Side blowing and inclined blowing combined smelting furnace and using method thereof
By introducing a combination of inclined blowing eyes and direct blowing eyes into the side blowing melting furnace, the problems of low heat utilization and cumbersome operation of the direct blowing eyes are solved, the risk of melt leakage is reduced, and the reaction efficiency and production stability are improved. .
Patent Information
- Application Number
- CN202411089719.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-12
AI Technical Summary
When using direct blowing eyes to supply air, existing side blowing furnaces have low heat utilization, cumbersome operation, inconvenient maintenance and melt leakage risks. The melt freezes after the furnace is shut down and the partition wall is blocked, affecting production.
Using a smelting furnace design combining side blowing and oblique blowing, by setting an inclined hole water jacket and oblique blowing eye on the furnace body, combining direct blowing eye eye to adjust the angle and quantity of the air eye, and using the oblique blowing eye to supply natural gas to reduce operation Difficulty and melt leakage risk, and turn on the oblique blower eye to enhance the reaction process when needed.
The heating efficiency of the furnace body refractory material is improved, the operation is simplified, the risk of melt leakage is reduced, the furnace condition deterioration caused by insufficient reaction agitation is avoided, and the reaction efficiency and production stability are enhanced.
Smart Images

Figure CN118936039A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of metal smelting, and in particular relates to a smelting furnace combining side blowing and oblique blowing and a use method thereof. Background Art
[0002] Side-blown smelting furnaces are mainly used for matte smelting of copper concentrate. The tuyere is the main gas supply device for the molten pool reaction in side-blown smelting. Currently, they are all designed as direct-blowing tuyere. First, the tuyere blows directly to supply gas, and the gas enters the molten pool for a distance and then escapes toward the outside, sucking in the material to react, with less erosion to the refractory masonry of the lower furnace cylinder and the copper water jacket; second, the gas blown directly from the tuyere escapes upward, and the stirring is mainly in the tuyere and the upper molten pool area, with less stirring to the lower molten pool, which is beneficial to the sedimentation and separation of slag and copper.
[0003] At present, lump coal and coke are mainly used as fuel for side-blowing smelting furnaces to bake, heat up, make molten pools and keep the furnace warm. If the CO produced by incomplete combustion enters the electrostatic precipitator, there will be an explosion risk and the toxic gas will escape and endanger the surrounding workers. Although the use of natural gas burners for direct blowing can solve the above problems, the direct blowing of burners installed from the top or side wall has the following shortcomings: first, the heat utilization is low; second, the operation is cumbersome and inconvenient to maintain; third, the natural gas gun on the furnace top cannot be used normally when the existing feeding equipment crosses to make the molten pool. On the other hand, when the side-blown smelting furnace is shut down and the melt is not drained, a certain amount of melt left in the furnace will gradually freeze as the material is stopped. After normal feeding, the upper molten pool melts, but the freezing of the lower part will cause blockage of the partition wall and the siphon. When the melt level in the furnace is too high, it cannot be discharged normally, resulting in frequent shutdown and restart of the furnace. During normal production, the direct blowing air inlet is below the liquid level of the molten pool. Improper operation when opening, blocking and cleaning the air eye may easily lead to melt leakage, which may block the air inlet at the least and burn the air eye and pipeline at the worst. Summary of the invention
[0004] In view of the above-mentioned shortcomings of the current side-blown smelting furnace using direct blowing tuyere to supply air, the present invention provides a smelting furnace combining side-blowing and oblique blowing and a method for using the same. The oblique blowing tuyere is used to reduce the difficulty of operations such as heating up the refractory materials, making a molten pool and opening the furnace in the side-blown smelting furnace. At the same time, the oblique blowing tuyere can be used to handle special furnace conditions and strengthen the reaction process during shutdown and resumption of production, thereby reducing the risk of melt leakage in the tuyere during normal production.
[0005] The present invention is achieved through the following technical solutions: A smelting furnace combining side blowing and oblique blowing, wherein an oblique hole water jacket is fixed on the smelting furnace body through a furnace body enclosure and a pull rod; the oblique hole water jacket is provided with oblique blowing air holes and straight blowing air holes; The angle between the oblique blowing air eye and the horizontal line is 15° to 45°, which is adjusted according to the actual production process; the oblique blowing air eye is a truncated cast copper water jacket, including a cast copper water jacket I, an air supply channel and a connecting pressure plate; the cast copper water jacket I has a copper pipe embedded therein, which is cast together with the air supply channel; the connecting pressure plate has an air supply pipeline inside, the front end of the air supply pipeline is fitted with the cast copper water jacket I and fixed to the oblique hole water jacket by bolts, and the end of the air supply pipeline is sealed and connected to the air supply tee by a thread or a flange; The inclined hole water jacket is a rectangular water jacket, including a cast copper water jacket II, a mounting boss, an inclined mounting hole and a threaded hole; a copper tube is buried in the cast copper water jacket II for cooling, the mounting boss and the inclined mounting hole are cast together, the angle of the inclined mounting hole is 15° to 45° for placing the oblique blowing air eye, which is adjusted according to the actual production process; a threaded hole is provided on the mounting boss to thread the oblique blowing air eye; The direct blowing wind eye is parallel to the horizontal line; The oblique blowing air eyes and the straight blowing air eyes are arranged at intervals, and one oblique blowing air eye is arranged between every 2 to 4 straight blowing air eyes.
