Electrified railway regenerative braking energy utilization device and system and control method
By installing regenerative braking energy utilization devices in electrified railways, real-time transfer and storage of regenerative braking energy is achieved, the problem of pollution of power supply quality in the power grid is solved, the energy utilization rate is improved, and the power waste and safety risks are reduced.
Patent Information
- Application Number
- CN202411190529.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When the regenerative braking energy of electrified railways is fed back in the public power grid, due to the high harmonic content and large negative sequence current, the power supply quality pollution of the power grid is caused, resulting in waste of electricity and safety impacts.
Design an electrified railway regenerative braking energy utilization device, including connecting transformer, AC-DC-AC converter, DC/DC converter, hybrid energy storage device and energy manager, installed in two traction substations In the meantime, real-time transfer and storage of regenerative braking energy is realized, transfer and storage power values are calculated through the energy manager, and energy utilization is performed from the 'space' and 'time' dimensions using a hybrid energy storage device.
It improves the utilization rate of regenerative braking energy, reduces power waste, improves the power supply quality of the power grid, and avoids the impact of pollution on the power grid.
Smart Images

Figure CN118970979A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of regenerative braking, and more specifically, to an electric railway regenerative braking energy utilization device, system and control method. Background Art
[0002] At present, electric locomotives and EMUs based on AC-DC-AC transmission technology are widely used in my country. AC-DC-AC transmission technology can realize the bidirectional flow of energy, creating conditions for the realization of regenerative braking when the train brakes. That is, when the train is in traction mode, it absorbs electrical energy from the traction network and drives the wheel pair motor through the transmission system to convert electrical energy into mechanical energy; when the train goes downhill or enters the station, the wheel pair motor generates a force opposite to the direction of the train's operation to consume the train's kinetic energy to achieve the effect of deceleration. At this time, the motor is in a power generation state, converting mechanical energy into regenerative electrical energy and feeding it back to the traction network through the transmission system.
[0003] As the power of trains increases and the line operation density increases, the regenerative braking energy generated by them becomes more and more prominent. However, since the railway traction power supply system uses industrial frequency AC and single-phase power supply, the traction power supply system uses phase-changing segmented power supply to maintain the balance of the three-phase public power grid. The length of each traction power supply arm is about 25 kilometers. Therefore, only a small part of the regenerative braking energy generated by the train is absorbed and utilized by other trains under the same power supply arm, and most of it is fed back to the public power grid. Due to the high harmonic content, large negative sequence current, impact and intermittent nature of regenerative braking energy, it pollutes the power supply quality of the public power grid and is regarded as "junk electricity" by the power company, which punishes it by "not counting feedback" or "counting feedback positively". Therefore, the regenerative braking energy generated by the train not only brings huge energy waste to the railway, but also affects the power grid and affects the safety of the power grid. Summary of the invention
[0004] In order to solve the current problem, the present invention proposes a regenerative braking energy utilization device, system and control method for electrified railways. The device is installed in a substation between two traction substations to realize the real-time transfer and utilization of regenerative braking energy between substations, and the regenerative braking energy is transferred and utilized from the two dimensions of "space" and "time" through a hybrid energy storage device, effectively improving the utilization rate of regenerative braking energy.
[0005] In order to achieve the above technical effects, the technical solution of the present invention is as follows:
[0006] An electric railway regenerative braking energy utilization device, installed in a substation between two traction substations, comprises: a connection transformer, an AC-DC-AC converter, a DC / DC converter, a hybrid energy storage device, an energy manager and a control protector;
[0007] The connecting transformer is connected to the AC-DC-AC converter, the hybrid energy storage device is connected to the DC bus of the AC-DC-AC converter through the DC / DC converter, the signal input end of the energy manager is connected to the electric energy metering point of the traction substation, the signal input end of the control protector is connected to the output end of the energy manager, and the signal output end of the control protector is respectively connected to the AC-DC-AC converter and the DC / DC converter.
[0008] The device proposed in this scheme realizes the real-time transfer and utilization of regenerative braking energy between substations, and transfers and utilizes the regenerative braking energy from the two dimensions of "space" and "time" through a hybrid energy storage device, effectively improving the utilization rate of regenerative braking energy.
