Water supply pipeline construction foundation pit supporting scheme optimization method and system
Through optimization algorithms and fitness evaluation, the foundation pit support scheme is automatically generated and optimized, which solves the limitations of relying on empirical judgment and static analysis in traditional methods, improves the accuracy and construction quality of the foundation pit support scheme, and reduces risks .
Patent Information
- Application Number
- CN202411053809.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-15
AI Technical Summary
Traditional foundation pit support design relies on empirical judgment and static analysis, and it is difficult to fully consider the complexity and dynamic changes of geological conditions, resulting in unreasonable resource allocation and increased construction risks.
Adoption algorithm and fitness evaluation method, obtain data variables through construction survey, analyze data association relationships, randomly generate initial populations, introduce fitness function evaluation and select probability optimization foundation pit support schemes, verify the optimization scheme to ensure construction safety and efficiency.
It improves the accuracy and construction quality of foundation pit support schemes, reduces the impact of human errors and subjective judgments, reduces construction risks, and improves the efficiency and safety of water supply pipeline construction.
Smart Images

Figure CN118965993A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and in particular to a method and system for optimizing a foundation pit support scheme for water supply pipeline construction. Background Art
[0002] In modern urban construction, water supply pipeline construction is an important part of infrastructure construction. In order to ensure the continuity and safety of water supply, foundation pit excavation is often required during the construction process. However, foundation pit excavation operations face many challenges, such as groundwater infiltration, soil collapse, etc., which will affect construction safety and efficiency. Therefore, it is crucial to choose a suitable foundation pit support solution.
[0003] Traditional methods for determining foundation pit support schemes mainly rely on engineers' empirical judgment and static analysis. These methods usually include preliminary surveys of geological conditions, selection of support structure types such as pile walls, anchors, support walls, etc., and structural stability calculations. However, these methods have certain limitations. First, due to the complexity and uncertainty of geological conditions, empirical judgments often make it difficult to fully consider all influencing factors, resulting in irrational allocation of resources and potential risks. Second, static analysis may not be able to accurately predict dynamic changes encountered during construction, such as groundwater level fluctuations, soil stress changes, etc. In addition, traditional methods usually rely on trial and error when optimizing support schemes, that is, gradually adjusting the scheme based on on-site feedback. This is not only time-consuming and labor-intensive, but may also increase construction risks and costs. Summary of the invention
[0004] The present application provides a method and system for optimizing foundation pit support schemes for water supply pipeline construction, which solves the limitations of traditional foundation pit support design that relies on empirical judgment and static analysis, realizes automatic generation and optimization of support schemes, thereby improving the accuracy of foundation pit support schemes and ensuring construction quality.
[0005] In view of the above problems, on the one hand, the present application provides a method for optimizing a construction pit support scheme for a water supply pipeline, the method comprising: conducting a construction survey on the water supply pipeline and formulating a construction pit support scheme based on the survey results; parsing the construction pit support scheme based on data association relationships to obtain multiple data variables; randomly generating an initial population based on the multiple data variables, the initial population comprising N candidate construction pit support schemes, where N is an integer greater than 1; traversing the initial population to introduce a fitness function for evaluation to generate a fitness evaluation result; selecting from the initial population based on a selection probability combined with the fitness evaluation result to generate M candidate construction pit support schemes, where M is an integer greater than or equal to 1 and less than or equal to N; verifying the M candidate construction pit support schemes, and generating an optimized construction pit support scheme for the water supply pipeline based on the verification result.
[0006] On the other hand, the present application also provides a water supply pipeline construction pit support scheme optimization system, the system comprising: a scheme formulation module, the scheme formulation module is used to formulate a construction pit support scheme according to the survey results by conducting a construction survey on the water supply pipeline; a scheme analysis module, the scheme analysis module is used to analyze the construction pit support scheme based on the data association relationship to obtain multiple data variables; a population generation module, the population generation module is used to randomly generate an initial population based on the multiple data variables, the initial population includes N candidate construction pit support schemes, N is an integer greater than 1; a population evaluation module, the population evaluation module is used to traverse the initial population and introduce a fitness function for evaluation to generate a fitness evaluation result; a scheme selection module, the scheme selection module is used to select from the initial population according to the selection probability combined with the fitness evaluation result to generate M candidate construction pit support schemes, M is an integer greater than or equal to 1 and less than or equal to N; a scheme verification module, the scheme verification module is used to verify the M candidate construction pit support schemes, and generate an optimization scheme for the construction pit support of the water supply pipeline according to the verification result.
[0007] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0008] By conducting construction surveys on water supply pipelines and formulating construction pit support schemes, the necessary data foundation is provided for the subsequent analysis and optimization of foundation pit support schemes. The construction pit support scheme is parsed based on data association relationships to obtain multiple data variables, identify key factors affecting foundation pit support, and provide input parameters for the optimization process. An initial population is randomly generated based on the multiple data variables, and the initial population contains N candidate construction pit support schemes, where N is an integer greater than 1. A diverse solution library is established to provide a wide range of references for subsequent selection and optimization. The initial population is traversed to introduce a fitness function for evaluation, generate fitness evaluation results, quantify the pros and cons of each solution, and provide specific standard references for solution optimization. According to the selection probability combined with the fitness evaluation results, selection is made in the initial population to generate M candidate construction pit support schemes, where M is an integer greater than or equal to 1 and less than or equal to N, simulating the natural selection process, focusing on the most promising minority of solutions among many solutions, and reducing the scope of subsequent verification work. The M candidate construction pit support schemes are verified, and an optimized construction pit support scheme for the water supply pipeline is generated according to the verification results. The performance of the theoretical optimal scheme in actual construction is tested, and the scheme is adjusted and optimized in a timely manner to ensure that the final selected scheme can achieve the expected support effect.
