Chemical control method for primary loop during minor repair of nuclear power plant
By formulating standardized chemical control plans based on multiple factors, the complexity and lack of normative chemical control plans during the minor repair of the nuclear power plant was solved, and the effect of reducing core corrosion products and radioactive deposition was achieved and improving core performance was achieved.
Patent Information
- Application Number
- CN202411003860.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-25
AI Technical Summary
During the minor repair of the nuclear power plant, the chemical control plan was complex and lacked standardization, resulting in an increase in core corrosion products, making it difficult to coordinate various influencing factors.
According to the maintenance defect time, maintenance plan, system operation status and duration from the last overhaul, the temperature and pressure platform during the minor repair will be determined, and the water chemical control strategies such as alkaline reduction, acidic reduction, acidic oxidation or zinc addition will be used to adjust the lithium concentration. , dissolved hydrogen concentration and hydrogen peroxide addition, and formulate standardized chemical control plans.
By taking into account multiple factors, appropriate chemical control plans are formulated to reduce radiodeposition and system corrosion, reduce dosage for overhaulers, and improve core performance.
Smart Images

Figure CN118942753A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of nuclear power, and in particular relates to a primary circuit chemical control method during minor repairs of a nuclear power plant. Background Art
[0002] Minor maintenance of nuclear power plants is a centralized maintenance activity for power plant equipment. Its purpose is to repair defects that occur in daily operation, improve unit performance, and ensure safe, stable and efficient operation of the power plant. During minor maintenance, chemical control plays a vital role. During minor maintenance of nuclear power plants, due to temperature fluctuations, pressure fluctuations, and reaction changes in the primary circuit, boron concentration changes, lithium concentration changes, dissolved hydrogen concentration changes, and corrosion product release will occur. Good chemical control during minor maintenance can avoid occupying the key path of minor maintenance, reduce the deposition of core corrosion products, optimize fuel performance, and reduce equipment corrosion. During minor maintenance, by adjusting the primary circuit boron concentration, lithium concentration, dissolved hydrogen concentration, dissolved oxygen concentration, purification flow, etc., the release of core corrosion products is promoted, radioactive deposition is reduced, and even the release of corrosion products during overhaul can be reduced, the dose of overhaul personnel can be reduced, and the core performance can be improved.
[0003] The current chemical control of nuclear power plant minor repairs faces the following problems:
[0004] 1) Complexity of chemical control during minor repairs. The chemical control plan during minor repairs is affected by many factors, such as the temperature platform of the reactor shutdown, whether the main pump is running, whether the purification system is in operation, whether the primary circuit is open, etc. In the face of these different system states, how to formulate a chemical control plan for minor repairs becomes a difficult problem.
[0005] 2) Lack of standardization of chemical control strategies for minor repairs. When formulating chemical control strategies for minor repairs, each power plant based on personal experience, there was no unified standard, which led to an increase in core corrosion products. Summary of the invention
[0006] In order to overcome the problems existing in the related technologies, a primary circuit chemical control method during minor repairs of a nuclear power plant is provided.
[0007] According to one aspect of an embodiment of the present disclosure, a method for controlling primary circuit chemistry during a minor repair of a nuclear power plant is provided, the method comprising:
[0008] Step 1: According to the time of the repair defect and the repair plan, determine the lowest temperature and pressure platform of the primary circuit during the minor repair, and confirm the maintenance and defect elimination work and the stay time at this platform;
[0009] Step 2, determine the operating status of important systems and equipment during minor repairs;
[0010] Step 3, determine the time from the last minor repair to the last major repair. If the time from the last minor repair to the last major repair exceeds the preset time, an acid reduction or acid oxidation strategy is adopted during the minor repair; if the time from the last minor repair does not exceed the preset time, an alkaline environment is maintained during the minor repair;
[0011] Step 4: Determine the water chemistry control strategy during the minor overhaul based on the determined minimum temperature and pressure of the unit, the system operating status, and the time since the last overhaul. The water chemistry control strategy includes any of the following:
[0012] Alkaline reduction: maintain the lithium concentration and dissolved hydrogen concentration, and keep the pHt of the first circuit alkaline;
[0013] Acid reduction: remove lithium and maintain dissolved hydrogen concentration;
[0014] Acidic oxidizing environment: perform lithium and hydrogen removal, add hydrogen peroxide, and maintain an acidic oxidizing environment;
[0015] Perform zinc addition.
