Process for recycling excess pressure of shaft furnace charging system during pressure increasing and releasing
By adding residual pressure recovery pipe and control valve group in the vertical furnace charging system, the recovery and reuse of nitrogen pressure is achieved, and the problems of nitrogen waste and high-frequency increase and pressure relief in the existing technology are solved, which significantly improves production efficiency and safety Suitable for a variety of vertical furnace projects.
Patent Information
- Application Number
- CN202411187481.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-12
AI Technical Summary
The existing vertical furnace charge system has a large amount of energy and resources for nitrogen during the pressure increase and unloading process, and frequent pressure increase and unloading operations are required every day, resulting in insufficient efficiency and economicality.
The pressure increase and unloading pipe of the loading pressure equalization chamber is added to the inlet and outlet of the pressure increase and unloading pipe of the loading pressure equalization chamber, and automatic management is realized through the control valve group and logic control, and the nitrogen pressure after the pressure is used for recycling and reuse, so as to realize the Pressure interoperability and recycling.
By recycling and utilization of nitrogen, half of nitrogen consumption is reduced, production efficiency and safety are improved, and it is suitable for all types of vertical furnace projects, especially in high yield and high frequency charging scenarios, which show significant nitrogen consumption saving effect.
Smart Images

Figure CN118936019A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to various pressure increasing and unloading fields, in particular to a method for pressure equalization treatment of multiple tanks, and more specifically discloses a process for recovering excess pressure of a vertical furnace charging system. Background Art
[0002] The vertical furnace needs to be operated under high pressure during production, with an operating pressure of 0.2 to 0.8 MPa. In the charging control, the pellets need to be loaded into the vertical furnace from the top charging system at normal pressure through the pressure switching of the pressure equalizing bin for pressurization and pressure relief. That is, the charging pressure equalizing bin at the top of the vertical furnace receives the pellets from the charging bin under normal pressure. After the charging is completed, gas (usually nitrogen) is introduced through the pressure boosting valve for pressurization, so that the pressure of the charging pressure equalizing bin increases from normal pressure to the high pressure inside the vertical furnace, and then the gas-tight shut-off valve is opened to load the pellets into the vertical furnace.
[0003] After the vertical furnace is loaded with materials, nitrogen is discharged into the atmosphere through the loading pressure relief valve. After the pressure is reduced to normal pressure, the loading continues. This loading process of increasing and reducing pressure is repeated continuously.
[0004] This process has always been the process flow of high-pressure charging systems such as vertical furnaces and blast furnaces, and requires hundreds of reciprocating motions every day.
[0005] However, under the current process, the gas (nitrogen) used for pressurization is vented during the pressure relief operation. The gas (nitrogen) used for pressurization and the internal capacity (pressure) are both in a one-time use state, resulting in unlimited consumption and waste of medium and energy, which is a great deficiency. Summary of the invention
[0006] The present invention provides a process for recovering and utilizing excess pressure of a vertical furnace charging system during pressure increase and pressure reduction, which can solve the problems raised in the above-mentioned background technology.
[0007] In order to solve the above technical problems, according to one aspect of the present invention, more specifically, a process for recovering and utilizing the residual pressure of the pressure-increasing and pressure-unloading system of a vertical furnace charging system is provided. A residual pressure recovery pipe is added to the inlet and outlet of the pressure-increasing and pressure-unloading pipe of the charging pressure-equalizing bin, and a control valve group is arranged on the pipeline. All automatic control is completed through control logic, mainly by program-controlled opening and closing switching of the airtight shut-off valve and the residual pressure recovery valve on the pipeline, and the valve groups of each charging pressure-equalizing bin are connected with the pipeline, and the nitrogen pressure originally to be discharged from the charging pressure-equalizing bin 1 after pressurization is used to pressurize the charging pressure-equalizing bin 2 waiting for pressurization. Specifically, the following steps are included:
[0008] S1, unloading is completed;
[0009] S2. When there is no material outflow signal from the vertical furnace ray level meter, make a judgment;
[0010] S3, when waiting for pressurization, the bypass gas shut-off valve is opened;
[0011] S31, through delay control, when the pressures of the two silos are equal, the charging and equalizing pressure silo 1 closes the relevant airtight shut-off valve, and after being disconnected from the residual pressure recovery system, the charging and equalizing pressure silo 1 automatically releases the pressure to normal pressure to prepare for receiving the pelletizing material from the raw materials;
[0012] S32, at this time, the charging pressure equalizing bin 2 needs to continue to increase the pressure to the internal pressure of the vertical furnace, and start the unloading action;
[0013] S4. If there is no waiting time for pressurization, the loading pressure relief valve opens to perform pressure relief operation, and then stops.