[0009] In summary, this application automatically generates and optimizes the foundation pit support scheme by introducing optimization algorithms and fitness evaluation, thereby reducing the impact of human errors and subjective judgments, improving the accuracy of the foundation pit support scheme, significantly improving the quality and efficiency of water supply pipeline construction, reducing risks, and ensuring the smooth progress of construction.
[0010] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 A schematic diagram of a flow chart of a method for optimizing a foundation pit support scheme for water supply pipeline construction provided in an embodiment of the present application;
[0012] Figure 2 A schematic diagram of a process for formulating a construction foundation pit support scheme in a method for optimizing a water supply pipeline construction foundation pit support scheme provided in an embodiment of the present application;
[0013] Figure 3 A schematic diagram of a flow chart for generating fitness evaluation results in a method for optimizing a foundation pit support scheme for water supply pipeline construction provided in an embodiment of the present application;
[0014] Figure 4 A structural schematic diagram of a water supply pipeline construction foundation pit support scheme optimization system provided in an embodiment of the present application.
[0015] Explanation of the reference numerals: plan formulation module 10 , plan analysis module 20 , population generation module 30 , population assessment module 40 , plan selection module 50 , plan verification module 60 . DETAILED DESCRIPTION
[0016] The embodiment of the present application provides a method and system for optimizing the foundation pit support scheme for water supply pipeline construction, thereby solving the limitations of traditional foundation pit support design that relies on empirical judgment and static analysis. By introducing optimization algorithms and fitness evaluation, automatic generation and optimization of support schemes are achieved, thereby improving the accuracy of the foundation pit support scheme and ensuring construction quality.
[0017] Embodiment 1, as Figure 1 As shown, an embodiment of the present application provides a method for optimizing a foundation pit support scheme for water supply pipeline construction, the method comprising:
[0018] Step S10: Conduct a construction survey on the water supply pipeline and formulate a construction foundation pit support plan based on the survey results.
[0019] Specifically, before carrying out foundation pit support construction work, the construction team will conduct a detailed survey of the scheduled construction area of the water supply pipeline, including geological survey, topographic survey, groundwater level monitoring, etc. The necessary data is collected through the survey, such as soil type, groundwater level, stability of surrounding buildings, etc. According to the survey results, a preliminary construction foundation pit support plan is formulated through computer simulation software, auxiliary design software, etc., including the selection of suitable support materials, such as steel supports or concrete walls, and the determination of the depth and width of the support structure. Through construction survey, key information such as the specific geological conditions, hydrological environment, and distribution of surrounding buildings at the construction site can be obtained to generate a preliminary construction foundation pit support plan, providing a data basis for subsequent plan analysis and optimization.
[0020] Furthermore, if Figure 2 As shown, step S10 of the embodiment of the present application also includes:
[0021] Step S11: Survey the construction area based on the water supply pipeline to obtain multiple survey parameters, which include geological structure parameters, soil layer property parameters, groundwater level parameters, and foundation pit environment parameters.
[0022] Step S12: Determine foundation pit shape information according to the construction period combined with the geological structure parameters and the soil layer property parameters.
[0023] Step S13: Determine foundation pit size information according to construction requirements in combination with the groundwater level parameters and the foundation pit environmental parameters.
[0024] Step S14: Generate foundation pit support requirement data based on the foundation pit shape information and the foundation pit size information, and generate the construction foundation pit support plan according to the foundation pit support requirement data.
[0025] Specifically, a detailed on-site investigation is conducted in the water supply pipeline construction area to collect a series of key data to obtain multiple survey parameters such as geological structure parameters, soil layer property parameters, groundwater level parameters, foundation pit environmental parameters, etc. These survey parameters are various data obtained during the construction survey process, which are used to describe the geology, soil layer, groundwater level and environmental characteristics of the construction area. Among them, geological structure parameters include the composition, distribution, rock type and stability of the strata. Soil layer property parameters include the physical, chemical and mechanical properties of the soil, such as density, cohesion, internal friction angle, etc. Groundwater level parameters include the horizontal height of groundwater, flow direction, water pressure, etc. Foundation pit environmental parameters include buildings, pipelines, transportation, etc. around the construction area.
[0026] The construction period and construction requirements are obtained through information interaction. The foundation pit shape information is determined based on the construction period combined with the geological structure parameters and soil layer property parameters. The foundation pit shape information refers to the specific shape of the foundation pit excavation, including rectangular, circular, irregular, etc. The construction period is considered to ensure that the support plan can adapt to the construction progress, while the geological and soil layer parameters affect the stability and support method of the foundation pit. For example, if the geological structure is loose or the soil layer is unstable, it may be necessary to design a stepped or arc-shaped foundation pit to enhance stability. Long-term construction may require a more stable support structure.
[0027] The size of the foundation pit is determined based on the construction requirements, combined with the groundwater level parameters and the foundation pit environmental parameters. The size of the foundation pit includes the length, depth and width of the foundation pit. Construction requirements include the diameter of the pipe, the size of the construction equipment, etc., while the groundwater level and the foundation pit environmental parameters are related to construction safety and the impact on the surrounding environment. For example, if the groundwater level is high, the foundation pit may need to be deepened to accommodate the drainage system; if there are important buildings nearby, the size of the foundation pit and the support structure must be strong enough to prevent ground collapse.
