layer contains different amounts of lime and is eroded to different degrees, it is gradually dissolved and divided into independent and diverse karst caves. The formation process of karst caves is complex, and its size and shape are diverse. It can be divided into three types: large, medium and small. These karst caves often form a complex karst system with underground rivers, caves, and karst crevices.
[0003] In the vicinity of the meandering section of the river, you will often encounter geology with strong karst development, and the karst caves will appear as super-large caves or beaded karst caves. This is because the meandering section of the river is often closely related to the groundwater system. In some sections of the river, due to changes in topography or the permeability of rocks, surface water may seep into the ground and become part of the groundwater. When these groundwaters flow underground, they will dissolve soluble rocks, thus helping the karst caves to form super-large caves or beaded karst caves.
[0004] Carrying out construction projects under geological conditions where karst is strongly developed, especially under cave geological conditions, is a complex process that requires high attention. Pile foundation construction under cave geological conditions requires solving problems such as cave leakage and collapse. The treatment methods for super-large caves or beaded caves include pouring concrete method and steel casing follow-up method. The pouring concrete method is applicable when encountering larger caves, and the steel casing follow-up method is applicable to unfilled caves or multi-layer empty caves and semi-empty caves. The length of the steel casing should be determined according to the properties of the soil layer above the limestone roof. When the drill reaches 1 to 1.5 meters from the top of the cave, the stroke is changed to slowly penetrate the cave roof.
[0005] Since the erosion of rivers also provides favorable conditions for the formation of karst caves, karst caves are often connected in series with rivers. The karst caves are not only super-large karst caves or beaded karst caves, but the covering soil layer above the karst caves is mostly soft geology of round gravel or silt sand. During the construction process, the soft layer and the karst cave layer are very easy to collapse, and the existing construction methods have an adverse effect on the quality of pile holes and construction safety. Summary of the invention
[0006] The purpose of the present invention is to provide a bored cast-in-place pile construction method under extremely developed karst cave geology, which adopts a protective measure of a double-layer casing composed of an inner and outer casing. The outer casing effectively prevents the collapse of the weak layer, and the inner casing and the bottom sealing concrete effectively isolate the pile hole and the karst cave backfill area around the hole, avoiding the collapse of backfill soil and rock and intrusion into the concrete during the concrete pouring process, thereby ensuring the quality of pile foundation pouring.
[0007] The technical solution for achieving the purpose of the present invention is as follows: The present invention provides a bored cast-in-place pile construction method under extremely developed karst cave geology, comprising the following steps: Step 1: Bury the positioning casing after geological exploration; Step 2: When the rotary drilling rig passes through a soft stratum, the operation is stopped, a rotary drilling hole is formed in the soft stratum, and an outer casing is arranged below the rotary drilling hole to form support for the soft stratum; Step 3: Replace the rotary drilling rig with an impact drilling rig to perform impact drilling, and successively penetrate the cave roof, cave area and cave bottom, until the impact reaches 0.5±0.2m from the cave bottom and stops drilling to form an impact drill hole; Step 4: lowering the inner casing into the outer casing and the impact drilled hole, and pouring bottom sealing concrete between the inner casing and the bottom of the cave; Step 5: After the bottom seal concrete hardens, subsequent construction is carried out until the bored pile construction is completed.
[0008] As a further limitation of the present invention, the step 1 comprises: Carry out geological exploration and testing, and take geological coring samples for each pile according to the pile hole area of bored pile construction to confirm the drilling depth corresponding to the soft strata and karst cave area at the pile hole location; The pile hole area is leveled and compacted, and after the pile position is located, the positioning casing is excavated and buried.
[0009] As a further limitation of the present invention, the step 2 comprises: The rotary drilling rig is in place and performs rotary drilling operation, and stops operating when the drill bit passes through the weak layer to form a rotary drilling hole. If inclined rock is encountered during the rotary drilling operation, the inclined rock is flattened and the operation is stopped to form the rotary drilling hole; An outer casing is arranged below to the corresponding rotary drilling hole to form support for the soft soil layer.