[0016] In a possible implementation, in step 1, if the primary circuit stays in mode 3 during the minor repair, the temperature of the primary circuit is between 250-290° C. and the pressure is between 12-15 MPa;
[0017] If the primary circuit stays in mode 4 during minor repairs, the primary circuit temperature is between 90-170°C, the pressure is between 2-3MPa, and the remaining exhaust system is put into operation;
[0018] If the primary circuit stays in mode 5 during minor repairs, the primary circuit temperature is between 60-90°C, and depending on the pressure requirements, it is necessary to determine whether the primary circuit is open.
[0019] In a possible implementation, in step 2, the operating status of important systems and equipment includes: whether the main pump is in operation and whether the shutdown purification bed is available;
[0020] If the main pump is in operation, use acidic chemical conditions to treat the corrosion products; if the main pump is out of operation, reduce the release of corrosion products;
[0021] The shutdown purification bed includes a shutdown purification bed for boron recovery and a purification bed for the chemical volume system; if the shutdown purification bed is available, it can purify the corrosion products of the first circuit and reduce the total amount of corrosion products in the system; if the shutdown purification bed is not available, it maintains an alkaline environment, reduces the corrosion rate and promotes the release of corrosion products.
[0022] In a possible implementation, when the temperature and pressure of a circuit are lowered to Mode 3 for minor repair:
[0023] If the main pump cannot be operated and the shutdown purification bed is unavailable, no lithium removal, no hydrogenation, and no zinc addition will be done in the primary circuit;
[0024] If the main pump remains in operation, the reactor purification bed is available, and the time since the last overhaul is less than the preset time, zinc addition is performed to maintain an alkaline reducing environment;
[0025] If the main pump remains in operation, the shutdown purification bed is available, and the time since the last overhaul is greater than the preset time, the primary circuit will perform lithium removal, maintain dissolved hydrogen, and will not perform zinc addition.
[0026] In a possible implementation, when the temperature and pressure of a circuit are lowered to Mode 4 for minor repair:
[0027] If the main pump cannot be operated and the shutdown purification bed is unavailable, the primary circuit will not remove lithium, partially remove hydrogen, and not add zinc;
[0028] If the main pump is available, the reactor cleaning bed is available, and the time since the last overhaul is less than the preset time, the primary circuit will not remove lithium, partially remove hydrogen, and will not add zinc;
[0029] If the main pump is available, the outage purification bed is available and the time since the last overhaul is greater than the preset time, the primary circuit will remove lithium and partially remove hydrogen without adding zinc.
[0030] In a possible implementation, when the temperature and pressure of a circuit are lowered to Mode 5 for minor repair:
[0031] If the main pump cannot be operated and the shutdown purification bed is unavailable, the primary circuit will not remove lithium, partially remove hydrogen, and not add zinc;
[0032] If the main pump is available, the reactor cleaning bed is available, and the time since the last overhaul is less than the preset time, the primary circuit will not remove lithium, partially remove hydrogen, and will not add zinc;
[0033] If the main pump is available, the reactor cleaning bed is available, the time since the last overhaul is greater than the preset time, and the primary circuit is not opened, the primary circuit will be de-lithiumed, partially de-hydrogenated, and no zinc will be added;
[0034] If the main pump is available, the reactor cleaning bed is available, the time since the last overhaul is greater than the preset time, the primary circuit is opened, and there is not enough time to perform the cleaning, the primary circuit will be de-liquidated, all hydrogen will be removed, and no zinc will be added;
[0035] If the main pump is available, the shutdown purification bed is available, the time since the last overhaul is greater than the preset time, the primary circuit is opened, and there is enough time to perform purification, the primary circuit will remove lithium and hydrogen completely, no zinc will be added, hydrogen peroxide will be added, and oxidation operation will be performed.