[0028] The foundation pit shape information and size information are integrated to generate foundation pit support demand data. The foundation pit support demand data refers to a set of parameters and indicators used to guide the foundation pit support design, including foundation pit shape information and foundation pit size information. According to the foundation pit support demand data, computer-aided design (CAD) software is used to draw foundation pit and support structure drawings, and structural analysis software is used to evaluate the structural stability of different support schemes. For example, GIS is used to analyze geological and soil layer data, CAD software is used to design detailed drawings of foundation pits and support structures, and finite element analysis software is used to simulate the performance of different design schemes to ensure the stability of the structure.
[0029] The above process ensures that the foundation pit support scheme not only meets the engineering requirements but also can adapt to complex site conditions.
[0030] Step S20: Analyze the construction pit support scheme based on the data association relationship to obtain multiple data variables.
[0031] Specifically, data association refers to the relationship and influence between different data, such as how geological conditions, groundwater level, support structure type and other factors work together on foundation pit support. Data variables are a series of variable key parameters extracted from the construction foundation pit support plan, which are important factors affecting the support effect and construction safety. Including the depth, width, support structure type, support material, support depth, etc. of the foundation pit. The construction foundation pit support plan formulated in step S1 is deeply analyzed using data association relationships in order to identify and extract key data variables that affect the support effect. These variables will be used as input parameters for the subsequent optimization process.
[0032] Furthermore, step S20 of the embodiment of the present application further includes:
[0033] Step S21: Decompose the construction pit support scheme to determine multiple independent variables and multiple dependent variables.
[0034] Step S22: Mapping the multiple dependent variables according to the multiple independent variables to generate data association relationships.
[0035] Step S23: performing correlation analysis on the multiple independent variables and the multiple dependent variables based on the data association relationship to generate the multiple data variables.
[0036] Specifically, independent variables are also called independent variables, which are variables that change independently in the analysis and have an impact on other variables. In the foundation pit support scheme, independent variables can be parameters such as soil type, groundwater level, and support structure type. Dependent variables are also called dependent variables, which are variables that depend on the changes of independent variables in the analysis and are affected by independent variables. In the foundation pit support scheme, dependent variables can be the stability of the foundation pit, construction cost, construction period, etc.
[0037] Use data statistics and analysis methods, such as exploratory data analysis or principal component analysis, to decompose the construction pit support scheme and determine multiple independent variables and multiple dependent variables. Use statistics or machine learning methods to find the relationship between independent variables and dependent variables. This can be achieved by building a mathematical model, and establishing a relationship model between independent variables and dependent variables through mathematical models or statistical analysis. For example, linear regression, decision trees, neural networks, etc., to understand how each independent variable affects the dependent variable. For example, by changing the type of support structure, you can see the specific impact on the stability of the foundation pit. Through correlation analysis or covariance analysis, factor analysis and other methods, multiple independent variables and multiple dependent variables are correlated based on data association relationships to identify which independent variables have the most significant impact on the dependent variables, thereby determining which factors are the most critical.
[0038] Exemplarily, principal component analysis (PCA) is used to generate multiple data variables. First, the variables of the construction pit support scheme need to be identified and the data need to be cleaned and standardized to ensure that all variables are on the same scale. Then the covariance matrix of these data is calculated to find the correlation between the variables. The covariance matrix shows the linear relationship between the variables in the data set. By performing eigenvalue decomposition on the covariance matrix, eigenvalues and corresponding eigenvectors can be obtained. Each eigenvalue represents the variability of a principal component, and the eigenvector represents the direction of maximum variation in the data. The most important principal component is selected according to the size of the eigenvalue. Usually, principal components whose cumulative contribution rate reaches a certain threshold (such as more than 80%) are selected, and these principal components contain most of the information. Analyze the variables represented by these principal components to determine which original variables contribute the most to them. These variables with large contributions can be used as independent variables, and the rest can be used as dependent variables.
[0039] The entire process described above can be implemented using data analysis software or specialized foundation pit design software. For example, using Excel for basic correlation analysis, or using programming languages such as R and Python for more complex data analysis. Through the above process, we can understand how different variables interact with each other and optimize the support plan accordingly.
[0040] Step S30: randomly generating an initial population based on the multiple data variables, wherein the initial population includes N candidate construction pit support schemes, where N is an integer greater than 1.
[0041] Specifically, the initial population refers to a set of randomly generated candidate solutions in the optimization algorithm, which will be used in the subsequent iterative optimization process. In the initial population, each possible foundation pit support scheme is regarded as a candidate solution, that is, a candidate construction foundation pit support scheme, which will be evaluated and optimized to find the best solution. Using a genetic algorithm, simulated annealing or other heuristic search algorithm, an initial population is randomly generated according to the multiple data variables determined in step S20, and this population contains N candidate construction foundation pit support schemes. Among them, N represents the number of candidate solutions in the initial population, which is an integer greater than 1, and is usually determined according to the complexity of the problem and computing resources.
[0042] Exemplarily, a genetic algorithm is used to generate the initial population. In this case, each candidate solution can be regarded as a chromosome, where each gene represents a specific parameter of the support solution, such as soil support capacity, groundwater isolation method, etc. The values of these parameters are randomly assigned to generate a series of different support solutions. The number N of these candidate solutions is set by the user or the system based on the required population diversity and computing resources. A larger value of N can provide more solutions and increase the chance of finding the optimal solution, but it will also increase the amount of calculation.
[0043] Step S30 provides a diverse starting point for the optimization process, randomly generating different candidate solutions so that these solutions can be evaluated and improved in subsequent iterations to ultimately find the best construction pit support solution.
[0044] Step S40: traverse the initial population and introduce a fitness function for evaluation to generate a fitness evaluation result.