[0010] As a further limitation of the present invention, the step three comprises: Replace the rotary drilling rig with an impact drilling rig, dig a mud pool to make slurry, and then perform impact drilling after the slurry is made; Continue to percuss drilling. When the percussion reaches 1m above the top of the cave area, increase the relative density of the mud and control the relative density of the mud to 1.3-1.5. At the same time, reduce the percussion drilling speed, reduce the height of the hammer, and hit slowly and low until the top of the cave is penetrated. After entering the cave area, different treatment measures are taken according to the height of the cave for impact drilling; The impact drill stops drilling until it reaches 0.5±0.2m below the bottom of the cave; The impact drill is withdrawn to form impact holes in the area where the cave is located and below the cave.
[0011] As a further limitation of the present invention, after entering the cave area, different treatment measures are taken according to the height of the cave for impact drilling, including: If the height of the cave is less than or equal to 4.0m, fill it with stone and loess, and add a large amount of water and mud, and impact it repeatedly until a mudstone wall is formed and no more mud leaks. The ratio of the stone to loess backfill is 1:1. If the cave height is greater than 4.0m, first backfill with loess flakes, add water and mud, and impact repeatedly to form a mudstone wall until the impact reaches 0.5m from the bottom of the cave, then stop drilling; The inner casing is lowered and the bottom concrete is poured to ensure that the gap between the inner casing and the cave is completely blocked.
[0012] As a further limitation of the present invention, the step 4 comprises: Lowering an inner casing into the outer casing and the impact drilled hole formed in step 3; Bottom sealing concrete is poured between the inner casing and the bottom of the cave to ensure that the gap between the casing and the cave is completely blocked.
[0013] As a further limitation of the present invention, the step five comprises: After the bottom sealing concrete of step 4 is completely hardened, continue to impact drill until the designed pile bottom elevation is reached, stop drilling, remove the drill bit, inspect and clean the pile hole; After acceptance, the steel cage is hoisted into the pile hole and the hoisting rods are set to position the steel cage.
[0014] As a further limitation of the present invention, the step five further comprises: After the second hole cleaning, when the mud sand content is less than 2%, the mud specific gravity is less than 1.1, the viscosity is 17-20s, and the thickness of the sediment at the bottom of the hole is no more than 5cm, an acceptance inspection is organized. After the acceptance is qualified, the guide tube is installed and concrete is poured to complete the pile foundation construction.
[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention adopts a double-layer casing protection measure consisting of an inner and outer casing. The outer casing effectively prevents the collapse of the weak layer, and the inner casing and the bottom sealing concrete effectively isolate the pile hole and the backfill area of the cave around the hole, avoiding the collapse of backfill soil and rock and invading the concrete during the concrete pouring process, thereby ensuring the quality of pile foundation pouring.
[0016] 2. The present invention conducts geological core drilling in advance to find out the geological distribution, prepares countermeasures for drilling in the cave area in advance, slows down the impact speed, reduces the height of the hammer, and effectively reduces the occurrence of problems such as hammer jamming and skewed holes.
[0017] 3. The present invention adopts a rotary drill to grind the inclined rock, effectively improving the efficiency of pile hole construction, and at the same time can strengthen the supporting effect of the outer casing, and prevent the soft soil layer in the inclined rock area from collapsing during the punching and drilling process.
[0018] 4. The present invention adopts different treatment measures according to the height of the cave, which can take into account both construction quality and economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 A flow chart of a bored pile construction method under extremely developed karst cave geology provided by the present invention; Figure 2 A schematic diagram of the arrangement of the double-layer steel casing provided by the present invention; Figure numerals: 1-positioning casing; 2-outer casing; 3-inner casing; 4-bottom sealing concrete; 5-karst cave area; 6-rock layer area. DETAILED DESCRIPTION
[0020] The present invention is described in detail below in conjunction with the various embodiments shown in the accompanying drawings, but it should be noted that these embodiments are not limitations of the present invention, and any equivalent transformations or substitutions in functions, methods, or structures made by ordinary technicians in the field based on these embodiments are all within the scope of protection of the present invention.
