Through a mobile three-dimensional laser scanning device, the tunnel is scanned and analyzed, the three-dimensional model is constructed, and the section data is extracted, which solves the problem that the existing technology cannot fully reflect the overall deformation of the tunnel, and realizes efficient tunnel deformation monitoring and early warning, ensuring tunnel construction Safety.
Patent Information
- Application Number
- CN202411068743.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-12
AI Technical Summary
The existing tunnel deformation monitoring methods require a lot of manpower and time investment, and cannot fully reflect the overall deformation of the tunnel, making it difficult to meet the needs of modern tunnel projects for comprehensive and real-time monitoring.
A mobile three-dimensional laser scanning device is used to scan the tunnel, build a three-dimensional model, extract cross-sectional data, analyze cross-sectional deformation data, and compare it with the deformation threshold to issue an early warning signal. The system includes a three-dimensional model construction unit, a section data extraction unit, a section deformation data analysis unit and an early warning unit, and uses memory and processor to realize monitoring and early warning methods.
Through the construction and analysis of the three-dimensional model, the overall deformation of the tunnel can be fully reflected, the monitoring efficiency is improved, and the tunnel construction safety is ensured.
Smart Images

Figure CN118936349A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of tunnel engineering technology, and in particular to a tunnel monitoring and early warning method, system and storage medium. Background Art
[0002] As an important part of infrastructure construction, tunnel engineering plays a key role in urban planning and transportation development. The stability of the tunnel is directly related to the safety and service life of the project. Therefore, deformation monitoring of the tunnel is an important part of ensuring project safety.
[0003] At present, the main method for monitoring tunnel deformation is to observe the tunnel through total stations and levels. Total stations and levels can provide high-precision measurement data to ensure the reliability of measurement results.
[0004] However, the existing monitoring methods still have the following shortcomings: 1. The use of total stations and levels requires a lot of manpower and time investment, which not only increases the project cost but also reduces the monitoring efficiency; 2. Total stations and levels can usually only provide measurement information of local or specific points, and cannot fully reflect the overall deformation of the tunnel; 3. The amount of information collected by total stations and levels is limited, which makes it difficult to meet the needs of modern tunnel projects for comprehensive and real-time monitoring. Summary of the invention
[0005] The purpose of the present application is to provide a tunnel monitoring and early warning method, system and storage medium to solve the problem that observation of the tunnel by a total station and a level cannot fully reflect the overall deformation of the tunnel.
[0006] The technical solution adopted by this application to solve its technical problem is:
[0007] In a first aspect, a tunnel monitoring and early warning method is provided, comprising: scanning the tunnel and constructing a three-dimensional model of the tunnel according to the scanning results; extracting cross-sectional data of the tunnel from the three-dimensional model; analyzing the cross-sectional data of the same position of the tunnel at different periods to obtain cross-sectional deformation data of the tunnel; comparing the cross-sectional deformation data of the tunnel with a deformation threshold, and issuing an early warning signal if the deformation data exceeds the deformation threshold.
[0008] Furthermore, a mobile three-dimensional laser scanning device is used to scan the tunnel.
[0009] Furthermore, the mobile three-dimensional laser scanning device includes a track arranged in the tunnel, a traveling trolley arranged on the track, and a three-dimensional laser scanner arranged on the traveling trolley.
[0010] Furthermore, the traveling vehicle is provided with a data storage center connected to the three-dimensional laser scanner.
[0011] Furthermore, the traveling trolley is provided with a gear controller for controlling the vehicle speed.
[0012] Furthermore, the walking trolley is provided with a lighting lamp.
[0013] Furthermore, a slag cleaning device for cleaning the debris on the track is provided at the front end of the traveling trolley, and the slag cleaning device includes a slag cleaning block, and the upper surface of the slag cleaning block is a slag cleaning surface extending obliquely downward along the forward direction of the traveling trolley.
