Buffering, anti-attrition and resistance-increasing method for staggered installation of deep well filling drill holes
Through the interlaced installation of buffer reduction and resistance reduction methods for deep well filling drilling, the filling pipeline is arranged in sections and reverse grouting and sealing measures are adopted, which solves the problem of serious wear of deep well drilling slurry, extends the drilling life and reduces the drilling life The construction cost is achieved, and the slurry flow rate is reduced and the drilling stability is improved.
Patent Information
- Application Number
- CN202410894223.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-04
AI Technical Summary
Due to the excessive depth of deep well filling drilling, the filling pipeline is subjected to huge pressure, and the slurry wears severely, causing the drilling holes to be blocked, damaged and short life. The existing technology is difficult to effectively buffer and increase resistance, resulting in stagnation of mine production.
The buffer reduction and resistance reduction method is adopted for deep well filling drilling staggered installation, and the filling pipeline is arranged in sections and staggered, and the resistance reduction is increased through vertical buffer sections to reduce the wear of the slurry on the inner wall of the pipeline, and the leakage is prevented by reverse grouting and sealing steel plates. slurry to improve the service life of the drilling hole.
It effectively reduces the slurry flow rate, reduces pipeline wear and erosion, extends the drilling service life, reduces construction period and cost, avoids drilling scrapping, and improves the stability of mine production.
Smart Images

Figure CN118934017A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mine filling, and in particular to a deep well filling drilling hole staggered installation buffering friction reduction and resistance increasing method. Background Art
[0002] As the "throat" project of the filling system, the backfilling borehole is used to transport the filling slurry from the surface to the underground goaf by gravity or pumping. With the gradual depletion of shallow mineral resources, deep mining of metal mineral resources is an inevitable trend. Due to the great depth of deep well backfilling boreholes, the filling pipes in the boreholes are under great pressure. During the transportation of the backfilling slurry, the slurry aggravates the wear and corrosion of the filling pipes. In severe cases, the boreholes will be blocked, damaged or even scrapped. Once the backfilling borehole is scrapped, new backfilling boreholes can only be reconstructed, which will not only directly bring great economic losses to the mine, but also lead to serious impacts such as paralysis of the entire backfilling system and stagnation of mine production.
[0003] In the existing technology, mines mainly use multi-step and return pipeline layout, and use existing tunnels to buffer and increase resistance of vertical filling pipelines. For multi-step and return pipeline layout technology, the amount of drilling and underground construction will be greatly increased, and the construction is difficult; the mining depth of deep metal mines is close to or exceeds 1000m, and some mines have reached the first mining depth of 1500m~2000m, making it difficult to realize the vertical filling pipeline using existing tunnels for buffering and increasing resistance.
[0004] In view of this, the present invention proposes a method for staggered installation of buffers to reduce friction and increase resistance in deep well filling boreholes, with the purpose of increasing resistance and reducing speed of deep well filling slurry, reducing wear and scouring of the inner wall of the filling pipe by the filling slurry, and increasing the service life of the filling borehole. Summary of the invention
[0005] The present invention provides a method for reducing wear and increasing resistance by staggered installation of buffers for deep well filling boreholes. The filling pipes in the deep well vertical filling boreholes are segmented and arranged in a staggered manner. The deep well filling slurry is increased in resistance and reduced in speed through vertical buffer sections, thereby solving the problems of severe pipe wear and short service life caused by drilling too deep.
[0006] In order to solve the above-mentioned invention object, the technical solution provided by the present invention is as follows:
[0007] A deep well filling drilling staggered installation buffering friction reduction and resistance increasing method comprises the following steps:
[0008] S1. Drill a vertical filling borehole from the ground level into the deep well, connect it with the underground filling connecting channel, and the filling pipeline enters the underground filling connecting channel from the vertical filling borehole;
[0009] S2. When the vertical filling borehole height exceeds 600m, the filling pipeline is arranged in sections and staggered;
[0010] S3, after the filling pipe is installed, since the filling borehole is too deep, the grouting and pipe fixing process adopts the reverse grouting measure at the bottom of the hole to prevent leakage of slurry at the bottom. A sealing steel plate is used at the bottom of the vertical filling borehole to seal the gap between the filling pipe and the vertical filling borehole, and a reverse grouting pipe is left on the sealing steel plate;
[0011] S4, reverse grouting is performed at a certain height through the reverse grouting pipe, and surface grouting is performed to fix the pipe after the cement slurry solidifies;
[0012] S5. After the filling pipeline is fixed, the filling slurry is transported from the surface through the filling pipeline to the filling connecting channel, wherein, after the filling slurry is buffered and increased in resistance by the vertical buffer section, the slurry flows to the next segmented filling pipeline through the horizontal transition section, and the last segmented filling pipeline reaches the filling connecting channel at the bottom of the hole, and then the slurry is transported to the deep well goaf by arranging the filling pipeline.
