Cooperative scheduling method of micro-grid, medium and program product

By obtaining the target operation curves of grid connection points and electric vehicles, and adjusting the target power of each module of the microgrid in real time, the problems of complex control logic and poor economics in the existing technology are solved, and flexible and efficient coordinated scheduling of the microgrid are realized, which improves the The operating economy and operability of the system.

CN118944058APending Publication Date: 2024-11-12NANJING DERI ENERGY RES INST CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410965488.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing microgrid energy storage system has complex control logic and poor economicality, making it difficult to achieve flexible and efficient coordinated scheduling.

Method used

By obtaining the first target operation curve of the connection point and the second target operation curve of the electric vehicle, the target power of the energy storage module, photovoltaic module, electric vehicle module and load module are adjusted in real time, so as to achieve intuitive and efficient coordinated scheduling and reduce control logic Complexity.

Benefits of technology

It improves the economical and readability of the system of the microgrid, making it more flexible and operational in practical applications, and achieves more efficient energy management and distribution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944058A_ABST
    Figure CN118944058A_ABST
Patent Text Reader

Abstract

The invention discloses a collaborative scheduling method of a micro-grid, a medium and a program product, and relates to the field of electric energy scheduling. According to the scheme, a first target operation curve of a grid-connected point and a second target operation curve of an electric vehicle are obtained, and current active power of a photovoltaic module, an energy storage module and a load module is obtained; and determining a control instruction according to the first target operation curve, the second target operation curve and each current active power, so as to adjust the target power of the energy storage module, the photovoltaic module, the electric vehicle module and the load module. Therefore, the first / second target operation curve is utilized to directly represent the power demand of the grid-connected point and the charging and discharging demand of the electric vehicle, and the active power of each module is adjusted in real time, so that more intuitive and efficient cooperative scheduling is realized, the complexity of control logic is reduced, and the economical efficiency and readability of system operation are improved; and the micro-grid is more flexible and operable in practical application.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric energy dispatching, and in particular to a coordinated dispatching method, medium and program product of a microgrid. Background Art

[0002] At present, microgrid energy storage systems usually use the method of constructing and optimizing objective functions to achieve control of microgrids. The control logic is complex and the system operation economy is poor. For example, patent CN201910153508 discloses a method for optimizing energy storage configuration of microgrids containing electric vehicles, which uses a multi-objective particle swarm algorithm as a method for multi-objective nonlinear optimization. The multi-objective function is converted into a single objective function through a linear weighted method and finally optimized using a particle swarm algorithm, but the logic readability is poor and the reuse is complex. Summary of the invention

[0003] The purpose of the present invention is to provide a method, medium and program product for coordinated scheduling of a microgrid, which directly characterizes the power demand of the grid connection point and the charging and discharging demand of the electric vehicle by using the first / second target operation curve, and achieves more intuitive and efficient coordinated scheduling by adjusting the active power of each module in real time, reduces the complexity of the control logic, improves the economy and readability of the system operation, and makes the microgrid more flexible and operational in practical applications.

[0004] On the one hand, the present invention provides a coordinated dispatching method of a microgrid, wherein the microgrid includes an energy storage module, a photovoltaic module, an electric vehicle module, and a load module, and the microgrid is connected to a main grid through a grid connection point. The coordinated dispatching method of the microgrid includes:

[0005] Obtaining a first target operating curve of the grid-connected point and a second target operating curve of the electric vehicle; the first target operating curve is used to characterize the target operating power demand of the microgrid in different time periods, and the second target operating curve is used to characterize the charging and discharging power demand of the electric vehicle in different time periods;

[0006] Acquiring the current active power of the photovoltaic module, the energy storage module and the load module;

[0007] determining a control instruction according to the first target operation curve, the second target operation curve and each of the current active powers;

[0008] The target powers of the energy storage module, the photovoltaic module, the electric vehicle module and the load module are adjusted according to the control instruction.

[0009] In one embodiment, obtaining the current active power of the photovoltaic module, the energy storage module, and the load module includes:

[0010] Obtaining the maximum power generation power of the photovoltaic module, the maximum power generation power and the maximum charging power of the energy storage module, and the load consumption power of the load module;

[0011] Determining a control instruction according to the first target operating curve, the second target operating curve, and each of the current active powers includes:

[0012] Determining a current target operating power requirement of the grid connection point according to the first target operating curve;

[0013] Determining the maximum discharge power and the maximum charging power of the electric vehicle module according to the second target operation curve;

[0014] The control instruction is determined according to the current target operating power demand, the maximum discharge power and the maximum charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, the maximum power generation power and the maximum charging power of the energy storage module, and the load consumption power of the load module.

[0015] In one embodiment, the control instruction is determined according to the current target operating power demand, the maximum discharge power and the maximum charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, the maximum power generation power and the maximum charging power of the energy storage module, and the load consumption power of the load module, including:

[0016] Determine whether the microgrid is in a normal working mode according to the current target operating power demand, the maximum discharge power and the maximum charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, the maximum power generation power and the maximum charging power of the energy storage module, and the load consumption power of the load module;

[0017] When the microgrid is in the normal working mode, generating a first control instruction;

[0018] When the microgrid is not in the normal working mode, generating a second control instruction;

[0019] Adjusting the target power of the energy storage module, the photovoltaic module, the electric vehicle module and the load module according to the control instruction includes:

[0020] When the microgrid is in the normal working mode, adjusting the target power of the energy storage module, the photovoltaic module, the electric vehicle module and the load module according to the first control instruction;

[0021] When the microgrid is not in the normal working mode, the target powers of the energy storage module, the photovoltaic module, the electric vehicle module and the load module are adjusted according to the second control instruction.

[0022] In one embodiment, it is determined whether the first working operating power of the microgrid is greater than the current target operating power requirement, and it is determined whether the second working operating power of the microgrid is less than the current target operating power requirement, the first working operating power is determined according to the load power consumption, the maximum power generation power of the photovoltaic module, the maximum charging power and the maximum discharging power of the electric vehicle module, and the maximum discharging power of the energy storage module, and the second working operating power is determined according to the load power consumption, the maximum power generation power of the photovoltaic module, the maximum charging power and the maximum discharging power of the electric vehicle module, and the maximum charging power of the energy storage module;

[0023] When the first working operating power is not greater than the current target operating power requirement, and the second working operating power is not less than the current target operating power requirement, determining that the microgrid is in the normal working mode;

[0024] When the first operating power is greater than the current target operating power requirement, or the second operating power is less than the current target operating power requirement, it is determined that the microgrid is not in the normal operating mode.