[0006] Preferably, the number of the oblique blowing tuyeres does not exceed 40% of the total number of tuyeres. The reaction gas supply is mainly provided by the straight blowing tuyeres to prevent the oblique blowing tuyeres from eroding the refractory materials of the furnace body and violently stirring the molten pool during normal production.
[0007] Preferably, the connecting pressure plate is cast together with the cast copper water jacket I and the air supply channel, and then threads and holes are processed to fix the air supply tee.
[0008] Preferably, the inner diameter of the gas supply channel is ≥40 mm to ensure that a natural gas burner can be inserted to provide sufficient natural gas to heat the refractory material.
[0009] Preferably, the two sides of the cast copper water jacket II are designed with overlapping staggered platforms for water jacket sealing, and the fire-facing surface of the cast copper water jacket II is designed with grooves for fixing refractory castables.
[0010] Preferably, the gas supply tee includes an oxygen-enriched air valve, an oxygen-enriched air pipeline, an observation cover, an operating ball valve, an air supply cleaning pipeline and a gas supply main channel; The oxygen-enriched air pipeline and the air supply cleaning pipeline are welded or cast to form a tee with the main air supply channel, and the oxygen-enriched air valve and the operating ball valve are connected to the air inlet ends of the oxygen-enriched air pipeline and the air supply cleaning pipeline respectively by threads or flanges; The observation cover is installed at the end of the operating ball valve.
[0011] Preferably, the diameter of the operating ball valve is greater than or equal to the inner diameter of the air supply cleaning pipeline, so that the valve will not be difficult to close due to slag when opening or blocking the air eye.
[0012] At the same time, the present invention also provides a method for using the smelting furnace combining side blowing and oblique blowing, which mainly includes but is not limited to the following three working conditions: A: Used for heating the refractory materials in the side-blown smelting furnace; B: Used for making molten pool and starting furnace in side-blown smelting furnace; C: Used for side-blown melting furnaces to recover from adhesion, insufficient stirring, and furnace freezing; The specific steps of A are as follows: A1: Complete the equipment processing and installation according to the above requirements, confirm that the refractory materials of the furnace body have been laid and are ready for heating; A2: According to the number of oblique air ports configured in the side-blowing smelting furnace and the heating curve of the refractory material, set the number of burners to be opened, and adjust the natural gas volume and combustion-supporting air volume of the burners; A3: After confirming that the smelting furnace has been heated to 200℃ using firewood and there is an open flame in the furnace, close the oxygen-enriched air valve of the gas supply tee, open the observation cover at the end of the operating ball valve, and then open the operating ball valve; A4: Insert the natural gas burner into the gas supply channel. The end of the natural gas burner should extend 300-1000mm beyond the end of the oblique air hole to prevent the copper water jacket from burning. After installation, supply natural gas for ignition. After successful ignition, adjust the natural gas flow rate. A5: When the refractory material is heated to 1200℃~1300℃, the heating operation of the furnace is finished; A6: After confirming that the side-blowing air eye is no longer in use, remove the natural gas burner, plug the air eye with an air eye plug, and end the operation; The specific steps of B are as follows: B1: Complete equipment processing and installation according to the above requirements and confirm that the heating of refractory materials has been completed; B2: Adjust the natural gas volume of the burner according to the number of oblique air holes opened and the position of the stockpile in the side-blowing smelting furnace; B3: Add the solid mixed materials such as smelting slag and copper matte according to the set material amount from the charging port on the top of the smelting furnace body; B4: Confirm the position of the pile formed by the solid mixed material in the furnace, select the oblique blowing eye at the position of the pile and close the oxygen-enriched air valve of the gas supply tee, open the observation cover and open the operating ball valve, install the natural gas burner in the gas supply channel, and after supplying natural gas, use the high temperature of the furnace to ignite the natural gas burner; B5: The solid mixed material added to the furnace is gradually melted by burning natural gas for heating, and the furnace top is continuously charged. When the liquid level in the furnace rises to 50-100mm below the end of the oblique blowing eye, the solid mixed material is stopped from being added. After the natural gas is stopped, the natural gas burner in the oblique blowing eye is removed, the operating ball valve of the gas supply three-way and the rear end observation cover are closed, and the oxygen-enriched air valve is opened for ventilation to prevent the oblique blowing eye channel from being blocked; B6: Solid copper matte is continuously added to the furnace top. The solid copper matte with high specific gravity settles to the furnace bottom and then raises the molten pool liquid level. When the melt surface rises to 100-200mm above