[0009] Preferably, the energy metering points of the traction substation TS1 and the traction substation TS2 are respectively provided with voltage transformers PT1, PT2 and current transformers CT1, CT2, and the energy manager collects voltage signals and current signals of the energy metering points through the voltage transformers and current transformers respectively.
[0010] Preferably, the energy manager includes: a power calculation unit, a switch and a power distribution calculation unit; the power calculation unit is connected to the electric energy metering point of the traction substation; the power calculation unit and the power distribution calculation unit are respectively connected to the railway communication network through the switch; the power distribution calculation unit is connected to the control protector.
[0011] Here, the energy manager is used to calculate the real-time power of the two traction substations, and the transfer power value and energy storage power value of the regenerative braking energy device are calculated respectively according to the preset energy management strategy; the transfer power value and energy storage power value calculated by the energy manager are received, and the corresponding PWM pulse signal is sent to the AC-DC-AC converter and the DC / DC converter to achieve the control target of regenerative braking energy utilization.
[0012] Preferably, the power calculation unit includes a first power calculation unit and a second power calculation unit, the signal input end of the first power calculation unit is connected to the voltage transformer PT1 and the current transformer CT1, and the signal input end of the second power calculation unit is connected to the voltage transformer PT2 and the current transformer CT2.
[0013] Preferably, the energy storage medium of the hybrid energy storage device includes a power type energy storage medium and an energy type energy storage medium.
[0014] Here, two different energy storage media are provided to meet the energy storage requirements of railway regenerative braking energy in both power and energy types.
[0015] Preferably, the DC / DC converter includes a first DC / DC converter and a second DC / DC converter, the power-type energy storage medium is connected to the DC bus of the AC-DC-AC converter through the first DC / DC converter, and the energy-type energy storage medium is connected to the DC bus of the AC-DC-AC converter through the second DC / DC converter.
[0016] Preferably, the AC-DC-AC converter forms a back-to-back structure through an AC / DC converter that shares a DC side capacitor to achieve bidirectional power flow.
[0017] Preferably, the connecting transformer comprises a first transformer T1 and a second transformer T2, and the T1 and T2 are connected in parallel to the power supply arm.
[0018] Here, the 27.5kV voltage is stepped down to a voltage value suitable for the AC-DC-AC converter by connecting a transformer; the power supply arm is connected in parallel, so that the device does not affect the normal operation of the train and is not easily affected by the outside world. Even if the device itself fails and stops running, it does not affect the normal operation of the railway.
[0019] An electrified railway traction power supply system comprises a power supply arm and a traction substation. The system also comprises the above-mentioned electrified railway regenerative braking energy utilization device. The power supply arm is connected to an AC-DC-AC converter via a connecting transformer, and the electric energy metering point of the traction substation is connected to an energy manager.
[0020] A control method based on the above-mentioned regenerative braking energy utilization device for electrified railways includes: collecting real-time current and voltage signals of traction substation TS1 and traction substation TS2, and calculating the transfer power and storage power of the traction substation in real time; recording the real-time power of traction substation TS1 as P1, the real-time power of traction substation TS2 as P2, the transfer power as Pc, and the storage power as Pe. The working mode is as follows:
[0021] When P1≥0 and P1≥0, the loads of the traction substation TS1 and the traction substation TS2 are both in traction working condition, the electric railway regenerative braking energy utilization device releases the electric energy of the hybrid energy storage device, and Pe<0;
[0022] When P1<0 and P2≥0, the load of the traction substation TS1 is in a regenerative braking condition, the load of the traction substation TS2 is in a traction condition, and the regenerative braking energy utilization device for the electrified railway transfers the regenerative braking energy of the traction substation TS1 to the traction substation TS2; and if |P1|<P2, then Pc=P1, and if |P1|>P2, then Pc=P2;
[0023] When P1≥0 and P2<0, the total train load of the traction substation TS2 is in the regenerative braking condition, the total train load of the traction substation TS1 is in the traction condition, and the electrified railway regenerative braking energy utilization device transfers the energy of the traction substation TS2 to the traction substation TS1; and if |P2|<P1, then Pc=P2, if |P2|>P1, then Pc=P1.
