Electromechanical equipment purchase management method, system and equipment and storage medium
By entering and modifying the project contract in the procurement management of electromechanical equipment, management difficulties caused by uncertainty in delivery time limits are solved, and equipment procurement and reception are realized according to the project time schedule, improving the scientificity and accuracy of procurement.
Patent Information
- Application Number
- CN202410928483.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-15
AI Technical Summary
In construction projects, during the procurement and management of electromechanical equipment, due to the uncertainty of delivery time limit and overdue delivery, the equipment is difficult to receive and store, and the management is unscientific, which affects the speed and accuracy of procurement.
By entering the project contract, obtain the contract signing time and delivery time limit of electromechanical equipment. If the delivery is not delivered on time, an alarm message will be issued, and the project contract will be modified and the new contract signing time will be re-entered to adjust the procurement progress and ensure that the equipment will be based on the Project time and progress procurement and reception.
It effectively reduces the difficulties in procurement and distribution of mechanical and electrical equipment, improves the scientificity and accuracy of management, ensures that equipment is delivered on time, reduces economic waste, and adapts to project progress.
Smart Images

Figure CN118967008A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure belongs to the technical field of procurement management, and in particular, relates to a method, system, device and storage medium for procurement management of electromechanical equipment. Background Art
[0002] The complete set of electromechanical equipment that needs to be installed and used in construction projects is usually produced by the manufacturer according to the design drawings. After arriving at the site, it needs to be installed and debugged by professionals. After the electromechanical equipment has passed the factory acceptance, it will be sorted, packed and shipped by the manufacturer.
[0003] Each set of electromechanical equipment is shipped with a contract that includes a waybill, a packing list, and a report of the boxes and equipment. Due to physical size or weight, the equipment may be shipped by one or more transport vehicles. The number of equipment boxes stacked on each transport vehicle may be different, and the corresponding box numbers may also be different. During transportation, the equipment will be packaged in containers, corrugated boxes, crates, pallets or bare pieces as needed.
[0004] However, when purchasing a large number of electromechanical equipment, the reports on waybills, packing lists, boxes and equipment: these loads have brought great difficulties to management, making it difficult to receive and keep a large number of electromechanical equipment. Summary of the invention
[0005] To solve the above problems, the present invention provides a method, system, equipment and storage medium for electromechanical equipment procurement management, which implements engineering control over the procurement and management of electromechanical equipment, helps reduce the difficulty of receiving and storing electromechanical equipment, facilitates the receipt and storage of electromechanical equipment, and improves the scientific nature of management.
[0006] A first aspect of the present disclosure provides a method for purchasing and managing electromechanical equipment, the method comprising entering a project contract; obtaining the contract signing time of the electromechanical equipment based on the project contract; obtaining the delivery deadline of the electromechanical equipment based on the contract signing time, and issuing an alarm message if the delivery fails to be on time; modifying the project contract based on the alarm message; and obtaining the actual contract signing time of the electromechanical equipment based on the re-entry of the new project contract.
[0007] With such settings, when a large number of electromechanical equipment are purchased and managed, the delivery deadline of the electromechanical equipment is controlled according to the contract signing time. If the delivery deadline of the electromechanical equipment is overdue, the project contract will be modified so that the overdue electromechanical equipment can be purchased under the modified project contract, and the progress of the purchased electromechanical equipment can be adjusted in time to facilitate the management of the procurement of electromechanical equipment before and during the project, so that a large number of electromechanical equipment can be purchased, received and issued according to the time schedule of the project, reducing the difficulties brought to management by the procurement reports of electromechanical equipment, solving the compatibility problems of reports in the receipt and issuance of electromechanical equipment, speeding up the procurement and issuance of electromechanical equipment, and improving the safety and accuracy of electromechanical equipment procurement.
