Pipe gallery prefabricating and assembling device and assembling method thereof
By introducing a tensioning mechanism and pre-pressing device into the prefabricated assembly device of the pipe corridor, combined with a car crane and a winch, the problem of lifting and assembly accuracy of prefabricated components is solved, ensuring that the tensioning force is within the specification range, avoiding structural defects and safety hazards, and improving Construction quality.
Patent Information
- Application Number
- CN202411293217.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-11-15
AI Technical Summary
The existing pipe corridor prefabricated components are difficult to lift and flip, the assembly accuracy is not high, the tension cannot be adjusted, and there are structural defects and safety hazards.
A prefabricated assembly device for pipe gallery is designed, including multiple prefabricated components, tensioning mechanisms, prepressing devices and adjustment devices. The tensioning force is adjusted by tensioning screws and jacks, and lifting and flipping are achieved using car cranes and hoists to ensure assembly accuracy. and stable structure.
It improves the lifting and flipping efficiency of prefabricated components, enhances assembly accuracy, ensures that the tensioning force is within the specification range, avoids structural defects and safety hazards, and improves construction quality.
Smart Images

Figure CN118958368A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of pipe gallery construction, in particular to a pipe gallery prefabricated assembly device and an assembly method thereof. Background Art
[0002] The construction technology of municipal pipe gallery projects is mainly divided into dark excavation construction, open excavation cast-in-place construction and open excavation prefabrication hoisting construction. In the construction of municipal pipe gallery, due to the small construction site and high requirements for safe and civilized construction brought by the urban construction environment, in order to ensure the safety of transportation, the segments are placed flat on the flatbed during transportation, so they need to be turned over on the site after unloading.
[0003] Existing prefabricated components require multiple cranes for hoisting, and the work site is small, which makes it difficult to hoist and flip the prefabricated components, wasting a lot of manpower and material resources, and difficult to assemble. In the construction of municipal pipe gallery projects, the requirements for precision are getting higher and higher. It is difficult to ensure that the existing pipe gallery prefabrication is assembled in place, and the assembly accuracy is poor. During the assembly process, it is difficult to align two adjacent prefabricated structures. At the same time, the assembled pipe gallery project structure is unstable. After the construction is completed, the pipe gallery project will have insufficient bearing capacity and cannot adjust the tension of the two adjacent prefabricated structures. The tension is not within the specification, and there are potential structural defects or deficiencies, which may cause safety hazards in later use. For this reason, we propose a pipe gallery prefabrication assembly device and an assembly method thereof to solve the above problems.
[0004] Chinese patent document CN205530346U records a kind of intelligent pipe gallery prefabrication and assembly equipment. The utility model discloses a kind of intelligent pipe gallery prefabrication and assembly equipment, including an assembly equipment base, an equipment reduction box, a lifting connection plate and a material lifting platform. The beneficial effects are: the equipment is small in size, the joints adopt an automatic telescopic structure, the joints are effectively protected, and the transportation cost is low. However, the prefabricated structure of the pipe gallery assembled by the device is unstable. After the construction is completed, the pipe gallery project will have insufficient bearing capacity, and the tensioning force of two adjacent prefabricated structures cannot be adjusted. The tensioning force is not within the specification, there are potential structural defects or deficiencies, there are defects in use, and improvements are needed. Summary of the invention
[0005] The technical problem to be solved by the present invention is to solve the difficulties in lifting and turning over prefabricated components, the difficulties in the assembly and alignment process of two adjacent prefabricated structures, and the low precision; at the same time, it solves the problem that the tensioning force of two adjacent prefabricated structures cannot be adjusted, the tensioning force is not within the specifications, there are potential structural defects or deficiencies, and there may be safety hazards in later use.
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: a prefabricated assembly device of a pipe gallery and an assembly method thereof, including a foundation pit and a plurality of prefabricated components, the prefabricated components are provided with a plurality of tensioning mechanisms, the tensioning mechanisms are provided with tensioning wire rods, the plurality of prefabricated components are spliced in sequence, a movable preloading device is provided on the foundation pit, the preloading device is provided with a plurality of jacks, and adjustment devices are provided at both ends of the top of the foundation pit.
