Silo structure slip form construction maintenance device
By using spray components and automatic maintenance devices of timed water supply systems in the construction of silo structure synovial membrane, the construction risks and high costs of traditional manual maintenance are solved, and a safe and economical concrete maintenance effect is achieved, ensuring that the concrete is in the Humidity and strength requirements within 7 days.
Patent Information
- Application Number
- CN202411227462.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-11-15
AI Technical Summary
In the construction of traditional silo structure synovial membranes, artificial traction pipes poured concrete maintenance has problems of high construction risks and increased costs. Especially when cross-operation is carried out in high altitude environment, there are unsafe factors such as object strikes, falling from high places and electric shock.
A silo structure synovial construction maintenance device including spraying components and a timed water supply system was designed, and the annular spray pipe and 360° automatic spraying scattering nozzle were used for automatic timed water spraying maintenance, and the rain sense was achieved through a booster water pump and solenoid valve. The timer and distribution box enable automated water supply, reducing manual intervention.
It realizes automatic timed water spray maintenance, reduces construction risks, saves construction costs, and maintains concrete humidity within 7 days, improves concrete strength, and meets quality requirements.
Smart Images

Figure CN118950292A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of sliding film construction, in particular to a sliding film construction and maintenance device for a silo structure. Background Art
[0002] Slipform construction is a construction technology for cast-in-place concrete engineering. Compared with conventional construction methods, this construction technology has the advantages of fast construction speed, high degree of mechanization, saving materials and labor required for formwork and scaffolding, and the formwork can be easily disassembled and flexibly assembled and reused. This construction method is often used in reinforced concrete chimneys and cylindrical coal bunkers, granaries and other silo structures.
[0003] During the sliding membrane construction of the silo structure, after the sliding formwork equipment, steel bars and formwork are completed, concrete pouring begins; the initial sliding is to pour the concrete in layers to 1 / 2-2 / 3 of the formwork height; after the strength of the first layer of concrete reaches 0.2-0.4MPa or the concrete penetration resistance value reaches 0.30-1.05KN / cm 2 During the initial sliding, the formwork device and the setting state of the concrete are comprehensively checked. After confirming that they are normal, the sliding is switched to normal. During each normal sliding, the formwork is first raised by 5cm, that is, the jack is lifted by 1 to 2 strokes. When the concrete strength reaches 0.2 to 0.4MPa, the sliding can continue. During the normal sliding stage, the concrete is poured in layers, circles, and evenly. When pouring the upper layer of concrete, the lower layer of concrete should be in a plastic state. Therefore, the concrete pouring height should not be greater than 0.3m each time, and the interval between each sliding is 1.5 to 2 hours.
[0004] Concrete quality is closely related to maintenance. Careful maintenance of poured concrete is an important means to improve its durability, such as strength, impermeability, and crack resistance. After pouring concrete, it is necessary to prevent water loss and drying shrinkage, as well as temperature shrinkage caused by early measures and excessive cooling of concrete. Therefore, it is necessary to water and maintain the poured concrete within 8 to 12 hours.
[0005] In the traditional silo structure sliding membrane construction process, the concrete is usually cured by manually pulling water pipes to pour concrete. However, the sliding platform has limited space and is located at a high altitude. If concrete curing, steel bar installation and concrete pouring are carried out at the same time, there are unsafe factors such as object hitting, falling from heights and electric shock, which increases the construction risk. In addition, the method of manually pulling water pipes to pour concrete increases the construction cost. Summary of the invention
[0006] Based on this, it is necessary to provide a silo structure sliding membrane construction and maintenance device to address the above technical problems, thereby reducing construction risks and construction costs.
[0007] The present invention provides a silo structure sliding film construction and maintenance device, including a spray assembly and a timed water supply system;
[0008] The spray assembly includes a first spray pipe and a second spray pipe, both of which are mounted on the bottom of the outer hanger of the synovial platform, and both of which are annular spray pipes. The first spray pipe is arranged inside the silo structure, and the second spray pipe is arranged outside the silo structure.
[0009] The timed water supply system includes a booster water pump, a distribution box for controlling the timing start and stop of the booster water pump, a three-way valve, a first solenoid valve rain sensing timer and a second solenoid valve rain sensing timer;
[0010] The distribution box is electrically connected to the booster water pump, the water inlet end of the three-way valve is connected to the water outlet end of the booster water pump, the two water outlet ends of the three-way valve are respectively connected to the water inlets of the first solenoid valve rain sensor timer and the second solenoid valve rain sensor timer, the water outlet end of the first solenoid valve rain sensor timer is connected to the first spray pipe, and the water outlet end of the second solenoid valve rain sensor timer is connected to the second spray pipe.
