Pile-anchor integrated pile bottom post-grouting compression-resistant and pulling-resistant structure and construction method
By using an integrated pile-anchor post-grouting structure, the problems of high construction cost, low bearing capacity, and poor durability of anti-uplift piles and anti-buoyancy anchors when the bedrock is shallow are solved, achieving efficient compressive and tensile resistance as well as convenient construction.
Patent Information
- Application Number
- CN202411286532.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-11-15
AI Technical Summary
Existing anti-tension piles and anti-buoyancy anchors have problems such as high construction costs, low bearing capacity, poor durability and complex construction when the bedrock is shallow.
The pile-anchor integrated pile bottom grouting structure is adopted to resist compression and pull-out. Anchor hole sleeves are set in the drilled cast-in-place pile, the anchor kit is lowered and grouting is carried out to form the pile bottom anchor. The anchor rod body penetrates into the rock layer, and the pile body provides the prestressed tension reaction force of the anchor rod to complete the pile bottom grouting.
It improves the compressive and tensile bearing capacity of a single pile, reduces the number of piles, lowers costs, solves the problems of anchor corrosion and complex construction, and ensures the smooth progress of the foundation slab construction and waterproofing effect.
Smart Images

Figure CN118958275A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of construction methods, and in particular relates to a pile-anchor integrated pile bottom post-grouting compression and tension resistance structure and a construction method. Background Art
[0002] Common anti-floating measures for basements include anti-pullout piles and anti-floating anchor rods, but each has its own advantages and disadvantages.
[0003] When the bedrock is shallow, if pull-out piles are used, and the pull-out piles are deeply inserted into the bedrock, the construction cost of entering the rock will be very high; if the pull-out piles are shallowly inserted into the rock, the pile length will be short, the pull-out bearing capacity of a single pile will be low, and a large number of pull-out piles will need to be installed, which will also result in a high cost.
[0004] When the bedrock is shallow, anti-floating anchor rods are generally used to resist floating. However, tension-type anti-floating anchor rods are prone to corrosion in the soil layer above the bedrock, and there are durability issues. The "Technical Standards for Anti-Floating of Construction Engineering" requires that for projects with anti-floating grades of Class A and Class B, anti-floating anchor rods must use pressure-type anchor rods and prestress must be applied. Construction of pressure-type anchor rods: First construct the anchor rods, then construct the base plate (when constructing the base plate, holes need to be reserved on the base plate). After the strength of the base plate reaches the requirements, tension and anchor the anchor rod body, and seal the base plate. The construction process of pressure-type anchor rods is many and the construction is complicated. In addition, leaving holes in the base plate is not only difficult to seal, but also has a high risk of basement leakage.
[0005] Therefore, there is an urgent need for a foundation form that is easy to construct and has high compressive and tensile bearing capacity. Summary of the invention
[0006] The purpose of the present invention is to solve the problems in the prior art and provide a pile-anchor combined compression and buoyancy resistance structure and a construction method.
[0007] The specific technical solutions adopted by the present invention are as follows:
[0008] In a first aspect, the present invention provides a method for constructing a compression and pull-out resistant structure with pile-anchor integrated pile bottom post-grouting, which comprises:
[0009] S1. Before excavating the basement foundation pit, bored piles are constructed at the designed location;
[0010] S2. A plurality of anchor hole casings are fixed inside the steel cage of the bored pile. Each anchor hole casing is arranged along the entire length of the bored pile and is temporarily blocked at both ends.