[0007] In the preferred embodiment, the prefabricated component includes a hollow box body, side grooves are provided at the four corners of the outer side of the box body, a connected grouting groove is provided on one side of the side groove, a tensioning mechanism is provided on the side groove, and through holes are provided at the four corners of the box body, and the tensioning wire rod rests on the through holes.
[0008] In the preferred embodiment, the side groove is connected to the grouting groove through a through hole, a grouting hole is provided on the grouting groove, one end of the tensioning wire rod passes through the side groove and extends into the grouting groove, and the other end of the tensioning wire rod extends into the grouting groove of the adjacent prefabricated component.
[0009] In the preferred embodiment, two side lifting ears are provided on both sides of the box body, a top lifting ear is provided on the top of the box body, a socket is provided at one end of the box body, and a rectangular plug plate is provided at the other end of the box body, and the rectangular plug plate rests on the socket of the adjacent box body.
[0010] In a preferred embodiment, the tensioning mechanism includes a base plate, a rotating seat is provided on the base plate, a rotating sleeve is provided on the rotating seat, and the sleeve is threadedly connected to the tensioning wire rod.
[0011] In the preferred embodiment, the preloading device includes a bracket and a screw rod, a base is provided at both ends of the bottom of the bracket, the screw rod is threadedly connected to the base, a first motor is provided at one end of the screw rod, jacks are installed at the four corners of the bracket, and a hydraulic oil gauge is provided on the jack; The foundation pit comprises foundation pit side walls on both sides and a pit bottom at the bottom. Grooves are arranged on both sides of the pit bottom, and the base rests on the grooves for movement.
[0012] In the preferred embodiment, the adjusting device includes a slide rail and an adjusting screw rod, a slider is provided on the slide rail, a winch is installed on the slider, the slider is threadedly connected to the adjusting screw rod, and one end of the adjusting screw rod is provided with a second motor installed on the foundation pit.
[0013] In the preferred embodiment, a mobile crane is also provided, a hanger is provided at the bottom of the mobile crane, movable support members are provided at both ends of the hanger, a third motor is provided at one end of the hanger, a bottom groove is provided at the bottom of the hanger, a displacement screw is provided at the output end of the third motor, a threaded hole is provided on the support member, the displacement screw is threadedly connected to the support member, the support member rests on the bottom groove, and a middle lifting ear is provided at the middle bottom of the hanger.
[0014] In a preferred embodiment, a bottom plate is provided at the bottom of the support member, and second hoists are provided on both sides of the bottom plate. The four second hoists on the two support members are respectively connected to different side lifting ears.
[0015] A method for assembling a prefabricated assembly device of a pipe gallery, the method comprising: S1, placing the hoisting equipment in place: installing the side lifting lugs on the box body, compacting the base soil before hoisting, and then pouring a concrete platform and a supporting platform, laying a roadbed box on the concrete platform to support the legs of a truck crane, and laying steel plates on the walking area and auxiliary road of the truck crane; S2, turning over and hoisting of single-section prefabricated components: the prefabricated components are transported by flatbed trucks, hoisted onto the hanger by a truck crane, and the third motor is driven to adjust the position of the support, connect the support and the prefabricated components, and the prefabricated components are turned over by the second winches at both ends of the hanger until multiple prefabricated components are hoisted to one side of the foundation pit; S3, positioning of the first section of prefabricated components: dismantle the connection between the second hoist and the side lifting lug, connect the top side lifting lug to the hoist, connect the top lifting lug to the middle lifting lug, adjust the position of the first section of prefabricated components by the second hoist and the truck crane, insert the tensioning wire rods into the prefabricated components at the four corners, inject grout into the grouting holes, and connect the top lifting lug to the side lifting lug after solidification; S4. Positioning of adjacent prefabricated components: the side lifting lugs at the top are connected to the winch, the top lifting lugs are connected to the middle lifting lugs, and the position of the box is adjusted by adjusting the middle lifting lugs and the winches on both sides so that the through holes at the four corners are aligned with the tensioning wire rods; S5. Assembling adjacent prefabricated components: by moving the preloading device and the adjusting device, the sockets of the prefabricated component being assembled and the prefabricated components that have been assembled are aligned, and at the same time, the four jacks at the four corners support the box body, and the seam width reaches the designed value; S6. Apply prestress: inject grout into the grouting hole, wait for the grout to solidify, rotate the sleeve, and adjust the value of the hydraulic oil gauge so that the hydraulic oil gauge of the four jacks at the four corners reaches the predetermined design value; S7. Repeat S4 to S6 until all prefabricated components are assembled.