[0025] In one embodiment, when the microgrid is not in the normal working mode, adjusting the target power of the energy storage module, the photovoltaic module, the electric vehicle module and the load module according to the second control instruction includes:

[0026] When the first working operation power is greater than the current target operation power requirement, the target power of the photovoltaic module is set to the maximum discharge power of the photovoltaic module, the target power of the energy storage module is set to the maximum discharge power of the energy storage module, the target power of the load module is the load consumption power, and the target discharge power of the electric vehicle module is the maximum discharge power of the electric vehicle;

[0027] The target charging power of the electric vehicle module is limited to a first charging power, where the first charging power is less than a maximum charging power of the electric vehicle module.

[0028] In one embodiment, limiting the target charging power of the electric vehicle module to a first charging power includes:

[0029] The first charging power of the electric vehicle module is determined according to the second operating power, the maximum discharge power of the photovoltaic module, the maximum discharge power of the energy storage module, the load consumption power and the maximum discharge power of the electric vehicle module.

[0030] In one embodiment, when the microgrid is not in the normal working mode, adjusting the target power of the energy storage module, the photovoltaic module, the electric vehicle module and the load module according to the second control instruction includes:

[0031] Determine whether the third operating power of the microgrid is less than the current target operating power requirement; the third operating power is greater than the second operating power, and the third operating power is determined according to the load consumption power, the maximum power generation power of the photovoltaic module, the maximum charging power of the electric vehicle module, and the maximum charging power of the energy storage module;

[0032] When the third operating power is less than the current target operating power requirement, it is determined that the microgrid is not in the normal working mode, and the target power of the energy storage module is set to the maximum charging power of the energy storage module, the target power of the load module is the load consumption power, and the target charging power of the electric vehicle module is the maximum charging power of the electric vehicle module;

[0033] Limiting the target power generation of the photovoltaic module to a first power generation, wherein the first power generation is less than the maximum discharge power of the photovoltaic module. In one embodiment, limiting the target power generation of the photovoltaic module to the first power generation includes:

[0034] The first power generation power is determined according to the current target operating power demand of the grid connection point, the load consumption power, the maximum charging power of the electric vehicle module and the maximum charging power of the energy storage module.

[0035] In one embodiment, before determining whether the third operating power of the microgrid is less than the current target operating power requirement, the method further includes:

[0036] Determining whether the second working operating power is less than the current target operating power requirement;

[0037] When the second working operating power is less than the current target operating power requirement, the step of determining whether the third operating power of the microgrid is less than the current target operating power requirement is entered.

[0038] In one embodiment, adjusting the target power of the energy storage module, the photovoltaic module, the electric vehicle module, and the load module according to the second control instruction includes:

[0039] When the second working operating power is less than the current target operating power requirement, and the third working operating power is less than the current target operating power requirement, the target power of the photovoltaic module is set to the maximum power generation power of the photovoltaic module, the target power of the energy storage module is set to the maximum charging power of the energy storage module, the load power is the load consumption power, and the target charging power of the electric vehicle module is the maximum charging power of the electric vehicle module;

[0040] The target discharge power of the electric vehicle module is limited to a second discharge power, wherein the second discharge power is less than a maximum discharge power of the electric vehicle module.

[0041] In one embodiment, limiting the target discharge power of the electric vehicle module to a second discharge power includes:

[0042] The second discharge power is determined according to the current target operating power demand of the grid connection point, the load consumption power, the maximum charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, and the maximum charging power of the energy storage module.

[0043] On the other hand, the present application also provides a non-volatile storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the collaborative scheduling method of the microgrid as described above are implemented.

[0044] On the other hand, the present application also provides a computer program product, including a computer program / instruction, which, when executed by a processor, implements the steps of the collaborative scheduling method of the microgrid as described above.

[0045] The present invention provides a method, medium and program product for coordinated dispatching of a microgrid. The scheme obtains a first target operating curve of a grid-connected point and a second target operating curve of an electric vehicle, and obtains the current active power of a photovoltaic module, an energy storage module and a load module; a control instruction is determined according to the first target operating curve, the second target operating curve and each current active power to adjust the target power of the energy storage module, the photovoltaic module, the electric vehicle module and the load module. It can be seen that the present application uses the first / second target operating curve to directly characterize the power demand of the grid-connected point and the charging and discharging demand of the electric vehicle, and by adjusting the active power of each module in real time, a more intuitive and efficient coordinated dispatch is achieved, the complexity of the control logic is reduced, the economy and readability of the system operation are improved, and the microgrid is more flexible and operable in practical applications. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] In order to more clearly illustrate the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0047] Figure 1 A flow chart of a coordinated dispatching method for a microgrid provided by the present invention;

[0048] Figure 2 A schematic diagram of the structure of a microgrid provided by the present invention;

[0049] Figure 3 A schematic diagram of a specific flow chart of a coordinated dispatching method for a microgrid provided by the present invention. DETAILED DESCRIPTION

[0050] The core of the present invention is to provide a microgrid collaborative scheduling method, medium and program product, which uses the first / second target operation curve to directly characterize the power demand of the grid connection point and the charging and discharging demand of the electric vehicle, and achieves more intuitive and efficient collaborative scheduling by adjusting the active power of each module in real time, reduces the complexity of the control logic, improves the economy and readability of the system operation, and makes the microgrid more flexible and operational in practical applications.

[0051] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0052] On the one hand, if Figure 1 As shown, the present invention provides a coordinated scheduling method for a microgrid, such as Figure 2 As shown, the microgrid includes energy storage modules, photovoltaic modules, electric vehicle modules, and load modules. The microgrid is connected to the main grid through a grid connection point.

[0053] In this embodiment, the energy storage module is used to store electrical energy, and is connected to the DC bus or AC bus through an energy storage converter. It can release or absorb electrical energy when the system needs it to balance the grid load or cope with energy fluctuations. The photovoltaic module (which may include a photovoltaic module and a photovoltaic optimizer, and the photovoltaic module is connected to the DC bus or AC bus through a photovoltaic optimizer) converts solar energy into electrical energy and is a renewable energy source in the system. Its output is affected by the intensity of sunlight and weather conditions. The electric vehicle module (including an electric vehicle and an electric vehicle charging and discharging pile, and the electric vehicle is connected to the DC bus or AC bus through an electric vehicle charging and discharging pile), as an adjustable power supply and load, the electric vehicle can charge or discharge, and is used to balance the system load and energy storage requirements, and participate in the system energy management. The load module refers to the power consumption equipment in the system, including household, industrial or commercial power equipment, whose power demand is crucial to the stable operation of the system; the DC load is connected to the DC bus, and the AC load is connected to the AC bus.