[0011] S3, lowering the pile body reinforcement cage with the anchor hole casing fixed thereto into the pile hole of the bored pile, and pouring the pile body concrete of the bored pile after it is in place;
[0012] S4, excavating the basement foundation pit, removing the temporary plugging on the top of the anchor hole casing after excavating to the bottom of the pit, extending the anchor machine along the anchor hole casing into the bottom of the bored pile, and constructing the anchor hole on the bedrock at the bottom of the pile;
[0013] S5. Lower the assembled anchor rod set into the anchor rod hole; the anchor rod set includes an anchor rod body, an isolation sleeve, a bearing plate, an isolation centering bracket and a grouting pipe, there is at least one anchor rod body, an isolation sleeve is arranged on the outside of each anchor rod body, the anchor rod body and the grouting pipe are inserted into a plurality of isolation centering brackets arranged at intervals, and the anchor rod body is centrally symmetrically distributed on the plane of the isolation centering bracket; the top and bottom ends of the anchor rod body both extend out of the isolation sleeve, and the bearing plate is fixedly installed on the bottom end of the anchor rod body; when the anchor rod set is lowered, the outer ring of each isolation centering bracket is supported in the anchor rod hole to form a relative limit in the horizontal direction;
[0014] S6, inject cement mortar into the grouting pipe, and gradually lift the grouting pipe, so as to grout the anchor hole from the bottom to the top, and when the grouting in the anchor hole reaches the top of the hole close to the anchor hole casing, use a plugging agent to block the hole section of the anchor hole casing and the space between the isolation casing and the grouting pipe, and then continue to inject cement mortar into the anchor hole with the top port blocked through the grouting pipe until the grouting pressure reaches the design value, and the pile bottom grouting of the bored pile is completed;
[0015] S7. After the grouting body of the bored pile reaches the required strength for anchor tensioning, tension the anchor rod body at the top of the bored pile. After tensioning to the designed pre-tension value, anchor the top of the anchor rod, and then continue to construct the bottom slab of the basement foundation pit.
[0016] Preferably, the anchor hole sleeves are fixed to the inner side of the pile body reinforcement cage by means of tying wires, and all the anchor hole sleeves are evenly distributed circumferentially along the inner side of the pile body reinforcement cage.
[0017] Preferably, the anchor hole casing is a thin-walled steel pipe with an inner diameter not less than the diameter of the anchor rod body.
[0018] Preferably, the anchor rod body is made of unbonded steel strands or prestressed steel bars.
[0019] Preferably, the isolation and centering brackets are arranged at equal intervals along the extension direction of the isolation sleeve, with an interval of 1 to 2 m.
[0020] Preferably, the minimum outer circle diameter of the isolation centering bracket cross section is slightly smaller than the inner diameter of the anchor hole.
[0021] Preferably, the plugging agent used to seal the anchor hole port is a grouting material that solidifies quickly and has a certain rigidity, preferably an epoxy resin.
[0022] Preferably, after the top of the anchor rod body is tensioned to a designed pre-tension value, it is anchored using an anchor plate and an anchor.
[0023] Preferably, the bearing plate is a circular steel plate.
[0024] In the second aspect, the present invention provides a compression and pull-out resistant structure of a pile-anchor integrated pile bottom post-grouting obtained by the construction method described in the first aspect, which includes a bored pile located at the upper part, an anchor hole casing located in the pile body, and a pile bottom anchor located at the lower part; the pile bottom anchor includes an anchor rod body sleeved with an isolation casing, the top of the anchor rod body passes through the anchor hole casing and is anchored to the top of the bored pile by an anchor pad and an anchor, the anchor rod body enters the rock layer through an anchor hole consistent with the extension direction of the anchor hole casing, and a bearing plate is fixed to the bottom end of the anchor rod body, and the space outside the isolation casing in the anchor hole is filled with grouting; there is a pile bottom post-grouting area at the bottom of the bored pile.
[0025] Compared with the prior art, the present invention has the following beneficial effects:
[0026] When the bedrock is shallow, this structure is compared with the pull-out pile:
[0027] The pile-anchor integrated pile bottom post-grouting compression and pull-out resistance structure of the present invention improves the compression and pull-out resistance of a single pile, reduces the number of piles, and saves the cost of pile foundation. The pile-anchor integrated structure of the present invention realizes pile bottom grouting, reinforces the pile bottom sediment, and improves the compression bearing capacity by about one time compared with ordinary non-pile bottom grouting piles; and by setting the lower anchor rod, the pull-out bearing capacity is improved many times compared with ordinary pull-out piles. The compression and pull-out resistance of this structure are much higher than those of ordinary piles, so that the number of piles can be greatly reduced and the cost of pile foundation can be saved.