[0016] The present invention provides a prefabricated assembly device for a pipe gallery and an assembly method thereof. During the hoisting process, four second winches are connected to the side lifting ears to drive the third motor, adjust the position of the support, drive the truck crane to lift the prefabricated component, tighten the second winch of the top side lifting ear, and extend the second winch of the bottom side lifting ear to flip the prefabricated component; disconnect the second winch from the side lifting ear, connect the top side lifting ear to the adjustment device, and connect the top lifting ear to the middle lifting ear. When hoisting the remaining prefabricated components, drive the truck crane to lift the gravity of the prefabricated component, drive the preloading device to better move the prefabricated component, avoid the prefabricated component from damaging the bottom of the pit during horizontal movement, and save the force of driving the preloading device.
[0017] The hanger can adjust the position of the support so that the overall structure can adapt to prefabricated components of different sizes. The hanger lifts the prefabricated components during assembly, which can facilitate the preloading device to drive the prefabricated components to move, and can also facilitate the adjustment device to adjust the prefabricated components left and right. The hanger, support and automobile crane cooperate with each other to flip and hoist the prefabricated components, avoiding the need for multiple cranes to cooperate for hoisting, and the small space on site makes it impossible to hoist, and at the same time avoids the need to use multiple cranes, wasting a lot of manpower and material resources.
[0018] The adjustment devices on both sides cooperate with the automobile crane on the top of the prefabricated component to adjust the position of the prefabricated component being assembled. The tensioning wire rods at the four corners of the fixed prefabricated component can be used as a positioning reference to improve the assembly accuracy and simplify the assembly steps. The preloading device has the function of pushing the prefabricated component being assembled. By moving the preloading device and the adjustment device, the sockets of the prefabricated component being assembled and the prefabricated components that have been assembled are aligned.
[0019] After the grouting in the grouting hole solidifies, the tensioning wire rod extended from the fixed prefabricated component is fixedly connected to the tensioning wire rod on the prefabricated component being assembled, and the four jacks of the preloading device are pressed against the prefabricated component, and the four sleeves are rotated at the same time. At this time, the tensioning force of the prefabricated component can be adjusted until the tensioning force of the prefabricated component is within the specified range. The preloading device and the adjusting device are then moved back to install the next prefabricated component.
[0020] The tensioning mechanism and tensioning wire rod can not only adjust the tensioning force, but the extended tensioning wire rod can also be used as a positioning reference for the subsequent installation of prefabricated components. The overall device can adjust the tensioning force to stabilize the structure of the installed corridor project. After the construction is completed, the corridor project will not have insufficient bearing capacity. The overall device can adjust the tensioning force of two adjacent prefabricated structures to ensure that the tensioning force is within the specified range. There are no potential structural defects or deficiencies, which can avoid safety hazards in later use and is suitable for popularization and use. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 It is a front view of the local structure hoisting structure of the present invention; Figure 2 For the present invention Figure 1 Magnified view of local structure; Figure 3 It is a side view of the local structure hoisting structure of the present invention; Figure 4 For the present invention Figure 3 Magnified view of local structure; Figure 5 It is a front view of the overall device of the present invention; Figure 6 It is an axonometric view of the overall device of the present invention; Figure 7 It is an axial side view of the foundation pit of the present invention; Figure 8 It is an axial side view of the preloading device of the present invention; Fig. 9 An exploded view of the regulating device of the present invention; Fig.10 is an axonometric view of the prefabricated component structure of the present invention; Fig.11 is an axonometric view of two prefabricated components of the present invention; Fig.12 It is a front view of