[0036] The beneficial effect of the present disclosure is that the present disclosure provides a chemical control method during minor maintenance of a nuclear power plant, which can coordinate factors such as minor maintenance plan, system operating status, and corrosion product deposition, and comprehensively consider the influence of multiple aspects such as the minor maintenance shutdown temperature platform, whether the main pump is running, whether the purification system is in operation, and whether the primary circuit is open, so as to formulate a suitable and standardized minor maintenance chemical control plan, which can reduce radioactive deposition, reduce system corrosion, reduce the dose of overhaul personnel, and improve core performance. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 It is a flow chart of a primary circuit chemical control method during minor repairs of a nuclear power plant shown in an embodiment of the present disclosure. DETAILED DESCRIPTION
[0038] The present disclosure is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0039] Unless otherwise defined, the technical and scientific terms used in the present disclosure have the same meanings as those generally understood by those skilled in the art to which the present disclosure belongs; the terms used in the present disclosure are only for the purpose of describing specific embodiments and are not intended to limit the present disclosure; the term "including" and any variations thereof in the present disclosure are intended to cover non-exclusive inclusions. Obviously, the embodiments described in the present disclosure are only part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in the field without making creative efforts are within the scope of protection of the present disclosure.
[0040] Reference to "embodiments" in this disclosure means that a particular feature, structure, or characteristic described in conjunction with the embodiments can be included in at least one embodiment of the disclosure. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments.
[0041] Figure 1 : is a flow chart of a method for controlling primary circuit chemistry during minor repairs of a nuclear power plant shown in an embodiment of the present disclosure. Figure 1 As shown, the method includes:
[0042] Step 1: According to the time of repair defect and the repair plan, determine the lowest temperature and pressure platform to which a circuit should be reduced during minor repairs, and confirm the time to perform repair and defect elimination work and stay at this platform.
[0043] For example, if a circuit stays in mode 3, NOT / NOP (normal operating temperature and pressure) during a minor repair, the temperature of the circuit will be between 250-290°C and the pressure will be between 12-15MPa. In mode 3, the unit will be slightly borated. If the grid connection time is delayed due to power adjustment, the unit will stay in mode 3 for a long time.
[0044] If one circuit stays in mode 4 during minor repairs, the temperature of the one circuit is between 90-170°C, the pressure is between 2-3MPa, and the remaining exhaust system is put into operation.
[0045] If the primary circuit stays in mode 5 during minor repairs, the primary circuit temperature is between 60-90°C, and depending on the pressure requirements, it is necessary to determine whether the primary circuit is open.
[0046] Step 2: Determine the operating status of important systems and equipment during minor repairs.
[0047] For example, it is necessary to focus on whether the main pump is in operation and whether the shutdown purification bed is available.
[0048] If the main pump is put into operation, the water quality of the primary circuit can be stirred evenly. At the same time, due to the high flow rate of the primary circuit and the core, there is a certain shear force on the corrosion products. The use of acidic chemical conditions can promote the release of corrosion products and reduce the deposition of corrosion products in the core. If the main pump is shut down, the release of corrosion products can be minimized and the deposition of corrosion products in the core can be reduced.
[0049] The shutdown purification bed includes the shutdown purification bed for boron recovery and the purification bed for the chemical volume system. If the shutdown purification bed is available, it can purify the corrosion products of the primary circuit and reduce the total amount of corrosion products in the system; if the shutdown purification bed is not available, it maintains an alkaline environment, reduces the corrosion rate, and promotes the release of corrosion products.
[0050] Step 3, determine the time from the last overhaul to the last overhaul. If the time from the last overhaul to the last overhaul exceeds the preset time, it indicates that enough corrosion products have accumulated in the first circuit. In this case, acid reduction or acid oxidation strategies are used during the overhaul to promote the release of corrosion products. If the time from the last overhaul to the last overhaul does not exceed the preset time, it indicates that the amount of corrosion products deposited in the core is small. In this case, an alkaline environment is maintained during the overhaul to reduce system corrosion. For example, the preset time can be 9 months. For units with higher doses or higher corrosion products, the preset time can be appropriately shortened. For units with lower doses and fewer corrosion products, the preset time can be appropriately extended.
[0051] Step 4, determine the water chemistry control strategy during the minor overhaul based on the determined lowest temperature and pressure of the unit, the system operating status and the time since the last overhaul.
[0052] Examples of water chemistry control strategies include any of the following:
[0053] Alkaline reduction: Maintaining the lithium concentration and dissolved hydrogen concentration, and keeping the pHt of a circuit alkaline can reduce corrosion, but it will also reduce the release of corrosion products.