[0013] As described above, when the filling slurry is transported to the vertical buffer section, the resistance increases, the slurry flow rate is reduced, and the wear and scouring of the pipe wall is reduced.
[0014] In step S1, the filling borehole is perpendicular to the filling connecting channel, the filling borehole deviation rate does not exceed 0.5%-1%, and the filling borehole diameter is 500-700 mm.
[0015] The outer diameter of the filling pipe in step S1 is 127-168 mm, and the filling pipe is made of seamless steel pipe, bainite pipe or composite pipe.
[0016] In step S2, when the filling borehole depth is 600m~1000m, the length of each segmented filling pipeline is 300m~400m; when the filling borehole depth is 1000m~2000m, the length of each segmented filling pipeline is 400m~500m; when the filling borehole depth exceeds 2000m, the length of each segmented filling pipeline is 500m;
[0017] Two adjacent sections of the filling pipe are staggeredly arranged in the filling borehole, and the filling pipes are connected by quick joints, welding, or threading.
[0018] The filling pipe is subjected to compressive stress on its wall under the action of high ground stress in the external deep well. In order to enable the cement ring formed by grouting to resist the ground stress, the gap between the vertical filling borehole and the filling pipe is not less than 50mm.
[0019] After the filling pipeline is segmented in step S2, each segmented filling pipeline is 300-500m long, and the lower end of each segmented filling pipeline is a buffer resistance-increasing pipeline, which includes a pipeline tee, a vertical buffer section and a horizontal transition section. During installation, the pipeline tee is first used to connect the lower end of the previous segmented filling pipeline, the vertical buffer section and the horizontal transition section, and then the horizontal transition section is connected to the upper end of the next segmented filling pipeline through a bend pipe.
[0020] The height of the reverse grouting in step S4 is not less than 2 m.
[0021] The length of the vertical buffer section is 0.5m~1m, and the bottom sealing thickness of the vertical buffer section is not less than 0.1m; the length of the horizontal transition section is 146mm~264mm, and the specific length is determined by the diameter of the drill hole and the diameter of the filling pipe.
[0022] When the distance between the air shaft and the deep well goaf meets the filling slurry transportation requirements, the existing air shaft space is used in step S1 to replace the vertical filling boreholes, the filling pipes are staggered along the air shaft, and the filling pipes are fixed to the air shaft wall.
[0023] Compared with the prior art, the above technical solution has at least the following beneficial effects:
[0024] The above scheme arranges the filling pipes in sections and staggered in the deep well vertical filling borehole. When the filling slurry is transported to the vertical buffer section, the resistance increases, the slurry flow rate is reduced, and the wear and scouring of the inner wall of the pipe is reduced; this method is beneficial to achieve the increase of resistance and speed reduction of deep well filling slurry, and avoids the problems of severe pipe wear and short service life caused by excessive drilling. With the continuous increase in the depth of the filling well, the traditional mine multi-step and return pipeline buffer resistance increase technology will not be able to solve the problems faced by the drilling section. The present invention increases resistance and reduces wear in the borehole. Compared with the resistance reduction of the dedicated tunnel between the boreholes, the construction period and cost are greatly reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0026] Figure 1 It is a schematic diagram of the arrangement of a deep well filling borehole staggered installation buffering friction reduction and resistance increase method of the present invention;
[0027] Figure 2 It is a schematic diagram of the buffer resistance-increasing pipeline of the present invention.
[0028] Among them: 1-vertical filling borehole, 2-filling connecting channel, 3-filling pipeline, 4-buffering resistance-increasing pipeline, 5-pipeline tee, 6-vertical buffer section, 7-horizontal transition section, 8-sealing steel plate, 9-reverse grouting pipe. DETAILED DESCRIPTION
[0029] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] Unless otherwise defined, the technical or scientific terms used in the present invention shall have the common meanings understood by persons with ordinary skills in the field to which the present invention belongs. The terms "upper", "lower", "left", "right", "front", "back", etc. used in the present invention are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0031] The invention provides a deep well filling borehole staggered installation buffering friction reduction and resistance increasing method.