[0028] In addition, the compression and pull-out resistance structure of the pile-anchor integrated pile bottom post-grouting of the present invention has the following advantages compared with the anti-floating anchor rod in the prior art:
[0029] 1. Compared with the common anti-floating anchor rods of tension type, the grouting body of the common anti-floating anchor rods of tension type is easy to crack after being stressed, and the upper part is located in the soil layer, which is easy to corrode over time and has durability problems. The upper part of the anchor rod of this structure is a pile, which has good corrosion resistance and reliable quality.
[0030] 2. Ordinary anti-floating anchor rods generally use pressure-type anchor rods, which need to be tensioned and anchored after the basement floor is poured, and then the holes in the floor are sealed, which is troublesome to construct and the floor is prone to water leakage. This structure uses the upper pile body as the tension support, which is tensioned before the floor is poured, and does not affect the construction of the floor. There is no need to leave holes in the floor, and the floor has a good waterproof effect.
[0031] 3. During ordinary anchoring construction, the upper soil layer is prone to hole collapse, and casing is required to protect the wall. The upper part of the anchor rod of this structure is located inside the pile, so there is no risk of hole collapse, the construction is convenient, and the construction quality is good. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 A schematic diagram of a pile-anchor combined compression and pull-out resistance structure;
[0033] Figure 2 It is a schematic diagram of the compression and tension resistant structure of the pile-anchor integrated pile bottom post-grouting under the basement foundation pit;
[0034] Figure 3 It is a schematic diagram of the specific structure of the bored pile and the anchor rod at the bottom of the pile inside the anchor rod hole casing;
[0035] Figure 4 for Figure 3 AA section diagram in;
[0036] Figure 5 The specific schematic diagram of the anchor rod structure is shown in FIG.
[0037] Figure 6 It is a cross-sectional schematic diagram of an anchor rod kit;
[0038] Figure 7 Schematic diagram of the state of sealing the orifice section of the anchor hole.
[0039] The reference numerals in the figure are as follows: bored cast-in-place pile 1, steel cage 11, pile body concrete 12, pile bottom post grouting 13, pile bottom anchor 2, anchor rod body 21, isolation casing 22, bearing plate 23, anchor pad 24, anchor 25, grouting body 26, isolation centering bracket 27, anchor rod hole casing 3, bottom plate 4, rock and soil layer 5, rock layer 6, plugging agent 7, grouting pipe 8. DETAILED DESCRIPTION
[0040] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below. The technical features in each embodiment of the present invention can be combined accordingly without conflicting with each other.
[0041] In the description of the present invention, it is to be understood that when an element is considered to be "connected" to another element, it may be directly connected to the other element or indirectly connected, that is, there are intermediate elements. On the contrary, when an element is said to be "directly" connected to another element, there are no intermediate elements.
[0042] In the description of the present invention, it should be understood that the terms "first" and "second" are only used for the purpose of distinguishing descriptions, and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features.
[0043] In a stratum with a shallow buried depth of bedrock, when anti-floating treatment is carried out on the basement, if anti-pullout piles are used, there are problems such as difficulty in entering the rock and high cost. If the rock is shallow, there are problems such as short pile length, low bearing capacity of a single pile, large number of piles, and high cost. In addition, if anti-floating anchor rods are used, pressure-type anchor rods need to be used, which is complicated to construct and prone to water leakage. Therefore, the present invention proposes a compression-resistant and anti-pullout structure and construction method of a pile-anchor integrated pile bottom post-grouting. The compression-resistant and anti-pullout structure is a pile in the upper soil layer section, which can withstand a large compressive load and partial pull-out load. It is a pressure-type anchor rod in the lower bedrock section. The anchor rod in the bedrock can provide a very high pull-out force, and the pile-anchor integrated can resist both compression and pull-out. The following is a detailed description of the compression-resistant and anti-pullout structure of the pile-anchor integrated pile bottom post-grouting and its specific construction method.