the end of the oblique blowing tuyere, mixed solid materials such as concentrate are added. At the same time, the oxygen-enriched air volume of the oblique blowing tuyere is increased to stir the upper high-temperature melt and the solid copper matte deposited at the bottom for reaction and heat exchange. After all the solid materials in the furnace are melted, the oblique blowing tuyere is plugged with a tuyere plug and the oxygen-enriched air valve is closed. B7: All oblique blowing tuyeres are plugged and stopped, and the reaction air supply is switched to the straight blowing tuyeres for normal production. The operation of using oblique blowing tuyeres to make a molten pool and start the furnace is completed; The specific steps of C are as follows: C1: Complete equipment processing and installation according to the above requirements, confirm that the side-blowing smelting furnace is put into production, and the smelting liquid level is 100-200mm higher than the end of the oblique blowing eye; C2: Confirm the area of bonding, freezing and insufficient stirring, select the oblique blowing eye in this area to open, and after determining the number of oblique blowing eyes to be opened, first open the oxygen-enriched air valve of the corresponding air supply tee, and then quickly pull out the eye plug. If the front end of the corresponding oblique blowing eye is blocked by bonding, use a steel chisel to clean it from the air supply cleaning pipeline. After confirming that the oblique blowing eye is ventilated normally, close the operating ball valve; C3: When the oblique blowing tuyere is used to supply oxygen-enriched air for reaction, the temperature of the surrounding water jacket and refractory surface should be checked. After the reaction is normal, switch to the straight blowing tuyere for air supply immediately, and plug the oblique blowing tuyere with a tuyere plug; C4: When all oblique blowing air eyes are plugged and stopped, the reaction air supply is switched to the straight blowing air eyes and normal production is carried out. The reaction operation using oblique blowing air eyes to strengthen the reaction is completed.
[0013] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. The present invention adopts an oblique blowing air eye to install a natural gas burner to introduce natural gas to heat the furnace refractory material or the molten pool. The natural gas burner can be quickly installed and removed in the oblique blowing air eye, avoiding the current natural gas burner hanging from the top of the furnace or plugging from the straight blowing air eye, which causes cumbersome operation, low heat utilization rate and the risk of burning the copper water jacket.
[0014] 2. The present invention adopts a combination of straight blowing tuyere and oblique blowing tuyere. When the reaction condition in the furnace is poor, the melt stirring is insufficient or the adhesion in the furnace is serious, the oblique blowing tuyere can be opened to supply air, thereby increasing the stirring in the furnace and improving the reaction efficiency. At the same time, the side walls and furnace body adhesion can be flushed away to avoid the deterioration of the furnace condition due to insufficient reaction stirring and the reduction of the effective volume of the furnace cylinder due to increased adhesion.
[0015] 3. The present invention uses oblique blowing tuyeres to open and block tuyeres, which makes the operation easier. At the same time, the air supply tee is controlled to make the end of the oblique blowing tuyere higher than the liquid level of the molten pool. Even if the operation is improper, the melt will not directly escape out of the furnace. When melt leakage causes blockage, the furnace can be directly stopped for inspection, disassembly and cleaning, thereby reducing the risk of accidents. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall installation cross-sectional structure of the present invention.
[0017] Figure 2 It is a schematic diagram of the cross-sectional structure of the oblique blowing air eye of the present invention.
[0018] Figure 3 It is a schematic diagram of the front structure of the inclined hole water jacket of the present invention.
[0019] Figure 4 It is a schematic diagram of the cross-sectional structure of the inclined hole water jacket of the present invention.
[0020] Figure 5 It is a schematic diagram of the gas supply tee structure of the present invention.
[0021] Figure numerals: 1-oblique blowing eye, 101-cast copper water jacket I, 102-air supply channel, 103-connecting pressure plate, 2-oblique hole water jacket, 201-cast copper water jacket II, 202-mounting boss, 203-mounting oblique hole, 204-threaded hole, 3-air supply tee, 301-oxygen-enriched air valve, 302-oxygen-enriched air pipeline, 303-observation cover, 304-operating ball valve, 305-air supply cleaning pipeline, 306-air supply main pipeline, 4-reaction melt, 5-smelting furnace body, 6-straight blowing eye. DETAILED DESCRIPTION
[0022] The present invention is further described below in conjunction with the accompanying drawings. In the embodiments, unless otherwise specified, the technical means used are all conventional technical means in the art. Example 1
[0023] 1. Equipment Installation like Figure 1-4 A smelting furnace combining side blowing and oblique blowing is shown, in which an oblique hole water jacket 2 is fixed to a smelting furnace body 5 through a furnace body enclosure and a tie rod; the oblique hole water jacket 2 is provided with an oblique blowing air eye 1 and a straight blowing air eye 6.