[0014] On the second aspect, a tunnel monitoring and early warning system is provided, including: a three-dimensional model construction unit, used to scan the tunnel and build a three-dimensional model of the tunnel according to the scanning results; a cross-sectional data extraction unit, used to extract the cross-sectional data of the tunnel from the three-dimensional model; a cross-sectional deformation data analysis unit, used to analyze the cross-sectional data of the same position of the tunnel at different periods to obtain the cross-sectional deformation data of the tunnel; an early warning unit, used to compare the cross-sectional deformation data of the tunnel with the deformation threshold, and if the deformation data exceeds the deformation threshold, a warning signal is issued.
[0015] In a third aspect, a tunnel monitoring and early warning system is provided, comprising: a memory and a processor; the memory stores instructions executable by the processor; when the processor is configured to execute the instructions, the system implements the tunnel monitoring and early warning method provided in the first aspect.
[0016] In a fourth aspect, a computer-readable storage medium is provided, comprising computer instructions. When the computer instructions are executed on a computer, the computer executes the tunnel monitoring and early warning method provided in the first aspect.
[0017] Beneficial effects of this application:
[0018] 1. By scanning the tunnel and constructing a three-dimensional model of the tunnel, the present application can extract and analyze the data of any section of the tunnel from the three-dimensional model, and then obtain the deformation data of any section of the tunnel, thereby comprehensively reflecting the overall deformation of the tunnel.
[0019] 2. This application uses a mobile three-dimensional laser scanning device to scan the tunnel, which can quickly obtain the three-dimensional coordinate information of the tunnel surface, greatly improve the efficiency of tunnel deformation monitoring, and thus ensure the construction safety of the tunnel to a great extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 is a flow chart of a tunnel monitoring and early warning method provided by an embodiment of the present application;
[0022] Figure 2 It is a schematic diagram of the composition of the tunnel monitoring and early warning system provided in an embodiment of the present application;
[0023] Figure 3 It is a schematic diagram of the hardware structure of the tunnel monitoring and early warning system provided in the embodiment of the present application;
[0024] Figure 4 It is a structural schematic diagram of a mobile three-dimensional laser scanning device.
[0025] Reference numerals:
[0026] 1-Mobile 3D laser scanning device;
[0027] 11- Track;
[0028] 12-Traveling trolley;
[0029] 13-3D laser scanner;
[0030] 14-Data storage center;
[0031] 15- gear controller;
[0032] 16-Lighting lamp;
[0033] 17-clean slag block;
[0034] 18-Slag cleaning surface;
[0035] 100- Early Warning System;
[0036] 101-3D model construction unit;
[0037] 102-section data extraction unit;
[0038] 103- cross-sectional deformation data analysis unit;
[0039] 104- Early Warning Unit;
[0040] 200- Early Warning System;
[0041] 201- memory;
[0042] 202 - processor;
[0043] 203-communication interface;
[0044] 204-bus. DETAILED DESCRIPTION
[0045] In order to make the purpose, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application.
[0046] It should be noted that similar numbers and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. In addition, the embodiments and features in the embodiments of this application can be combined with each other without conflict.
[0047] In the description of the embodiments of the present application, the indicated orientation or positional relationship is based on the orientation or positional relationship shown in the accompanying drawings, or is the orientation or positional relationship in which the product of the application is usually placed when in use, or is the orientation or positional relationship commonly understood by those skilled in the art. The terms "disposed", "opened", "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, and an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the internal connection of two elements.
[0048] See also Figure 1 The present invention provides a tunnel monitoring and early warning method, comprising the following steps:
[0049] S1. Scan the tunnel and construct a three-dimensional model of the tunnel based on the scanning results.
[0050] For example, a 3D laser scanner is used to scan the tunnel at a set monitoring frequency, and a 3D model of the tunnel at different times is constructed based on the scanning results. A 3D laser scanner can obtain millions of point cloud data per second, which not only increases the amount of information collected, but also improves scanning efficiency compared to total station and level measurement.
[0051] S2. Extract the cross-sectional data of the tunnel from the 3D model.