two prefabricated components of the present invention; Fig.13 For the present invention Fig.12 A cross-sectional view of Fig.14 For the present invention Fig.13 A magnified view of A; In the figure: prefabricated component 1; box body 101; side groove 102; grouting hole 103; top lifting ear 104; side lifting ear 105; through hole 106; socket 107; rectangular plug plate 108; grouting groove 109; tensioning mechanism 2; bottom plate 201; rotating seat 202; sleeve 203; tensioning screw rod 3; preloading device 4; bracket 401; base 402; first motor 403; jack 404; screw rod 405; adjustment device 5; slide rail 501; slider 502; adjustment screw rod 503; second motor 504; winch 505; foundation pit 6; foundation pit side wall 601; pit bottom 602; trough body 603; hanger 7; third motor 701; displacement screw rod 702; middle lifting ear 703; bottom groove 704; support member 8; second winch 801; bottom plate 802; truck crane 9. DETAILED DESCRIPTION
[0022] Embodiment 1: like Figures 1 to 14A pipe gallery prefabricated assembly device and an assembly method thereof are provided, comprising a foundation pit 6 and a plurality of prefabricated components 1, the prefabricated components 1 are provided with a plurality of tensioning mechanisms 2, the tensioning mechanisms 2 are provided with tensioning wire rods 3, the plurality of prefabricated components 1 are sequentially spliced, a movable preloading device 4 is provided on the foundation pit 6, the preloading device 4 is provided with a plurality of jacks 404, and adjustment devices 5 are provided at both ends of the top of the foundation pit 6. With this structure, during the lifting process, the four second winches 801 are connected to the side lifting ears 105 to drive the third motor 701, adjust the position of the support 8, drive the truck crane 9 to lift the prefabricated component 1, tighten the second winch 801 of the top side lifting ear 105, and extend the second winch 801 of the bottom side lifting ear 105 to flip the prefabricated component 1; disconnect the second winch 801 from the side lifting ears 105, connect the top side lifting ears 105 to the adjustment device 5, and connect the top lifting ears 104 to the middle lifting ears 703. When lifting the remaining prefabricated components 1, drive the truck crane 9 so that the truck crane 9 can lift the gravity of the prefabricated component 1, and drive the preloading device 4 to better move the prefabricated component 1, thereby avoiding the phenomenon that the prefabricated component 1 damages the pit bottom 602 during the horizontal movement, and at the same time, it can save the force of driving the preloading device 4.
[0023] The hanger 7 can adjust the position of the support 8 so that the overall structure can adapt to prefabricated components 1 of different sizes. The hanger 7 lifts the prefabricated component 1 during assembly, which can facilitate the prepressing device 4 to drive the prefabricated component 1 to move, and at the same time, it can facilitate the adjustment device 5 to adjust the prefabricated component 1 left and right. The hanger 7, the support 8 and the automobile crane 9 cooperate with each other to flip and hoist the prefabricated component 1, avoiding the need for multiple cranes to cooperate in hoisting, and the small space on site makes it impossible to hoist, and at the same time avoids the need to use multiple cranes and waste a lot of manpower and material resources.
[0024] The adjusting devices 5 on both sides cooperate with the automobile crane 9 on the top of the prefabricated component 1 to adjust the position of the prefabricated component 1 being assembled. The tensioning wire rods 3 at the four corners of the fixed prefabricated component 1 can be used as positioning references to improve assembly accuracy and simplify assembly steps. The preloading device 4 has the function of pushing the prefabricated component 1 being assembled. By moving the preloading device 4 and the adjusting device 5, the sockets 107 of the prefabricated component 1 being assembled and the prefabricated component 1 that has been assembled are aligned.
[0025] After the grouting in the grouting hole 103 solidifies, the tensioning wire rod 3 extending from the fixed prefabricated component 1 is fixedly connected to the tensioning wire rod 3 on the prefabricated component 1 being assembled, and the four jacks 404 of the preloading device 4 are pressed against the prefabricated component 1, and the four sleeves 203 are rotated at the same time. At this time, the tensioning force of the prefabricated component 1 can be adjusted until the tensioning force of the prefabricated component 1 is within the specified range, and the preloading device 4 and the adjusting device 5 are moved back to install the next prefabricated component 1.