[0044] like Figure 1 As shown in the figure, a schematic diagram of a pile-anchor integrated pile bottom post-grouting compression and pull-out resistance structure provided in a preferred embodiment of the present invention is shown. In the compression and pull-out resistance structure, the main part includes a bored pile 1 located at the upper part, an anchor hole casing 3 located in the pile body, and a pile bottom anchor 2 located at the lower part. Figure 2 As shown, under the completed pile body, the bored pile 1 is located in the rock layer 5 below the basement floor 4, with its top supporting the floor 4 and its bottom supported on the rock layer 6. The anchor hole casing 3 extends from the top of the bored pile 1 to the rock layer 6, and its interior is used to construct the pile bottom anchor 2, which includes structures such as the anchor and the grouting body.
[0045] like Figure 3 , Figure 4 and Figure 5As shown, the pile bottom anchor rod 2 comprises a rod body 21, an isolation sleeve 22, a bearing plate 23, an anchor pad 24, an anchor 25 and a grouting body 26. The outside of the anchor rod body 21 is covered with an isolation sleeve 22. The top of the anchor rod body 21 passes through the anchor rod hole sleeve 3 and is anchored in the top of the bored pile 1 by the anchor pad 24 and the anchor 25. An anchor rod hole is opened in the rock layer 6 along the extension direction of the anchor rod hole sleeve 3 in the same direction as the anchor rod hole sleeve 3. The anchor rod body 21 enters the rock layer 6 along the anchor rod hole, and a bearing plate 23 is fixed to the bottom end of the anchor rod body 21. The grouting body 26 is filled in the space outside the isolation sleeve 22 in the anchor rod hole through the grouting process. In addition, the present invention can realize pile bottom grouting during the anchor grouting process, so there is a pile bottom post-grouting 13 area at the bottom of the bored pile 1, thereby strengthening the sediment at the bottom of the pile and further improving the compressive bearing capacity. The anchor rods in this structure are pressure-type anchor rods. The upper pile body provides the reaction force for the prestressing of the anchor rods. The tensioning is completed before the basement construction. There is no need to leave a hole on the basement basement, which does not affect the construction of the basement basement and is convenient for construction. In addition, the upper soil layer of this structure is a pile, and the anchor rods do not directly contact the soil layer, which can solve the corrosion problem of the anchor rods.
[0046] In a preferred embodiment of the present invention, a method for constructing a compression and pull-out resistant structure of the above-mentioned pile-anchor integrated pile bottom post-grouting is provided, which comprises the following steps:
[0047] S1. Before excavating the basement foundation pit, bored pile construction is carried out at the designed location.
[0048] It should be noted that the specific locations where bored piles need to be drilled need to be determined based on the design documents and construction plan of the basement pit, and will not be described in detail here.
[0049] S2. A plurality of anchor hole casings 3 are fixed inside the pile body reinforcement cage 11 of the bored pile. Each anchor hole casing 3 is arranged along the entire length of the bored pile body and is temporarily blocked at both ends.
[0050] It should be noted that the pile body reinforcement cage 11 of the bored pile can be tied according to the requirements of the design documents and construction plan. The specific form belongs to the existing technology and will not be described in detail here. The anchor hole sleeve 3 can be implemented by a thin-walled steel pipe with an inner diameter not less than the diameter of the anchor rod body 21. The number of anchor hole sleeves 3 fixed inside the pile body reinforcement cage 11 can be determined according to the actual design documents and construction plan. Figure 4 In the figure, three anchor hole sleeves 3 are used as an example for explanation. Each anchor hole sleeve 3 can be fixed to the inner side of the pile body reinforcement cage by tying wires, and in order to ensure the stability of the force, it is necessary to ensure that all anchor hole sleeves 3 are evenly distributed along the inner side of the pile body reinforcement cage as much as possible.
[0051] It should be noted that since there is an anchor hole casing 3 inside the bored pile, and the bored pile needs to be grouted with concrete later, in order to prevent the concrete slurry from entering the anchor hole casing 3, it is necessary to temporarily block the two ends of the anchor hole casing 3. The temporary blocking of the ends of the anchor hole casing 3 needs to be in a removable blocking form, such as setting a cover plate.