[0021] When bored cast-in-place pile construction is carried out near a meandering section of a river, geology with strongly developed karst is often encountered. The karst caves appear as super-large caves or beaded caves, and are usually connected in series with the river. The overlying soil layers are mostly soft geology of rounded gravel and silt sand. During the bored cast-in-place pile hole forming process, the soft layer and the karst cave layer are very easy to collapse, which will have an adverse effect on the pile hole quality and construction safety. Therefore, an embodiment of the present invention provides a bored cast-in-place pile construction method that is applied to a geological environment with extreme development of karst caves and can ensure that the pile foundation quality and construction safety can be controlled.
[0022] See also Figure 1 and Figure 2 The embodiment of the present invention provides a bored pile construction method under extremely developed karst cave geology, comprising the following steps: Step 1: Bury the positioning casing after geological exploration.
[0023] The above-mentioned step one of the embodiment of the present invention includes: (1) conducting geological exploration and testing, taking geological coring for each pile in the pile hole area of the bored pile construction, and confirming the drilling depth corresponding to the soft stratum and the karst cave area at the pile hole position; (2) leveling and compacting the pile hole area, locating the pile position, and then excavating and burying the positioning casing 1. Specifically, the embodiment of the present invention first conducts preliminary geological exploration and testing, and takes coring for each pile in the pile hole area to confirm the drilling depth corresponding to the soft stratum and the karst cave area at the pile hole position in the pile hole area. Next, the pile hole area is leveled and compacted, and after measuring and locating the pile position, excavation and burying the positioning casing 1. Please continue to refer to Figure 2 The positioning casing 1 of the embodiment of the present invention is buried in a soft stratum, and the inner diameter of the positioning casing 1 is larger than the outer diameter of the outer casing 2, so that the outer casing 2 can pass through the positioning casing 1 from the inside of the positioning casing 1.
[0024] The embodiment of the present invention conducts geological core drilling in advance to find out the geological distribution, prepares countermeasures for drilling in the cave area in advance, slows down the impact speed, reduces the hammer lift, and effectively reduces the occurrence of problems such as hammer jamming and deviated holes.
[0025] Step 2: When the rotary drilling rig passes through a soft stratum, the operation is stopped, a rotary drilling hole is formed in the soft stratum, and an outer casing is arranged below the rotary drilling hole to form support for the soft stratum.
[0026] The above-mentioned step 2 of the embodiment of the present invention includes: (1) the rotary drilling rig is in place and performs rotary drilling operation, and stops the operation when the drill bit passes through the soft layer to form a rotary drilling hole. If inclined rock is encountered during the rotary drilling operation, the inclined rock is leveled and the operation is stopped to form a rotary drilling hole; (2) an outer casing is lowered to the corresponding rotary drilling hole to form support for the soft soil layer. Please continue to refer to Figure 2 The material of the outer casing 2 in the embodiment of the present invention is preferably steel, that is, the outer casing 2 is preferably an outer steel casing.
[0027] Step 3: Replace the rotary drilling rig with an impact drill for impact drilling, and successively penetrate the cave top, cave area and cave bottom, until the impact reaches 0.5±0.2m from the cave bottom and stops drilling to form an impact borehole.
[0028] The above-mentioned step three of the embodiment of the present invention includes: (1) replacing the rotary drilling rig with an impact drilling rig, excavating a mud pool to make slurry, and performing impact drilling after the slurry making is completed; (2) continuing the impact drilling, when the impact reaches 1m from the top of the cave area, increasing the relative density of the mud, and controlling the relative density of the mud to 1.3~1.5, while reducing the impact drilling construction speed, reducing the height of the hammer, and hitting slowly and low until the cave top is penetrated; (3) after entering the cave area, taking different treatment measures according to the height of the cave for impact drilling; (4) the impact drilling rig stops drilling until it impacts 0.5±0.2m below the bottom of the cave; (5) exiting the impact drilling rig to form an impact drill hole in the cave area and below the cave.