[0024] The oblique blowing eye 1 is a truncated cone cast copper water jacket, including a cast copper water jacket Ⅰ101, an air supply channel 102 and a connecting pressure plate 103; the cast copper water jacket Ⅰ101 has a copper tube buried inside, and is cast together with the air supply channel 102; the connecting pressure plate 103 has an air supply pipeline inside, and the front end of the air supply pipeline is fitted with the cast copper water jacket Ⅰ101 and fixed to the oblique hole water jacket 2 by bolts, and the end of the air supply pipeline is sealed and connected to the air supply tee 3 by threads or flanges; the connecting pressure plate 103 is cast together with the cast copper water jacket Ⅰ101 and the air supply channel 102, and then threads and holes are processed for fixing the air supply tee 3.
[0025] The inclined hole water jacket 2 is a rectangular water jacket, including a cast copper water jacket II 201, a mounting boss 202, an inclined mounting hole 203 and a threaded hole 204; a copper tube is buried in the cast copper water jacket II 201 for cooling, the mounting boss 202 and the inclined mounting hole 203 are cast together, the angle of the inclined mounting hole 203 is 5° to 75° for placing the oblique blowing air eye 1; a threaded hole is provided on the mounting boss 202 to threadably fix the oblique blowing air eye 1; overlapped staggered platforms are designed on both sides of the cast copper water jacket II 201 for water jacket sealing, and a groove is designed on the fire-facing surface of the cast copper water jacket II 201 for fixing refractory castables.
[0026] The air supply tee 3 includes an oxygen-enriched air valve 301, an oxygen-enriched air pipeline 302, an observation cover 303, an operating ball valve 304, an air supply cleaning pipeline 305 and an air supply main channel 306; the oxygen-enriched air pipeline 302 and the air supply cleaning pipeline 305 form a tee with the air supply main channel 306 by welding or casting, and the oxygen-enriched air valve 301 and the operating ball valve 304 are respectively connected to the air inlet ends of the oxygen-enriched air pipeline 302 and the air supply cleaning pipeline 305 by threads or flanges; the observation cover 303 is installed at the end of the operating ball valve 304.
[0027] 2. Production conditions The side-blowing smelting furnace is equipped with 60 tuyeres in total. The inner diameter of the air supply channel of the straight-blowing tuyere 6 is 40 mm. The number of oblique-blowing tuyeres 1 is set at 20% of the total tuyeres. The inner diameter of the air supply channel 102 of the oblique-blowing tuyere 1 is 60 mm, and the angle between the oblique-blowing tuyere 1 and the horizontal line is 30°.
[0028] 3. Process Calculation There are 12 oblique blowing tuyeres 1, 6 of which are arranged on both sides of the side-blowing smelting furnace, and one oblique blowing tuyere 1 is arranged every 4 straight blowing tuyeres 6; according to the diameter of the oblique blowing tuyere 1, the external combustion-supporting air duct of the natural gas burner is selected to be Φ58×4mm (smaller than the tuyere air supply channel, which is convenient for disassembly and installation), and the internal natural gas pipe diameter is Φ42×3mm. According to the natural gas pressure of 0.25MPa and the flow rate of 15m / s, the maximum flow rate of a single natural gas burner is 200Nm³ / h, which can meet the heat requirements for heating the refractory materials and making the molten pool; in order to ensure the stirring of the molten pool and sufficient reaction, the flow rate of the oxygen-enriched air valve 301 is 100m / s (the normal direct blowing tuyere outlet flow rate is 120m / s. Under the condition of ensuring stirring, the wind speed can be appropriately reduced as the inclination angle increases). According to the oxygen-enriched air supply pressure of 0.1MPa, the oxygen-enriched air flow rate of a single oblique blowing tuyere 1 should not be less than 2500Nm³ / h.
[0029] 4. Oven and refractory material heating Open 12 oblique blowing air eyes 1 for heating, 6 on each side, set the initial flow rate of a single natural gas burner to 50Nm³ / h, match the combustion-supporting air volume, and use the straight blowing air eye 6 near the oblique blowing air eye 1 to blow in oxygen-rich air to assist combustion, to ensure complete combustion of natural gas and stable flame; according to the heating curve of refractory materials, gradually increase the flow rate of a single natural gas burner to 200Nm³ / h, and when the refractory materials are heated to 1200℃~1300℃, the heating operation of the furnace is completed.