[0026] The tensioning mechanism 2 and the tensioning wire rod 3 are not only able to adjust the tensioning force, but the extended tensioning wire rod 3 can also serve as a positioning reference for the subsequent installation of the prefabricated component 1. The overall device can adjust the tensioning force to ensure that the installed pipe gallery project structure is stable. After the construction is completed, the pipe gallery project will not have insufficient bearing capacity. The overall device can adjust the tensioning force of two adjacent prefabricated structures to ensure that the tensioning force is within the specified range, without potential structural defects or deficiencies, and thus avoiding safety hazards in later use.
[0027] In the preferred embodiment, the prefabricated component 1 includes a hollow box body 101, side grooves 102 are provided at the four corners of the outer side of the box body 101, a grouting groove 109 is provided on one side of the side groove 102, a tensioning mechanism 2 is provided on the side groove 102, through holes 106 are provided at the four corners of the box body 101, and the tensioning wire rod 3 abuts against the through holes 106. With this structure, the four tensioning mechanisms 2 of the prefabricated component 1 correspond to the four jacks 404 on the preloading device 4, which is convenient for the staff to adjust the corresponding jacks 404 and reduce the error during adjustment.
[0028] In the preferred embodiment, the side groove 102 is connected to the grouting groove 109 through the through hole 106, and the grouting groove 109 is provided with a grouting hole 103. One end of the tensioning wire rod 3 passes through the side groove 102 and extends into the grouting groove 109, and the other end of the tensioning wire rod 3 extends into the grouting groove 109 of the adjacent prefabricated component 1. With this structure, The grouting hole 103 is used for grouting. One end of the tensioning wire rod 3 passes through the side groove 102 and extends into the grouting groove 109. The other end of the tensioning wire rod 3 extends into the grouting groove 109 of the adjacent prefabricated component 1, so that the tensioning wire rod 3 plays a role in tensioning and positioning.
[0029] In the preferred embodiment, two side ears 105 are provided on both sides of the box 101, a top ear 104 is provided on the top of the box 101, a socket 107 is provided at one end of the box 101, and a rectangular plug 108 is provided at the other end of the box 101. The rectangular plug 108 abuts against the socket 107 of the adjacent box 101. With this structure, In the preferred embodiment, the tensioning mechanism 2 includes a bottom plate 201, a rotating seat 202 is provided on the bottom plate 201, a rotating sleeve 203 is provided on the rotating seat 202, and the sleeve 203 is threadedly connected with the tensioning wire rod 3. With this structure, after the grouting in the grouting hole 103 solidifies, the tensioning wire rod 3 extending from the fixed prefabricated component 1 is fixedly connected with the tensioning wire rod 3 on the prefabricated component 1 being assembled, and the four jacks 404 of the preloading device 4 are pressed against the prefabricated component 1, and the four sleeves 203 are rotated at the same time, and the tensioning force of the prefabricated component 1 can be adjusted at this time until the tensioning force of the prefabricated component 1 is within the specified range, and the preloading device 4 and the adjusting device 5 are withdrawn and moved to install the next prefabricated component 1.
[0030] In the preferred embodiment, the preloading device 4 includes a bracket 401 and a screw rod 405. A base 402 is provided at both ends of the bottom of the bracket 401. The screw rod 405 is threadedly connected to the base 402. A first motor 403 is provided at one end of the screw rod 405. Jacks 404 are installed at the four corners of the bracket 401. A hydraulic oil gauge is provided on the jack 404. The foundation pit 6 includes foundation pit side walls 601 on both sides and a pit bottom 602 at the bottom. A groove body 603 is provided on both sides of the pit bottom 602, and the base 402 moves against the groove body 603. With this structure, the first motor 403 is driven to rotate the screw rod 405 to move the bracket 401, so that the preloading device 4 pushes the prefabricated component 1 being hoisted and assembled to move, and the hydraulic oil gauge on the jack 404 is used to display the tension force of the prefabricated component 1.