[0014] Furthermore, in step S5, the pressure increase and pressure reduction between the chambers are cyclically repeated to recover and utilize the pressure after the mutual pressurization.
[0015] Furthermore, the logic control specifically includes the following steps:
[0016] S1. Pressure detection and selection of the pressurized high-pressure chamber, specifically through pressure detection and program discrimination value setting;
[0017] S2, the normal pressure warehouse is selected through pressure detection and the timing of loading and unloading in the program;
[0018] S3. The residual pressure recovery control counter is used to switch between valve groups to achieve automatic pressure recovery. At the same time, the residual pressure recovery process is automatically determined by a time calculator or a differential pressure transmitter.
[0019] The beneficial effects of the residual pressure recovery and utilization process of the vertical furnace charging system pressure increase and discharge of the present invention are as follows:
[0020] The method for recovering pressurized gas (nitrogen) of the present invention can reuse the high-pressure nitrogen after pressurization in the front bin, thereby reducing nitrogen emissions. Under normal production conditions, a certain amount of nitrogen will be consumed in each loading and unloading process of each charging silo in the vertical furnace. After the process of the present invention, half of the nitrogen consumed in the early stage can be recovered and utilized. Calculated based on an annual output of 1 million tons, 23 loadings are required per hour under the working condition of 125t / h. The present invention can save nitrogen consumption by 287.5Nm 3 / h. At the same time, the process of the present invention is highly safe and fully intelligent.
[0021] The present invention is practical and economical in a hydrogen-based vertical furnace, has broad prospects, and can be extended to other vertical furnace projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The present invention is further described in detail below with reference to the accompanying drawings and specific implementation methods.
[0023] Figure 1 It is the pipeline process pipeline diagram of the present invention;
[0024] Figure 2 It is a process control flow chart of the present invention. DETAILED DESCRIPTION
[0025] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.
[0026] According to the attached Figure 1-2 , provides a process for recycling excess pressure in the pressure increase and unloading of a vertical furnace charging system, wherein an excess pressure recovery pipe is added to the inlet and outlet of the pressure increase and unloading pipe of the charging pressure equalizing bin, and a control valve group is arranged on the pipeline, and all automatic control is completed through control logic, mainly by program-controlled opening and closing switching of the gas-tight shut-off valve and the excess pressure recovery valve on the pipeline, and the valve group of each charging pressure equalizing bin is connected with the pipeline, and the nitrogen pressure originally to be unloaded in the charging pressure equalizing bin 1 after pressurization is used to pressurize the charging pressure equalizing bin 2 waiting for pressurization. Specifically, the following steps are included:
[0027] S1, unloading is completed;
[0028] S2. When there is no material outflow signal from the vertical furnace ray level meter, make a judgment;
[0029] S3, when waiting for pressurization, the bypass gas shut-off valve is opened;
[0030] S31, through delay control, when the pressures of the two silos are equal, the charging and equalizing pressure silo 1 closes the relevant airtight shut-off valve, and after being disconnected from the residual pressure recovery system, the charging and equalizing pressure silo 1 automatically releases the pressure to normal pressure to prepare for receiving the pelletizing material from the raw materials;
[0031] S32, at this time, the charging pressure equalizing bin 2 needs to continue to increase the pressure to the internal pressure of the vertical furnace, and start the unloading action;
[0032] S4. If there is no waiting time for pressurization, the loading pressure relief valve opens to perform pressure relief operation, and then stops.
[0033] In this embodiment, in step S5, the pressure increase and reduction cycles between the chambers are repeated to recover and utilize the pressure after the mutual pressurization.
[0034] In this embodiment, the logic control specifically includes the following steps:
[0035] S1. Pressure detection and selection of the pressurized high-pressure chamber, specifically through pressure detection and program discrimination value setting;
[0036] S2, the normal pressure warehouse is selected through pressure detection and the timing of loading and unloading in the program;
[0037] S3. The residual pressure recovery control counter is used to switch between valve groups to achieve automatic pressure recovery. At the same time, the residual pressure recovery process is automatically determined by a time calculator or a differential pressure transmitter.