[0052] S3, lowering the pile body reinforcement cage with the anchor hole sleeve 3 fixed thereto into the pile hole of the bored pile, and pouring the pile body concrete 12 of the bored pile after it is in place.
[0053] It should be noted that the pouring of the pile body concrete 12 can refer to the pouring process of bored piles in the prior art, which belongs to the prior art and will not be described in detail. The pile body concrete 12 needs to be cured after pouring, and the curing process also belongs to the prior art.
[0054] S4, excavate the basement foundation pit, remove the temporary blockage on the top of the anchor hole casing 3 after excavating to the bottom of the pit, extend the anchor machine along the anchor hole casing 3 into the bottom of the bored pile, and construct the anchor hole on the bedrock at the bottom of the pile.
[0055] It should be noted that the anchor hole casing 3 has temporary plugging at both the top and bottom ends. The temporary plugging at the top will be exposed to the outside after the basement foundation pit is excavated to the bottom of the pit, and can be removed manually or by other machinery, but the temporary plugging at the bottom is in the rock and soil layer 5 and cannot be removed directly. However, it can be broken by the anchor bolt machine during the process of the anchor bolt machine constructing the anchor hole along the anchor hole casing 3 on the bedrock at the bottom of the pile to form the anchor hole.
[0056] S5. Lower the assembled anchor rod kit into the anchor rod hole.
[0057] It should be noted that the anchor rod kit can be pre-assembled or installed at the construction site before being lowered. Figure 6 As shown, the anchor rod kit includes an anchor rod body 21, an isolation sleeve 22, an isolation centering bracket 27 and a grouting pipe 8, wherein the bottom of the anchor rod body 21 also needs to be pre-assembled according to Figure 5 The structure shown in FIG. is connected to a carrier plate 23. Figure 6In the embodiment, there are three anchor rod bodies 21, and an isolation sleeve 22 is arranged outside each anchor rod body 21. The anchor rod body 21 and the grouting pipe 8 are inserted into a plurality of isolation centering brackets 27 arranged at intervals, and the anchor rod body 21 is centrally symmetrically distributed on the plane of the isolation centering bracket 27. The length of the anchor rod body 21 should be greater than the length of the isolation sleeve 22, and the top and bottom ends of the anchor rod body 21 should both remain in a state of extending out of the isolation sleeve 22. The bearing plate 23 is fixedly mounted on the bottom end of the anchor rod body 21. The bearing plate 23 can theoretically adopt any rigid plate material as long as it can meet the strength requirements. In an embodiment of the present invention, the bearing plate 23 can adopt a circular steel plate, and the bearing plate 23 and the anchor rod body 21 can be fixed by an anchor or by welding. In addition, since the isolation sleeve 22 of the built-in anchor rod body 21 is lowered into the anchor hole sleeve 3 and the anchor hole before grouting, it may generate thrust to it during the subsequent anchor hole grouting process, causing it to shift. Therefore, in order to ensure the reliability of anchoring, when the anchor rod kit is made in the present invention, it is necessary to install multiple isolation centering brackets 27 at intervals outside the isolation sleeve 22. The function of the isolation centering bracket 27 is to limit the isolation sleeve 22 and the grouting pipe 8 on the horizontal cross section of the anchor rod hole, so that the anchor rod body 21 in the isolation sleeve 22 can be kept fixed in relative position after being lowered into the anchor rod hole. The form of the isolation centering bracket 27 is not limited. In theory, as long as there are more than three parts of the isolation centering bracket 27 that can be supported on the inner wall of the anchor rod hole, it can be ensured that the isolation sleeve 22 at this cross-sectional position will not shift in the anchor rod hole. In an embodiment of the present invention, the isolation centering bracket 27 adopts a hard structure in the shape of a gear, and the minimum outer diameter of the cross section is slightly smaller than the inner diameter of the anchor rod hole. When the anchor rod kit is lowered, the outer ring of each isolation centering bracket 27 is supported in the anchor rod hole to form a relative limit in the horizontal direction. Preferably, the difference between the minimum outer diameter of the cross section of the isolation centering bracket 27 and the inner diameter of the anchor rod hole is preferably in the centimeter level. The anchor rod body 21 with the isolation sleeve 22 passes through the central hole of the isolation centering bracket 27, and the grouting pipe 8 is arranged in the serrated space of the outer ring of the isolation centering bracket 27. A single isolation centering bracket 27 can only ensure that the isolation sleeve 22 at one position will not shift in the anchor hole. Since the isolation sleeve 22 is long and narrow, it is necessary to arrange multiple centering brackets 27 at equal intervals along the extension direction of the isolation sleeve 22, and it is appropriate to set adjacent centering brackets 27 at intervals of 1 to 2 meters.