[0032] The method is arranged as Figure 1 As shown, the specific steps are as follows:
[0033] S1, drilling a vertical filling borehole 1 from the ground level to the deep well, connecting with the underground filling connecting channel 2, and the filling pipeline 3 enters the underground filling connecting channel 2 from the vertical filling borehole 1;
[0034] S2. When the height of the vertical filling borehole 1 exceeds 600m, the filling pipes 3 are arranged in sections and staggered;
[0035] S3, after the filling pipe 3 is installed, the grouting and pipe fixing process adopts the reverse grouting measure at the bottom of the hole, and the gap between the filling pipe 3 and the vertical filling borehole 1 is sealed by a sealing steel plate 8 at the bottom of the vertical filling borehole 1, and a reverse grouting pipe 9 is left on the sealing steel plate 8;
[0036] S4, reverse grouting is performed at a certain height through the reverse grouting pipe 9, and surface grouting is performed to fix the pipe after the cement slurry solidifies;
[0037] S5. After the filling pipeline 3 is fixed, the filling slurry is transported from the surface through the filling pipeline 3 to the filling connecting channel 2, wherein, after the filling slurry is buffered and increased in resistance by the vertical buffer section 6, the slurry flows to the next segmented filling pipeline through the horizontal transition section 7, and the last segmented filling pipeline reaches the filling connecting channel at the bottom of the hole, and then the slurry is transported to the deep well goaf by arranging the filling pipeline.
[0038] like Figure 2 After the filling pipeline is segmented in step S2, each segmented filling pipeline is 300~500m long, and the lower end of each segmented filling pipeline is a buffer resistance-increasing pipeline 4, which includes a pipeline tee 5, a vertical buffer section 6 and a horizontal transition section 7; during installation, first use the pipeline tee 5 to connect the lower end of the previous segmented filling pipeline, the vertical buffer section 6 and the horizontal transition section 7, and then connect the horizontal transition section 7 to the upper end of the next segmented filling pipeline through a bend pipe.
[0039] When the distance between the air shaft and the deep well goaf meets the filling slurry transportation requirements, the existing air shaft space is used in step S1 to replace the vertical filling boreholes, the filling pipes are staggered along the air shaft, and the filling pipes are fixed to the air shaft wall.
[0040] This will be described below with reference to specific embodiments.
[0041] The mining depth of a certain mine is 1200m. The mining method adopted by the mine is the filling mining method. In order to solve the problems of severe pipe wear and short service life caused by excessively deep drilling, a deep well filling drilling staggered installation buffering friction reduction and resistance increase method provided by the present invention is adopted. The specific process includes the following steps:
[0042] S1: Drill a vertical filling borehole 1 from the ground level into the deep well, which is connected with the underground filling connecting channel 2. The borehole diameter is 600mm. The borehole is kept vertical as much as possible during the drilling construction, and the borehole deviation rate does not exceed 1%. The cross-sectional structure of the vertical filling borehole 1 is that a filling pipe 3 is installed in the borehole, and the outer diameter of the pipe is 159mm. The filling pipe is made of seamless steel pipe, and the pipes are connected by threaded threads;
[0043] S2: The height of the vertical filling borehole 1 is 1200m, and the filling pipeline is divided into 3 sections and arranged in a staggered manner. Each section filling pipeline is 400m long, and the lower end is a buffer resistance-increasing pipeline 4. During installation, the vertical buffer section 6 and the horizontal transition section 7 are first connected using the pipeline tee 5 to complete the connection of the buffer resistance-increasing pipeline 4. The length of the vertical buffer section 6 is 1m, and the bottom sealing thickness of the vertical buffer section is 0.1m. The gap between the vertical filling borehole 1 and the filling pipeline 3 is 60mm. The length of the horizontal transition section 7 is 162mm, and then the horizontal transition section 7 of the buffer resistance-increasing pipeline 4 is connected to the lower section filling pipeline through a bend pipe, and then the upper section pipeline is connected to the upper end of the pipeline tee 5;
[0044] S3: After the filling pipe 3 is installed, since the filling borehole 1 is too deep, a reverse grouting measure can be taken at the bottom of the hole in the grouting and pipe fixing process to prevent leakage of slurry at the bottom. A sealing steel plate 8 is used at the bottom of the hole to seal the gap between the filling pipe 3 and the vertical filling borehole 1. The sealing steel plate 8 has a reverse grouting pipe 9. First, a certain amount of reverse grouting is performed. The height of the reverse grouting is about 3m. After the high-grade cement slurry solidifies, surface grouting and pipe fixing are performed. Grouting is stopped until cement slurry overflows from the orifice of the vertical filling borehole 1, and grouting is performed depending on the settlement of the cement slurry.
[0045] S4: transporting the filling slurry from the surface to the deep well goaf through the filling pipe 3. When the filling slurry is transported to the vertical buffer section 6, the resistance increases and the slurry flow rate is reduced, thereby reducing the wear and scouring of the pipe wall.
[0046] S5: After buffering and increasing resistance in the vertical buffer section 6, the slurry flows to the next section through the horizontal transition section 7. The filling pipeline of the last section reaches the filling connecting channel 2 at the bottom of the hole, and then the filling slurry is transported to the deep well goaf by arranging the filling pipeline.
