Cleaning machine track structure assembly with drainage function and preparation method of cleaning machine track structure assembly

By using aluminum alloy material and semi-fluid die-casting technology, combined with heat treatment and anodizing treatment, a track structure of glass greenhouse cleaning machine with drainage function was designed, solving the problems of low structural strength and easy corrosion in the existing technology, and achieving high strength , corrosion resistance and effective drainage effect.

CN118977062APending Publication Date: 2024-11-19SHANGHAI KAISHENG HAOFENG AGRI DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411077410.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2024-07-02
Filing Date
2024-08-07
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The existing glass greenhouse cleaning machine track structure has low structural strength, is prone to leakage and corrosion in long-term rainwater environments, and cannot withstand the weight of the cleaning machine for a long time.

Method used

The track structure components made of aluminum alloy material increase strength by semi-fluid die-casting and heat treatment, and design a track structure with drainage function, including track gutters, brackets and herringbone beams, combined with anodizing treatment to enhance corrosion resistance.

Benefits of technology

It improves the strength and corrosion resistance of the track structure, ensures that it is not prone to corrosion during long-term use, and realizes the effective discharge of rainwater, can withstand the weight of the cleaning machine for a long time, and ensures the connection and guidance functions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118977062A_ABST
    Figure CN118977062A_ABST
Patent Text Reader

Abstract

The invention discloses a preparation method of a cleaning machine track structure assembly with a drainage function. The preparation method comprises the following steps: 1, model design; 2, performing subdivision to obtain three subdivision structures; 3, preparation before manufacturing: selecting and inspecting raw materials; 4, first-stage manufacturing: manufacturing a mold; 5, the inspected raw materials are subjected to semi-fluid die casting, and a track die, a gutter die and a bracket die are alternately subjected to die casting; sixthly, second-stage manufacturing is conducted, wherein shaping is conducted through numerical milling finish machining after die casting is completed; 7, carrying out heat treatment and quenching after shaping; 8, numerical milling rough machining; ninthly, secondary heat treatment is conducted again after the bench worker conducts shaping; tenthly, after secondary heat treatment, processing and shaping are conducted through finish machining; 11, sequentially performing three-dimensional detection, mechanical property detection, fluorescence detection and ray detection after finish machining treatment; and 12, carrying out anodic oxidation treatment on the surface of the structure. According to the rail structure, the structural strength of the rail structure of the cleaning machine for the glass greenhouse is improved, and the rail structure is high in sealing performance, not prone to water leakage and resistant to corrosion.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a cleaning machine track structure component with drainage function and a preparation method thereof, belonging to the technical field of structural component manufacturing. Background Art

[0002] The construction scale and application fields of glass greenhouses are gradually expanding. During use, dust easily accumulates on the outside of the top glass, which reduces the light transmittance of the glass and affects the light intensity in the glass greenhouse. In order to maintain a good lighting effect, the top glass of the glass greenhouse needs to be cleaned in time.

[0003] Currently, the cleaning of glass greenhouses is mostly done by installing a cleaning machine on the top of the glass greenhouse and equipping it with a cleaning machine track that is compatible with the cleaning machine to clean the glass of the glass greenhouse. Most of the current cleaning machine tracks are directly installed between the gutters on the top of the glass greenhouse through bolts and other connecting parts, and at the same time play the role of connecting multiple glass greenhouses. However, the existing track structure has low structural strength and is prone to water leakage. It is also impossible to ensure that the track can bear the weight of the cleaning machine for a long time while playing a connecting role, and it is also easily corroded in a long-term rain environment. Summary of the invention

[0004] The technical problem to be solved by the present invention is how to make the track structure play the role of connecting multiple glass greenhouses while improving the structural strength of the track structure of the glass greenhouse cleaning machine to meet the long-term use requirements, and reduce the possibility of water accumulation and leakage in the track structure, which may lead to corrosion due to long-term use.