[0031] In the preferred embodiment, the adjusting device 5 includes a slide rail 501 and an adjusting screw rod 503, a slider 502 on the slide rail 501, a winch 505 installed on the slider 502, the slider 502 is threadedly connected to the adjusting screw rod 503, and one end of the adjusting screw rod 503 is provided with a second motor 504 installed on the foundation pit 6. According to this structure, the second motor 504 is driven to move the slider 502 to adjust the relative position of the winch 505 and the prefabricated component 1. The adjusting devices 5 on both sides cooperate with the automobile crane 9 on the top of the prefabricated component 1 to adjust the position of the prefabricated component 1 being assembled. The tensioning screw rods 3 at the four corners of the fixed prefabricated component 1 can be used as a positioning reference to improve the assembly accuracy and simplify the assembly steps. The preloading device 4 has the function of pushing the prefabricated component 1 being assembled. By moving the preloading device 4 and the adjusting device 5, the sockets 107 of the prefabricated component 1 being assembled and the prefabricated component 1 that has been assembled are aligned.
[0032] In the preferred embodiment, a mobile crane 9 is further provided, a hanger 7 is provided at the bottom of the mobile crane 9, movable support members 8 are provided at both ends of the hanger 7, a third motor 701 is provided at one end of the hanger 7, a bottom groove 704 is provided at the bottom of the hanger 7, a displacement screw 702 is provided at the output end of the third motor 701, a threaded hole is provided on the support member 8, the displacement screw 702 is threadedly connected to the support member 8, the support member 8 rests on the bottom groove 704, and a middle lifting ear 703 is provided at the middle bottom of the hanger 7. With this structure, during the lifting process, the four second winches 801 are connected to the side lifting ears 105 to drive the third motor 701, adjust the position of the support 8, drive the truck crane 9 to lift the prefabricated component 1, tighten the second winch 801 of the top side lifting ear 105, and extend the second winch 801 of the bottom side lifting ear 105 to flip the prefabricated component 1; disconnect the second winch 801 from the side lifting ears 105, connect the top side lifting ears 105 to the adjustment device 5, and connect the top lifting ears 104 to the middle lifting ears 703. When lifting the remaining prefabricated components 1, drive the truck crane 9 so that the truck crane 9 can lift the gravity of the prefabricated component 1, and drive the preloading device 4 to better move the prefabricated component 1, thereby avoiding the phenomenon that the prefabricated component 1 damages the pit bottom 602 during the horizontal movement, and at the same time, it can save the force of driving the preloading device 4.
[0033] In the preferred solution, a bottom plate 802 is provided at the bottom of the support member 8, and second hoists 801 are provided on both sides of the bottom plate 802. The four second hoists 801 on the two support members 8 are respectively connected to different side lifting ears 105. With this structure, the hanger 7 can adjust the position of the support member 8 so that the overall structure can adapt to prefabricated components 1 of different sizes. When the hanger 7 lifts the prefabricated component 1 during assembly, it is convenient for the prepressing device 4 to drive the prefabricated component 1 to move, and it is convenient for the adjustment device 5 to adjust the prefabricated component 1 to the left and right. The hanger 7, the support member 8 and the automobile crane 9 cooperate with each other to turn over and hoist the prefabricated component 1, avoiding the situation where the hoisting requires the cooperation of multiple cranes and the small space on site makes it impossible to hoist, and avoiding the need to use multiple cranes and waste a lot of manpower and material resources.