[0011] In one embodiment, a one-way circuit breaker, an AC contactor and a time-space switch connected in sequence are arranged inside the distribution box;
[0012] The one-way circuit breaker is connected to the external power supply, and the time-space switch is electrically connected to the booster water pump.
[0013] In one embodiment, the time-space switch is powered on once every 2 hours, each power-on time is 20 minutes, and the power-on period is from time T1 to time T2;
[0014] The first solenoid valve rain sensor timer and the second solenoid valve rain sensor timer are both started once every 2 hours, and each power-on time is 10 minutes. The running time period after the first solenoid valve rain sensor timer is started is time T1 to T3, and the running time period after the second solenoid valve rain sensor timer is started is time T3 to T2, and T3 is the middle time between T1 and T2.
[0015] In one of the embodiments, the first spray pipe and the second spray pipe are both provided with a plurality of evenly distributed 360° automatic spraying and scattering nozzles on one side facing the silo structure wall;
[0016] The distance between the 360° automatic spraying and scattering nozzle and the silo structure wall is 0.5m to 0.7m
[0017] In one of the embodiments, the first spray pipe and the second spray pipe are both mounted on the outer hanger of the synovial platform through a plurality of evenly distributed spray pipe connection assemblies;
[0018] Each spray pipe connection assembly is provided with a sling and a lifting ring, one end of the sling is fixedly connected to the outer hanger of the synovial platform, the other end of the sling is fixedly connected to the lifting ring, and the lifting ring is sleeved on the first spray pipe or the second spray pipe.
[0019] In one embodiment, the booster pump is connected to an external water source or a water storage tank.
[0020] In one embodiment, the first solenoid valve rain sensor timer and the second solenoid valve rain sensor timer are both electrically connected to the AC contactor.
[0021] Beneficial effects of the present invention: The silo structure sliding membrane construction and maintenance device of the present invention utilizes a timing water supply system combined with a spray component to realize automatic timing water spray maintenance on the inner and outer walls of the silo, avoiding the construction risks brought by traditional manual water spraying maintenance of the silo structure and saving construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 A schematic diagram of the structure of a silo structure sliding membrane construction and maintenance device provided by an embodiment of the present invention;
[0023] Figure 2 A schematic diagram of the structure of the silo structure sliding membrane construction and maintenance device provided by an embodiment of the present invention being assembled in the silo;
[0024] Figure 3 A schematic diagram of the circuit structure of a distribution box provided in an embodiment of the present invention;
[0025] Figure 4 It is a schematic diagram of the assembly relationship between the second spray pipe and the outer hanger of the sliding membrane platform.
[0026] Explanation of the reference numerals in the accompanying drawings: 100, first spray pipe; 200, second spray pipe; 300, silo structure; 400, external hanger; 500, booster pump; 510, distribution box; 511, one-way circuit breaker; 512, AC contactor; 513, time-space switch; 520, three-way valve; 530, first solenoid valve rain sensor timer; 540, second solenoid valve rain sensor timer; 600, 360° automatic spray scattering nozzle; 700, sling. DETAILED DESCRIPTION
[0027] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0028] It should be noted that in the description of the present invention, “upper”, “lower”, “top”, “bottom”, orientation or position relationship is based on the attached Figure 1Regarding the orientation or positional relationship shown, it should be understood that these orientation terms are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0029] In one embodiment, Figure 1 and Figure 2 As shown, the silo structure sliding membrane construction and maintenance device of this embodiment includes a spray assembly and a timed water supply system. The spray assembly is used to spray water to the silo wall, and the timed water supply system is used to supply water to the spray assembly.
[0030] In this embodiment, the spray assembly includes a first spray pipe 100 and a second spray pipe 200. The first spray pipe 100 and the second spray pipe 200 are both installed at the bottom of the outer hanger 400 of the synovial platform. The first spray pipe 100 and the second spray pipe 200 are both annular spray pipes. The first spray pipe 100 is arranged inside the silo structure 300, and the second spray pipe 200 is arranged outside the silo structure 300.
[0031] The timed water supply system includes a booster pump 500, a distribution box 510 for controlling the timing start and stop of the booster pump 500, a three-way valve 520, a first solenoid valve rain sensor timer 530 and a second solenoid valve rain sensor timer 540. The booster pump 500 is connected to an external water source or a water storage tank.