[0005] In order to achieve the above technical objectives and the above technical effects, this application is implemented through the following technical solutions:

[0006] In a first aspect, the present invention provides a method for preparing a cleaning machine track structure assembly with a drainage function, comprising the following steps:

[0007] S1, model design: design the structure of the track structure component to obtain the track structure component; the track structure component includes a track gutter, the track gutter includes a gutter body and a track body, the track body is located at the top of the gutter body and forms a mounting groove with the gutter body, a herringbone beam adapted thereto can be detachably arranged in the mounting groove, a track adapted to the cleaning machine is arranged at the top of the track body, both sides of the track body have embedded grooves for installing glass, a protrusion is arranged on the top side wall of the gutter body, and the protrusion and the mounting groove form a slide groove; the track structure component also includes a bracket, a mounting groove for clamping the gutter body is arranged in the bracket, a hook tongue is arranged on the inner wall of the mounting groove close to the top, a first limit block and a second limit block are formed on the outer wall of the gutter body, and the hook tongue is hooked between the first limit block and the second limit block; a through hole 1 is opened on the bottom and side walls of the gutter body, and a through hole 2 adapted to the through hole 1 is opened on the bracket;

[0008] S2, model segmentation, with the side of the bracket away from the track gutter as the bottom, and the end of the track body away from the bracket as the top, and the direction from the bottom to the top is selected as the manufacturing direction, and then the track structure components obtained in S1 are segmented along the manufacturing direction to obtain three segmented structures, among which the track body is the first segmented structure, the gutter body is the second segmented structure, and the bracket is the third segmented structure;

[0009] S3, preparation before manufacturing: raw materials selection and inspection by spectrometer and mechanical testing machine;

[0010] S4, the first stage of manufacturing: mold manufacturing, select SKD11 or D2 materials for mold manufacturing, which are rail mold, gutter mold and bracket mold. The rail mold corresponds to the structure of the rail body, the gutter mold corresponds to the gutter body and the connection structure between the gutter body and the rail body, and the bracket mold corresponds to the bracket structure;

[0011] S5, the inspected raw materials are subjected to semi-fluid die casting, and the track mold, gutter mold and bracket mold are alternately die-casted by a die-casting machine;

[0012] S6, second stage manufacturing: after die casting, it is reshaped by CNC milling;

[0013] S7, heat treatment after shaping: heat treatment at 400℃~550℃ for 6-10 hours in a high temperature furnace and quenching;

[0014] S8, CNC roughing;

[0015] S9, after the fitter finalizes the shape, the secondary heat treatment is performed again;

[0016] S10, after secondary heat treatment, finishing is performed to finalize the shape;

[0017] S11, after finishing, three-dimensional testing, mechanical properties testing, fluorescence testing, and X-ray testing are performed in sequence;

[0018] S12, the surface of the structural component is anodized.

[0019] Preferably, the installation groove in step S1 is opened to be inclined upward to adapt to the corresponding herringbone beam, and the inclination angle is between 15° and 60°.

[0020] Preferably, when the gutter mold is manufactured in step S4, the top of the hook tongue of the gutter mold abuts against the bottom of the second limit block, and a gap of 0.5 to 2 mm is reserved between the bottom of the hook tongue and the first limit block.

[0021] Preferably, the raw materials in step S3 include but are not limited to 6030-T6 aluminum bars.

[0022] Furthermore, in step S9, the secondary heat treatment temperature is set at 110°C to 200°C.

[0023] Furthermore, in step S3, a universal mechanical testing machine is used to test the tensile strength, yield strength and elongation of the cast test bar and the main body sample test bar, and the mechanical properties are tested in an environment of 150°C.

[0024] Furthermore, in step S5, the semi-fluid die-casting temperature is 360° C., and the relative humidity of the air at the die-casting production site during the semi-fluid die-casting process shall not be greater than 50%.

[0025] Furthermore, during the heat treatment in step S7, a special tool is used to clamp and fix the workpiece, and the workpiece is kept in a vertical state for production, and the workpiece is fed into the furnace and quenched by vertical movement.