[0008] In some embodiments, obtaining the contract signing time of the electromechanical equipment according to the engineering contract includes: obtaining the ordering time sequence, ordering and arrival time nodes of the electromechanical equipment according to the engineering contract; obtaining the signing time of the electromechanical equipment contract according to the ordering time sequence, ordering and arrival time nodes.
[0009] With such a configuration, the ordering sequence, ordering time nodes and arrival time nodes of the electromechanical equipment can be obtained respectively through engineering activities, and the signing time of the electromechanical equipment procurement contract can be determined in combination with the ordering sequence, ordering time nodes and arrival time nodes.
[0010] In some embodiments, the delivery deadline of the electromechanical equipment is obtained according to the contract signing time. If the delivery cannot be made on time, an alarm message is issued, and the contract of the electromechanical equipment is modified, including: marking the ordering contract associated with the electromechanical equipment; evaluating the engineering contract associated with the ordered equipment according to the length of equipment delay time and loss status; and using the evaluation results as the basis for modifying the general engineering contract and related unit engineering contracts.
[0011] With this setting, after the contract signing time is known, it is determined whether the electromechanical equipment can be delivered within the specified time according to the delivery time limit specified in the contract signing time. If it can be delivered in time, the electromechanical equipment will continue to be received and kept in accordance with the engineering contract; if it cannot be delivered in time, an alarm message will be issued to remind the staff that the electromechanical equipment cannot be delivered in time. Then the ordering contracts associated with the electromechanical equipment that cannot be delivered in time are marked, and the engineering contracts associated with the ordered equipment are evaluated according to the length of the equipment delay and the loss status. Finally, the evaluation results are used as the basis for the modification of the general engineering contract and the relevant unit engineering contracts, so as to modify the engineering contract so as to facilitate the purchase of the electromechanical equipment that is overdue under the modified engineering contract and adjust the progress of the purchased electromechanical equipment in time.
[0012] In some embodiments, modifying the engineering contract according to the alarm information includes: entering the modified engineering contract; and executing mechanical and electrical equipment procurement, acceptance and assessment according to the contract signing time node of the modified engineering contract.
[0013] With this setting, the modified project contract will be re-entered to change the contract signing time of the electromechanical equipment, and the procurement, acceptance and assessment of the electromechanical equipment will be carried out according to the modified signing time of the electromechanical equipment, so as to timely adjust the procurement progress of the electromechanical equipment to adapt to the project progress.
[0014] In some embodiments, the entering of the modified project contract includes: re-dividing sub-projects, budgets, and assessment nodes according to the modified project contract; and replacing the original contract with the modified project contract.
[0015] With this arrangement, the engineering contract is modified and redivided to replace the original contract, so that the electromechanical equipment can be purchased and managed according to the redivided sub-projects, budgets and assessment nodes, which helps to improve the scientific nature of the electromechanical equipment procurement management.
[0016] In some embodiments, entering the modified engineering contract includes: entering basic information of the changed engineering contract; and checking milestone data based on the basic information.
[0017] With this setting, when re-entering the project contract, the basic information in the project contract will also be entered, so that the milestone data can be checked through the basic information, mainly checking the amount and proportion in the milestone, which will help monitor the amount and proportion in the electromechanical equipment procurement contract.
[0018] In some embodiments, the delivery deadline of the electromechanical equipment is obtained according to the contract signing time, and an alarm message is issued if the delivery cannot be made on time, including: obtaining the procurement and budget availability status of the electromechanical equipment; based on the procurement and budget availability status of the electromechanical equipment, determining whether the electromechanical equipment is overdue at the procurement time node or the equipment availability time node, and issuing an alarm message if at least one of the procurement time node or the equipment availability time node is overdue.