[0058] In addition, if more or fewer anchor rods 21 are required in an anchor hole, they can also be fixed by isolating the centering bracket 27 to keep the multiple anchor rods 21 centrally symmetrically distributed on the plane of the isolating centering bracket 27, ensuring that the anchors are evenly stressed, while isolating different anchors so that each anchor rod is in full contact with the grouting body.
[0059] In the embodiment of the present invention, the anchor rod body 21 may be in the form of unbonded steel strands or prestressed steel bars, etc., and the specific selection needs to be made according to the design documents or construction plan.
[0060] S6, inject cement mortar into the grouting pipe 8, and gradually lift the grouting pipe 8, so as to grout the anchor hole from bottom to top. When the grouting in the anchor hole is close to the top of the anchor hole casing 3, the hole section of the anchor hole casing 3 and the space between the isolation casing 22 and the grouting pipe 8 are blocked by the blocking agent 7, and then continue to inject cement mortar into the anchor hole with the top port blocked through the grouting pipe 8 until the grouting pressure reaches the design value, thereby completing the pile bottom grouting of the bored pile.
[0061] It should be noted that the injection of cement mortar into the grouting pipe 8 needs to be achieved with the help of corresponding grouting equipment. When the grouting starts, it is best to start grouting from 300 to 500 mm away from the bottom of the hole, and slowly lift it while grouting to ensure that the grouting port of the anchor hole is below the liquid surface to ensure the grouting quality. After the anchor hole is filled with grout by the grouting pipe 8, it continues to enter the anchor hole casing 3 for grouting. The anchor hole casing 3 can be regarded as an extension section of the anchor hole. For the sake of ease of description, the top section of the anchor hole casing 3 is called the orifice section. When the anchor hole is grouted to the top of the hole close to the anchor hole casing 3, it is necessary to stop injecting cement mortar into the grouting pipe 8 first to form an un-grouted orifice section that can be filled with the plugging agent 7. The purpose is to use this orifice section to seal the orifice, forming a Figure 7 The hole-sealing state shown is to facilitate high-pressure grouting inside the anchor hole casing 3. Grouting continues in the hole-sealing state. As the grouting pressure inside the anchor hole casing 3 increases, the grout will seep out along the bottom of the anchor hole casing 3, achieving grouting at the bottom of the bored pile 1, thereby improving the bearing capacity and pull-out resistance of the pile end.
[0062] In the embodiment of the present invention, the plugging agent 7 used for plugging the anchor hole port needs to be a grouting material that solidifies quickly and has a certain rigidity. It should be able to solidify quickly after plugging to facilitate the subsequent pile bottom grouting construction as soon as possible. The plugging agent should also have a certain rigidity to ensure that it can withstand the pressure of high-pressure grouting. In the embodiment of the present invention, the plugging agent 7 can be selected from epoxy resin.
[0063] S7. After the grouting body of the bored pile reaches the required strength for anchor tensioning, the anchor rod body 21 is tensioned at the top of the bored pile 1. After tensioning to the designed pre-tension value, the top of the anchor rod 2 is anchored, and then the construction of the basement foundation pit bottom plate 4 is continued.