[0054] Acidic reduction: perform lithium removal to maintain dissolved hydrogen concentration. Perform lithium removal during minor repairs to maintain an acidic environment, which is conducive to the release of corrosion products. However, because the unit will start up quickly, hydrogen removal is not performed, or only partial hydrogen removal is performed to reduce the rebound of dissolved hydrogen during the startup process.
[0055] Acidic oxidizing environment: perform lithium and hydrogen removal work, add hydrogen peroxide, maintain an acidic oxidizing environment, and maximize the release of corrosion products, which is equivalent to forced oxidation operation during overhaul. This method will maximize the release of core corrosion products and remove them through purification.
[0056] Zinc addition: In the case of minor repairs, zinc addition is generally stopped due to the release of corrosion products. If the alkaline reduction is maintained for a long time and the corrosion products such as nickel and iron meet the conditions, zinc addition is performed to maximize the passivation of the first circuit.
[0057] In one possible implementation, Figure 1 As shown in the figure, when the temperature and pressure of a circuit are lowered to mode 3 during minor repair:
[0058] If the main pump cannot be operated and the shutdown purification bed is unavailable, the primary circuit will not remove lithium, add hydrogen, or add zinc. Because the main pump cannot be operated, an alkaline reducing environment is maintained to reduce system corrosion, and zinc addition is stopped to avoid the system being unable to stir evenly, resulting in excessive zinc concentration.
[0059] If the main pump remains in operation, the reactor purification bed is available, and the time from the last overhaul is less than 9 months, the lithium concentration and zinc concentration of the primary circuit are kept similar to those during power operation, and zinc addition is performed. Maintain an alkaline reducing environment to reduce system corrosion, and perform zinc addition under the premise that the corrosion product meets the requirements, and increase the zinc passivation time.
[0060] If the main pump remains in operation, the reactor purification bed is available, and the time since the last overhaul is more than 9 months, the primary circuit will perform lithium removal, maintain dissolved hydrogen, and not perform zinc addition. Maintain an acidic reducing environment to promote the release and purification of core corrosion products and improve core performance. Stop zinc addition because the absorption rate of zinc is low under acidic conditions.
[0061] like Figure 1 As shown: When the temperature and pressure of a circuit are lowered to mode 4 during minor repair,
[0062] If the main pump cannot be operated and the shutdown purification bed is unavailable, the primary circuit will not remove lithium, partially remove hydrogen, and not add zinc. Because the main pump cannot be operated, maintain an alkaline reducing environment to reduce system corrosion; stop adding zinc to avoid the system being unable to stir evenly, resulting in excessive zinc concentration; partially perform hydrogen removal to reduce hydrogen in the gas phase space of the pressurizer, because in mode 4, the primary circuit pressure is greatly reduced, to avoid the hydrogen in the gas phase of the pressurizer dissolving into the coolant during the boost process, resulting in excessive dissolved hydrogen.
[0063] If the main pump is available, the reactor cleaning bed is available and the time from the last overhaul is less than 9 months, the primary circuit will not remove lithium, partially remove hydrogen, and not add zinc. Because the power operation time is short, the accumulation of corrosion products is small, and the alkaline reducing environment is maintained to reduce system corrosion; zinc addition is stopped, and the absorption rate of zinc is slow under low temperature conditions; partial dehydrogenation is performed to reduce the total amount of hydrogen in the gas phase space of the pressurizer, because in mode 4, the primary circuit pressure is greatly reduced, so as to avoid the hydrogen in the gas phase of the pressurizer dissolving into the coolant during the boost process, resulting in excessive dissolved hydrogen.
[0064] If the main pump is available, the shutdown purification bed is available, and the time from the last overhaul is more than 9 months, the primary circuit will be de-lithiumed, partially de-hydrogenated, and no zinc will be added. Because the power operation time is long, the accumulation of corrosion products is large, and the acidic reducing environment is maintained to promote the release of corrosion products, optimize the core performance, and reduce the shutdown critical path; stop adding zinc, and the absorption rate of zinc is slow under low temperature conditions; partially perform de-hydrogenation work to reduce the hydrogen in the gas phase space of the stabilizer, because in mode 4, the primary circuit pressure is greatly reduced, so as to avoid the hydrogen in the gas phase of the stabilizer from dissolving into the coolant during the boost process.