[0030] 5. Open the furnace and make the molten pool Open 12 oblique air vents for heating, 6 on each side, set the initial flow rate of each natural gas gun to 200Nm³ / h, match the combustion-supporting air volume, and use the direct air vents near the oblique air vents to blow in oxygen-enriched air to support combustion, to ensure complete combustion of natural gas and stable flame; add smelting slag, copper matte and other solid mixed materials from the charging port on the top of the furnace according to the set amount of material, and gradually melt the solid mixed materials added to the furnace through the combustion of natural gas to provide heat. When the liquid level in the furnace rises to 100mm below the end of the oblique air vent 1, stop adding the solid mixed materials and stop the day. After burning, remove the natural gas burner in the oblique blowing eye, continue to put solid copper matte into the furnace top to raise the molten pool liquid level, when the melt surface rises to 200mm above the end of the oblique blowing eye 1, put in concentrate and other mixed solid materials, adjust the oxygen-enriched air volume of the oblique blowing eye to 2500Nm³ / h, increase the stirring and heat exchange of the molten pool, and plug the oblique blowing eye with an eye plug after all the solid materials in the furnace are melted, close the oxygen-enriched air valve, and stop using the oblique blowing eye after all the solid materials in the furnace are plugged. Switch the reaction air supply to the straight blowing eye and resume normal production, and the molten pool preparation and furnace opening operations are completed using the oblique blowing eye.
[0031] 6. Restore the furnace when there is adhesion, insufficient stirring, or the furnace cylinder is frozen Confirm the areas with insufficient bonding, freezing and stirring, and choose to open an oblique blowing eye 1 in this area. After the eye is opened, adjust the oxygen-enriched air volume of the oblique blowing eye to 2500Nm³ / h, strengthen the inspection of the surface temperature of the water jacket and refractory materials here, and immediately switch to the direct blowing eye 6 for air supply after the reaction is normal (bonding, freezing is melted, and stirring is restored), use the eye plug to block the oblique blowing eye 1, and the reaction air supply is switched to the direct blowing eye 6 for normal production. Use the oblique blowing eye 1 to strengthen the reaction operation and end. Example 2
[0032] 1. Equipment Installation Same as Example 1.
[0033] 2. Production conditions The side-blowing smelting furnace is equipped with 60 tuyeres in total. The inner diameter of the air supply channel of the straight-blowing tuyere 6 is 40 mm. The number of oblique-blowing tuyeres 1 is set at 30% of the total tuyeres. The inner diameter of the air supply channel 102 of the oblique-blowing tuyere 1 is 60 mm, and the angle between the oblique-blowing tuyere 1 and the horizontal line is 45°.
[0034] 3. Process Calculation There are 18 oblique blowing tuyeres 1, 9 of which are arranged on both sides of the side-blowing smelting furnace, and one oblique blowing tuyere 1 is arranged every two straight blowing tuyeres 6; according to the diameter of the oblique blowing tuyere 1, the external combustion-supporting air duct of the natural gas burner is selected to be Φ58×4mm (smaller than the tuyere air supply channel, which is convenient for disassembly and installation), and the internal natural gas pipe diameter is Φ42×3mm. Calculated based on the natural gas pressure of 0.25MPa and the flow rate of 15m / s, the maximum flow rate of a single natural gas burner is 200Nm³ / h, which can meet the heat requirements for heating the refractory materials and making the molten pool; in order to ensure the stirring of the molten pool and sufficient reaction, the flow rate of the oxygen-enriched air valve 301 is 80m / s (the normal direct blowing tuyere outlet flow rate is 120m / s. Under the condition of ensuring stirring, the wind speed can be appropriately reduced as the inclination angle increases). Calculated based on the oxygen-enriched air supply pressure of 0.15MPa, the oxygen-enriched air flow rate of a single oblique blowing tuyere 1 should not be less than 2000Nm³ / h.
[0035] 4. Oven and refractory material heating Open 18 oblique blowing air eyes 1 for heating, 9 on each side, set the initial flow rate of a single natural gas burner to 50Nm³ / h, match the combustion-supporting air volume, and use the straight blowing air eyes 6 near the oblique blowing air eyes 1 to blow in oxygen-rich air to assist combustion, to ensure complete combustion of natural gas and stable flame; according to the heating curve of refractory materials, gradually increase the flow rate of a single natural gas burner to 200Nm³ / h, and when the refractory materials are heated to 1200℃~1300℃, the furnace heating operation is completed.
[0036] 5. Open the furnace and make the molten pool Open 12 oblique air vents for heating, 6 on each side, set the initial flow rate of each natural gas gun to 200Nm³ / h, match the combustion-supporting air volume, and use the direct air vents near the oblique air vents to blow in oxygen-enriched air to support combustion, to ensure complete combustion of natural gas and stable flame; add smelting slag, copper matte and other solid mixed materials from the charging port on the top of the furnace according to the set amount of material, and gradually melt the solid mixed materials added to the furnace through the combustion of natural gas to provide heat. When the liquid level in the furnace rises to 100mm below the end of the oblique air vent 1, stop adding the solid mixed materials and stop the day. After burning, remove the natural gas burner in the oblique blowing eye, continue to put solid copper matte into the furnace top to raise the molten pool liquid level, when the melt surface rises to 100mm above the end of the oblique blowing eye 1, put in concentrate and other mixed solid materials, adjust the oxygen-enriched air volume of the oblique blowing eye to 2500Nm³ / h, increase the stirring and heat exchange of the molten pool, and plug the oblique blowing eye with an eye plug after all the solid materials in the furnace are melted, close the oxygen-enriched air valve, and stop using the oblique blowing eye after all the solid materials in the furnace are plugged. Switch the reaction air supply to the straight blowing eye and resume normal production, and the molten pool preparation and furnace opening operations are completed using the oblique blowing eye.