[0054] These modules are connected to the main grid through the grid connection point in the microgrid system, working together to achieve efficient use and management of energy.

[0055] like Figure 1 As shown in FIG. 1 , the coordinated dispatching method of the microgrid includes:

[0056] S11: Obtain a first target operating curve of the grid connection point and a second target operating curve of the electric vehicle; the first target operating curve is used to characterize the target operating power demand of the microgrid in different time periods, and the second target operating curve is used to characterize the charging and discharging power demand of the electric vehicle in different time periods;

[0057] This step describes the process of obtaining the first target operating curve of the grid connection point and the second target operating curve of the electric vehicle. The first target operating curve is determined based on the target operating power demand of the microgrid in different time periods. It directly reflects the changes in the system's demand for electricity. The generation of this curve takes into account various factors, such as user demand, seasonal changes, system load forecasts, etc., and provides guidance for the system on how to adjust the target power of each module in different time periods. The second target operating curve is used to describe the charging and discharging power demand of electric vehicles in different time periods. The generation of this curve is based on factors such as the charging demand of electric vehicles, vehicle driving mode, and battery status to ensure that the energy of electric vehicles is effectively managed and utilized in the system.

[0058] The processor may communicate with the cloud to obtain a first target operating curve of the grid connection point and a second target operating curve of the electric vehicle.

[0059] By obtaining these two curves, the microgrid system can more accurately predict and plan its energy usage and allocation strategies, thereby achieving coordinated scheduling among various modules within the system.

[0060] S12: Obtain the current active power of the photovoltaic module, the energy storage module and the load module;

[0061] The core of this step is to monitor and record the current power output or consumption of each module in real time. The photovoltaic module converts solar energy into electrical energy, and its output power is affected by the intensity of solar radiation and weather conditions; the energy storage module can store or release electrical energy, and its power output depends on the current battery charge state and system requirements; and the load module represents the actual power consumption of various users and devices in the microgrid, and its power consumption directly affects the overall energy consumption and stability of the system.

[0062] The current active power of the photovoltaic module, the energy storage module and the load module can be obtained through RS485 or CAN bus but is not limited to it.

[0063] By acquiring the active power of these modules in real time, the microgrid system can understand the current energy status and load conditions of each module during operation, providing real-time data support for subsequent control decisions.

[0064] S13: determining a control instruction according to the first target operation curve, the second target operation curve and each current active power;

[0065] S14: Adjust the target power of the energy storage module, the photovoltaic module, the electric vehicle module and the load module according to the control instruction.

[0066] This step describes the process of determining the control instructions and adjusting the target power of each module accordingly. The control instructions are calculated based on the first target operating curve, the second target operating curve of the electric vehicle and the current real-time active power. The purpose is to adjust the power output or consumption level of the energy storage module, photovoltaic module, electric vehicle module and load module according to the system requirements and optimization goals. By responding to and adjusting the target power of these modules in real time, the microgrid can achieve efficient utilization and distribution of electric energy while ensuring system stability and operational economy, thereby improving the energy efficiency and overall operation of the system. This dynamic scheduling strategy based on real-time data and target curves enables the microgrid to respond more flexibly to different energy demands and environmental changes, and improve the reliability and response speed of the system.

[0067] In one embodiment, the current active power of the photovoltaic module, the energy storage module and the load module is obtained, including: obtaining the maximum power generation power of the photovoltaic module, the maximum power generation power and the maximum charging power of the energy storage module, and the load power consumption of the load module; determining the control instruction according to the first target operation curve, the second target operation curve and each current active power, including: determining the current target operation power requirement of the grid connection point according to the first target operation curve; determining the maximum discharge power and the maximum charging power of the electric vehicle module according to the second target operation curve; determining the control instruction according to the current target operation power requirement, the maximum discharge power and the maximum charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, the maximum power generation power and the maximum charging power of the energy storage module, and the load power consumption of the load module.

[0068] In this embodiment, the current active power of the photovoltaic module, energy storage module and load module is obtained based on real-time monitoring and measurement of the current power output or consumption of each module. First, the maximum power generation power of the photovoltaic module represents the maximum power output capacity that the photovoltaic system can provide under ideal conditions; the energy storage module includes its maximum power generation power and maximum charging power, the former refers to the maximum power output capacity of the energy storage system in the discharge state, and the latter is the maximum charging power it can receive. The load consumption power of the load module represents the amount of electric energy currently consumed by the load module.

[0069] Subsequently, the control instructions of each module are determined according to the set first target operation curve and second target operation curve. The first target operation curve is used to plan the expected operating power demand of the grid connection point in different time periods, which reflects the overall demand trend of the microgrid for electricity. The second target operation curve is used to determine the maximum discharge power and maximum charging power demand of the electric vehicle module in different time periods, which directly affects the charging and discharging behavior of the electric vehicle in the microgrid.

[0070] Finally, specific control instructions are generated based on the current target operating power demand, the discharge and charging demand of the electric vehicle module, the power generation capacity of the photovoltaic module, the discharge and charging capacity of the energy storage module, and the power consumption of the load module. These instructions achieve coordinated scheduling and optimized operation of the microgrid by adjusting the operating status and power output of each module to ensure that the system achieves optimal performance in terms of stability, economy, and reliability. This dynamic control strategy based on real-time data and preset target curves enables the microgrid to flexibly respond to different load demands and external environmental changes, and improve energy utilization efficiency and overall system performance.

[0071] In one embodiment, a control instruction is determined based on the current target operating power demand, the maximum discharge power and maximum charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, the maximum power generation power and maximum charging power of the energy storage module, and the load consumption power of the load module, including: determining whether the microgrid is in a normal working mode based on the current target operating power demand, the maximum discharge power and maximum charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, the maximum power generation power and maximum charging power of the energy storage module, and the load consumption power of the load module; when the microgrid is in the normal working mode, generating a first control instruction; when the microgrid is not in the normal working mode, generating a second control instruction; adjusting the target power of the energy storage module, the photovoltaic module, the electric vehicle module, and the load module according to the control instruction, including: when the microgrid is in the normal working mode, adjusting the target power of the energy storage module, the photovoltaic module, the electric vehicle module, and the load module according to the first control instruction; when the microgrid is not in the normal working mode, adjusting the target power of the energy storage module, the photovoltaic module, the electric vehicle module, and the load module according to the second control instruction.