[0026] In a second aspect, the present invention provides a cleaning machine track structure component with drainage function, which is prepared by applying the above-mentioned preparation method of the cleaning machine track structure component with drainage function.

[0027] The cleaning machine track structure assembly with drainage function and the preparation method thereof provided by the present invention have the following advantages:

[0028] 1. The glass greenhouse cleaning machine track structure components manufactured by the present invention are made of aluminum alloy, with high structural strength. Compared with the traditional iron gutter with the same strength, the structure is light and rust-proof, and the track body and the gutter body can guide the operation of the cleaning machine while having the function of draining rainwater. In addition, while playing a connecting role, it ensures that the track can bear the weight of the cleaning machine for a long time, and is not easily corroded in a long-term rain environment.

[0029] 2. The present invention performs X-ray flaw detection on die-casting parts and fluorescent flaw detection on the surface to ensure the safety and reliability of the inner and outer surface quality of structural components. The segmented pressurization function of the semi-fluid die-casting machine is used to adjust the system pressure parameters and time during the semi-fluid die-casting process. By matching time and pressure during the process, hierarchical die-casting is achieved to ensure stable product performance. During heat treatment, special tooling is used to clamp and fix the workpiece to maintain a vertical state for production, thereby reducing structural deformation during the heat treatment process. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a front structural schematic diagram of a cleaning machine track structure assembly with drainage function according to the present invention;

[0031] Figure 2 This is a schematic diagram of the die-casting molding of the track mold of the present invention;

[0032] Figure 3 This is a schematic diagram of the die-casting of the gutter mold of the present invention;

[0033] In the figure:

[0034] 1-track gutter; 11-gutter body; 12-track body; 2-bracket; 3-installation groove; 4-embedded groove; 5-protrusion; 6-hook tongue; 7-first limit block; 8-second limit block; 9-herringbone beam. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technical personnel in this field without making creative work are within the scope of protection of the present invention.

[0036] Reference Figure 1-Figure 3 , a method for preparing a cleaning machine track structure component with drainage function, comprising the following steps:

[0037] S1, model design: design the structure of the track structure component to obtain the track structure component; the track structure component includes a track gutter 1, the track gutter 1 includes a gutter body 11 and a track body 12, the track body 12 is located at the top of the gutter body 11 and forms a mounting groove 3 between the gutter body 11, the mounting groove 3 can be detachably installed with a herringbone beam 9 adapted thereto by bolts or positioning pieces, the top of the track body 12 is a track adapted to the cleaning machine, and both sides of the track body 12 have inlay grooves 4 for installing glass A protrusion 5 is provided on the top side wall of the gutter body 11, and the protrusion 5 forms a slide groove with the mounting groove 3; the track structure assembly also includes a bracket 2, and a mounting groove 3 for clamping the gutter body 11 is provided in the bracket 2, and a hook tongue 6 is provided on the inner wall of the mounting groove 3 near the top, and a first limit block 7 and a second limit block 8 are formed on the outer wall of the gutter body 11, and the hook tongue 6 is hooked between the first limit block 7 and the second limit block 8; a through hole 1 is opened on the bottom and side walls of the gutter body 11, and a through hole 2 matched with the through hole 1 is opened on the bracket 2.

[0038] Furthermore, the installation groove 3 is opened to be inclined upward to adapt to the corresponding herringbone beam 9, and the inclination angle is between 15° and 60°.

[0039] S2, model segmentation, with the side of the bracket 2 away from the track gutter 1 as the bottom, and the end of the track body 12 away from the bracket 2 as the top, and the direction from the bottom to the top is selected as the manufacturing direction, and then the track structure components obtained in S1 are segmented along the manufacturing direction to obtain three segmented structures, among which the track body 12 is the first segmented structure, the gutter body 11 is the second segmented structure, and the bracket 2 is the third segmented structure.

[0040] S3, Pre-manufacturing preparation: Raw material selection and inspection by spectrometer and mechanical testing machine

[0041] The raw materials include but are not limited to 6030-T6 aluminum bars. The tensile strength, yield strength and elongation of the cast test bars and the main body sampling test bars are tested using a universal mechanical testing machine, and the mechanical properties are tested at 150°C.