[0047] There are a few points to note:
[0048] (1) The drawings of the embodiments of the present invention only involve structures related to the embodiments of the present invention. Other structures may refer to conventional designs.
[0049] (2) In the absence of conflict, the embodiments of the present invention and the features therein may be combined with each other to obtain new embodiments.
[0050] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. The protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. A deep well filling drilling staggered installation buffering friction reduction and resistance increase method, characterized in that: The steps include: S1. Drill a vertical filling borehole from the ground level into the deep well, connect it with the underground filling connecting channel, and the filling pipeline enters the underground filling connecting channel from the vertical filling borehole; S2. When the vertical filling borehole height exceeds 600m, the filling pipeline is arranged in sections and staggered; S3, after the filling pipe is installed, the grouting and pipe fixing process adopts the reverse grouting measure at the bottom of the hole, and a sealing steel plate is used at the bottom of the vertical filling borehole to seal the gap between the filling pipe and the vertical filling borehole, and a reverse grouting pipe is left on the sealing steel plate; S4, reverse grouting is performed at a certain height through the reverse grouting pipe, and surface grouting is performed to fix the pipe after the cement slurry solidifies; S5. After the filling pipeline is fixed, the filling slurry is transported from the surface through the filling pipeline to the filling connecting channel, wherein, after the filling slurry is buffered and increased in resistance by the vertical buffer section, the slurry flows to the next segmented filling pipeline through the horizontal transition section, and the last segmented filling pipeline reaches the filling connecting channel at the bottom of the hole, and then the slurry is transported to the deep well goaf by arranging the filling pipeline.
2. The deep well filling drilling staggered installation buffering friction reduction and resistance increase method according to claim 1 is characterized in that: In step S1, the filling borehole is perpendicular to the filling connecting channel, the filling borehole deviation rate does not exceed 0.5%-1%, and the filling borehole diameter is 500-700 mm.
3. The deep well filling drilling staggered installation buffering friction reduction and resistance increase method according to claim 1 is characterized in that: The outer diameter of the filling pipe in step S1 is 127-168 mm, and the filling pipe is made of seamless steel pipe, bainite pipe or composite pipe.
4. The deep well filling drilling staggered installation buffering friction reduction and resistance increase method according to claim 1 is characterized in that: In step S2, when the filling borehole depth is 600m~1000m, the length of each segmented filling pipeline is 300m~400m; when the filling borehole depth is 1000m~2000m, the length of each segmented filling pipeline is 400m~500m; when the filling borehole depth exceeds 2000m, the length of each segmented filling pipeline is 500m; Two adjacent sections of the filling pipe are staggeredly arranged in the filling borehole, and the filling pipes are connected by quick joints, welding, or threading.
5. The deep well filling drilling staggered installation buffering friction reduction and resistance increase method according to claim 1 is characterized in that: The gap between the vertical filling borehole and the filling pipe is not less than 50 mm.
6. The deep well filling drilling staggered installation buffering friction reduction and resistance increase method according to claim 1 is characterized in that: After the filling pipeline is segmented in step S2, each segmented filling pipeline is 300-500m long, and the lower end of each segmented filling pipeline is a buffer resistance-increasing pipeline, which includes a pipeline tee, a vertical buffer section and a horizontal transition section. During installation, the pipeline tee is first used to connect the lower end of the previous segmented filling pipeline, the vertical buffer section and the horizontal transition section, and then the horizontal transition section is connected to the upper end of the next segmented filling pipeline through a bend pipe.
7. The deep well filling drilling staggered installation buffering friction reduction and resistance increase method according to claim 1 is characterized in that: The height of the reverse grouting in step S4 is not less than 2 m.
8. The deep well filling drilling staggered installation buffering friction reduction and resistance increase method according to claim 6 is characterized in that: The length of the vertical buffer section is 0.5m~1m, and the bottom sealing thickness of the vertical buffer section is not less than 0.1m; the length of the horizontal transition section is 146mm~264mm.
9. The deep well filling drilling staggered installation buffering friction reduction and resistance increase method according to claim 1 is characterized in that: When the distance between the air shaft and the deep well goaf meets the filling slurry transportation requirements, the existing air shaft space is used in step S1 to replace the vertical filling boreholes, the filling pipes are staggered along the air shaft, and the filling pipes are fixed to the air shaft wall.
Citation Information
Patent Citations
Mechanical combined mining method for steep multi-layer thin ores
CN108060924A
Method for looking for hole at bottom of filling drill hole
CN109578070A
Resistance-increasing and pressure-relieving system for filling slurry pipeline transportation and using method thereof
CN114017107A
Intelligent control expansion capsule grouting system
CN117722229A
System for synchronous hydraulic coal mining and filling
CN203925502U