[0072] In this embodiment, the operation status of the microgrid and the power management of each module are regulated based on real-time monitoring and preset operation requirements. First, according to the current target operation power requirement and the capacity limit of each module (such as the maximum discharge and charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, the maximum power generation and charging power of the energy storage module, and the power consumption of the load module), it is determined whether the microgrid is in a normal operation mode.

[0073] If the microgrid is in normal operating mode, a first control instruction is generated, which adjusts the target power of the energy storage module, photovoltaic module, electric vehicle module and load module based on the current target operating power demand to ensure that the microgrid operates stably under the current load conditions and utilizes photovoltaic power generation and energy storage power supply as much as possible to reduce dependence on the main power grid.

[0074] If the microgrid is not in normal operation mode, a second control instruction is generated, which may involve an adjustment strategy for emergency or special circumstances to ensure the safe operation of the microgrid or the achievement of specific goals. Such control instructions may include limiting or optimizing the power output of certain modules, or adjusting the charging and discharging strategy to cope with abnormal loads or insufficient energy supply.

[0075] In summary, by dynamically adjusting the target power of each module and generating corresponding control instructions according to the current operating requirements and system status, the microgrid can achieve flexible energy management and optimized scheduling, thereby improving energy utilization efficiency, reducing operating costs, and ensuring stability and reliability under various operating conditions. This strategy can not only effectively cope with daily energy fluctuations and changes in load demand, but also quickly adjust in the face of emergencies or unforeseen situations to ensure the continuous and stable operation of the microgrid system.

[0076] In one embodiment, whether the microgrid is in a normal working mode is determined according to the current target operating power demand, the maximum discharge power and the maximum charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, the maximum power generation power and the maximum charging power of the energy storage module, and the load consumption power of the load module, including: judging whether the first operating power of the microgrid is greater than the current target operating power demand, and judging whether the second operating power of the microgrid is less than the current target operating power demand, the first operating power is determined according to the load consumption power, the maximum power generation power of the photovoltaic module, the maximum charging power and the maximum discharge power of the electric vehicle module, and the maximum discharge power of the energy storage module, and the second operating power is determined according to the load consumption power, the maximum power generation power of the photovoltaic module, the maximum charging power and the maximum discharge power of the electric vehicle module, and the maximum charging power of the energy storage module; when the first operating power is not greater than the current target operating power demand, and the second operating power is not less than the current target operating power demand, it is determined that the microgrid is in a normal working mode; when the first operating power is greater than the current target operating power demand, or the second operating power is less than the current target operating power demand, it is determined that the microgrid is not in a normal working mode.

[0077] In this embodiment, the determination basis of the normal working mode and the abnormal working mode of the microgrid is based on the comparison of two working operating powers. The first working operating power is defined as the maximum power that the microgrid can provide, which should be sufficient to meet the current target operating power requirement. The second working operating power is the minimum operating power of the microgrid, which should be greater than or equal to the current target operating power requirement to ensure that the microgrid can still operate normally under minimum load conditions.

[0078] Specifically, the first operating power is determined by the load consumption power, the maximum power generation power of the photovoltaic module, the maximum charging power and discharging power of the electric vehicle module, and the maximum discharge power of the energy storage module. If the first operating power is not greater than the current target operating power requirement, and the second operating power is not less than the current target operating power requirement, the microgrid is determined to be in normal operating mode.

[0079] When the first operating power is greater than the current target operating power requirement, or the second operating power is less than the current target operating power requirement, it indicates that the microgrid fails to meet the current load demand and is therefore determined to be in an abnormal operating mode.

[0080] Among them, the first working operating power is:

[0081] P load +P pv-up +P ev-down +P ev-_up +P bat-up ; The second working power is:

[0082] P load +P pv-up +P ev-down +P ev-_up +P bat-down ; where P load is the load power consumption, P pv-up is the maximum power generation of the photovoltaic module, P ev-down is the maximum charging power of the electric vehicle module, P ev-_up is the maximum discharge power of the electric vehicle module, P bat-up is the maximum discharge power of the energy storage module, P pcc-eco The current target operating power demand for the grid connection point.

[0083] This determination method effectively evaluates the operating status of the microgrid by comparing the two working operating powers, ensuring that the microgrid can maintain stable operation under various load conditions.

[0084] In one embodiment, when the microgrid is not in a normal working mode, adjusting the target power of the energy storage module, the photovoltaic module, the electric vehicle module, and the load module according to the second control instruction includes:

[0085] When the first working operating power is greater than the current target operating power requirement, the target power of the photovoltaic module is set to the maximum discharge power of the photovoltaic module, the target power of the energy storage module is set to the maximum discharge power of the energy storage module, the target power of the load module is the load consumption power, and the target discharge power of the electric vehicle module is the maximum discharge power of the electric vehicle;

[0086] The target charging power of the electric vehicle module is limited to a first charging power, where the first charging power is less than a maximum charging power of the electric vehicle module.

[0087] In this embodiment, when the microgrid is not in normal operating mode, the target power of each key module (including energy storage module, photovoltaic module, electric vehicle module and load module) is adjusted according to the second control instruction to restore the normal operating state of the microgrid as much as possible.

[0088] Specifically, first, it is determined whether the first operating power is greater than the current target operating power requirement. The calculation of the first operating power is based on the load consumption power, the maximum power generation power of the photovoltaic module, the maximum charging power and discharging power of the electric vehicle module, and the maximum discharge power of the energy storage module. If the first operating power is indeed greater than the current target operating power requirement, the microgrid needs to be adjusted to adapt to the current load conditions and power demand.

[0089] In this case, the target power of the photovoltaic module is set to the maximum discharge power of the photovoltaic module. The maximum discharge power of the photovoltaic module is the maximum electric power output that the photovoltaic module can provide under given conditions, so as to maximize the utilization of solar energy resources. The target power of the energy storage module is set to the maximum discharge power of the energy storage module. The maximum discharge power of the energy storage module represents the maximum discharge capacity that the battery system can provide under certain conditions, which is used to meet instantaneous high power demand or adjust the grid frequency and other functions. The target power of the load module is set to the load consumption power. The load consumption power is the total electric power consumed by various electrical equipment in the microgrid system, including various household appliances, equipment and lighting. The target discharge power of the electric vehicle module is set to the maximum discharge power of the electric vehicle. The maximum discharge power of the electric vehicle represents the maximum power output that the vehicle can provide under the current battery state, which is used to meet the power demand of the electric vehicle or provide power to the grid.