[0034] Embodiment 2: Further explanation in combination with Example 1: A prefabricated assembly device and assembly method of a pipe gallery, comprising the following steps: S1, the hoisting equipment is in place: the side lifting lug 105 is installed on the box body 101, the base soil is compacted before hoisting, and then a concrete platform and a supporting platform are poured, a roadbed box is laid on the concrete platform to support the legs of the truck crane 9, and the walking area and auxiliary road of the truck crane 9 are fully paved with steel plates; S2, turning over and hoisting a single prefabricated component 1: the prefabricated component 1 is transported by a flatbed truck, the automobile crane 9 is hoisted onto the hanger 7, the third motor 701 is driven to adjust the position of the support 8, the support 8 and the prefabricated component 1 are connected, and the prefabricated component 1 is turned over by the second winches 801 at both ends of the hanger 7 until multiple prefabricated components 1 are hoisted to one side of the foundation pit 6; S3, positioning of the first section of prefabricated component 1: dismantle the connection between the second hoist 801 and the side lifting lug 105, connect the top side lifting lug 105 to the hoist 505, connect the top lifting lug 104 to the middle lifting lug 703, adjust the position of the first section of prefabricated component 1 by the second hoist 801 and the truck crane 9, insert the tensioning wire rod 3 into the prefabricated component 1 at the four corners, inject grout into the grouting hole 103, and connect the top lifting lug 104 to the side lifting lug 105 after solidification; S4, positioning of adjacent prefabricated components 1: the side lifting lug 105 at the top is connected to the hoist 505, the top lifting lug 104 is connected to the middle lifting lug 703, and the position of the box 101 is adjusted by adjusting the middle lifting lug 703 and the hoists 505 on both sides so that the through holes 106 at the four corners are aligned with the tensioning wire rod 3; S5, assembling adjacent prefabricated components 1: by moving the preloading device 4 and the adjusting device 5, the sockets 107 of the prefabricated component 1 being assembled and the prefabricated component 1 that has been assembled are aligned, and at the same time, the four jacks 404 at the four corners support the box body 101, and the seam width reaches the designed value; S6, applying prestress: inject grout into the grouting hole 103, wait for the grout to solidify, rotate the sleeve 203, and adjust the value of the hydraulic oil gauge so that the hydraulic oil gauge of the four jacks 404 at the four corners reaches a predetermined range of design values; S7, repeat S4 to S6 until all prefabricated components 1 are assembled.
[0035] The above-mentioned embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The embodiments and features in the embodiments of the present application can be arbitrarily combined with each other without conflict. The protection scope of the present invention shall be the technical solutions recorded in the claims, including the equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A prefabricated assembly device for a pipe gallery, Its characteristics are: The invention comprises a foundation pit (6) and a plurality of prefabricated components (1), wherein the prefabricated components (1) are provided with a plurality of tensioning mechanisms (2), the tensioning mechanisms (2) are provided with tensioning wire rods (3), the plurality of prefabricated components (1) are spliced in sequence, a movable preloading device (4) is provided on the foundation pit (6), a plurality of jacks (404) are provided on the preloading device (4), and adjustment devices (5) are provided at both ends of the top of the foundation pit (6).
2. According to the prefabricated assembly device of the pipe gallery as described in claim 1, Its characteristics are: The prefabricated component (1) comprises a hollow box body (101), side grooves (102) are provided at the four corners of the outer side of the box body (101), a connected grouting groove (109) is provided on one side of the side groove (102), a tensioning mechanism (2) is provided on the side groove (102), through holes (106) are provided at the four corners of the box body (101), and a tensioning wire rod (3) abuts against the through holes (106).
3. According to the prefabricated assembly device of pipe gallery described in claim 2, Its characteristics are: The side groove (102) is connected to the grouting groove (109) via a through hole (106); a grouting hole (103) is provided on the grouting groove (109); one end of the tensioning rod (3) passes through the side groove (102) and extends into the grouting groove (109); the other end of the tensioning rod (3) extends into the grouting groove (109) of the adjacent prefabricated component (1).
4. According to the pipe gallery prefabrication assembly device of claim 2, Its characteristics are: Two side lifting ears (105) are provided on both sides of the box body (101), a top lifting ear (104) is provided on the top of the box body (101), a socket (107) is provided at one end of the box body (101), and a rectangular plug plate (108) is provided at the other end of the box body (101), and the rectangular plug plate (108) abuts against the socket (107) of the adjacent box body (101).
5. According to the prefabricated assembly device of the pipe gallery as described in claim 1, Its characteristics are: The tensioning mechanism (2) comprises a base plate (201), a rotating seat (202) is provided on the base plate (201), a rotating sleeve (203) is provided on the rotating seat (202), and the sleeve (203) is threadedly connected to the tensioning wire rod (3).
6. According to the prefabricated assembly device of the pipe gallery of claim 1, Its characteristics are: The preloading device (4) comprises a bracket (401) and a screw rod (405); bases (402) are provided at both ends of the bottom of the bracket (401); the screw rod (405) is threadedly connected to the base (402); a first motor (403) is provided at one end of the screw rod (405); jacks (404) are installed at the four corners of the bracket (401); and a hydraulic oil gauge is provided on the jack (404); The foundation pit (6) comprises foundation pit side walls (601) on both sides and a pit bottom (602) at the bottom. Grooves (603) are provided on both sides of the pit bottom (602), and the base (402) moves against the grooves (603).