[0032] In this embodiment, the distribution box 510 is electrically connected to the booster water pump 500, the water inlet end of the three-way valve 520 is connected to the water outlet end of the booster water pump 500, the two water outlet ends of the three-way valve 520 are respectively connected to the water inlet ends of the first solenoid valve rain sensor timer 530 and the second solenoid valve rain sensor timer 540, the water outlet end of the first solenoid valve rain sensor timer 530 is connected to the first spray pipe 100, and the water outlet end of the second solenoid valve rain sensor timer 540 is connected to the second spray pipe 200. In this embodiment, the booster water pump 500 is a 1500W stainless steel multi-stage jet booster pump.
[0033] The silo structure sliding membrane construction and maintenance device of this embodiment can avoid the construction risks brought by the traditional manual water spraying maintenance of the silo structure 300 and save construction costs.
[0034] like Figure 3 As shown, in one embodiment, a one-way circuit breaker 511, an AC contactor 512 and a time-space switch 513 which are connected in sequence are provided inside the distribution box 510; the one-way circuit breaker 511 is connected to an external power supply, and the time-space switch 513 is electrically connected to the booster water pump 500.
[0035] Specifically, the parameter of the single-phase circuit breaker 511 is 20A, the parameter of the AC contactor 512 is 220V, the model is 1210, and the parameter of the time-space switch 513 is 220V / 30A. The single-phase circuit breaker is used for total power control, the AC contactor 512 is used to automatically cut off the current after the water source is cut off to prevent the booster pump 500 from working without water, and the time-space switch 513 is used to provide timed power supply to the booster pump 500.
[0036] In one embodiment, the space-time switch 513 is powered on once every 2 hours, each power-on duration is 20 minutes, and the power-on period is from time T1 to T2; the first solenoid valve rain sensor timer 530 and the second solenoid valve rain sensor timer 540 are both started once every 2 hours, each power-on duration is 10 minutes, the first solenoid valve rain sensor timer 530 runs during the time period from time T1 to T3 after being started, and the second solenoid valve rain sensor timer 540 runs during the time period from time T3 to T2 after being started, and T3 is the middle time between T1 and T2.
[0037] Exemplarily, within 24 hours a day, the time-space switch 513, the first solenoid valve rain sensor timer 530 and the second solenoid valve rain sensor timer 540 are all started and stopped every 2 hours. The time-space switch 513 starts at the top of the hour and lasts for 20 minutes. The first solenoid valve rain sensor timer 530 also starts at the top of the hour and lasts for 10 minutes. The second solenoid valve rain sensor timer 540 starts 10 minutes after the top of the hour and lasts for 10 minutes.
[0038] The water supply is fully controlled by a timer switch, which enables unmanned operation and a high degree of automation.
[0039] It is worth noting that when the silo structure 300 synovial construction and maintenance device is installed and used for the first time, a certain amount of water can be pumped into the first spray pipe 100 and the second spray pipe 200 according to the height of the synovial platform to reduce the delay of the automatic cycle spraying water.
[0040] In one embodiment, the first spray pipe 100 and the second spray pipe 200 are both provided with multiple evenly distributed 360° automatic spray scattering nozzles 600 on the side facing the wall of the silo structure 300; the distance between the 360° automatic spray scattering nozzles 600 and the wall of the silo structure 300 is 0.5m to 0.7m. The distance between any two adjacent 360° automatic spray scattering nozzles 600 is equal, and the distance between the two nozzles in this embodiment is 3.5m. Then, on the plane where the sliding membrane construction platform is located, there is a 360° automatic spray scattering nozzle 600 on the inner and outer walls of the silo structure 300 every 3.5m to spray water on the wall.
[0041] In one embodiment, Figure 4As shown, the first spray pipe 100 and the second spray pipe 200 are assembled on the outer hanger 400 of the synovial platform through a plurality of evenly distributed spray pipe connection assemblies; each spray pipe connection assembly is provided with a sling 700 and a lifting ring, one end of the sling 700 is fixedly connected to the outer hanger 400 of the synovial platform, and the other end of the sling 700 is fixedly connected to the lifting ring, and the lifting ring is sleeved on the first spray pipe 100 or the second spray pipe 200.
[0042] In one specific embodiment, the maintenance effect of the silo structure sliding membrane construction and maintenance device of the present invention is explained by taking the sliding formwork project of the raw coal silo wall with a silo height of 45m, a wall thickness of 320mm and a silo diameter of 22m as an example.
[0043] The silo structure sliding membrane construction and maintenance device of the present invention was used to continuously maintain the concrete in the above-mentioned raw coal silo wall sliding membrane project for 7 days, and the rebound strength of ten different areas of the raw coal silo wall was measured. The measurement results are shown in Table 1.