[0019] With such a setting, during the monitoring of the delivery time limit of electromechanical equipment, the procurement status and budget status of the electromechanical equipment are obtained, and whether the electromechanical equipment is overdue at the procurement time node is judged based on whether the electromechanical equipment has been purchased, and whether the electromechanical equipment is overdue at the arrival time node is judged based on whether the budget for the electromechanical equipment is sufficient. Once one of the overdue situations occurs, an alarm message is issued to facilitate timely adjustment of the engineering contract corresponding to the overdue electromechanical equipment, and then adjust the overdue electromechanical equipment procurement and management plan, which helps to adjust the overdue electromechanical equipment and adapt it to the project progress.
[0020] A second aspect of the present disclosure provides an electromechanical equipment procurement management system, the system comprising an input module for inputting a project contract; a management module for obtaining the contract signing time of the electromechanical equipment based on the project contract; for obtaining the delivery deadline of the electromechanical equipment based on the contract signing time, and issuing an alarm message if the delivery is not on time; for modifying the project contract based on the alarm message; and an output module for obtaining the actual contract signing time of the electromechanical equipment based on the re-entered new project contract.
[0021] In the present disclosure, after the input module enters the project contract, the pipeline module obtains the contract signing time of the electromechanical equipment according to the entered project contract, and then determines whether the electromechanical equipment is delivered on time according to the contract signing time. If it can be delivered on time, the project contract will continue to be executed. If it cannot be delivered on time, an alarm message will be issued and the project contract will be modified to adjust the contract signing time of the electromechanical equipment so that the electromechanical equipment can adapt to the project progress after adjustment, and finally the actual contract signing time of the electromechanical equipment is output, so as to facilitate the planning of the management plan of the procurement and delivery of electromechanical equipment before the project starts, so as to reduce economic waste and increase the scientific nature of management.
[0022] A third aspect of the present disclosure provides an electronic device, comprising a memory for storing a computer program; and a processor for implementing the steps of the electromechanical equipment procurement management method of the first aspect when executing the computer program.
[0023] The technical effects brought about by any possible implementation of the third aspect can refer to the technical effects brought about by the above-mentioned first aspect, and will not be repeated here.
[0024] A fourth aspect of the present disclosure discloses a computer storage medium, on which a computer program is stored. When the computer program is executed by a processor, the electromechanical equipment procurement management method described in the first aspect is implemented.
[0025] The technical effects brought about by any possible implementation of the fourth aspect can refer to the technical effects brought about by the above-mentioned first aspect, and will not be repeated here.
[0026] Compared with the prior art, the present invention has the following advantages:
[0027] Evaluate the contract through overdue warnings, obtain the evaluation results, and conduct project management and control based on the evaluation results. Adjust the progress of purchased electromechanical equipment in time to manage the purchase of electromechanical equipment before and during the project. Specify the purchase, receipt and issuance of electromechanical equipment according to the project schedule, speed up the procurement and issuance of electromechanical equipment, solve the report compatibility problem in the receipt and issuance of electromechanical equipment, and improve the safety and accuracy of electromechanical equipment procurement.
[0028] Other features and advantages of the present disclosure will be described in the following description, and partly become apparent from the description, or be understood by implementing the present disclosure. The purpose and other advantages of the present disclosure can be realized and obtained by the structures pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the embodiments of the present disclosure or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0030] Figure 1 A flow chart of a method for purchasing and managing electromechanical equipment provided by an embodiment of the present disclosure;
[0031] Figure 2 A flow chart of a mechanical and electrical equipment contract and a delivery list provided for an embodiment of the present disclosure;
[0032] Figure 3 A flowchart for the initial inspection of electromechanical equipment upon arrival provided for the implementation of the present disclosure;
[0033] Figure 4 A flow chart of the transfer of electromechanical equipment provided by an embodiment of the present disclosure;
[0034] Figure 5 A flow chart of the contract payment function provided in the embodiment of the present disclosure;
[0035] Figure 6 It is a structural block diagram of the electromechanical equipment procurement management system according to an embodiment of the present disclosure;
[0036] Figure 7 A structural block diagram of an electronic device provided for the implementation of the present disclosure. DETAILED DESCRIPTION
[0037] In order to make the purpose, technical solution and advantages of the embodiments of the present disclosure clearer, the technical solution in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present disclosure.