[0090] In addition, according to the second control instruction, the target charging power of the electric vehicle module needs to be limited to the first charging power. The first charging power must be less than the maximum charging power of the electric vehicle module to ensure that the charging operation of the electric vehicle is safe and effective under the current situation.

[0091] Through the above adjustments, the microgrid can effectively adjust the operating status and power output of each module in the face of load exceeding expectations or insufficient power supply to ensure the stable operation of the microgrid system and the reliability of power supply. This method can quickly respond to changes in power demand, optimize energy utilization efficiency, and improve the overall performance and economy of the microgrid system.

[0092] In one embodiment, limiting the target charging power of the electric vehicle module to a first charging power includes:

[0093] The first charging power of the electric vehicle module is determined according to the second operating power, the maximum discharge power of the photovoltaic module, the maximum discharge power of the energy storage module, the load consumption power and the maximum discharge power of the electric vehicle module.

[0094] Specifically, the process of limiting the target charging power of the electric vehicle module to the first charging power is as follows: first, the first charging power of the electric vehicle module is determined according to the second working power of the current microgrid. The second working power is determined by the load consumption power, the maximum power generation power of the photovoltaic module, the maximum discharge power of the energy storage module, and the maximum discharge power of the electric vehicle module. These parameters reflect the current power supply and demand status of the microgrid system and the maximum power output capacity of each module.

[0095] Judge P load +P pv-up +P ev-down +P ev-_up +P bat-up >P pcc-eco ; That is, the load power consumption P load +The maximum power generation of photovoltaic modules P pv-up + Maximum charging power P of electric vehicle module ev-down + Maximum discharge power P of electric vehicle module ev-_up + Maximum discharge power of energy storage module P bat-up Greater than the current target operating power demand P of the grid connection point pcc-eco When the charging of the electric vehicle module needs to be restricted.

[0096] If greater than, then:

[0097] P pv-set =P pv-up ;

[0098] P bat-set =P bat-up ;

[0099] P ev-set =P pcc-eco -P load -P pv-up -P ev-up -P bat-up .

[0100] That is, the target power P of the photovoltaic module pv-set is the maximum power P that can be generated by the photovoltaic module pv-up , the target power P of the energy storage module bat-set Set to the maximum adjustable discharge power P of the energy storage bat-up , the target charging power P of the electric vehicle ev-set = Current target operating power demand P of the grid-connected pointpcc-eco - Load power consumption P load - Maximum discharge power P of electric vehicle module ev-up -The maximum power generation power P of the photovoltaic module pv-up - Maximum discharge power P of the energy storage module bat-up .

[0101] The first charging power of the electric vehicle module ensures that the charging operation of the electric vehicle can be carried out under appropriate conditions when the microgrid is not in normal working mode, while avoiding excessive load or unnecessary power consumption on the microgrid system. By dynamically adjusting the target charging power of the electric vehicle module, the microgrid can more intelligently manage and allocate the operating status of each energy module to achieve high efficiency and stability of system operation.

[0102] In one embodiment, when the microgrid is not in the normal working mode, the target powers of the energy storage module, the photovoltaic module, the electric vehicle module and the load module are adjusted according to the second control instruction, including: judging whether the third operating power of the microgrid is less than the current target operating power requirement; the third operating power is greater than the second operating power, and the third operating power is determined according to the load consumption power, the maximum power generation power of the photovoltaic module, the maximum charging power of the electric vehicle module and the maximum charging power of the energy storage module; when the third operating power is less than the current target operating power requirement, it is determined that the microgrid is not in the normal working mode, and the target power of the energy storage module is set to the maximum charging power of the energy storage module, the target power of the load module is the load consumption power, and the target charging power of the electric vehicle module is the maximum charging power of the electric vehicle module; and the target power generation power of the photovoltaic module is limited to the first power generation power, and the first power generation power is less than the maximum discharge power of the photovoltaic module.

[0103] In one embodiment, limiting the target power generation power of the photovoltaic module to a first power generation power includes: determining the first power generation power according to the current target operating power requirement of the grid connection point, the load consumption power, the maximum charging power of the electric vehicle module and the maximum charging power of the energy storage module.

[0104] In this embodiment, first, it is determined whether the third operating power of the microgrid is less than the current target operating power requirement. The calculation of the third operating power depends on the load consumption power, the maximum power generation power of the photovoltaic module, the maximum charging power of the electric vehicle module, and the maximum charging power of the energy storage module. These parameters determine the maximum power output that the system can provide in the current state.

[0105] The setting of the third working operating power is based on the power demand of the current load, the maximum power generation capacity of the photovoltaic module, the maximum charging capacity of the electric vehicle module and the maximum charging capacity of the energy storage module, ensuring that the system can effectively adjust the target power of each module to meet the current power demand when it is not in normal working mode.

[0106] If the third working operating power is less than the current target operating power requirement, it is determined that the microgrid is not in normal working mode. Specifically, the microgrid transmits more power to the grid connection point, and it is necessary to limit part of the power transmitted to the grid connection point. In this case, the target power of the energy storage module is set to the maximum charging power of the energy storage module so that the energy storage module can absorb as much electricity as possible. The target power of the load module is set to the current load consumption power to ensure that the normal power supply to each load device is maintained. The target charging power of the electric vehicle module is set to the maximum charging power of the electric vehicle module to meet the charging needs of the electric vehicle in the current state. The target power generation power of the photovoltaic module is also limited to the first power generation power to ensure that the power output of the photovoltaic module does not exceed its maximum discharge power when it is not in normal working mode, so as to limit the power transmitted to the main power grid through the grid connection point.

[0107] Specifically, the third working operating power is: P load +P pv-up +P ev-down +P bat-down , that is, the third working power is: load power consumption P load +The maximum power generation of photovoltaic modules P pv-up + Maximum charging power P of electric vehicle module ev-down + Maximum charging power P of the energy storage module bat-down .

[0108] If the first power value is less than the current target operating power requirement P pcc-eco ,but:

[0109] P pv-set =P pcc-eco -P load -P ev-down -P bat-down ;

[0110] P bat-set =P bat-down ;

[0111] P ev-set =P ev-down ;

[0112] Target power P of PV module pv-set Set as the current target operating power demand P of the grid-connected point pcc-eco - Load power consumption P load- Maximum charging power P of the electric vehicle module ev-down - Maximum charging power P of the energy storage module bat-down , the target power P of the energy storage module bat-set is the maximum charging power P of the energy storage module bat-down , the target charging power P of the electric vehicle module ev-set is the maximum charging power P of the electric vehicle module ev-down .