[0045] Specifically, the fitness function is a function used in the optimization algorithm to evaluate the quality or adaptability of each candidate solution, and can measure the pros and cons of each solution according to the goal of the problem. After evaluating the fitness function of each candidate solution in the initial population, an evaluation result is obtained, namely the fitness evaluation result, which will be used to guide the subsequent optimization process. Construct a fitness function that comprehensively considers the stability of the support structure, construction cost and construction period. This function will assign a fitness score to each candidate solution. A high score indicates that the solution performs well in meeting the engineering objectives. Use evaluation models or tools, such as structural analysis software, cost estimation models and environmental assessment tools, to perform fitness evaluation on the initial population, comprehensively evaluate the performance of each candidate solution, and obtain fitness evaluation results.
[0046] Step S40 provides a criterion for measuring the quality of candidate solutions for the optimization process through the evaluation of the fitness function, which helps to focus on better solutions in subsequent iterations, thereby increasing the probability of finding the best construction pit support solution.
[0047] Furthermore, if Figure 3 As shown, step S40 in the embodiment of the present application also includes:
[0048] Step S41: Score the construction according to the foundation pit shape information and the foundation pit size information to obtain a construction safety score and an environmental impact score.
[0049] Step S42: The support cost is retrieved by calculation, and weights are assigned to the support cost and the construction safety score to obtain a plurality of weight coefficients.
[0050] Step S43: Construct a fitness function, and use the fitness function to traverse the initial population and calculate the N candidate construction pit support schemes in combination with the multiple weight coefficients, the support cost, the construction safety score, the construction period, and the environmental impact score to generate the fitness of the N candidate schemes.
[0051] Step S44: adding the fitness of the N candidate solutions to the fitness evaluation result.
[0052] Furthermore, the fitness function in step S43 is:
[0053]
[0054] Among them, F (x) is the fitness of the candidate construction pit support scheme, x is the candidate construction pit support scheme, C (x) is the support cost, ε is a small positive number to prevent the denominator from being 0, S (x) S is the construction safety score. max is the maximum value of the safety score, T (x) is the construction period, T max is the maximum allowable value of the construction period, E (x) For environmental impact score, E max is the maximum value of the environmental impact score, P (x) is the penalty factor, ω1 and ω2 are weight coefficients, and are both included in multiple weight coefficients.
[0055] Specifically, the construction safety score refers to the score that quantitatively evaluates the performance of the construction plan in ensuring the safety of workers and preventing accidents. The environmental impact score refers to the score that quantitatively evaluates the performance of the construction plan in reducing the impact on the surrounding environment, including noise, vibration, pollution and other aspects.
[0056] The construction plan is scored based on the shape and size information of the foundation pit to evaluate its construction safety and impact on the environment. For example, a deep and narrow foundation pit may have a higher safety risk than a shallow and wide foundation pit. The construction safety score includes stability analysis, risk assessment, construction safety measures and other aspects. Stability analysis evaluates the stability of the side walls of the foundation pit, including the mechanical properties of the soil, the strength and stiffness of the support structure, etc. Risk assessment considers possible risk factors such as groundwater infiltration and uneven settlement of soil layers, and evaluates the impact of these risks on construction safety. Construction safety measures assessment refers to the assessment of safety measures taken, such as setting up safety fences and installing safety monitoring equipment, to reduce safety risks during construction. Environmental impact scoring includes noise and vibration analysis, soil and water quality impact, ecological impact and other aspects. Noise and vibration analysis evaluates the impact of noise and vibration during construction on the surrounding environment and residents. Soil and water quality impact assesses the impact of construction on soil and groundwater quality, including possible pollution and damage. Ecological impact assesses the impact of construction on the surrounding ecological environment, such as damage to vegetation and interference with animal habitats.
[0057] The assessment process can use geotechnical engineering analysis software, environmental impact assessment software, etc. to conduct in-depth analysis of the shape and size information of the foundation pit, formulate specific scoring standards and indicators based on relevant safety standards and environmental regulations, and obtain scoring results. For example, a scoring system of 0 to 10 points can be used, where 0 points means no impact and 10 points means severe impact.
[0058] Calculate and retrieve the support cost, and assign weights to the support cost and construction safety score to determine their relative importance in the fitness function. The support cost is the economic cost required to implement the support scheme, including materials, manpower and other resources, which can be calculated using existing foundation pit design software, such as FRWS, GTJ2021 foundation pit support module, Lizheng deep foundation pit, etc., without too many restrictions here. The weight coefficient is a numerical value used to adjust the relative importance of different evaluation indicators in the fitness function. The determination of the weight coefficient may be based on expert opinion or historical data analysis. Construct a fitness function based on multiple weight coefficients, support costs, construction safety scores, construction cycles, and environmental impact scores:
[0059]
[0060] Among them, F (x) is the fitness of the candidate construction pit support scheme, x is the candidate construction pit support scheme, C (x) is the support cost, ε is a small positive number to prevent the denominator from being 0, S (x) S is the construction safety score. max is the maximum value of the safety score, T (x) is the construction period, T max is the maximum allowable value of the construction period, E (x) For environmental impact score, E max is the maximum value of the environmental impact score, P (x) is the penalty factor, ω1 and ω2 are weight coefficients, and are both included in multiple weight coefficients.
[0061] A penalty factor is a parameter used to penalize candidate solutions that perform poorly on certain undesirable features or behaviors, with the goal of ensuring that the optimization algorithm can identify and avoid solutions that perform poorly on a specific metric. For example, if a candidate solution performs poorly on the construction period, that is, the construction period is far beyond the maximum allowed value, then it may be penalized. The penalty factor causes the fitness function to give a higher weight to the penalty term of the construction period when calculating, thereby reducing the fitness score of the solution. The size and allocation of the penalty factor are usually based on engineering experience and expertise. In some cases, it may be a fixed value, while in other cases, it may be a dynamically adjusted parameter to reflect the priority and urgency of the engineering goals. By using the penalty factor, the fitness function is able to more comprehensively evaluate the performance of the candidate solution and guide the optimization algorithm in a direction that better meets the engineering needs.