[0038] The working principle of the present invention is:
[0039] By adding a residual pressure recovery pipe to the inlet and outlet of the pressure-increasing and unloading pipe of the charging and pressure-equalizing bunker, and setting a control valve group on the pipeline, all automatic control is completed through the preferred control logic. It is mainly composed of the program-controlled opening and closing switching of the airtight shut-off valve and the residual pressure recovery valve on the pipeline, and is connected to the pipeline through the valve group of each charging and pressure-equalizing bunker. The nitrogen pressure that was originally to be unloaded in the charging and pressure-equalizing bunker 1 after pressurization is used to pressurize the charging and pressure-equalizing bunker 2 that is waiting for pressurization. Through delay control, when the pressures of the two bunkers are equal, the charging and pressure-equalizing bunker 1 closes the relevant airtight shut-off valve, and after being cut off from the residual pressure recovery system, the charging and pressure-equalizing bunker 1 automatically releases the pressure to normal pressure to prepare to receive the pelletized material from the raw materials; at this time, the charging and pressure-equalizing bunker 2 continues to pressurize to the internal pressure of the vertical furnace and starts the unloading action. The pressure increase and unloading cycles between the bunkers are repeated to recycle the pressure after mutual pressurization.
[0040] The logic control of the present invention is intelligently selected and automatically programmed: the pressure detection of the pressurized high-pressure chamber is selected (selected by pressure detection and program discrimination value setting) → the normal pressure chamber (selected by pressure detection and loading and unloading timing discrimination in the program), and the pressure is automatically recovered by switching between valve groups through the residual pressure recovery control counter. At the same time, the residual pressure recovery process is automatically recovered and discriminated by a time calculator or a differential pressure transmitter.
[0041] The electrical components that appear in this article are all electrical components that exist in reality.
[0042] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present invention also fall within the protection scope of the present invention.
Claims
1. A process for recycling excess pressure in a vertical furnace charging system, wherein an excess pressure recovery pipe is added to the inlet and outlet of the pressure increasing and unloading pipe of the charging pressure equalizing bin, and a control valve group is arranged on the pipeline, and all automatic control is completed through control logic, mainly by program-controlled opening and closing switching of the gas-tight shut-off valve and the excess pressure recovery valve on the pipeline, and the valve group of each charging pressure equalizing bin is connected with the pipeline, and the nitrogen pressure originally to be discharged from the charging pressure equalizing bin 1 after pressurization is used to pressurize the charging pressure equalizing bin 2 waiting for pressurization, and the characteristics are: The specific steps include: S1, unloading is completed; S2. When there is no material outflow signal from the vertical furnace ray level meter, make a judgment; S3, when waiting for pressurization, the bypass gas shut-off valve is opened; S31, through delay control, when the pressures of the two silos are equal, the charging and equalizing pressure silo 1 closes the relevant airtight shut-off valve, and after being disconnected from the residual pressure recovery system, the charging and equalizing pressure silo 1 automatically releases the pressure to normal pressure to prepare for receiving the pelletizing material from the raw materials; S32, at this time, the charging pressure equalizing bin 2 needs to continue to increase the pressure to the internal pressure of the vertical furnace, and start the unloading action; S4. If there is no waiting time for pressurization, the loading pressure relief valve opens to perform pressure relief operation, and then stops.
2. A process for recovering excess pressure of a vertical furnace charging system according to claim 1, characterized in that: In step S5, the pressure increase and pressure reduction between the chambers are repeated to recover and utilize the pressure after the mutual pressurization.
3. A process for recovering excess pressure of a vertical furnace charging system according to claim 1, characterized in that: The logic control specifically includes the following steps: S1. Pressure detection and selection of the pressurized high-pressure chamber, specifically through pressure detection and program discrimination value setting; S2, the normal pressure warehouse is selected through pressure detection and the timing of loading and unloading in the program; S3. The residual pressure recovery control counter is used to switch between valve groups to achieve automatic pressure recovery. At the same time, the residual pressure recovery process is automatically determined by a time calculator or a differential pressure transmitter.
Citation Information
Cited By
Emergency disposal switching process technology for large hydrogen-based shaft furnace
CN120967087A