[0064] It should be noted that the strength of the grouting body of the bored pile should meet the requirements of anchor tensioning. Generally, after the grouting body reaches 80% strength, the anchor can be tensioned with a jack. After the top of the anchor rod body 21 is tensioned to the designed pre-tension value, it can be anchored with an anchor pad 24 and an anchor 25. The anchor formed by the above construction method is a pressure-type anchor. The grouting body is under pressure, not easy to crack, and has a greater bearing capacity.
[0065] In addition, although in the above embodiment Figure 4 In the description, three anchor hole sleeves 3 are taken as an example, but in fact the number of anchor hole sleeves 3 can be reasonably adjusted according to actual conditions.
[0066] It can be seen that the compression and pull-out resistance structure of the pile-anchor combined with the pile bottom post-grouting of the present invention is convenient to construct and has high compression and pull-out resistance of a single pile. The pile-anchor integrated compression and pull-out resistance structure has piles in the upper soil layer and anchors in the lower rock layer. Compared with piles, the lower anchor rod of the compression and pull-out resistance structure of the present invention is located in the rock layer, with a small hole diameter, convenient hole formation, and low cost, but it can give full play to the anchoring force of the rock layer, can provide a very high pull-out resistance, and effectively improve the pull-out resistance of a single pile; at the same time, when the anchor rod is grouting, the pile bottom is grouting to reinforce the sediment at the pile end, which also improves the compression and pull-out resistance of the pile end; the compression and pull-out resistance structure of the pile-anchor combined with the pile bottom post-grouting has high compression and pull-out resistance of a single pile. Compared with the anti-floating anchor rod, the upper rock and soil layer of the compression and pull-out structure of the present invention is a pile, which completely solves the corrosion problem of the upper part; the bottom anchor rod can be a pressure-type anchor rod with high bearing capacity; the prestressed tensioning of the anchor rod uses the pile as a support and is completed before the bottom plate construction. It does not need to leave a hole on the bottom plate like ordinary prestressed anchoring, and then tension the anchor rod after the concrete strength of the bottom plate reaches the requirement, and then seal the bottom plate. It does not affect the construction of the bottom plate, and there is no complicated process such as leaving holes and sealing the bottom plate, and there is no risk of water leakage in the bottom plate.
[0067] In addition, the compression and pull-out resistance structure of the present invention also has the advantage of convenient construction of anchor rods at the bottom of the pile, that is, the present invention first constructs the upper pile, pre-buries the hole casing in the pile body, and then extends from the hole casing into the pile bottom to construct the anchor rod hole after the pile body reaches the designed strength. It is impossible to first construct the anchor rod hole in the pile body concrete and then construct the anchor rod hole at the bottom of the pile. The construction is convenient and the cost is low.
[0068] The above-described embodiments are only some preferred implementations of the present invention, but are not intended to limit the present invention. A person skilled in the relevant technical field may make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, any technical solution obtained by equivalent replacement or equivalent transformation falls within the protection scope of the present invention.