[0113] This process can effectively respond to changes in power demand of the microgrid under different working conditions by dynamically adjusting the target power of each energy module, ensuring the stability and efficiency of system operation. This intelligent control strategy can adjust energy distribution according to real-time data and system requirements to optimize the overall performance of the microgrid.

[0114] In one embodiment, before determining whether the third operating power of the microgrid is less than the current target operating power requirement, it also includes: determining whether the second operating power is less than the current target operating power requirement; when the second operating power is less than the current target operating power requirement, entering the step of determining whether the third operating power of the microgrid is less than the current target operating power requirement.

[0115] In this embodiment, the second operating power is first calculated, which is determined by the current load consumption power, the maximum power generation power of the photovoltaic module, the maximum charging power of the electric vehicle module, and the maximum charging power of the energy storage module. If the second operating power is less than the current target operating power requirement, the system needs to be further adjusted to meet the actual power demand.

[0116] If the second operating power is indeed less than the current target operating power demand, it means that the microgrid currently provides more power to the main grid through the grid connection point. At this time, the third operating power will continue to be determined. Here, the third operating power is greater than the second operating power. Running at the third operating power means that the power provided to the main grid is less than when running at the second operating power. The calculation of the third operating power depends on the load consumption power, the maximum power generation power of the photovoltaic module, the maximum charging power of the electric vehicle module, and the maximum charging power of the energy storage module. The purpose of this step is to confirm how much excess power the current system provides to the main grid in the current state, so as to determine how much power output needs to be limited to the main grid, and which module is limited to output power to the main grid.

[0117] According to the above judgment results, the working state of the microgrid is divided into two possible situations:

[0118] If the second working operating power is less than the current target operating power requirement, and the third working operating power is also less than the current target operating power requirement, the microgrid transmits more power to the main grid. At this time, the first part of the power is limited to stop transmitting the first part of the power to the main grid.

[0119] If the second working operating power is less than the current target operating power requirement, but the third working operating power is not less than the current target operating power requirement, the power transmitted by the microgrid to the main grid is also relatively large, but not as much as the above-mentioned output power. At this time, the second part of the power is limited to stop transmitting the second part of the power to the main grid, where the second part of the power is less than the first part of the power.

[0120] In one embodiment, the target powers of the energy storage module, the photovoltaic module, the electric vehicle module and the load module are adjusted according to the second control instruction, including: when the second working operating power is less than the current target operating power requirement, and the third working operating power is less than the current target operating power requirement, the target power of the photovoltaic module is set to the maximum power generation power of the photovoltaic module, the target power of the energy storage module is set to the maximum charging power of the energy storage module, the load power is the load consumption power, and the target charging power of the electric vehicle module is the maximum charging power of the electric vehicle module; and the target discharge power of the electric vehicle module is limited to the second discharge power, and the second discharge power is less than the maximum discharge power of the electric vehicle module.

[0121] In one embodiment, limiting the target discharge power of the electric vehicle module to a second discharge power includes: determining the second discharge power according to the current target operating power requirement of the grid connection point, the load consumption power, the maximum charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, and the maximum charging power of the energy storage module.

[0122] In this embodiment, the third working operating power is:

[0123] P load +P pv-up +P ev-down +P ev-_up +P bat-down ;

[0124] If P load +P pv-up +P ev-down +P ev-_up +P bat-down <P pcc-eco ,and

[0125] P load +P pv-up +P ev-down +P bat-down >Ppcc-eco ,but:

[0126] P pv-set =P pv-up ;

[0127] P bat-set =P bat-down ;

[0128] P ev-set =P pcc-eco -P load -P ev-down -P pv-up -P bat-down ;

[0129] Target power P of PV module pv-set is the maximum power generation power P of the photovoltaic module pv-up , the target power P of the energy storage module bat-set is the maximum charging power P of the energy storage module bat-down , the target discharge power P of the electric vehicle module ev-set is the current target operating power demand P of the grid-connected point pcc-eco - Load power consumption P load -Charging power P of electric vehicle module ev-down -The maximum power generation power P of the photovoltaic module pv-up - Maximum charging power P of the energy storage module bat-down .

[0130] In a specific embodiment, Figure 3 As shown in Figure 1, if the behavior tree is used, the microgrid decision control model includes the total fallback node FB, the target forward deviation control subtree Target reverse deviation control subtree and normal operating interval control subtree

[0131] (1) Where the target is positively deviating from the control subtree The decision logic is:

[0132] Target positive deviation control subtree It includes sequence node SQ1, condition node C1, and action node A1;

[0133] When the condition node C1 returns a failure, the sequence node SQ1 returns a failure to the general fallback node FB; when the condition node C1 returns a success, the action node A1 is executed, and the sequence node SQ1 returns a success to the general fallback node FB;

[0134] Among them, the judgment logic of condition node C1 is:

[0135] P load +Ppv-up +P ev-down +P ev-_up +P bat-up >P pcc-eco (1)

[0136] When the load consumes power P load +The maximum power generation of photovoltaic modules P pv-up + Maximum charging power P of electric vehicle module ev-down + Maximum discharge power P of electric vehicle module ev-_up + Maximum discharge power of energy storage module P bat-up Greater than the current target operating power demand P of the grid connection point pcc-eco When , the condition node C1 returns success to the sequence node SQ1, otherwise the condition node C1 returns failure to the sequence node SQ1.

[0137] Action node A1 implements the electric vehicle module to start limiting charging. The execution logic of action node A1 is:

[0138] P pv-set =P pv-up (2)

[0139] P bat-set =P bat-up (3)

[0140] P ev-set =P pcc-eco -P load -P pv-up -P ev-up -P bat-up (4)

[0141] Target power P of PV module pv-set is the maximum power P that can be generated by the photovoltaic module pv-up , the target power P of the energy storage module bat-set Set to the maximum adjustable discharge power P of the energy storage module bat-up , the target charging power P of the electric vehicle module ev-set = Grid-connected point operation target power P pcc-eco - Load power consumption P load - Maximum discharge power P of electric vehicle module ev-up -The maximum power generation power P of the photovoltaic module pv-up - Maximum discharge power P of the energy storage module bat-up And return success to the sequence node SQ1.