[0052] For example, after the three-dimensional model of the tunnel is constructed, the cross-sectional curve of the tunnel is extracted from the three-dimensional model using MIDAX GTX NX finite element analysis software on a PC, and the cross-sectional data of the tunnel is obtained according to the cross-sectional curve of the tunnel.
[0053] S3. Analyze the cross-sectional data of the same position of the tunnel at different times to obtain the cross-sectional deformation data of the tunnel.
[0054] For example, MIDAX GTX NX finite element analysis software is used on the PC to analyze the changes in the same section in the tunnel to monitor the overall deformation information of the tunnel segment lining. By comparing the section data of the same location at different times, and the spatial state and time characteristics of the deformation of the tunnel segment, the deformation information of the tunnel section is obtained, and the deformation characteristics of the tunnel are obtained.
[0055] S4. Compare the cross-sectional deformation data of the tunnel with the deformation threshold. If the deformation data exceeds the deformation threshold, issue a warning signal.
[0056] For example, deformation thresholds are set at various locations in the tunnel on the PC side. If the cross-sectional deformation data at a certain location in the tunnel exceeds the deformation threshold, an early warning signal is issued on the PC side to warn the staff. At the same time, a detection report is also generated on the PC side to facilitate maintenance personnel to maintain the tunnel according to the detection report.
[0057] The tunnel monitoring and early warning method provided in the embodiment of the present application can extract and analyze the data of any cross-section of the tunnel from the three-dimensional model by scanning the tunnel and constructing a three-dimensional model of the tunnel, and then obtain the deformation data of any cross-section of the tunnel, thereby comprehensively reflecting the overall deformation of the tunnel.
[0058] In step S1, the 3D laser scanner can be scanned in a station-mounted manner. The station-mounted manner is to set up a number of measuring stations at intervals along the longitudinal direction of the tunnel, and set up the 3D laser scanner on each measuring station in turn to scan the tunnel station by station. However, if the distance between two adjacent measuring stations is far, insufficient measurement data may occur in the middle of the two adjacent measuring stations due to the low scanning density.
[0059] In some embodiments, a mobile 3D laser scanning device 1 is used to scan the tunnel. Figure 4 The mobile three-dimensional laser scanning device 1 includes a track 11 arranged in the tunnel, a traveling vehicle 12 arranged on the track 11 , and a three-dimensional laser scanner 13 arranged on the traveling vehicle 12 .
[0060] The track 11 is fixed in the tunnel and extends in the longitudinal direction of the tunnel. The trolley 12 is arranged on the track 11 and can move along the track 11. The three-dimensional laser scanner 13 is installed on the trolley 12 and is used to perform three-dimensional scanning of the tunnel. Among them, the three-dimensional laser scanner 13 has high-precision measurement and ranging technology and WFD waveform digitization technology. When in use, the trolley 12 is controlled to move on the track 11, and then the three-dimensional laser scanner 13 is driven by the trolley 12 to move in the tunnel. In this process, the three-dimensional laser scanner 13 is used to continuously scan the tunnel.
[0061] The present application adopts a mobile three-dimensional laser scanning device 1 to scan the tunnel, which can quickly obtain the three-dimensional coordinate information of the tunnel surface, greatly improve the efficiency of tunnel deformation monitoring, and thus ensure the construction safety of the tunnel to a great extent; compared with the station-type method, there is no need to set up a measuring station in the tunnel, avoiding the situation in which the station-type method may have insufficient measurement data in the middle position between two adjacent measuring stations.
[0062] In step S1, the data scanned by the three-dimensional laser scanner 13 on the tunnel can be transmitted to the background processing center in real time by wireless means to construct a three-dimensional model of the tunnel.
[0063] In some embodiments, see Figure 4 The walking trolley 12 is provided with a data storage center 14 connected to the three-dimensional laser scanner 13. The data scanned by the three-dimensional laser scanner 13 on the tunnel can be temporarily stored in the data storage center 14. When the tunnel scanning is completed, the scanned data stored in the data storage center 14 is imported into the PC to construct a three-dimensional model of the tunnel.