[0038] The following is a brief introduction to some concepts that may be involved in the embodiments of the present disclosure.
[0039] The procurement of electromechanical equipment in construction projects is complex and the cost accounts for the majority of the total project cost. The complete set of electromechanical equipment that needs to be installed and used in construction projects is usually produced by the manufacturer according to the design drawings. After arriving at the site, it needs to be installed and debugged by professionals, and then packaged and transported according to the purchased electromechanical equipment report.
[0040] The purchased electromechanical equipment reports include waybills, packing lists, boxes and equipment: these load reports bring great difficulties to management. The management procedures stipulate that each equipment needs to be independently coded for easy identification. The ordering of a large number of electromechanical equipment, especially the overdue period stipulated in the contract during the procurement process of electromechanical equipment, is likely to cause great difficulties in the receipt and storage of electromechanical equipment.
[0041] To this end, the present invention provides a method for purchasing and managing electromechanical equipment, such as Figure 1 As shown, Figure 1 A flow chart of a method for purchasing and managing electromechanical equipment provided by an embodiment of the present disclosure, the method comprising:
[0042] S101. Enter the project contract.
[0043] In the disclosed embodiment, in order to ensure that the engineering contract information can be clearly and accurately entered and the progress of the engineering project can be effectively managed and tracked, the engineering contract is split and the engineering code is drafted. The splitting and formulation of the engineering code can be carried out according to factors such as the nature, scale, and stage of the project, so as to classify, identify and manage the engineering projects to avoid confusion and errors and improve the management efficiency and quality of the engineering contract.
[0044] like Figure 2 As shown, Figure 2 The flow chart of the electromechanical equipment contract and delivery list provided by the embodiment of the present disclosure. Enter the delivery list, that is, enter the basic contract information, quotation quantity and price information, and define the sub-assembly group. Then locate the equipment coding structure at the same time to encode each electromechanical equipment, and finally approve the delivery list to complete the process of electromechanical equipment contract and delivery.
[0045] S102. Obtain the contract signing time of the electromechanical equipment according to the project contract.
[0046] In the disclosed embodiment, the order of project commencement is determined based on the analysis of the project contract and the sub-project packages of the project decomposition, as well as the order of ordering the electromechanical equipment corresponding to the requirements of the entire project and each sub-project, the ordering and arrival time nodes, and then the final signing time of the contract for ordering electromechanical equipment is output. The order of project commencement should give priority to the work on the critical path to ensure that the entire project can proceed on time. The ordering time sequence, ordering and arrival time nodes of electromechanical equipment need to be determined based on the project schedule and the delivery cycle of the equipment supplier to ensure that the equipment can be in place on time.
[0047] It should be noted that the procurement of mechanical and electrical equipment should be reasonably arranged according to the progress of the project, while also leaving room for the project budget. Possible changes in equipment costs over time should be reflected in the project contract.
[0048] S103. Obtain the delivery deadline of the electromechanical equipment according to the contract signing time. If the delivery fails to be made on time, an alarm message is issued.
[0049] In the disclosed embodiment, according to the last signing time of the electromechanical equipment ordering contract provided by S102, the last payment time node of the electromechanical equipment ordering payment is proposed in the order of signing time, and the delivery deadline of the electromechanical equipment is given; if delivery can be made on time, it is executed in accordance with the original engineering contract and the electromechanical equipment ordering contract; if delivery fails to be made on time, an overdue alarm is issued.
[0050] In some embodiments, when an expected warning is issued, the associated ordering contract is marked, and the engineering contract associated with the ordered equipment is evaluated based on the length of equipment delay and loss status. The evaluation results are submitted to the system for use as a basis for modifying the general contract and related unit contracts.