[0142] (2) Target reverse deviation control subtree The decision logic is:

[0143] Target reverse deviation control subtree Including sequence node SQ2, sequence node SQ3, fallback node FB1, condition node C2, condition node C3, action node A2, action node A3:

[0144] When the condition node C2 returns failure, the sequence node SQ2 returns failure to the total fallback node FB. When the condition node C2 returns success, the fallback node FB1 is judged. If the fallback node FB1 returns success, the sequence node SQ2 returns success to the total fallback node FB, otherwise the sequence node SQ2 returns failure to the total fallback node FB.

[0145] When the condition node C3 returns failure, the sequence node SQ3 returns failure to the fallback node FB1. When the condition node C3 returns success, the action node A2 is executed, and the sequence node SQ3 returns success to the fallback node FB1.

[0146] When the sequence node SQ3 returns success, the fallback node FB1 returns success; when the sequence node SQ3 returns failure, the action node A3 is executed, and the fallback node FB1 returns success;

[0147] The judgment logic of conditional node C2 is:

[0148] P load +P pv-up +P ev-down +P ev-_up +P bat-down <P pcc-eco (5)

[0149] When the load consumes power P load +The maximum power generation of photovoltaic modules P pv-up + Maximum charging power P of electric vehicle module ev-down + Maximum discharge power P of electric vehicle module ev-_up + Maximum charging power P of the energy storage module bat-down Less than the target power P of the grid-connected point pcc-eco When the condition node C2 returns success to the sequence node SQ2, otherwise the node returns failure to the sequence node SQ2;

[0150] The judgment logic of conditional node C3 is:

[0151] P load +P pv-up +P ev-down +P bat-down <P pcc-eco (6)

[0152] When the load consumes power P load +The maximum power generation of photovoltaic modules P pv-up + Maximum charging power P of electric vehicle module ev-down+ Maximum charging power P of the energy storage module bat-down Less than the target power P of the grid-connected point pcc-eco When , the condition node C3 returns success to the sequence node SQ2, otherwise it returns failure to the sequence node SQ2;

[0153] Action node A2 is used to limit photovoltaic power generation. The execution logic of action node A2 is:

[0154] P pv-set =P pcc-eco -P load -P ev-down -P bat-down (7)

[0155] P bat-set =P bat-down (8)

[0156] P ev-set =P ev-down (9)

[0157] Target power P of PV module pv-set Set as the grid-connected point operation target power P pcc-eco - Load power consumption P load - Maximum charging power P of the electric vehicle module ev-down - Maximum charging power P of the energy storage module bat-down , the target power P of the energy storage module bat-set is the maximum charging power P of the energy storage module bat-down , the target power P of the electric vehicle module ev-set is the maximum charging power P of the electric vehicle module ev-down , and returns success to the sequential node SQ2;

[0158] Action node A3 is used to limit the discharge of electric vehicles. The execution logic of action node A3 is:

[0159] P pv-set =P pv-up (10)

[0160] P bat-set =P bat-down (11)

[0161] P ev-set =P pcc-eco -P load -P ev-down -P pv-up -P bat-down (12) Target power P of photovoltaic module pv-set is the maximum power generation power P of the photovoltaic module pv-up , the target power P of the energy storage module bat-setis the maximum charging power P of the energy storage module bat-down , the target power P of the electric vehicle module ev-set The target power P for the grid connection point operation pcc-eco - Load power consumption P load -Charging power P of electric vehicle module ev-dwon -The maximum power generation power P of the photovoltaic module pv-up - Maximum charging power P of the energy storage module bat-down , and returns success to the fallback node FB1.

[0162] (3) Normal operating interval control subtree The decision logic is:

[0163] Normal operating interval control subtree including action node A4;

[0164] Action node A4 is executed and returns success to the general fallback node FB;

[0165] The execution logic of action node A4 is:

[0166] P pv-set =P pv-up (13)

[0167] P bat-set =P pcc-eco -P load -P pv-up -P ev-eco (14)

[0168] P ev-set =P ev-eco (15)

[0169] Target power P of PV module pv-set is the maximum power generation power P of the photovoltaic module pv-up , the target power P of the energy storage module bat-set The target power P for the grid connection point operation pcc-eco - Load power consumption P load -The maximum power generation power P of the photovoltaic module pv-up -Economical operating power P of electric vehicle module ev-eco , the target power P of the electric vehicle module ev-eset is the economic power P of the electric vehicle module ev-eco And return success to the general fallback node FB.

[0170] On the other hand, the present application also provides a non-volatile storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the collaborative scheduling method of the microgrid as described above are implemented.

[0171] For an introduction to the non-volatile storage medium, please refer to the above embodiments, and this application will not go into details here.

[0172] On the other hand, the present application also provides a computer program product, including a computer program / instruction, which, when executed by a processor, implements the steps of the above-mentioned microgrid collaborative scheduling method. For the introduction of the computer program product, please refer to the above-mentioned embodiment, and the present application will not repeat it here.

[0173] It should also be noted that, in this specification, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "comprises", "comprising" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the statement "comprising a ..." does not exclude the presence of other identical elements in the process, method, article or device including the element.

[0174] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A coordinated dispatching method for a microgrid, characterized in that: The microgrid includes an energy storage module, a photovoltaic module, an electric vehicle module, and a load module. The microgrid is connected to the main grid through a grid connection point. The coordinated dispatching method of the microgrid includes: Obtaining a first target operating curve of the grid-connected point and a second target operating curve of the electric vehicle; the first target operating curve is used to characterize the target operating power demand of the microgrid in different time periods, and the second target operating curve is used to characterize the charging and discharging power demand of the electric vehicle in different time periods; Acquiring the current active power of the photovoltaic module, the energy storage module and the load module; determining a control instruction according to the first target operation curve, the second target operation curve and each of the current active powers; The target powers of the energy storage module, the photovoltaic module, the electric vehicle module and the load module are adjusted according to the control instruction.

2. The coordinated dispatching method of a microgrid according to claim 1, characterized in that: Acquiring the current active power of the photovoltaic module, the energy storage module and the load module, including: Obtaining the maximum power generation power of the photovoltaic module, the maximum power generation power and the maximum charging power of the energy storage module, and the load consumption power of the load module; Determining a control instruction according to the first target operating curve, the second target operating curve, and each of the current active powers includes: Determining a current target operating power requirement of the grid connection point according to the first target operating curve; Determining the maximum discharge power and the maximum charging power of the electric vehicle module according to the second target operation curve; The control instruction is determined according to the current target operating power demand, the maximum discharge power and the maximum charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, the maximum power generation power and the maximum charging power of the energy storage module, and the load consumption power of the load module.