[0024] When P1+P2<0, the regenerative braking power of the total train load of the traction substation TS1 and the traction substation TS2 is greater than the traction power, and the overall energy is regenerative. The electrified railway regenerative braking energy utilization device stores the regenerative braking energy of the two traction substations, Pe>0; when P1+P2>0, the energy is released, Pe<0.
[0025] Compared with the prior art, the technical solution of the present invention has the following beneficial effects:
[0026] The present invention proposes an electrified railway regenerative braking energy utilization device, system and control method, which are installed in a substation between two traction substations, and include: a connecting transformer, an AC-DC-AC converter, a DC / DC converter, a hybrid energy storage device, an energy manager and a control protector; the connecting transformer is connected to the AC-DC-AC converter, the hybrid energy storage device is connected to the DC bus of the AC-DC-AC converter through the DC / DC converter, the signal input end of the energy manager is connected to the electric energy metering point of the traction substation, the signal input end of the control protector is connected to the output end of the energy manager, and the signal output end of the control protector is respectively connected to the AC-DC-AC converter and the DC / DC converter, so as to achieve the technical effect of mainly utilizing the regenerative braking energy transfer between adjacent traction substations and supplementing it with energy storage, thereby realizing the utilization of the regenerative braking energy in two dimensions of time and space, and improving the utilization rate of the regenerative braking energy. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 A schematic diagram showing the overall structure of the electric railway regenerative braking energy utilization device proposed in Embodiment 1 of the present invention;
[0028] Figure 2 A schematic diagram of the structure of the energy manager proposed in Embodiment 1 of the present invention is shown. DETAILED DESCRIPTION
[0029] The drawings are for illustrative purposes only and should not be construed as limiting the present patent;
[0030] In order to better illustrate the present embodiment, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the actual size;
[0031] It is understandable to those skilled in the art that descriptions of certain well-known contents in the drawings may be omitted.
[0032] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0033] The positional relationships described in the drawings are only for illustrative purposes and should not be construed as limiting the present patent;
[0034] Example 1
[0035] like Figure 1 As shown, this embodiment proposes an electric railway regenerative braking energy utilization device, which is installed in a substation between two traction substations, including: a connecting transformer, an AC-DC-AC converter, a DC / DC converter, a hybrid energy storage device, an energy manager and a control protector;
[0036] The connecting transformer is connected to the AC-DC-AC converter, the hybrid energy storage device is connected to the DC bus of the AC-DC-AC converter through the DC / DC converter, the signal input end of the energy manager is connected to the electric energy metering point of the traction substation, the signal input end of the control protector is connected to the output end of the energy manager, and the signal output end of the control protector is respectively connected to the AC-DC-AC converter and the DC / DC converter.
[0037] In this embodiment, the energy metering points of the traction substation TS1 and the traction substation TS2 are respectively provided with voltage transformers PT1 and PT2 and current transformers CT1 and CT2, and the energy manager collects voltage signals and current signals of the energy metering points through the voltage transformers and current transformers respectively.
[0038] The energy manager includes: a power calculation unit, a switch and a power distribution calculation unit; the power calculation unit is connected to the electric energy metering point of the traction substation; the power calculation unit and the power distribution calculation unit are respectively connected to the railway communication network through the switch, wherein the power calculation unit includes a first power calculation unit and a second power calculation unit, the signal input end of the first power calculation unit is connected to the traction voltage transformer PT1 and the current transformer CT1, and the signal input end of the second power calculation unit is connected to the voltage transformer PT2 and the current transformer CT2; the power distribution calculation unit is connected to the control protector, and sends the transfer power value and the energy storage power value to the control protector.
[0039] Here, the energy manager is used to calculate the real-time power of the two traction substations, and the transfer power value and energy storage power value of the regenerative braking energy device are calculated respectively according to the preset energy management strategy; the transfer power value and energy storage power value calculated by the energy manager are received, and the corresponding PWM pulse signal is sent to the AC-DC-AC converter and the DC / DC converter to achieve the control target of regenerative braking energy utilization.
[0040] Furthermore, the DC / DC converter includes a first DC / DC converter and a second DC / DC converter, the power-type energy storage medium is connected to the DC bus of the AC-DC-AC converter through the first DC / DC converter, and the energy-type energy storage medium is connected to the DC bus of the AC-DC-AC converter through the second DC / DC converter. The AC-DC-AC converter forms a back-to-back structure through the AC / DC converter that shares the DC side capacitor to achieve bidirectional power flow.