[0037] 6. Restore the furnace when there is adhesion, insufficient stirring, or the furnace cylinder is frozen Confirm the areas with insufficient bonding, freezing and stirring, and choose to open an oblique blowing eye 1 in this area. After the eye is opened, adjust the oxygen-enriched air volume of the oblique blowing eye to 2000Nm³ / h, strengthen the inspection of the surface temperature of the water jacket and refractory materials here, and immediately switch to the direct blowing eye 6 for air supply after the reaction is normal (bonding, freezing is melted, and stirring is restored), use the eye plug to block the oblique blowing eye 1, and the reaction air supply is switched to the direct blowing eye 6 for normal production. Use the oblique blowing eye 1 to strengthen the reaction operation and end. Example 3
[0038] 1. Equipment Installation Same as Example 1.
[0039] 2. Production conditions The side-blowing smelting furnace is equipped with 60 tuyeres in total. The inner diameter of the air supply channel of the straight-blowing tuyere 6 is 40 mm. The number of oblique-blowing tuyeres 1 is set at 30% of the total tuyeres. The inner diameter of the air supply channel 102 of the oblique-blowing tuyere 1 is 60 mm, and the angle between the oblique-blowing tuyere 1 and the horizontal line is 15°.
[0040] 3. Process Calculation There are 18 oblique blowing tuyeres 1, 9 of which are arranged on both sides of the side-blowing smelting furnace, and one oblique blowing tuyere 1 is arranged every two straight blowing tuyeres 6; according to the diameter of the oblique blowing tuyere 1, the external combustion-supporting air duct of the natural gas burner is selected to be Φ58×4mm (smaller than the tuyere air supply channel, which is convenient for disassembly and installation), and the internal natural gas pipe diameter is Φ42×3mm. Calculated based on the natural gas pressure of 0.25MPa and the flow rate of 15m / s, the maximum flow rate of a single natural gas burner is 200Nm³ / h, which can meet the heat requirements for heating the refractory materials and making the molten pool; in order to ensure the stirring of the molten pool and sufficient reaction, the flow rate of the oxygen-enriched air valve 301 is 110m / s (the normal direct blowing tuyere outlet flow rate is 120m / s. Under the condition of ensuring stirring, the wind speed can be appropriately reduced as the inclination angle increases). Calculated based on the oxygen-enriched air supply pressure of 0.1MPa, the oxygen-enriched air flow rate of a single oblique blowing tuyere 1 should not be less than 2800Nm³ / h.
[0041] 4. Oven and refractory material heating Open 18 oblique blowing air eyes 1 for heating, 9 on each side, set the initial flow rate of a single natural gas burner to 50Nm³ / h, match the combustion-supporting air volume, and use the straight blowing air eyes 6 near the oblique blowing air eyes 1 to blow in oxygen-rich air to assist combustion, to ensure complete combustion of natural gas and stable flame; according to the heating curve of refractory materials, gradually increase the flow rate of a single natural gas burner to 200Nm³ / h, and when the refractory materials are heated to 1200℃~1300℃, the furnace heating operation is completed.
[0042] 5. Open the furnace and make the molten pool 18 oblique air vents are opened for heating, 9 on each side, and the initial flow rate of each natural gas gun is set to 200Nm³ / h. The combustion-supporting air volume is matched, and oxygen-enriched air is blown into the direct air vents near the oblique air vents to ensure complete combustion of natural gas and stable flames. Solid mixed materials such as smelting slag and copper matte are added from the charging port on the top of the furnace according to the set amount of material. The solid mixed materials added to the furnace are gradually melted by the combustion of natural gas to provide heat. When the liquid level in the furnace rises to 100mm below the end of the oblique air vent 1, the addition of solid mixed materials is stopped and the furnace is stopped. After burning, remove the natural gas burner in the oblique blowing eye, continue to put solid copper matte into the furnace top to raise the molten pool liquid level, when the melt surface rises to 150mm above the end of the oblique blowing eye 1, put in concentrate and other mixed solid materials, adjust the oxygen-enriched air volume of the oblique blowing eye to 2800Nm³ / h, increase the stirring and heat exchange of the molten pool, and plug the oblique blowing eye with an eye plug after all the solid materials in the furnace are melted, close the oxygen-enriched air valve, and stop using the oblique blowing eye after all the solid materials in the furnace are plugged. Switch the reaction air supply to the straight blowing eye and resume normal production, and the molten pool preparation and furnace opening operations are completed using the oblique blowing eye.