[0044] Table 1 Rebound strength measurement values of different areas of raw coal silo wall
[0045]
[0046] It can be seen from Table 1 that by using the curing device of the present invention to cure concrete during the sliding membrane construction process, under the condition of ensuring humidity within 7 days of concrete pouring, the concrete strength value can reach 85.75% of the design value, which can meet the requirements of improving concrete quality.
[0047] In addition, if the concrete curing during the sliding film construction of the raw coal silo is done manually, the curing is done for 7 days with two people per shift, two shifts per day and a salary of 300 yuan per person per shift, which saves 8,400 yuan in labor costs and cannot be reused. However, the curing device of the present invention has lower investment and labor costs, which can save construction costs.
[0048] In this embodiment, by using a silo structure sliding membrane construction and maintenance device instead of the traditional artificial watering maintenance method, the cement is continuously hydrated, the strength is continuously increased, the maintenance meets the specification requirements, and the construction risk and construction cost can be reduced.
[0049] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the attached claims.
Claims
1. A silo structure sliding membrane construction and maintenance device, characterized in that: Includes sprinkler assembly and timed water supply system; The spray assembly comprises a first spray pipe (100) and a second spray pipe (200), the first spray pipe (100) and the second spray pipe (200) are both mounted on the bottom of an outer hanger (400) of a sliding membrane platform, the first spray pipe (100) and the second spray pipe (200) are both annular spray pipes, the first spray pipe (100) is arranged inside the silo structure (300), and the second spray pipe (200) is arranged outside the silo structure (300); The timed water supply system comprises a booster water pump (500), a distribution box (510) for controlling the timed start and stop of the booster water pump (500), a three-way valve (520), a first solenoid valve rain sensing timer (530), and a second solenoid valve rain sensing timer (540); The distribution box (510) is electrically connected to the booster water pump (500); the water inlet end of the three-way valve (520) is connected to the water outlet end of the booster water pump (500); the two water outlet ends of the three-way valve (520) are respectively connected to the water inlets of the first solenoid valve rain sensor timer (530) and the second solenoid valve rain sensor timer (540); the water outlet end of the first solenoid valve rain sensor timer (530) is connected to the first spray pipe (100); and the water outlet end of the second solenoid valve rain sensor timer (540) is connected to the second spray pipe (200).
2. A silo structure sliding membrane construction and maintenance device according to claim 1, characterized in that: The distribution box (510) is provided with a one-way circuit breaker (511), an AC contactor (512) and a time-space switch (513) connected in sequence. The one-way circuit breaker (511) is connected to an external power source, and the time-space switch (513) is electrically connected to a booster water pump (500).
3. A silo structure sliding membrane construction and maintenance device according to claim 2, characterized in that: The space-time switch (513) is powered on once every 2 hours, each power-on time is 20 minutes, and the power-on time period is from time T1 to time T2; The first solenoid valve rain sensor timer (530) and the second solenoid valve rain sensor timer (540) are both activated once every 2 hours, and each power-on time is 10 minutes. The first solenoid valve rain sensor timer (530) operates during a time period from T1 to T3 after being activated, and the second solenoid valve rain sensor timer (540) operates during a time period from T3 to T2 after being activated, with T3 being the middle time between T1 and T2.
4. A silo structure sliding membrane construction and maintenance device according to claim 3, characterized in that: A plurality of evenly distributed 360° automatic spraying and scattering nozzles (600) are provided on one side of the first spray pipe (100) and the second spray pipe (200) facing the wall of the silo structure (300); The distance between the 360° automatic spraying and scattering nozzle (600) and the wall surface of the silo structure (300) is 0.5m to 0.7m.
5. A silo structure sliding membrane construction and maintenance device according to claim 4, characterized in that: The first spray pipe (100) and the second spray pipe (200) are both assembled on the outer hanger (400) of the sliding membrane platform through a plurality of evenly distributed spray pipe connection assemblies; Each spray pipe connection assembly is provided with a sling (700) and a lifting ring, one end of the sling (700) is fixedly connected to the outer hanger (400) of the sliding membrane platform, and the other end of the sling (700) is fixedly connected to the lifting ring, and the lifting ring is sleeved on the first spray pipe (100) or the second spray pipe (200).
6. A silo structure sliding membrane construction and maintenance device according to claim 5, characterized in that: The booster water pump (500) is connected to an external water source or a water storage tank.
7. A silo structure sliding membrane construction and maintenance device according to claim 6, characterized in that: The first solenoid valve rain sensor timer (530) and the second solenoid valve rain sensor timer (540) are both electrically connected to the AC contactor (512).