[0041] In this embodiment, the connecting transformer includes a first transformer T1 and a second transformer T2, and T1 and T2 are connected in parallel to the power supply arm; here, the 27.5kV voltage is stepped down to a voltage value suitable for the AC-DC-AC converter to be connected, such as 1kV, 3kV, etc.; by connecting to the power supply arm in parallel, the device will not affect the normal operation of the train and is not easily affected by the outside world. Even if the device itself fails and exits operation, it will not affect the normal operation of the railway.
[0042] Example 2
[0043] This embodiment is based on the electric railway regenerative braking energy utilization device described in Example 1, and further explains its control method.
[0044] like Figure 2 As shown, the energy manager is composed of a power calculation unit, a switch, a power distribution calculation unit, etc. The first power calculation unit and the second power calculation unit respectively collect the real-time current and voltage signals of the traction substation TS1 and the traction substation TS2, calculate the real-time power values of the two traction substations, and transmit them to the power distribution calculation unit through the railway communication network, and calculate the transfer power value and the storage power value in real time. Assuming that the real-time power of the traction substation TS1 is P1, the real-time power of the traction substation TS2 is P2, the transfer power is Pc, and the storage power is Pe, the typical working mode is described as follows:
[0045] First working mode: when P1≥0 and P1≥0, the loads of the traction substation TS1 and the traction substation TS2 are both in traction working condition, the electric railway regenerative braking energy utilization device releases the electric energy of the hybrid energy storage device, Pe<0;
[0046] The second working mode: when P1<0 and P2≥0, the load of the traction substation TS1 is in the regenerative braking condition, the load of the traction substation TS2 is in the traction condition, and the regenerative braking energy utilization device of the electrified railway transfers the regenerative braking energy of the traction substation TS1 to the traction substation TS2; and if |P1|<P2, then Pc=P1, if |P1|>P2, then Pc=P2;
[0047] The third working mode: when P1≥0 and P2<0, the total train load of the traction substation TS2 is in the regenerative braking condition, the total train load of the traction substation TS1 is in the traction condition, and the electrified railway regenerative braking energy utilization device transfers the energy of the traction substation TS2 to the traction substation TS1; and if |P2|<P1, then Pc=P2, if |P2|>P1, then Pc=P1.
[0048] The fourth working mode: when P1+P2<0, the regenerative braking power of the total train load of the traction substation TS1 and the traction substation TS2 is greater than the traction power, and the overall energy is regenerative. The electrified railway regenerative braking energy utilization device stores the regenerative braking energy of the two traction substations, Pe>0; when P1+P2>0, the energy is released, Pe<0.
[0049] In this embodiment, the remaining regenerative braking energy is utilized through a hybrid energy storage device, so that the regenerative braking energy can be transferred and utilized from two dimensions of "space" and "time", thereby maximizing the utilization rate of railway regenerative braking energy.
[0050] Example 3
[0051] In this embodiment, based on the electric railway regenerative braking energy utilization device described in Example 1, an electric railway traction power supply system is proposed, such as Figure 1 As shown, it includes a power supply arm and a traction substation. The system also includes the electrified railway regenerative braking energy utilization device as described in Example 1. The power supply arm is connected to the AC-DC-AC converter via a connecting transformer. The hybrid energy storage device is connected to the DC bus of the AC-DC-AC converter via a DC / DC converter. The signal input end of the energy manager is connected to the electric energy metering point of the traction substation. The signal input end of the control protector is connected to the output end of the energy manager. The signal output end of the control protector is respectively connected to the AC-DC-AC converter and the DC / DC converter. Figure 1 In, P L1 and P L2 They are the train loads of traction substation TS1 and traction substation TS2 respectively.
[0052] Obviously, the above embodiments of the present invention are only examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. An electric railway regenerative braking energy utilization device installed in a substation between two traction substations. It is characterized in that include: Connecting transformers, AC-DC-AC converters, DC / DC converters, hybrid energy storage devices, energy managers and control protectors; The connecting transformer is connected to the AC-DC-AC converter, the hybrid energy storage device is connected to the DC bus of the AC-DC-AC converter through the DC / DC converter, the signal input end of the energy manager is connected to the electric energy metering point of the traction substation, the signal input end of the control protector is connected to the output end of the energy manager, and the signal output end of the control protector is respectively connected to the AC-DC-AC converter and the DC / DC converter.