[0064] In some embodiments, see Figure 4 The traveling trolley 12 is provided with a gear controller 15 for controlling the vehicle speed. The traveling trolley 12 is integrated with high-precision sensors such as a non-contact laser odometer, so that different speed gears can be set through the gear controller 15 to adjust the traveling speed of the traveling trolley 12 to achieve uniform automatic operation, which not only saves time and effort, but also greatly improves the field efficiency. The traveling trolley 12 is provided with an illumination lamp 16. By providing the illumination lamp 16, it is used to provide a light source during the tunnel scanning process to improve the accuracy of the scanning data.
[0065] In some embodiments, see Figure 4 The front end of the traveling trolley 12 is provided with a slag cleaning device for cleaning the slag on the track 11, and the slag cleaning device includes a slag cleaning block 17, and the upper surface of the slag cleaning block 17 is a slag cleaning surface 18 extending obliquely downward along the forward direction of the traveling trolley 12. When the traveling trolley 12 moves on the track 11, the slag cleaning surface 18 of the slag cleaning block 17 can be used to remove the slag or stones dropped on the track 11, so as to avoid the derailment of the traveling trolley 12 during the movement on the track 11, thereby improving the safety of the movement of the traveling trolley 12.
[0066] The embodiment of the present application can divide the functional modules of the system and the server according to the above method example. For example, each functional module can be divided according to each function, or two or more functions can be integrated into one processing module. The above integrated modules can be implemented in the form of hardware or in the form of software functional modules. It should be noted that the division of modules in the embodiment of the present application is schematic and is only a logical function division. There may be other division methods in actual implementation.
[0067] In the case of dividing each functional module into corresponding functional modules, Figure 2 A possible schematic diagram of the early warning system involved in the above embodiment is shown. Figure 2 The early warning system 100 may include a three-dimensional model building unit 101, a cross-sectional data extraction unit 102, a cross-sectional deformation data analysis unit 103 and an early warning unit 104.
[0068] Among them, the three-dimensional model construction unit 101 is used to scan the tunnel and construct a three-dimensional model of the tunnel according to the scanning results. The cross-sectional data extraction unit 102 is used to extract the cross-sectional data of the tunnel from the three-dimensional model. The cross-sectional deformation data analysis unit 103 is used to analyze the cross-sectional data of the same position of the tunnel at different periods to obtain the cross-sectional deformation data of the tunnel. The early warning unit 104 is used to compare the cross-sectional deformation data of the tunnel with the deformation threshold, and if the deformation data exceeds the deformation threshold, a warning signal is issued.
[0069] Figure 2 The units in can also be called modules. For example, the 3D model building unit can be called a 3D model building module. Figure 2 If each unit in the system is implemented in the form of a software function module and sold or used as an independent product, it can be stored in a computer-readable storage medium.
[0070] See also Figure 3 The embodiment of the present application also provides a hardware structure of an early warning system, the early warning system 200 includes a memory 201 and a processor 202, and optionally, also includes a communication interface 203 connected to the processor 202. The memory 201, the processor 202 and the communication interface 203 are connected via a bus 204.
[0071] The memory 201 may be a read-only memory or other types of static storage devices that can store static information and instructions, a random access memory or other types of dynamic storage devices that can store information and instructions, or an electrically erasable programmable read-only memory, a read-only optical disk or other optical disk storage, an optical disk storage, a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, and the embodiments of the present application do not impose any limitations on this.
[0072] The processor 202 may be a central processing unit, a general-purpose processor network processor, a digital signal processor, a microprocessor, a microcontroller, a programmable logic device, or any combination thereof. The processor 202 may also be any other device having a processing function, such as a circuit, a device, or a software module. The processor 202 may also include multiple CPUs, and the processor 202 may be a single-core processor or a multi-core processor. The processor 202 here may refer to one or more devices, circuits, or processing cores for processing data.