7. According to the pipe gallery prefabrication assembly device of claim 1, Its characteristics are: The adjusting device (5) comprises a slide rail (501) and an adjusting screw rod (503), a slider (502) on the slide rail (501), a winch (505) mounted on the slider (502), the slider (502) being threadedly connected to the adjusting screw rod (503), and a second motor (504) mounted on the foundation pit (6) being provided at one end of the adjusting screw rod (503).
8. According to the pipe gallery prefabrication assembly device of claim 1, Its characteristics are: A vehicle crane (9) is also provided. A hanger (7) is provided at the bottom of the vehicle crane (9). A movable support member (8) is provided at both ends of the hanger (7). A third motor (701) is provided at one end of the hanger (7). A bottom groove (704) is provided at the bottom of the hanger (7). A displacement screw rod (702) is provided at the output end of the third motor (701). A threaded hole is provided on the support member (8). The displacement screw rod (702) is threadedly connected to the support member (8). The support member (8) abuts against the bottom groove (704). A middle lifting ear (703) is provided at the middle bottom of the hanger (7).
9. According to the pipe gallery prefabrication assembly device of claim 8, Its characteristics are: A bottom plate (802) is provided at the bottom of the support member (8), and second hoists (801) are provided on both sides of the bottom plate (802). The four second hoists (801) on the two support members (8) are respectively connected to different side lifting ears (105).
10. A pipe gallery prefabricated assembly device and an assembly method thereof according to any one of claims 1 to 9, wherein the method is: S1, the hoisting equipment is in place: the side lifting lugs (105) are installed on the box body (101), the base soil is compacted before hoisting, and then a concrete platform and a supporting platform are poured, a roadbed box is laid on the concrete platform to support the legs of the truck crane (9), and steel plates are fully laid on the walking area and auxiliary road of the truck crane (9); S2, turning over and hoisting a single prefabricated component (1): the prefabricated component (1) is transported by a flatbed truck, the truck crane (9) is hoisted onto the hanger (7), the third motor (701) is driven to adjust the position of the support member (8), the support member (8) and the prefabricated component (1) are connected, and the prefabricated component (1) is turned over by the second winch (801) at both ends of the hanger (7), until the plurality of prefabricated components (1) are hoisted to one side of the foundation pit (6); S3, positioning of the first section of the prefabricated component (1): dismantle the connection between the second hoist (801) and the side lifting lug (105), connect the top side lifting lug (105) to the hoist (505), connect the top lifting lug (104) to the middle lifting lug (703), adjust the position of the first section of the prefabricated component (1) by means of the second hoist (801) and the truck crane (9), insert the tensioning wire rods (3) into the prefabricated components (1) at the four corners, inject grout into the grouting holes (103), and connect the top lifting lug (104) to the side lifting lug (105) after solidification; S4, positioning of adjacent prefabricated components (1): the side lifting lug (105) at the top is connected to the winch (505), the top lifting lug (104) is connected to the middle lifting lug (703), and the position of the box (101) is adjusted by adjusting the middle lifting lug (703) and the winches (505) on both sides so that the through holes (106) at the four corners are aligned with the tensioning wire rod (3); S5, assembling adjacent prefabricated components (1): by moving the preloading device (4) and the adjusting device (5), the sockets (107) of the prefabricated component (1) being assembled and the prefabricated components (1) that have been assembled are aligned, and at the same time, four jacks (404) at the four corners support the box body (101), and the seam width reaches the designed value; S6, applying prestress: injecting grout into the grouting hole (103), waiting for the grout to solidify, rotating the sleeve (203), and adjusting the value of the hydraulic oil gauge so that the hydraulic oil gauges of the four jacks (404) at the four corners are within a predetermined range of design values; S7. Repeat S4 to S6 until all prefabricated components (1) are assembled.
Citation Information
Patent Citations
Equipment is assembled in prefabrication of wisdom piping lane
CN205530346U