[0065] like Figure 1 As shown: When the temperature and pressure of a circuit are lowered to mode 5 for minor repair:
[0066] If the main pump cannot be operated and the shutdown purification bed is unavailable, the primary circuit will not remove lithium, partially remove hydrogen, and not add zinc. Because the main pump cannot be operated, maintain an alkaline reducing environment to reduce system corrosion; stop adding zinc to avoid the system being unable to stir evenly, resulting in excessive zinc concentration; partially perform hydrogen removal to reduce hydrogen in the gas phase space of the pressurizer, because in mode 5, the primary circuit pressure is greatly reduced, to avoid the hydrogen in the gas phase of the pressurizer dissolving into the coolant during the boost process, resulting in excessive dissolved hydrogen.
[0067] If the main pump is available, the reactor cleaning bed is available and the time from the last overhaul is less than 9 months, the primary circuit will not remove lithium, partially remove hydrogen, and not add zinc. Because the power operation time is short, the accumulation of corrosion products is small, maintain an alkaline reducing environment, and reduce system corrosion; stop adding zinc, and the absorption rate of zinc is slow under low temperature conditions; partially perform hydrogen removal to reduce the total amount of hydrogen in the gas phase space of the pressurizer, because in mode 5, the primary circuit pressure is greatly reduced, to avoid the hydrogen in the gas phase of the pressurizer dissolving into the coolant during the boost process, resulting in excessive dissolved hydrogen.
[0068] If the main pump is available, the shutdown purification bed is available, the time from the last overhaul is more than 9 months, and the primary circuit is not opened, the primary circuit will be de-lithiumed, partially de-hydrogenated, and no zinc will be added. Because the power operation time is long, the accumulation of corrosion products is large, and the acidic reducing environment is maintained to promote the release of corrosion products, optimize the core performance, and reduce the shutdown critical path; stop adding zinc, and the absorption rate of zinc is slow under low temperature conditions; partially perform de-hydrogenation to reduce the hydrogen in the gas phase space of the pressurizer, because in mode 5, the primary circuit pressure is greatly reduced, so as to avoid the hydrogen in the gas phase of the pressurizer from dissolving into the coolant during the boost process.
[0069] If the main pump is available, the reactor shutdown purification bed is available, the time from the last overhaul is more than 9 months, and the primary circuit is opened, but there is not enough time to perform purification, the primary circuit will be de-liquidated, all hydrogen will be removed, and no zinc will be added. Because the power operation time is long, the accumulation of corrosion products is large, and the acidic reducing environment is maintained to promote the release of corrosion products, optimize the core performance, and reduce the shutdown critical path; stop adding zinc, and the absorption rate of zinc is slow under low temperature conditions; because the primary circuit is open, all hydrogen removal work is performed to reduce the rebound of dissolved hydrogen after the primary circuit is opened.
[0070] If the main pump is available, the shutdown purification bed is available, the time from the last overhaul is more than 9 months, the primary circuit is opened, and there is enough time to perform purification, the primary circuit will remove lithium, all hydrogen, no zinc, add hydrogen peroxide, and perform oxidation operation. Because the unit has been running for a long time, the amount of corrosion products accumulated is large, and maintaining an acidic oxidation environment greatly promotes the release of corrosion products, optimizes core performance, and reduces shutdown critical paths.
[0071] The embodiments of the present disclosure have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or improvements to the technology in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.
Claims
1. A method for controlling primary circuit chemistry during minor repairs in a nuclear power plant, characterized in that: The method comprises: Step 1: According to the time of the repair defect and the repair plan, determine the lowest temperature and pressure platform of the primary circuit during the minor repair, and confirm the maintenance and defect elimination work and the stay time at this platform; Step 2, determine the operating status of important systems and equipment during minor repairs; Step 3, determine the time from the last minor repair to the last major repair. If the time from the last minor repair to the last major repair exceeds the preset time, an acid reduction or acid oxidation strategy is adopted during the minor repair; if the time from the last minor repair does not exceed the preset time, an alkaline environment is maintained during the minor repair; Step 4: Determine the water chemistry control strategy during the minor overhaul based on the determined minimum temperature and pressure of the unit, the system operating status, and the time since the last overhaul. The water chemistry control strategy includes any of the following: Alkaline reduction: maintain the lithium concentration and dissolved hydrogen concentration, and keep the pHt of the first circuit alkaline; Acid reduction: remove lithium and maintain dissolved hydrogen concentration; Acidic oxidizing environment: perform lithium and hydrogen removal, add hydrogen peroxide, and maintain an acidic oxidizing environment; Perform zinc addition.