[0073] The memory 201 may exist independently or be integrated with the processor 202. The memory 201 stores computer program codes, and the processor 202 is used to execute the computer program codes stored in the memory 201, thereby realizing the tunnel monitoring and early warning method provided in the embodiment of the present application.
[0074] The communication interface 203 may be used to communicate with other devices or a communication network, and the communication network may be Ethernet, a wireless access network, a wireless local area network, etc. The communication interface 203 may be a module, a circuit, a transceiver, or any device capable of implementing communication.
[0075] The bus 204 may be a peripheral component interconnection standard bus or an extended industry standard structure bus. The bus 204 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 3 The fact that only one line is used in the diagram does not mean that there is only one bus or only one type of bus.
[0076] The embodiment of the present application also provides a computer-readable storage medium, including computer instructions, which, when executed on a computer, enable the computer to execute the tunnel monitoring and early warning method provided in the above embodiment. The computer-readable storage medium may be any available medium that can be accessed by a computer or a data storage device such as a server or a data center that includes one or more media integrated therein. For example, the available medium may be a magnetic medium, an optical medium, or a semiconductor medium.
[0077] The above are only preferred embodiments of the present application and do not constitute any form of limitation to the present application. Based on the technical essence of the present application and within the spirit and principles of the present application, any simple modification, equivalent replacement and improvement of the above embodiments shall still fall within the protection scope of the technical solution of the present application.
Claims
1. A tunnel monitoring and early warning method, It is characterized in that include: Scan the tunnel and build a three-dimensional model of the tunnel based on the scanning results; Extract tunnel cross-section data from the 3D model; Analyze the cross-sectional data of the same position of the tunnel at different times to obtain the cross-sectional deformation data of the tunnel; The cross-sectional deformation data of the tunnel is compared with the deformation threshold. If the deformation data exceeds the deformation threshold, an early warning signal is issued.
2. The tunnel monitoring and early warning method according to claim 1, It is characterized in that A mobile three-dimensional laser scanning device (1) is used to scan the tunnel.
3. The tunnel monitoring and early warning method according to claim 2, It is characterized in that The mobile three-dimensional laser scanning device (1) comprises a track (11) arranged in a tunnel, a traveling trolley (12) arranged on the track (11), and a three-dimensional laser scanner (13) arranged on the traveling trolley (12).
4. The tunnel monitoring and early warning method according to claim 3, It is characterized in that The traveling trolley (12) is provided with a data storage center (14) connected to the three-dimensional laser scanner (13).
5. The tunnel monitoring and early warning method according to claim 3, It is characterized in that The traveling trolley (12) is provided with a gear controller (15) for controlling the vehicle speed.
6. The tunnel monitoring and early warning method according to claim 3, It is characterized in that The traveling trolley (12) is provided with an illumination lamp (16).
7. The tunnel monitoring and early warning method according to claim 3, It is characterized in that A slag cleaning device for cleaning the slag on the track (11) is provided at the front end of the traveling trolley (12), the slag cleaning device comprising a slag cleaning block (17), the upper surface of the slag cleaning block (17) being a slag cleaning surface (18) extending obliquely downward along the advancing direction of the traveling trolley (12).
8. A tunnel monitoring and early warning system, It is characterized in that include: A three-dimensional model building unit, used for scanning the tunnel and building a three-dimensional model of the tunnel according to the scanning result; A cross-sectional data extraction unit, used for extracting cross-sectional data of the tunnel from the three-dimensional model; A cross-sectional deformation data analysis unit is used to analyze cross-sectional data of the same position of the tunnel at different times to obtain cross-sectional deformation data of the tunnel; The early warning unit is used to compare the cross-sectional deformation data of the tunnel with the deformation threshold. If the deformation data exceeds the deformation threshold, an early warning signal is issued.
9. A tunnel monitoring and early warning system, It is characterized in that include: Memory and processor; The memory stores instructions executable by the processor; When the processor is configured to execute the instructions, the system implements the method according to any one of claims 1 to 7.