[0051] It should be noted that the delay in the delivery of some electromechanical equipment does not affect the completion of the overall contract, but it is easy to affect the completion of the unit contract directly related to the delayed delivery of electromechanical equipment, resulting in delayed construction period and increased costs. The system must make a reasonable loss assessment of the general project contract and the unit contract, and modify the contract according to the assessment conclusion. The extension of the construction period and the increase in the budget directly caused by the modification of the contract can also be reflected through the assessment. According to the assessment results, the construction period should be reasonably controlled, the content and budget of the unit contract should be modified, and the impact of the modification of the contract should be notified to the related engineering units.
[0052] like Figure 3 As shown, Figure 3 The flow chart of the initial inspection of electromechanical equipment upon arrival provided for the implementation of the present disclosure, during the initial inspection of the equipment upon arrival, the waybill registration, box number registration, and carton list entry are first performed, and then the packing list is received according to the registered box number. If there is a mismatch, the acceptance status is modified and returned to the initial inspection of the equipment upon arrival. If the registered box number and the packing list match, the receiving details connection and receiving details maintenance are performed in sequence, and the receiving maintenance is performed according to the entered carton list.
[0053] like Figure 4 As shown, Figure 4 The electromechanical equipment transfer flow chart provided for the embodiment of the present disclosure first enters the transfer order cover, then performs the whole box transfer and selects the transfer details at the same time, after completing the whole box transfer and selecting the transfer details, the next step is to confirm the transfer details, after the confirmation is completed, the transfer order is approved to complete the transfer.
[0054] S104. Modify the project contract according to the warning information.
[0055] The system monitors the change status of the engineering contract. If the engineering contract changes, it returns to step S102, otherwise the original contract is executed. After the engineering contract is modified, the electromechanical equipment that is overdue for delivery is purchased under the modified engineering contract, and the progress of the purchased electromechanical equipment is adjusted in time, so as to manage the procurement of electromechanical equipment before and during the project, specify the procurement, receipt and issuance of electromechanical equipment according to the time schedule of the project, speed up the procurement and issuance of electromechanical equipment, solve the report compatibility problem in the receipt and issuance of electromechanical equipment, and improve the safety and accuracy of electromechanical equipment procurement.
[0056] In some embodiments, if the engineering contract is modified, the modified engineering contract is entered, and the procurement, acceptance and assessment of electromechanical equipment are performed according to the contract signing time node of the modified engineering contract. If the engineering contract is not modified, after completing the engineering contract task, the inventory of electromechanical equipment in stock is obtained, and the remaining number of electromechanical equipment is given.
[0057] It is worth noting that the modified project contract is submitted to the project management system, replacing the original project contract. The procurement, acceptance and assessment of mechanical and electrical equipment are carried out according to the nodes of the modified contract. The budget is strictly used as the control benchmark, and delivery assessment and quality acceptance are carried out according to the modified contract.
[0058] In some embodiments, before and after the engineering contract is changed, the project needs to be re-divided into sub-projects, budgets, and assessment nodes according to the changed contract content, and the changed engineering contract needs to be stored in the management system to replace the original contract, and subsequent assessments are performed according to the changed contract.
[0059] It should be noted that after the engineering contract is changed, the basic information of the changed engineering contract needs to be entered, and the basic information of the changed engineering contract includes: change entry personnel, change basic information, change quotation information entry, change basic information of the milestone group to be changed, contract code, milestone group code, reason for change, etc.
[0060] After the change, check the milestone data according to the basic information of the change, mainly check the amount and proportion of the milestone items. Milestone settlement is part of the contract settlement, so milestone settlement must also go through the original settlement application process. Milestone settlement application can be initiated by the contractor or directly by the owner. Milestone settlement application is part of the contract payment process. The contractor, supervisor, and owner enter and approve the contract payment order and milestone settlement application. The flow chart is as follows Figure 5 As shown, Figure 5The contract payment function flow chart provided for the embodiment of the present disclosure goes through the contractor operator, contractor approver, supervisor operator, resume approver, owner operator, and owner approver in sequence.