3. The coordinated dispatching method of a microgrid as claimed in claim 2, characterized in that: The control instruction is determined according to the current target operating power demand, the maximum discharge power and the maximum charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, the maximum power generation power and the maximum charging power of the energy storage module, and the load consumption power of the load module, including: Determine whether the microgrid is in a normal working mode according to the current target operating power demand, the maximum discharge power and the maximum charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, the maximum power generation power and the maximum charging power of the energy storage module, and the load consumption power of the load module; When the microgrid is in the normal working mode, generating a first control instruction; When the microgrid is not in the normal working mode, generating a second control instruction; Adjusting the target power of the energy storage module, the photovoltaic module, the electric vehicle module and the load module according to the control instruction includes: When the microgrid is in the normal working mode, adjusting the target power of the energy storage module, the photovoltaic module, the electric vehicle module and the load module according to the first control instruction; When the microgrid is not in the normal working mode, the target powers of the energy storage module, the photovoltaic module, the electric vehicle module and the load module are adjusted according to the second control instruction.

4. The coordinated dispatching method of a microgrid as claimed in claim 3, characterized in that: Determining whether the microgrid is in a normal working mode according to the current target operating power demand, the maximum discharge power and the maximum charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, the maximum power generation power and the maximum charging power of the energy storage module, and the load consumption power of the load module includes: Determine whether the first working operating power of the microgrid is greater than the current target operating power requirement, and determine whether the second working operating power of the microgrid is less than the current target operating power requirement, the first working operating power is determined according to the load power consumption, the maximum power generation power of the photovoltaic module, the maximum charging power and the maximum discharging power of the electric vehicle module, and the maximum discharging power of the energy storage module, and the second working operating power is determined according to the load power consumption, the maximum power generation power of the photovoltaic module, the maximum charging power and the maximum discharging power of the electric vehicle module, and the maximum charging power of the energy storage module; When the first working operating power is not greater than the current target operating power requirement, and the second working operating power is not less than the current target operating power requirement, determining that the microgrid is in the normal working mode; When the first operating power is greater than the current target operating power requirement, or the second operating power is less than the current target operating power requirement, it is determined that the microgrid is not in the normal operating mode.

5. The coordinated dispatching method of microgrid according to claim 4, characterized in that: When the microgrid is not in the normal working mode, adjusting the target power of the energy storage module, the photovoltaic module, the electric vehicle module and the load module according to the second control instruction includes: When the first working operating power is greater than the current target operating power requirement, the target power of the photovoltaic module is set to the maximum discharge power of the photovoltaic module, the target power of the energy storage module is set to the maximum discharge power of the energy storage module, the target power of the load module is the load consumption power, and the target discharge power of the electric vehicle module is the maximum discharge power of the electric vehicle; The target charging power of the electric vehicle module is limited to a first charging power, where the first charging power is less than a maximum charging power of the electric vehicle module.

6. The coordinated dispatching method of microgrid according to claim 5, characterized in that: Limiting the target charging power of the electric vehicle module to a first charging power includes: The first charging power of the electric vehicle module is determined according to the second operating power, the maximum discharge power of the photovoltaic module, the maximum discharge power of the energy storage module, the load consumption power and the maximum discharge power of the electric vehicle module.

7. The coordinated dispatching method of microgrid according to claim 4, characterized in that: When the microgrid is not in the normal working mode, adjusting the target power of the energy storage module, the photovoltaic module, the electric vehicle module and the load module according to the second control instruction includes: Determine whether the third operating power of the microgrid is less than the current target operating power requirement; the third operating power is greater than the second operating power, and the third operating power is determined according to the load consumption power, the maximum power generation power of the photovoltaic module, the maximum charging power of the electric vehicle module, and the maximum charging power of the energy storage module; When the third operating power is less than the current target operating power requirement, it is determined that the microgrid is not in the normal working mode, and the target power of the energy storage module is set to the maximum charging power of the energy storage module, the target power of the load module is the load consumption power, and the target charging power of the electric vehicle module is the maximum charging power of the electric vehicle module; The target power generation power of the photovoltaic module is limited to a first power generation power, where the first power generation power is less than the maximum discharge power of the photovoltaic module.

8. The coordinated dispatching method of microgrid according to claim 4, characterized in that: Limiting the target power generation of the photovoltaic module to a first power generation includes: The first power generation power is determined according to the current target operating power demand of the grid connection point, the load consumption power, the maximum charging power of the electric vehicle module and the maximum charging power of the energy storage module.

9. The coordinated dispatching method of microgrid according to claim 7, characterized in that: Before determining whether the third operating power of the microgrid is less than the current target operating power requirement, the method further includes: Determining whether the second working operating power is less than the current target operating power requirement; When the second working operating power is less than the current target operating power requirement, the step of determining whether the third operating power of the microgrid is less than the current target operating power requirement is entered.

10. The coordinated dispatching method of microgrid according to claim 7, characterized in that: Adjusting the target power of the energy storage module, the photovoltaic module, the electric vehicle module and the load module according to the second control instruction includes: When the second working operating power is less than the current target operating power requirement, and the third working operating power is less than the current target operating power requirement, the target power of the photovoltaic module is set to the maximum power generation power of the photovoltaic module, the target power of the energy storage module is set to the maximum charging power of the energy storage module, the load power is the load consumption power, and the target charging power of the electric vehicle module is the maximum charging power of the electric vehicle module; The target discharge power of the electric vehicle module is limited to a second discharge power, wherein the second discharge power is less than a maximum discharge power of the electric vehicle module.

11. The coordinated dispatching method of a microgrid according to claim 10, characterized in that: Limiting the target discharge power of the electric vehicle module to a second discharge power includes: The second discharge power is determined according to the current target operating power demand of the grid connection point, the load consumption power, the maximum charging power of the electric vehicle module, the maximum power generation power of the photovoltaic module, and the maximum charging power of the energy storage module.

12. A non-volatile storage medium, characterized in that: The non-volatile storage medium stores a computer program, and when the computer program is executed by the processor, the steps of the coordinated scheduling method of the microgrid as described in any one of claims 1 to 11 are implemented.

13. A computer program product comprising a computer program / instructions, characterized in that When the computer program / instructions are executed by a processor, the steps of the coordinated dispatching method of a microgrid as described in any one of claims 1 to 11 are implemented.