[0062] Use the constructed fitness function to traverse each candidate solution in the initial population, calculate the fitness value of each candidate solution, and add these fitness values to the fitness evaluation results. The above steps provide a comprehensive evaluation framework for the optimization process by constructing fitness functions and weight assignments, which facilitates comparative analysis of foundation pit support solutions in the initial population.
[0063] Step S50: Select from the initial population according to the selection probability and the fitness evaluation result to generate M candidate construction pit support schemes, where M is an integer greater than or equal to 1 and less than or equal to N.
[0064] Specifically, the selection probability refers to the possibility of each candidate solution being selected in the optimization algorithm. It is usually associated with the evaluation result of the fitness function. The higher the fitness, the greater the probability of being selected. Use the selection mechanism in the optimization algorithm, such as roulette selection or tournament selection in the genetic algorithm, to determine the selection probability. According to the selection probability combined with the fitness evaluation result, select from the initial population to generate M candidate construction pit support schemes. M represents the number of candidate construction pit support schemes selected from the initial population, which is an integer greater than or equal to 1 and less than or equal to N.
[0065] Exemplarily, a roulette wheel selection method is used to select in the initial population. The roulette wheel selection method is a commonly used selection mechanism in genetic algorithms, which determines the probability of each candidate solution being selected based on fitness. The higher the fitness score, the greater the probability of the candidate being selected. First, calculate the sum of the fitness of all candidate solutions in the initial population. Then, for each candidate solution, calculate its selection probability, that is, the fitness of the solution divided by the sum of the fitness of all candidate solutions. Generate a random number, which will be between 0 and 1. Compare the random number with the selection probability of each candidate solution, and if the random number is less than or equal to the selection probability of a candidate solution, select the candidate solution. Repeat this process until M candidate solutions are selected. For example, suppose there is an initial population containing 5 candidate solutions 1-5, whose fitness are 10, 15, 20, 25 and 30 respectively. The sum of fitness is 100. The selection probability of each candidate solution is calculated to be 0.1, 0.15, 0.2, 0.25, and 0.3 respectively. Generate a random number, such as 0.223. Compare the selection probability of each candidate with the size of the random number. If the random number is less than or equal to the selection probability of a candidate, select the candidate. The selection probability of the first candidate is 0.1<0.223, so the first candidate is not selected. The selection probability of the second candidate is 0.15<0.223, so the second candidate is not selected. Repeat the above steps and finally select 2 candidate solutions, namely candidate solutions 4 and 5.
[0066] Step S50 selects better candidate solutions from the initial population through a selection mechanism and focuses on better solutions, thereby increasing the probability of finding the best construction pit support solution.
[0067] Step S60: verifying the M candidate construction pit support schemes, and generating an optimized construction pit support scheme for the water supply pipeline according to the verification results.
[0068] Specifically, structural analysis software such as PLAXIS, FLAC, etc. are used to perform numerical simulations on candidate solutions to evaluate their stability under different working conditions. The simulation results will be used to verify whether the candidate solutions can meet the engineering objectives, such as the stability of the support structure, construction cost, construction period, etc. If the simulation results show that there are problems with a candidate solution, such as insufficient stability or excessive cost, it may be adjusted or replaced, and re-verified. This process will be iterative until one or more candidate solutions that meet the engineering objectives are found. After the verification is completed, an optimized construction pit support plan for the water supply pipeline is generated based on the verification results, and this plan will be used for actual construction.
[0069] Step S60 is a verification and confirmation process, which verifies the actual performance of the candidate solution through simulation and testing to ensure that the construction pit support solution can achieve the expected effect in actual construction, thereby improving the safety and efficiency of the construction.
[0070] Furthermore, step S60 in the embodiment of the present application also includes:
[0071] Step S61: randomly selecting a first candidate construction pit support scheme and a second candidate construction pit support scheme based on the M candidate construction pit support schemes, wherein the first candidate construction pit support scheme and the second candidate construction pit support scheme are two different schemes.
[0072] Step S62: cross-validate the first candidate construction pit support scheme and the second candidate construction pit support scheme as parent generations to generate a first child generation scheme.
[0073] Step S63: randomly selecting a plurality of data points based on the first offspring scheme, performing random mutation according to the plurality of data points, and generating a first offspring mutation scheme.
[0074] Step S64: Verify whether the first offspring mutation scheme complies with a preset optimization direction.
[0075] Step S65: If the first child variation scheme conforms to the preset optimization direction, it is deemed to have passed the verification, and the first child variation scheme is used as the construction foundation pit support optimization scheme for the water supply pipeline.
[0076] Specifically, first, two different candidate schemes are randomly selected from the M candidate construction pit support schemes generated in step S50, namely, the first candidate construction pit support scheme and the second candidate construction pit support scheme. The first candidate construction pit support scheme and the second candidate construction pit support scheme are cross-validated as the parent generation, that is, the partial structures of the two schemes, such as the design parameters of the support structure, are exchanged to generate a first child scheme. This child scheme combines the advantages of the two parent schemes and may have new features.
[0077] Based on the first generation scheme, multiple data points are randomly selected, and random mutation is performed according to the multiple data points, that is, some parameters of the generation scheme are randomly changed to generate the first generation mutation scheme. For example, some parameters of the support structure are randomly changed.