[0061] S105. Obtain the actual contract signing time of the electromechanical equipment based on the re-entry of the new engineering contract.
[0062] In the disclosed embodiment, by controlling and adjusting the electromechanical equipment that is overdue for delivery, timely updating the project contract and the actual contract signing time of the electromechanical equipment, it is helpful to purchase, receive and distribute the electromechanical equipment according to the time schedule of the project.
[0063] It should be noted that in the procurement process of electromechanical equipment, there are multiple reports, such as waybills, packing lists, boxes and equipment, etc. The following will describe waybills, packing lists, boxes and equipment respectively.
[0064] Waybill: After the electromechanical equipment has passed the factory acceptance, the manufacturer will sort out the information such as the carrier of the packed equipment, the date of shipment, the number of the transport vehicle, the box number of the equipment, etc. to form a shipping list, referred to as the waybill. Each waybill must be numbered for easy identification. This number is called the waybill number. The waybill number is generally generated by the manufacturer when shipping. One waybill generally corresponds to one or more transport vehicle numbers.
[0065] Packing list: When the equipment on each waybill is shipped, it may be transported by one or more transport vehicles due to physical size or weight. The number of equipment boxes stacked on each transport vehicle may be different, and the corresponding box numbers will also be different. Based on this, the list of boxes transported on each transport vehicle forms a packing list. The packing list is generally numbered by the manufacturer or the carrier (transshipment) unit for easy identification. One packing list corresponds to one or more box numbers.
[0066] Box: During transportation, the equipment will be packed in containers, corrugated boxes, crates, pallets or bare pieces as needed. Each box / pallet may correspond to one or more types / pieces of equipment, while bare pieces are generally transported separately for each piece of equipment. Whether it is boxed (pallet packaging can be regarded as a special form of boxed) or bare pieces, they should be numbered to distinguish them during transportation and arrival. This number is uniformly called the box number. The box number is generally compiled by the manufacturer.
[0067] Equipment: According to the design documents of the design institute, the manufacturer will conduct factory acceptance and delivery of the components / assemblies with relatively independent functions in the generator, turbine, and public equipment. Such components / assemblies are generally called equipment. Each equipment needs to be independently coded for easy identification.
[0068] Based on the above method, the embodiment of the present disclosure also provides a mechanical and electrical equipment procurement management system 1000 corresponding to the above method, such as Figure 6 As shown, Figure 6 1 is a structural block diagram of the electromechanical equipment procurement management system according to an embodiment of the present disclosure. The system includes an input module 100 for inputting a project contract, splitting the project contract into draft project codes, and then inputting the codes.
[0069] The management module 110 is used to obtain the contract signing time of the electromechanical equipment according to the engineering contract, and then obtain the delivery time limit of the electromechanical equipment according to the contract signing time. If the delivery is not on time, an alarm message is issued; then the engineering contract is modified according to the alarm message.
[0070] On the other hand, it is also used to prepare project codes based on the split of the project contract, split the project contract into the electromechanical equipment demand plan corresponding to the entire project, and assign a predetermined equipment code to each electromechanical equipment to facilitate the distinction between multiple electromechanical equipment.
[0071] The output module 120 is used to obtain the actual contract signing time of the electromechanical equipment based on the re-entry of the new engineering contract, and is also used to output the electromechanical equipment procurement and issuance schedule determined by the system, and to associate the electromechanical equipment procurement and issuance schedule determined by the system with the electromechanical equipment payment arrival time node specified in the engineering budget.
[0072] It should be noted that the management module is also used to execute the method in S103.
[0073] Based on the same inventive concept as the above disclosed content, the present disclosure also provides an electronic device. Figure 7 As shown, Figure 7 A block diagram of an electronic device structure provided for the implementation of the present disclosure, the electronic device of the present disclosure embodiment includes at least one processor and at least one memory electrically connected. The memory is electrically connected to the processor, wherein the memory stores instructions that can be executed by at least one processor, and the instructions are executed by at least one processor so that at least one processor can perform the method as described above.