[0042] S4, the first stage of manufacturing: mold manufacturing, select SKD11 or D2 material for mold manufacturing, which are track mold, gutter mold and bracket 2 mold respectively. The track mold corresponds to the structure of track body 12, the gutter mold corresponds to the gutter body 11 and the connection structure between the gutter body 11 and the track body 12, and the bracket 2 mold corresponds to the bracket 2 structure.

[0043] When making the gutter mold, the top of the hook tongue 6 of the gutter mold abuts against the bottom of the second limit block 8, and a gap of 0.5 to 2 mm is reserved between the bottom of the hook tongue 6 and the first limit block 7.

[0044] S5, the inspected raw materials are semi-fluid die-casted, and the track mold, gutter mold and bracket 2 mold are alternately die-casted by the die-casting machine.

[0045] Furthermore, the semi-fluid die-casting temperature is 360° C., and the relative humidity of the air at the die-casting production site during the semi-fluid die-casting process shall not be greater than 50%.

[0046] S6, second stage manufacturing: after die casting, it is reshaped by CNC milling;

[0047] S7, heat treatment after shaping: heat treatment and quenching in a high temperature furnace at 400℃~550℃ for 6-10 hours. During heat treatment, special fixtures are used to clamp the workpiece and keep it in a vertical state for production. The workpiece is fed into the furnace and quenched by vertical movement.

[0048] S8, rough machining by CNC milling.

[0049] S9, after the fitter has finalized the shape, a secondary heat treatment is performed again, and the secondary heat treatment temperature is preferably between 110°C and 200°C.

[0050] S10, after the secondary heat treatment, the product is processed and shaped by finishing.

[0051] S11, after finishing, three-dimensional testing, mechanical properties testing, fluorescence testing, and X-ray testing are performed in sequence;

[0052] S12, the surface of the aluminum structural components is anodized.

[0053] The cleaning machine track structure assembly with drainage function prepared by the above method, the bracket 2 is used to connect the track gutter 1 and the glass greenhouse steel structure; one end of the glass can be inserted into the groove body of the herringbone beam 9 and the other end can be clamped on the track body 12 and pressed by a rubber strip; a protrusion 5 is integrally formed on the top side wall of the gutter body 11, and an installer can be slidably installed between the protrusion 5 and the installation groove 3 to assist the installation of the herringbone beam 9 to achieve longitudinal and lateral limitation of the herringbone beam 9.

[0054] A small amount of leaked water entering the gutter body 11 is discharged through the inner cavity thereof. At the same time, the herringbone beam 9, the gutter body 11 and the glass are sealed together to allow rainwater to be discharged smoothly, thus achieving a double drainage function and avoiding the occurrence of backflow. At the same time, the track frame on the top of the gutter body 11 can guide the cleaning machine, which can not only guide the cleaning machine but also connect the glass greenhouse and prevent water accumulation.