[0078] Pre-set an optimization direction according to the actual construction needs, including but not limited to reducing total cost, improving structural stability, enhancing environmental friendliness, shortening construction period, etc. Select evaluation software according to the preset optimization direction, such as finite element analysis, cost evaluation tools, etc. Evaluate the performance of the first child solution under actual conditions Compare the performance of the child solution with the original candidate solution and the existing best solution to see whether it has improved on the optimization target. If the child solution is better than or at least reaches the original solution in key indicators, then it can be regarded as verified. If the first child solution meets the preset optimization direction, then this child solution will be used as the construction foundation pit support optimization solution for the water supply pipeline.
[0079] Furthermore, step S60 in the embodiment of the present application also includes:
[0080] Step S66: If the first child variation scheme does not conform to the preset optimization direction, it is deemed that the verification has failed, and the parent generation combination of the first candidate construction pit support scheme and the second candidate construction pit support scheme is added to the candidate list.
[0081] Step S67: Based on the M candidate construction pit support schemes, reverse random selection is performed according to the candidate list for cross-validation to obtain a second generation scheme.
[0082] Step S68: Randomly select multiple data points based on the second offspring plan, perform random mutation according to the multiple data points, and generate a second offspring mutation plan.
[0083] Step S69: Verify whether the second child variation scheme conforms to the preset optimization direction, and iterate until the verification is passed, and output the construction foundation pit support optimization scheme.
[0084] Specifically, if the first child variation scheme does not conform to the preset optimization direction, that is, if the verification fails, the parent combination of the first candidate construction pit support scheme and the second candidate construction pit support scheme is added to the candidate list. Based on the M candidate construction pit support schemes, reverse random selection is performed according to the candidate list to perform cross-validation to obtain the second child scheme. That is, in the subsequent iteration process, the first candidate construction pit support scheme and the second candidate construction pit support scheme are no longer selected as the parent combination. It should be noted that at this time, the first candidate construction pit support scheme and the second candidate construction pit support scheme still exist separately, and can be combined with other schemes except these two schemes as parents for calculation.
[0085] Based on the generated second-generation solution, multiple data points are randomly selected, and random mutation is performed based on these data points to generate a second-generation mutation solution, and verify whether the second-generation solution after random mutation meets the preset optimization direction. If the second-generation solution meets the optimization direction, the second-generation solution is used as the construction foundation pit support optimization solution for the water supply pipeline. If the second-generation solution does not meet the optimization direction, iterations will continue until the verification is passed, and the final construction foundation pit support optimization solution is obtained.
[0086] If all offspring fail validation, anomaly correction is required, backtracking to the previous iteration step, analyzing possible anomalies and making adjustments. For example, the system may re-evaluate the selection of parent combinations, adjust cross-validation and mutation parameters, or introduce new parent combinations to increase population diversity.
[0087] The above steps are an iterative and optimization process, which generates new candidate schemes through cross-validation and random mutation, which helps to improve the diversity and innovation of foundation pit support scheme design, thereby improving efficiency and reducing costs while ensuring construction safety.
[0088] In summary, the method for optimizing the foundation pit support scheme for water supply pipeline construction provided by the embodiment of the present application has the following technical effects:
[0089] By conducting construction surveys on water supply pipelines and formulating construction foundation pit support schemes, the necessary data foundation is provided for the subsequent analysis and optimization of foundation pit support schemes. The construction foundation pit support scheme is parsed based on data association relationships to obtain multiple data variables, identify key factors affecting foundation pit support, and provide input parameters for the optimization process. An initial population is randomly generated based on the multiple data variables, and the initial population contains N candidate construction foundation pit support schemes, where N is an integer greater than 1. A diverse solution library is established to provide a wide range of references for subsequent selection and optimization. The initial population is traversed to introduce a fitness function for evaluation, generate fitness evaluation results, quantify the pros and cons of each solution, and provide a specific standard reference for solution optimization. According to the selection probability combined with the fitness evaluation results, selection is made in the initial population to generate M candidate construction foundation pit support schemes, where M is an integer greater than or equal to 1 and less than or equal to N, simulating the natural selection process, focusing on the most promising minority of solutions among many solutions, and reducing the scope of subsequent verification work. The M candidate construction pit support schemes are verified, and an optimized construction pit support scheme for the water supply pipeline is generated according to the verification results. The performance of the theoretical optimal scheme in actual construction is tested, and the scheme is adjusted and optimized in a timely manner to ensure that the final selected scheme can achieve the expected support effect.
[0090] In general, the embodiment of the present application introduces optimization algorithms and fitness evaluation to intelligently generate and evaluate multiple candidate solutions, and finally determines the optimal foundation pit support solution. This method can take into account more variables and possibilities, making the selection of solutions more objective and efficient, reducing the impact of human errors and subjective judgments, and improving the accuracy of foundation pit support solutions. In addition, through the verification link, the solution can be adjusted and corrected in a timely manner to ensure the safety and economy of the construction, significantly improve the quality and efficiency of water supply pipeline construction, reduce risks, and ensure the smooth progress of construction.
[0091] Embodiment 2, as Figure 4 As shown, the embodiment of the present application provides a system for optimizing foundation pit support schemes for water supply pipeline construction, the system comprising:
[0092] The scheme formulation module 10 is used to formulate a construction foundation pit support scheme based on the construction survey of the water supply pipeline.
[0093] The solution analysis module 20 is used to analyze the construction foundation pit support solution based on the data association relationship to obtain multiple data variables.
[0094] A population generation module 30 is used to randomly generate an initial population based on the multiple data variables, and the initial population includes N candidate construction pit support schemes, where N is an integer greater than 1.
[0095] The population evaluation module 40 is used to traverse the initial population and introduce a fitness function to perform evaluation, thereby generating a fitness evaluation result.