[0043] 6. Recovery when there is adhesion in the furnace, insufficient stirring, or the furnace cylinder is frozen Confirm the areas with insufficient bonding, freezing and stirring, and choose to open an oblique blowing eye 1 in this area. After the eye is opened, adjust the oxygen-enriched air volume of the oblique blowing eye to 2800Nm³ / h, strengthen the inspection of the surface temperature of the water jacket and refractory materials here, and immediately switch to the direct blowing eye 6 for air supply after the reaction is normal (bonding, freezing is melted, and stirring is restored), use the eye plug to block the oblique blowing eye 1, and the reaction air supply is switched to the direct blowing eye 6 for normal production. Use the oblique blowing eye 1 to strengthen the reaction operation and end.
[0044] The above embodiments are only exemplary embodiments of the present invention and are not intended to limit the present invention. The protection scope of the present invention is defined by the claims. Those skilled in the art may make various modifications or equivalent substitutions to the present invention within the essence and protection scope of the present invention, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present invention.
Claims
1. A smelting furnace combining side blowing and oblique blowing, characterized in that: An inclined hole water jacket (2) is fixed on a smelting furnace body (5) through a furnace body enclosure and a tie rod; the inclined hole water jacket (2) is provided with an inclined blowing air eye (1) and a straight blowing air eye (6); The angle between the oblique blowing air eye (1) and the horizontal line is 15° to 45°; the oblique blowing air eye (1) is a truncated cast copper water jacket, comprising a cast copper water jacket I (101), an air supply channel (102) and a connecting plate (103); a copper tube is embedded in the cast copper water jacket I (101) and cast together with the air supply channel (102); an air supply pipeline is arranged inside the connecting plate (103); the front end of the air supply pipeline is fitted with the cast copper water jacket I (101) and then fixed to the oblique hole water jacket (2) by bolts; the end of the air supply pipeline is sealedly connected to the air supply tee (3) by threads or flanges; The inclined hole water jacket (2) is a rectangular water jacket, comprising a cast copper water jacket II (201), a mounting boss (202), an inclined mounting hole (203) and a threaded hole (204); a copper tube is buried in the cast copper water jacket II (201) for cooling; the mounting boss (202) and the inclined mounting hole (203) are cast together; the angle of the inclined mounting hole (203) is 15° to 45° for placing the oblique blowing air eye (1); a threaded hole is provided on the mounting boss (202) for threadedly fixing the oblique blowing air eye (1); The direct blowing air eye (6) is parallel to the horizontal line; The oblique blowing air eyes (1) and the straight blowing air eyes (6) are arranged at intervals, and one oblique blowing air eye (1) is arranged between every 2 to 4 straight blowing air eyes (6).
2. The smelting furnace combining side blowing and oblique blowing according to claim 1, characterized in that: The number of the oblique blowing air eyes (1) does not exceed 40% of the total number of air eyes.
3. The smelting furnace combining side blowing and oblique blowing according to claim 1, characterized in that: The connecting pressing plate (103) is cast together with the cast copper water jacket I (101) and the air supply channel (102), and then threads and holes are processed to fix the air supply tee (3).
4. The smelting furnace combining side blowing and oblique blowing according to claim 1, characterized in that: The inner diameter of the air supply channel (102) is ≥40 mm.
5. The smelting furnace combining side blowing and oblique blowing according to claim 1, characterized in that: The cast copper water jacket II (201) is designed with overlapping staggered platforms on both sides for water jacket sealing, and the fire-facing surface of the cast copper water jacket II (201) is designed with grooves for fixing refractory castables.
6. The smelting furnace combining side blowing and oblique blowing according to claim 1, characterized in that: The gas supply tee (3) comprises an oxygen-enriched air valve (301), an oxygen-enriched air pipeline (302), an observation cover (303), an operating ball valve (304), a gas supply cleaning pipeline (305) and a gas supply main channel (306); The oxygen-enriched air pipeline (302) and the air supply and cleaning pipeline (305) are connected to the main air supply channel (306) by welding or casting to form a three-way connection, and the oxygen-enriched air valve (301) and the operating ball valve (304) are connected to the air inlet ends of the oxygen-enriched air pipeline (302) and the air supply and cleaning pipeline (305) respectively by threads or flanges; The observation cover (303) is installed at the end of the operating ball valve (304).
7. The smelting furnace combining side blowing and oblique blowing according to claim 6, characterized in that: The diameter of the operating ball valve (304) is greater than or equal to the inner diameter of the air supply and cleaning pipeline (305).