[0029] Furthermore, after entering the karst cave area, the embodiment of the present invention adopts different treatment measures for impact drilling according to the height of the karst cave, including: if the height of the karst cave is less than or equal to 4.0m, backfill with stone and loess, and replenish water and mud in large quantities, and impact repeatedly until a mudstone protective wall is formed and no more slurry leaks, wherein the ratio of loess stone backfill in stone and loess is 1:1; if the height of the karst cave is greater than 4.0m, first backfill with loess stone, replenish water and mud, and impact repeatedly to form a mudstone protective wall until the impact reaches 0.5m from the bottom of the karst cave, and then stop drilling; lower the inner casing and pour the bottom concrete to ensure that the gap between the inner casing and the karst cave is completely blocked. The embodiment of the present invention adopts different treatment measures according to the height of the karst cave, which can take into account both construction quality and economic benefits.
[0030] Step 4: lower the inner casing 3 into the outer casing 2 and the impact drilled hole, and pour the bottom sealing concrete 4 between the inner casing 3 and the bottom of the cave.
[0031] The above-mentioned step 4 of the embodiment of the present invention includes: (1) lowering the inner casing 3 into the outer casing 2 and the impact drilled hole formed in step 3; (2) pouring the bottom sealing concrete 4 between the inner casing 3 and the bottom of the cave to ensure that the gap between the casing and the cave is completely blocked. Please continue to read Figure 2 In the embodiment of the present invention, the material of the inner casing 3 is preferably steel, that is, the inner casing 3 is preferably an inner steel casing.
[0032] The embodiment of the present invention adopts a protective measure of a double-layer casing composed of an inner and outer layer casing. The outer layer casing effectively prevents the collapse of the weak layer, and the inner layer casing and the bottom sealing concrete effectively isolate the pile hole and the backfill area of the cave around the hole, avoiding the collapse of backfill soil and rock and invading the concrete during the concrete pouring process, thereby ensuring the quality of pile foundation pouring.
[0033] Step 5: After the bottom seal concrete 4 hardens, subsequent construction is carried out until the bored pile construction is completed.
[0034] The above-mentioned step five of the embodiment of the present invention includes: (1) after the bottom sealing concrete of step four is completely hardened, continue to impact drill until the designed pile bottom elevation is reached, stop drilling, pull out the drill bit, inspect and clean the pile hole; (2) after the acceptance is qualified, hoist the steel cage into the pile hole, and set the hoisting rod to locate the position of the steel cage.
[0035] Furthermore, step five of the embodiment of the present invention also includes: secondary hole cleaning, when the mud sand content is less than 2%, the mud specific gravity is less than 1.1, the viscosity is 17-20s, and the thickness of the sediment at the bottom of the hole is not more than 5cm, organize acceptance, install the conduit and pour concrete after qualified acceptance, and complete the pile foundation construction.
[0036] The embodiment of the present invention adopts a rotary drill to grind the inclined rock, effectively improving the efficiency of pile hole construction, and at the same time can strengthen the support effect of the outer casing, and prevent the soft soil layer in the inclined rock area from collapsing during the punching and drilling process.
[0037] The series of detailed descriptions listed above are only specific descriptions of feasible implementation methods of the present invention. They are not intended to limit the scope of protection of the present invention. Any equivalent implementation methods or changes that do not deviate from the technical spirit of the present invention should be included in the scope of protection of the present invention.