[0096] A scheme selection module 50 is used to select from the initial population according to the selection probability combined with the fitness evaluation result to generate M candidate construction foundation pit support schemes, where M is an integer greater than or equal to 1 and less than or equal to N.
[0097] The scheme verification module 60 is used to verify the M candidate construction pit support schemes and generate an optimized construction pit support scheme for the water supply pipeline according to the verification results.
[0098] Furthermore, the scheme formulation module 10 of the embodiment of the present application is also used to perform the following steps:
[0099] The construction area is surveyed based on the water supply pipeline to obtain a plurality of survey parameters, which include geological structure parameters, soil layer property parameters, groundwater level parameters, and foundation pit environment parameters.
[0100] The foundation pit shape information is determined according to the construction period combined with the geological structure parameters and the soil layer property parameters.
[0101] The foundation pit size information is determined according to the construction requirements in combination with the groundwater level parameters and the foundation pit environmental parameters.
[0102] The foundation pit support requirement data is generated based on the foundation pit shape information and the foundation pit size information, and the construction foundation pit support plan is generated according to the foundation pit support requirement data.
[0103] Furthermore, the solution analysis module 20 of the embodiment of the present application is also used to perform the following steps:
[0104] Decompose the construction foundation pit support scheme to determine multiple independent variables and multiple dependent variables.
[0105] The plurality of dependent variables are mapped according to the plurality of independent variables to generate a data association relationship.
[0106] Based on the data association relationship, correlation analysis is performed on the multiple independent variables and the multiple dependent variables to generate the multiple data variables.
[0107] Furthermore, the population assessment module 40 in the embodiment of the present application is also used to perform the following steps:
[0108] The construction is scored according to the foundation pit shape information and the foundation pit size information to obtain a construction safety score and an environmental impact score.
[0109] The support cost is calculated and retrieved, and weights are assigned to the support cost and the construction safety score to obtain a plurality of weight coefficients.
[0110] A fitness function is constructed, and the fitness function is used to traverse the initial population to calculate the N candidate construction pit support schemes in combination with the multiple weight coefficients, the support cost, the construction safety score, the construction period, and the environmental impact score to generate the fitness of the N candidate schemes.
[0111] The fitness of the N candidate solutions is added to the fitness evaluation result.
[0112] Preferably, the fitness function in the analysis module 20 of the embodiment of the present application is:
[0113]
[0114] Among them, F (x) is the fitness of the candidate construction pit support scheme, x is the candidate construction pit support scheme, C (x) is the support cost, ε is a small positive number to prevent the denominator from being 0, S (x) S is the construction safety score. max is the maximum value of the safety score, T (x) is the construction period, T max is the maximum allowable value of the construction period, E (x) For environmental impact score, E max is the maximum value of the environmental impact score, P (x) is the penalty factor, ω1 and ω2 are weight coefficients, and are both included in multiple weight coefficients.
[0115] Furthermore, the solution verification module 60 of the embodiment of the present application is also used to perform the following steps:
[0116] A first candidate construction pit support scheme and a second candidate construction pit support scheme are randomly selected based on the M candidate construction pit support schemes, and the first candidate construction pit support scheme and the second candidate construction pit support scheme are two different schemes.
[0117] The first candidate construction pit support scheme and the second candidate construction pit support scheme are used as parents for cross-validation to generate a first child scheme.
[0118] Based on the first offspring plan, a plurality of data points are randomly selected, and random mutation is performed according to the plurality of data points to generate a first offspring mutation plan.
[0119] Verify whether the first offspring mutation scheme complies with the preset optimization direction.
[0120] If the first child variation scheme conforms to the preset optimization direction, it is deemed to have passed the verification, and the first child variation scheme is used as the construction pit support optimization scheme for the water supply pipeline.
[0121] Furthermore, the solution verification module 60 of the embodiment of the present application is also used to perform the following steps:
[0122] If the first child variation scheme does not conform to the preset optimization direction, it is deemed that the verification has failed, and the parent generation combination of the first candidate construction pit support scheme and the second candidate construction pit support scheme is added to the candidate list.
[0123] Based on the M candidate construction pit support schemes, reverse random selection is performed according to the candidate list to perform cross-validation to obtain a second generation scheme.
[0124] Based on the second offspring plan, a plurality of data points are randomly selected, and random mutation is performed according to the plurality of data points to generate a second offspring mutation plan.
[0125] Verify whether the second child variation scheme conforms to the preset optimization direction, and iterate until the verification is passed, and output the construction foundation pit support optimization scheme.
[0126] Through the above-mentioned detailed description of a method for optimizing a foundation pit support scheme for water supply pipeline construction, technical personnel in this specification can clearly understand that this embodiment is a system for optimizing a foundation pit support scheme for water supply pipeline construction. For the system disclosed in Example 2, since it corresponds to the method disclosed in Example 1 and has corresponding functional modules and beneficial effects, the relevant parts can be referred to the description of the method part.
[0127] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for optimizing foundation pit support scheme for water supply pipeline construction, characterized in that: The method comprises: Conduct construction surveys on water supply pipelines and formulate construction foundation pit support plans based on the survey results; Analyze the construction foundation pit support scheme based on the data association relationship to obtain multiple data variables; Randomly generate an initial population based on the multiple data variables, the initial population comprising N candidate construction foundation pit support schemes, where N is an integer greater than 1; Traversing the initial population and introducing a fitness function for evaluation to generate a fitness evaluation result; Select from the initial population according to the selection probability combined with the fitness evaluation result to generate M candidate construction foundation pit support schemes, where M is an integer greater than or equal to 1 and less than or equal to N; The M candidate construction pit support schemes are verified, and an optimized construction pit support scheme for the water supply pipeline is generated according to the verification results.