Claims
1. A method for constructing a compression and tension-resistant structure with pile-anchor integrated pile bottom post-grouting, characterized in that: include: S1. Before excavating the basement foundation pit, bored piles are constructed at the designed location; S2, fixing a plurality of anchor hole sleeves (3) inside the pile body reinforcement cage (11) of the bored pile, wherein each anchor hole sleeve (3) is arranged along the entire length of the bored pile body and is temporarily blocked at both ends; S3, lowering the pile body reinforcement cage (11) fixed with the anchor hole sleeve (3) into the pile hole of the bored pile, and pouring the pile body concrete (12) of the bored pile after it is in place; S4, excavating the basement foundation pit, removing the temporary plugging at the top of the anchor hole casing (3) after excavating to the bottom of the pit, extending the anchor bolt machine along the anchor hole casing (3) into the bottom of the bored pile, and constructing the anchor hole on the bedrock at the bottom of the pile; S5. Lower the assembled anchor rod set into the anchor rod hole; the anchor rod set comprises an anchor rod body (21), an isolation sleeve (22), a bearing plate (23), an isolation centering bracket (27) and a grouting pipe (8); there is at least one anchor rod body (21), an isolation sleeve (22) is arranged outside each anchor rod body (21), the anchor rod body (21) and the grouting pipe (8) are inserted into a plurality of isolation centering brackets (27) arranged at intervals, and the anchor rod body (21) is centrally symmetrically distributed on the plane of the isolation centering bracket (27); the top and bottom ends of the anchor rod body (21) both extend out of the isolation sleeve (22), and the bearing plate (23) is fixedly installed on the bottom end of the anchor rod body (21); when the anchor rod set is lowered, the outer ring of each isolation centering bracket (27) is supported in the anchor rod hole to form a relative limit in the horizontal direction; S6, injecting cement mortar into the grouting pipe (8), and gradually lifting the grouting pipe (8), so as to perform grouting on the anchor hole from bottom to top, and when the grouting in the anchor hole reaches the top of the hole close to the anchor hole casing (3), the hole mouth section of the anchor hole casing (3) and the space between the isolation casing (22) and the grouting pipe (8) are blocked with a plugging agent (7), and then cement mortar is continuously injected into the anchor hole whose top port is blocked through the grouting pipe (8) until the grouting pressure reaches the design value, thereby completing the pile bottom grouting of the bored pile; S7. After the grouting body of the bored pile reaches the required strength for anchor tensioning, the anchor rod body (21) is tensioned at the top of the bored pile (1). After tensioning to the designed pre-tension value, the top of the anchor rod (2) is anchored, and then the construction of the basement foundation pit bottom plate (4) is continued.
2. The construction method according to claim 1, characterized in that: The anchor rod hole sleeves (3) are fixed to the inner side of the pile body reinforcement cage (11) by means of wire tying, and all the anchor rod hole sleeves (3) are evenly distributed in the circumferential direction along the inner side of the pile body reinforcement cage (11).
3. The construction method according to claim 1, characterized in that: The anchor rod hole sleeve (3) is a thin-walled steel pipe with an inner diameter not less than the diameter of the anchor rod body (21).
4. The construction method according to claim 1, characterized in that: The anchor rod body (21) is made of unbonded steel strands or prestressed steel bars.
5. The construction method according to claim 1, characterized in that: The isolation centering brackets (27) are arranged at equal intervals along the extension direction of the isolation sleeve (22), with an interval of 1 to 2 m.
6. The construction method according to claim 1, characterized in that: The minimum outer circle diameter of the cross section of the isolation centering bracket (27) is slightly smaller than the inner diameter of the anchor hole.
7. The construction method according to claim 1, characterized in that: The plugging agent (7) used to plug the anchor hole port is epoxy resin.
8. The construction method according to claim 1, characterized in that: After the top of the anchor rod body (21) is tensioned to a designed pre-tension value, it is anchored using an anchor pad (24) and an anchor (25).
9. The construction method according to claim 1, characterized in that: The bearing plate (23) is a circular steel plate.
10. A compressive and tensile resistant structure with pile-anchor integrated pile bottom post-grouting obtained by the construction method of claim 1, characterized in that: The invention comprises a bored pile (1) at the top, an anchor hole sleeve (3) located in the pile body, and a pile bottom anchor (2) at the bottom; the pile bottom anchor (2) comprises an anchor rod body (21) sleeved with an isolation sleeve (22); the top of the anchor rod body (21) passes through the anchor hole sleeve (3) and is anchored to the top of the bored pile (1) by an anchor pad (24) and an anchor (25); the anchor rod body (21) enters the rock layer (6) through an anchor hole extending in the same direction as the anchor hole sleeve (3); a bearing plate (23) is fixed to the bottom end of the anchor rod body (21); and a grouting body (26) is filled in the space outside the isolation sleeve (22) in the anchor hole; and a pile bottom post-grouting (13) area is present at the bottom of the bored pile (1).
Citation Information
Cited By
Electric transmission line rock anchor rod-steel pipe pile foundation suitable for upper soil and lower rock
CN120719687A