2. The method according to claim 1, characterized in that In step 1, If the primary circuit stays in mode 3 during minor repairs, the primary circuit temperature is between 250-290°C and the pressure is between 12-15MPa; If one circuit stays in mode 4 during minor repairs, the temperature of the one circuit is between 90-170°C, the pressure is between 2-3MPa, and the remaining exhaust system is put into operation. If the primary circuit stays in mode 5 during minor repairs, the primary circuit temperature is between 60-90°C, and depending on the pressure requirements, it is necessary to determine whether the primary circuit is open.
3. The method according to claim 1, characterized in that In step 2, the operating status of important systems and equipment includes: whether the main pump is in operation and whether the shutdown purification bed is available; If the main pump is in operation, use acidic chemical conditions to treat the corrosion products; if the main pump is out of operation, reduce the release of corrosion products; The shutdown purification bed includes a shutdown purification bed for boron recovery and a purification bed for the chemical volume system; if the shutdown purification bed is available, it can purify the corrosion products of the first circuit and reduce the total amount of corrosion products in the system; if the shutdown purification bed is not available, it maintains an alkaline environment, reduces the corrosion rate and promotes the release of corrosion products.
4. The method according to claim 1, characterized in that: When the temperature and pressure of a circuit are lowered to Mode 3 for minor repairs: If the main pump cannot be operated and the shutdown purification bed is unavailable, no lithium removal, no hydrogenation, and no zinc addition will be done in the primary circuit; If the main pump remains in operation, the reactor purification bed is available, and the time since the last overhaul is less than the preset time, zinc addition is performed to maintain an alkaline reducing environment; If the main pump remains in operation, the shutdown purification bed is available, and the time since the last overhaul is greater than the preset time, the primary circuit will perform lithium removal, maintain dissolved hydrogen, and will not perform zinc addition.
5. The method according to claim 1, characterized in that When the temperature and pressure of a circuit are lowered to Mode 4 during minor repairs: If the main pump cannot be operated and the shutdown purification bed is unavailable, the primary circuit will not remove lithium, partially remove hydrogen, and not add zinc; If the main pump is available, the reactor cleaning bed is available, and the time since the last overhaul is less than the preset time, the primary circuit will not remove lithium, partially remove hydrogen, and will not add zinc; If the main pump is available, the outage purification bed is available and the time since the last overhaul is greater than the preset time, the primary circuit will remove lithium and partially remove hydrogen without adding zinc.
6. The method according to claim 1, characterized in that When the temperature and pressure of a circuit are lowered to Mode 5 for minor repair: If the main pump cannot be operated and the shutdown purification bed is unavailable, the primary circuit will not remove lithium, partially remove hydrogen, and not add zinc; If the main pump is available, the reactor cleaning bed is available, and the time since the last overhaul is less than the preset time, the primary circuit will not remove lithium, partially remove hydrogen, and will not add zinc; If the main pump is available, the reactor cleaning bed is available, the time since the last overhaul is greater than the preset time, and the primary circuit is not opened, the primary circuit will be de-lithiumed, partially de-hydrogenated, and no zinc will be added; If the main pump is available, the reactor cleaning bed is available, the time since the last overhaul is greater than the preset time, the primary circuit is opened, and there is not enough time to perform the cleaning, the primary circuit will be de-liquidated, all hydrogen will be removed, and no zinc will be added; If the main pump is available, the shutdown purification bed is available, the time since the last overhaul is greater than the preset time, the primary circuit is opened, and there is enough time to perform purification, the primary circuit will remove lithium and hydrogen completely, no zinc will be added, hydrogen peroxide will be added, and oxidation operation will be performed.
Citation Information
Patent Citations
Pressurized water reactor nuclear power station primary loop hydrogen removal method
CN114974623A
Direct cycle type nuclear power plant and method of operating the plant
JP1990243999A
Desalination tower of mix bed type in pressurized water nuclear power plant, and operation method thereof
JP2005003598A
Complex preparation-process for decreasing the non-radioactive salt content of waste solutions of nuclear power stations
US4983302A
Boiling water reactor and its operating method
US5892805A