2. A method for optimizing foundation pit support scheme for water supply pipeline construction as claimed in claim 1, characterized in that: Through the construction survey of the water supply pipeline, the construction foundation pit support plan is formulated according to the survey results. The methods include: Survey the construction area based on the water supply pipeline to obtain multiple survey parameters, wherein the multiple survey parameters include geological structure parameters, soil layer property parameters, groundwater level parameters, and foundation pit environment parameters; Determine foundation pit shape information according to the construction period combined with the geological structure parameters and the soil layer property parameters; Determine foundation pit size information according to construction requirements combined with the groundwater level parameters and the foundation pit environmental parameters; The foundation pit support requirement data is generated based on the foundation pit shape information and the foundation pit size information, and the construction foundation pit support plan is generated according to the foundation pit support requirement data.
3. A method for optimizing foundation pit support scheme for water supply pipeline construction as claimed in claim 1, characterized in that: The construction foundation pit support scheme is analyzed based on the data association relationship to obtain multiple data variables, and the method includes: Decomposing the construction foundation pit support scheme to determine a plurality of independent variables and a plurality of dependent variables; Mapping the multiple dependent variables according to the multiple independent variables to generate a data association relationship; Based on the data association relationship, correlation analysis is performed on the multiple independent variables and the multiple dependent variables to generate the multiple data variables.
4. A method for optimizing a foundation pit support scheme for water supply pipeline construction as claimed in claim 2, characterized in that: The initial population is traversed and a fitness function is introduced to perform evaluation to generate a fitness evaluation result. The method includes: Score the construction according to the foundation pit shape information and the foundation pit size information to obtain a construction safety score and an environmental impact score; By calculating and retrieving the support cost, weighting the support cost and the construction safety score is assigned to obtain a plurality of weight coefficients; Constructing a fitness function, and calculating the N candidate construction pit support schemes through the initial population by combining the multiple weight coefficients, the support cost, the construction safety score, the construction period, and the environmental impact score to generate the fitness of the N candidate schemes; The fitness of the N candidate solutions is added to the fitness evaluation result.
5. A method for optimizing foundation pit support scheme for water supply pipeline construction as claimed in claim 4, characterized in that: The fitness function is: Among them, F (x) is the fitness of the candidate construction pit support scheme, x is the candidate construction pit support scheme, C (x) is the support cost, ε is a small integer to prevent the denominator from being 0, S (x) S is the construction safety score. max is the maximum value of the safety score, T (x) is the construction period, T max is the maximum allowable value of the construction period, E (x) For environmental impact score, E max is the maximum value of the environmental impact score, P (x) is the penalty factor, ω1 and ω2 are weight coefficients, and are both included in multiple weight coefficients.
6. A method for optimizing foundation pit support scheme for water supply pipeline construction according to claim 1, characterized in that: The M candidate construction pit support schemes are verified, and an optimization scheme for the construction pit support of the water supply pipeline is generated according to the verification results. The method includes: Randomly selecting a first candidate construction pit support scheme and a second candidate construction pit support scheme based on the M candidate construction pit support schemes, wherein the first candidate construction pit support scheme and the second candidate construction pit support scheme are two different schemes; The first candidate construction pit support scheme and the second candidate construction pit support scheme are used as parents for cross-validation to generate a first child scheme; Randomly selecting a plurality of data points based on the first offspring scheme, performing random mutation according to the plurality of data points, and generating a first offspring mutation scheme; Verify whether the first offspring mutation scheme meets the preset optimization direction; If the first child variation scheme conforms to the preset optimization direction, it is deemed to have passed the verification, and the first child variation scheme is used as the construction pit support optimization scheme for the water supply pipeline.
7. A method for optimizing a foundation pit support scheme for water supply pipeline construction as claimed in claim 6, characterized in that the method include: If the first child variation scheme does not conform to the preset optimization direction, it is deemed that the verification fails, and the parent generation combination of the first candidate construction foundation pit support scheme and the second candidate construction foundation pit support scheme is added to the candidate list; Based on the M candidate foundation pit support schemes, reverse random selection is performed according to the candidate list to perform cross-validation to obtain a second generation scheme; Randomly selecting a plurality of data points based on the second offspring scheme, performing random mutation according to the plurality of data points, and generating a second offspring mutation scheme; Verify whether the second child variation scheme conforms to the preset optimization direction, and iterate until the verification is passed, and output the construction foundation pit support optimization scheme.
8. A water supply pipeline construction foundation pit support scheme optimization system, characterized in that: The system comprises: A plan formulation module, which is used to formulate a construction foundation pit support plan based on the survey results by conducting a construction survey on the water supply pipeline; A scheme analysis module, the scheme analysis module is used to analyze the construction foundation pit support scheme based on the data association relationship to obtain multiple data variables; A population generation module, the population generation module is used to randomly generate an initial population based on the multiple data variables, the initial population includes N candidate construction foundation pit support schemes, N is an integer greater than 1; A population evaluation module, the population evaluation module is used to traverse the initial population and introduce a fitness function for evaluation to generate a fitness evaluation result; A scheme selection module, wherein the scheme selection module is used to select from the initial population according to the selection probability combined with the fitness evaluation result to generate M candidate construction foundation pit support schemes, where M is an integer greater than or equal to 1 and less than or equal to N; A scheme verification module is used to verify the M candidate construction pit support schemes and generate an optimized construction pit support scheme for the water supply pipeline according to the verification results.
Citation Information
Cited By
Optimization design method, device and equipment for narrow and deep foundation pit support and medium
CN120579396A
Rock slope ecological protection scheme intelligent recommendation method, system, equipment and medium
CN121979930A