[0038] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
[0039] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A bored pile construction method under extremely developed karst cave geology, characterized in that: The following steps are involved: Step 1: Bury the positioning casing after geological exploration; Step 2: When the rotary drilling rig passes through a soft stratum, the operation is stopped, a rotary drilling hole is formed in the soft stratum, and an outer casing is arranged below the rotary drilling hole to form support for the soft stratum; Step 3: Replace the rotary drilling rig with an impact drilling rig to perform impact drilling, and successively penetrate the cave roof, cave area and cave bottom, until the impact reaches 0.5±0.2m from the cave bottom and stops drilling to form an impact drill hole; Step 4: lowering the inner casing into the outer casing and the impact drilled hole, and pouring bottom sealing concrete between the inner casing and the bottom of the cave; Step 5: After the bottom seal concrete hardens, subsequent construction is carried out until the bored pile construction is completed.
2. The bored pile construction method under extremely developed karst cave geology according to claim 1 is characterized in that: The step one comprises: Carry out geological exploration and testing, and take geological coring samples for each pile according to the pile hole area of bored pile construction to confirm the drilling depth corresponding to the soft strata and karst cave area at the pile hole location; The pile hole area is leveled and compacted, and after the pile position is located, the positioning casing is excavated and buried.
3. The bored pile construction method under extremely developed karst cave geology according to claim 1 is characterized in that: The second step comprises: The rotary drilling rig is in place and performs rotary drilling operation, and stops operating when the drill bit passes through the weak layer to form a rotary drilling hole. If inclined rock is encountered during the rotary drilling operation, the inclined rock is flattened and the operation is stopped to form the rotary drilling hole; An outer casing is arranged below to the corresponding rotary drilling hole to form support for the soft soil layer.
4. The bored pile construction method under extremely developed karst cave geology according to claim 1 is characterized in that: The step three comprises: Replace the rotary drilling rig with an impact drilling rig, dig a mud pool to make slurry, and then perform impact drilling after the slurry is made; Continue to percuss drilling. When the percussion reaches 1m above the top of the cave area, increase the relative density of the mud and control the relative density of the mud to 1.3-1.
5. At the same time, reduce the percussion drilling speed, reduce the height of the hammer, and hit slowly and low until the top of the cave is penetrated. After entering the cave area, different treatment measures are taken according to the height of the cave for impact drilling; The impact drill stops drilling until it reaches 0.5±0.2m below the bottom of the cave; The impact drill is withdrawn to form impact holes in the area where the cave is located and below the cave.
5. The bored pile construction method under extremely developed karst cave geology according to claim 4 is characterized in that: After entering the cave area, different treatment measures are taken according to the height of the cave for impact drilling, including: If the height of the cave is less than or equal to 4.0m, fill it with stone and loess, and add a large amount of water and mud, and impact it repeatedly until a mudstone wall is formed and no more mud leaks. The ratio of the stone to loess backfill is 1:
1. If the cave height is greater than 4.0m, first backfill with loess flakes, add water and mud, and impact repeatedly to form a mudstone wall until the impact reaches 0.5m from the bottom of the cave, then stop drilling; The inner casing is lowered and the bottom concrete is poured to ensure that the gap between the inner casing and the cave is completely blocked.
6. The bored pile construction method under extremely developed karst cave geology according to claim 1 is characterized in that: The fourth step comprises: Lowering an inner casing into the outer casing and the impact drilled hole formed in step 3; Bottom sealing concrete is poured between the inner casing and the bottom of the cave to ensure that the gap between the casing and the cave is completely blocked.
7. The bored pile construction method under extremely developed karst cave geology according to claim 1 is characterized in that: The step five comprises: After the bottom sealing concrete of step 4 is completely hardened, continue to impact drill until the designed pile bottom elevation is reached, stop drilling, remove the drill bit, inspect and clean the pile hole; After acceptance, the steel cage is hoisted into the pile hole and the hoisting rods are set to position the steel cage.
8. The bored pile construction method under extremely developed karst cave geology according to claim 7 is characterized in that: The step five also includes: After the second hole cleaning, when the mud sand content is less than 2%, the mud specific gravity is less than 1.1, the viscosity is 17-20s, and the thickness of the sediment at the bottom of the hole is no more than 5cm, an acceptance inspection is organized. After the acceptance is qualified, the guide tube is installed and concrete is poured to complete the pile foundation construction.