[0055] The above is only a preferred embodiment of the present invention, and is not any formal or substantial limitation of the present invention. It should be pointed out that ordinary technicians in this technical field can make several improvements and supplements without departing from the present invention, and these improvements and supplements should also be regarded as the protection scope of the present invention. Any technician familiar with this profession, without departing from the spirit and scope of the present invention, can make some changes, modifications and equivalent changes made by using the technical content disclosed above, which are equivalent embodiments of the present invention; at the same time, any changes, modifications and evolutions of any equivalent changes made to the above embodiments based on the essential technology of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. A method for preparing a cleaning machine track structure component with drainage function, It is characterized in that The steps include: S1, model design: design the structure of the track structure component to obtain the track structure component; the track structure component includes a track gutter, the track gutter includes a gutter body and a track body, the track body is located at the top of the gutter body and forms a mounting groove with the gutter body, a herringbone beam adapted thereto can be detachably arranged in the mounting groove, a track adapted to the cleaning machine is arranged at the top of the track body, both sides of the track body have embedded grooves for installing glass, a protrusion is arranged on the top side wall of the gutter body, and the protrusion and the mounting groove form a slide groove; the track structure component also includes a bracket, a mounting groove for clamping the gutter body is arranged in the bracket, a hook tongue is arranged on the inner wall of the mounting groove close to the top, a first limit block and a second limit block are formed on the outer wall of the gutter body, and the hook tongue is hooked between the first limit block and the second limit block; a through hole 1 is opened on the bottom and side walls of the gutter body, and a through hole 2 adapted to the through hole 1 is opened on the bracket; S2, model segmentation, with the side of the bracket away from the track gutter as the bottom, and the end of the track body away from the bracket as the top, and the direction from the bottom to the top is selected as the manufacturing direction, and then the track structure components obtained in S1 are segmented along the manufacturing direction to obtain three segmented structures, among which the track body is the first segmented structure, the gutter body is the second segmented structure, and the bracket is the third segmented structure; S3, preparation before manufacturing: raw materials selection and inspection by spectrometer and mechanical testing machine; S4, the first stage of manufacturing: mold manufacturing, select SKD11 or D2 materials for mold manufacturing, which are rail mold, gutter mold and bracket mold. The rail mold corresponds to the structure of the rail body, the gutter mold corresponds to the gutter body and the connection structure between the gutter body and the rail body, and the bracket mold corresponds to the bracket structure; S5, the inspected raw materials are subjected to semi-fluid die casting, and the track mold, gutter mold and bracket mold are alternately die-casted by a die-casting machine; S6, second stage manufacturing: after die casting, it is reshaped by CNC milling; S7, heat treatment after shaping: heat treatment at 400℃~550℃ for 6-10 hours in a high temperature furnace and quenching; S8, CNC roughing; S9, after the fitter finalizes the shape, the secondary heat treatment is performed again; S10, after secondary heat treatment, finishing is performed to finalize the shape; S11, after finishing, three-dimensional testing, mechanical properties testing, fluorescence testing, and X-ray testing are performed in sequence; S12, the surface of the structural component is anodized.

2. A method for preparing a cleaning machine track structure assembly with drainage function as claimed in claim 1, It is characterized in that The installation groove in step S1 is opened to be inclined upward to fit the corresponding herringbone beam, and the inclination angle is between 15° and 60°.

3. A method for preparing a cleaning machine track structure assembly with drainage function as claimed in claim 1, It is characterized in that When the gutter mold is manufactured in step S4, the top of the hook tongue of the gutter mold abuts against the bottom of the second limit block, and a gap of 0.5 to 2 mm is reserved between the bottom of the hook tongue and the first limit block.

4. A method for preparing a cleaning machine track structure assembly with drainage function as claimed in claim 1, It is characterized in that The raw materials in step S3 include but are not limited to 6030-T6 aluminum bars.

5. A method for preparing a cleaning machine track structure assembly with drainage function as claimed in claim 4, It is characterized in that In step S9, the secondary heat treatment temperature is set at 110°C to 200°C.

6. A method for preparing a cleaning machine track structure assembly with drainage function as claimed in claim 4, It is characterized in that In step S3, a universal mechanical testing machine is used to test the tensile strength, yield strength and elongation of the cast test bar and the main body sample test bar, and the mechanical properties are tested in an environment of 150°C.

7. A method for preparing a cleaning machine track structure assembly with drainage function as claimed in claim 4, It is characterized in that The semi-fluid die-casting temperature in step S5 is 360° C., and the relative humidity of the air at the die-casting production site during the semi-fluid die-casting process shall not be greater than 50%.

8. A method for preparing a cleaning machine track structure assembly with drainage function as claimed in claim 4, It is characterized in that During the heat treatment in step S7, a special tool is used to clamp and fix the workpiece, and the workpiece is kept in a vertical state for production, and the workpiece is fed into the furnace and quenched by vertical movement.

9. A cleaning machine track structure assembly with drainage function, It is characterized in that The cleaning machine track structure component with drainage function is prepared by the preparation method according to any one of claims 1 to 8.