8. The method for using the smelting furnace combining side blowing and oblique blowing according to any one of claims 1 to 7, characterized in that: A: Used for heating the refractory materials of the side-blown smelting furnace; B: Used for side-blown smelting furnace to make molten pool and start furnace; C: Used for side-blown melting furnaces to recover from adhesion, insufficient stirring, and furnace freezing; The specific steps of A are as follows: A1: Complete the equipment processing and installation according to the above requirements, confirm that the refractory materials of the furnace body have been laid and are ready for heating; A2: According to the number of oblique air ports configured in the side-blowing smelting furnace and the heating curve of the refractory material, set the number of burners to be opened, and adjust the natural gas volume and combustion-supporting air volume of the burners; A3: After confirming that the smelting furnace body (5) has been heated to 200°C using firewood and there is an open flame in the furnace, close the oxygen-enriched air valve (301) of the gas supply tee (3), open the observation cover (303) at the end of the operating ball valve (304), and then open the operating ball valve (304); A4: Insert the natural gas burner into the gas supply passage (102). The end of the natural gas burner should extend 300 to 1000 mm beyond the end of the oblique air hole (1) to prevent the copper water jacket from burning. After installation, supply natural gas for ignition. After successful ignition, adjust the natural gas flow rate. A5: When the refractory material is heated to 1200℃~1300℃, the heating operation of the furnace is finished; A6: After confirming that the side-blowing air eye (1) is no longer in use, remove the natural gas burner and plug the air eye with an air eye plug to end the operation; The specific steps of B are as follows: B1: Complete equipment processing and installation according to the above requirements and confirm that the heating of refractory materials has been completed; B2: Adjust the natural gas flow to the burner according to the number of oblique air holes (1) opened in the side-blowing smelting furnace and the position of the stockpile; B3: adding a set amount of solid mixed materials such as smelting slag and copper matte from the charging port on the top of the smelting furnace body (5); B4: Confirm the position of the pile formed by the solid mixed material in the furnace, select the oblique blowing eye (1) at the position of the pile, close the oxygen-enriched air valve (301) of its gas supply tee (3), open the observation cover (303), open the operating ball valve (304), install a natural gas burner in the gas supply channel (102), supply natural gas, and ignite the natural gas burner using the high temperature of the furnace body; B5: The solid mixed material added into the furnace is gradually melted to form a reaction melt (4) by burning natural gas to provide heat. At the same time, the furnace top is continuously fed with material. When the liquid level in the furnace rises to 50 to 100 mm below the end of the oblique blowing eye (1), the solid mixed material is stopped from being added. After the natural gas is stopped, the natural gas burner in the oblique blowing eye (1) is removed, the operating ball valve (304) of the gas supply tee (3) and the rear end observation cover (303) thereof are closed, and the oxygen-enriched air valve (301) is opened for ventilation to prevent the oblique blowing eye (1) from being blocked; B6: Solid copper matte is continuously added to the furnace top. The solid copper matte with high specific gravity settles to the furnace bottom and then raises the molten pool liquid level. When the molten surface rises to 100-200 mm above the end of the oblique blowing tuyere (1), mixed solid materials such as concentrate are added. At the same time, the oxygen-enriched air volume of the oblique blowing tuyere (1) is increased to stir the high-temperature melt on the upper part and the solid copper matte deposited on the lower part for reaction and heat exchange. After all the solid materials in the furnace are melted, the oblique blowing tuyere is plugged with a tuyere plug and the oxygen-enriched air valve (301) is closed. B7: All oblique blowing tuyeres (1) are plugged and stopped, and the reaction air supply is switched to the straight blowing tuyeres (6) for normal production. The operation of using the oblique blowing tuyeres (1) to make a molten pool and start the furnace is completed; The specific steps of C are as follows: C1: Complete the equipment processing and installation according to the above requirements, confirm that the side-blowing smelting furnace is put into production, and the smelting liquid level is 100-200mm above the end of the oblique blowing eye (1); C2: Confirm the area with insufficient adhesion, freezing and stirring, and select to open the oblique blowing air eye (1) in this area. After determining the number of oblique blowing air eyes (1) to be opened, first open the oxygen-enriched air valve (301) of the corresponding air supply tee (3), and then quickly pull out the air eye plug. If the front end of the corresponding oblique blowing air eye (1) is blocked by adhesion, use a steel chisel to clean it from the air supply cleaning pipe (305). After confirming that the oblique blowing air eye (1) is ventilated normally, close the operating ball valve (304); C3: When the oblique blowing air eye (1) is used to supply oxygen-enriched air for reaction, the temperature of the surrounding water jacket and refractory surface should be checked. When the reaction is normal, switch to the straight blowing air eye (6) for air supply immediately, and plug the oblique blowing air eye (1) with an air eye plug; C4: When all the oblique blowing air eyes (1) are plugged and stopped, the reaction air supply is switched to the straight blowing air eyes (6) and then the production resumes normally. The operation of using the oblique blowing air eyes (1) to intensify the reaction is completed.