[0074] It should be noted that the electrical connection between the above-mentioned units does not necessarily mean the connection between lines. An indirect connection method can be applied to the embodiments of the present disclosure as long as the purpose of the present disclosure is achieved.
[0075] Based on the same inventive concept, the present disclosure also provides a computer storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the method described above is performed. The storage medium may include: a U disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.
[0076] Although the present disclosure has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present disclosure.
Claims
1. A method for purchasing and managing electromechanical equipment, characterized in that: The method comprises: Enter the project contract; Obtain the contract signing time of the electromechanical equipment according to the engineering contract; Obtain the delivery deadline of electromechanical equipment according to the contract signing time, and issue an alarm message if the delivery fails to be made on time; Modify the engineering contract according to the warning information; Based on the re-entry of the new engineering contract, the actual contract signing time of the electromechanical equipment is obtained.
2. The method according to claim 1, characterized in that The contract signing time for obtaining electromechanical equipment according to the engineering contract includes: Obtain the ordering sequence, ordering and arrival time nodes of electromechanical equipment according to the engineering contract; The signing time of the electromechanical equipment contract is obtained according to the ordering time sequence, ordering and arrival time nodes.
3. The method according to claim 1, characterized in that The method of obtaining the delivery time limit of the electromechanical equipment according to the contract signing time, issuing an alarm message if the delivery fails to be made on time, and modifying the contract of the electromechanical equipment includes: Marking of ordering contracts associated with electromechanical equipment; Evaluate the engineering contracts associated with the ordered equipment based on the length of equipment delay and loss status; The evaluation results will be used as the basis for modifying the general project contract and related unit project contracts.
4. The method according to claim 1, characterized in that: The modifying of the engineering contract according to the warning information includes: Enter the revised project contract; The procurement, acceptance and assessment of mechanical and electrical equipment shall be carried out according to the contract signing time node of the revised project contract.
5. The method according to claim 4, characterized in that The engineering contract after the modification is entered includes: Re-divide sub-projects, budgets and assessment nodes according to the revised project contract; The revised project contract will replace the original contract.
6. The method according to claim 4, characterized in that The engineering contract after the modification is entered includes: Enter the basic information of the changed engineering contract; Check the milestone data against the basic information.
7. The method according to claim 1, characterized in that The delivery time limit of the electromechanical equipment is obtained according to the contract signing time. If the delivery fails to be made on time, the alarm information issued includes: Obtain the status of mechanical and electrical equipment procurement and budget availability; Based on the electromechanical equipment procurement and budget availability status, determine whether the electromechanical equipment is overdue at the procurement time node or the equipment availability time node. If at least one of the procurement time node or the equipment availability time node is overdue, an alarm message is issued.
8. A mechanical and electrical equipment procurement management system, characterized in that: The system comprises: Input module, used to input engineering contracts; A management module is used to obtain the contract signing time of the electromechanical equipment according to the engineering contract; obtain the delivery time limit of the electromechanical equipment according to the contract signing time, and issue an alarm message if the delivery fails to be on time; and modify the engineering contract according to the alarm message; The output module is used to obtain the actual contract signing time of the electromechanical equipment based on the re-entry of the new engineering contract.
9. An electronic device, characterized in that: The electronic device comprises: Memory for storing computer programs; A processor is used to implement the steps of the electromechanical equipment procurement management method as claimed in any one of claims 1 to 7 when executing the computer program.
10. A computer storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the electromechanical equipment procurement management method according to any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Material managing and controlling system and method
CN105913211A
EPC project purchase management method, system and device, and storage medium
CN108288148A
Contract buying management control system and method
CN1567314A
Ordering management system
JP2002352049A
A method of post purchase management for executingsupply business in a shipyard
KR1020080004266A