2. The electric railway regenerative braking energy utilization device according to claim 1, It is characterized in that The electric energy metering points of the traction substation TS1 and the traction substation TS2 are respectively provided with voltage transformers PT1 and PT2 and current transformers CT1 and CT2. The energy manager collects voltage signals and current signals of the electric energy metering points through the voltage transformers and the current transformers respectively.
3. The electric railway regenerative braking energy utilization device according to claim 2, It is characterized in that The energy manager includes: a power calculation unit, a switch and a power distribution calculation unit; the power calculation unit is connected to the electric energy metering point of the traction substation; the power calculation unit and the power distribution calculation unit are respectively connected to the railway communication network through the switch; the power distribution calculation unit is connected to the control protector.
4. The electric railway regenerative braking energy utilization device according to claim 3, It is characterized in that The power calculation unit includes a first power calculation unit and a second power calculation unit. The signal input end of the first power calculation unit is connected to the voltage transformer PT1 and the current transformer CT1. The signal input end of the second power calculation unit is connected to the voltage transformer PT2 and the current transformer CT2.
5. The electric railway regenerative braking energy utilization device according to claim 1, It is characterized in that The energy storage medium of the hybrid energy storage device includes a power type energy storage medium and an energy type energy storage medium.
6. The electric railway regenerative braking energy utilization device according to claim 5, It is characterized in that The DC / DC converter includes a first DC / DC converter and a second DC / DC converter, the power-type energy storage medium is connected to the DC bus of the AC-DC-AC converter through the first DC / DC converter, and the energy-type energy storage medium is connected to the DC bus of the AC-DC-AC converter through the second DC / DC converter.
7. The electric railway regenerative braking energy utilization device according to claim 1, It is characterized in that The AC-DC-AC converter forms a back-to-back structure through AC / DC converters that share DC side capacitors.
8. The electric railway regenerative braking energy utilization device according to claim 1, It is characterized in that The connecting transformer includes a first transformer T1 and a second transformer T2, and T1 and T2 are connected in parallel to the power supply arm.
9. An electrified railway traction power supply system, comprising a power supply arm and a traction substation, It is characterized in that The system also includes an electrified railway regenerative braking energy utilization device as described in any one of claims 1 to 8, the power supply arm is connected to the AC-DC-AC converter via a connecting transformer, and the power metering point of the traction substation is connected to the energy manager.
10. A control method for the electric railway regenerative braking energy utilization device according to any one of claims 1 to 8, It is characterized in that include: The real-time current and voltage signals of traction substation TS1 and traction substation TS2 are collected, and the transfer power and storage power of the traction substation are calculated in real time; the real-time power of traction substation TS1 is recorded as P1, the real-time power of traction substation TS2 is recorded as P2, the transfer power is recorded as Pc, and the storage power is recorded as Pe. The working mode is as follows: When P1≥0 and P1≥0, the loads of the traction substation TS1 and the traction substation TS2 are both in traction working condition, the electric railway regenerative braking energy utilization device releases the electric energy of the hybrid energy storage device, and Pe<0; When P1<0 and P2≥0, the load of the traction substation TS1 is in a regenerative braking condition, the load of the traction substation TS2 is in a traction condition, and the regenerative braking energy utilization device for the electrified railway transfers the regenerative braking energy of the traction substation TS1 to the traction substation TS2; and if |P1|<P2, then Pc=P1, and if |P1|>P2, then Pc=P2; When P1≥0 and P2<0, the total train load of the traction substation TS2 is in the regenerative braking condition, the total train load of the traction substation TS1 is in the traction condition, and the electrified railway regenerative braking energy utilization device transfers the energy of the traction substation TS2 to the traction substation TS1; and if |P2|<P1, then Pc=P2, if |P2|>P1, then Pc=P1. When P1+P2<0, the regenerative braking power of the total train load of the traction substation TS1 and the traction substation TS2 is greater than the traction power, and the overall energy is regenerative. The electrified railway regenerative braking energy utilization device stores the regenerative braking energy of the two traction substations, Pe>0; when P1+P2>0, the energy is released, Pe<0.