Integrated forming method for internal solid stiffening of centrifugal precast pile
By using a solid, integrated molding method with circular hinges and limiting bars inside the precast pipe pile, the problem of concrete filling at the connection between the precast pipe pile and the steel pipe was solved, improving construction efficiency and quality, and enabling flexible concrete filling operations.
Patent Information
- Application Number
- CN202411134354.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-19
AI Technical Summary
In existing technologies, the concrete filling construction at the connection between precast pipe piles and steel pipes is difficult, the pouring quality is hard to guarantee, and it affects construction efficiency.
The method of solid internal reinforcement and integrated molding of centrifugal precast piles is adopted, and circular hinges and limiting bars are used for pre-embedding and fixing. Combined with centrifugal molding and vibration technology, the process of pouring core concrete is simplified.
It simplifies the concrete pouring process for precast pipe piles, improves construction efficiency and pouring quality, meets design requirements for different heights, and offers flexibility and reliability.
Smart Images

Figure CN118977318A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of prefabricated pipe piles, in particular to a method for integrally forming a centrifugal prefabricated pile with solid internal reinforcement. Background Art
[0002] There are two main forms of precast high-strength concrete pipe piles: pre-tensioned prestressed pipe piles and post-tensioned prestressed pipe piles. Pre-tensioned prestressed high-strength concrete pipe piles are hollow cylindrical concrete components made by pre-tensioning construction technology and centrifugal forming technology. Its main components are cylindrical pile caps, steel sleeves and end plates. Prestressed high-strength concrete precast pipe piles are widely used, such as tower crane foundations and the base foundations of reinforced concrete structures. The pile body has strong impact resistance, good crack resistance, and relatively low cost. And because the concrete strength of the pile body is greater than C80, its single pile bearing capacity is high and its bending resistance is good.
[0003] When the adjacent prefabricated pipe piles are unearthed at a large height, transverse steel pipes need to be arranged between the pipe piles to increase the transverse stiffness of the pile plate substructure. Considering that the local stress at the connection between the pipe pile and the steel pipe is too large, concrete core filling is performed at this location for reinforcement. However, the construction of concrete core filling at the connection between the pipe pile and the steel pipe is difficult, and the pouring quality is not easy to guarantee, which reduces the construction efficiency of prefabricated pipe piles. Summary of the invention
[0004] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a centrifugal precast pile internal solid reinforcement integrated molding method, which is aimed at the concrete core filling construction of prestressed high-strength concrete pipe piles by pre-tensioning method, facilitates the construction of precast pipe pile concrete core filling and improves the pouring quality, and ensures the local force at the connection between the precast pipe pile and the steel pipe.
[0005] The purpose of the present invention can be achieved by the following technical solutions:
[0006] The present invention provides a centrifugal prefabricated pile internal solid reinforcement integrated molding method, comprising the following steps:
[0007] S1: The prefabricated pipe pile is reinforced with steel bars, and at this time, a circular hinge is embedded and installed at one end of the part to be poured with core-filled concrete; the circular hinge comprises: a left semicircular hinge piece, a right semicircular hinge piece and a hinge latch bar, the left semicircular hinge piece is provided with a left semicircular hinge piece latch hole, and the right semicircular hinge piece is provided with a right semicircular hinge piece latch hole; the hinge latch bar passes through the left semicircular hinge piece latch hole and the right semicircular hinge piece latch hole for hinge assembly, and the hinge latch bar is fixed to the prefabricated pipe pile reinforcement;
[0008] S2: Install the limiting rib under the circular hinge, close to the circular hinge;
[0009] S3: After the prefabricated pipe pile is centrifugally formed, the interior of the prefabricated pipe pile is cleaned in the direction of closing the circular hinge;
[0010] S4: After the interior of the precast pipe pile is cleaned, pour the calculated amount of concrete into the pouring inlet of the core filling concrete part to fill the core.
[0011] Furthermore, the limiting ribs and the hinge pin ribs are cross-shaped.
[0012] Furthermore, the limiting bars are fixed to the adjacent pipe pile reinforcements when the prefabricated pipe pile reinforcements are tied.
[0013] Furthermore, the circular hinge is a one-way opening and closing structure.
[0014] Furthermore, the closing direction of the circular hinge points to the casting section of the core-filled concrete part.
[0015] Furthermore, when the circular hinge is in an open state, the left semicircular hinge piece and the right semicircular hinge piece are held back by the limiting ribs and are laid flat.
[0016] Furthermore, in S4, vibration is performed during the core filling process.
[0017] Furthermore, the circular hinge is customized by a processing factory according to size requirements.
[0018] Furthermore, the diameter of the circular hinge is 2 to 3 cm smaller than the inner diameter of the prefabricated pipe pile to ensure normal opening and closing of the circular hinge.
[0019] Furthermore, in S1, the circular hinge is pre-embedded as a bottom template for concrete pouring at one end of the part where the core-filling concrete is to be poured.
[0020] Compared with the prior art, the present invention has the following advantages:
[0021] (1) The present invention proposes a centrifugal precast pile internal solid reinforcement integrated molding method, which simplifies the precast pipe pile core filling concrete pouring and formwork support steps and improves the construction efficiency of the precast pipe pile core filling concrete.
[0022] (2) The present invention can perform concrete core filling at different heights of pipe piles according to actual needs, while meeting design requirements and construction quality requirements, and has good flexibility and reliability. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a schematic diagram of the finished product of prefabricated pipe pile concrete core filling;
[0024] Figure 2 This is a schematic diagram of the closed state of the circular hinge of the prefabricated pipe pile;
[0025] Figure 3 This is a schematic diagram of the prefabricated pipe pile circular hinge in the open state;
[0026] Figure 4 This is a schematic diagram of pouring core concrete for precast pipe piles;
[0027] Figure 5 This is a schematic diagram of the opening and closing of the circular hinge of the prefabricated pipe pile;
[0028] Figure 6 It is a schematic diagram of a semicircular hinge.
[0029] Figure numerals: 1. prefabricated pipe pile, 11. core-filled concrete part; 2. circular hinge, 21. left semicircular hinge piece, 211. left semicircular hinge piece pin hole, 22. right semicircular hinge piece, 221. right semicircular hinge piece pin hole, 23. hinge pin rib; 3. limiting rib. DETAILED DESCRIPTION
[0030] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. Component models, material names, connection structures, control methods, algorithms and other features not clearly described in this technical solution are all considered to be common technical features disclosed in the prior art.
[0031] Example 1
[0032] This embodiment provides a centrifugal prefabricated pile internal solid reinforcement integrated molding method, such as Figure 1 , 2 , 3, 4, 5, and 6, including the following steps:
[0033] S1: The prefabricated pipe pile 1 is reinforced with steel bars, and the circular hinge 2 is embedded and installed at one end of the core-filled concrete portion 11 to be poured; the circular hinge 2 comprises: a left semicircular hinge piece 21, a right semicircular hinge piece 22 and a hinge latch rib 23, wherein the left semicircular hinge piece 21 is provided with a left semicircular hinge piece latch hole 211, and the right semicircular hinge piece 22 is provided with a right semicircular hinge piece latch hole 221; the hinge latch rib 23 passes through the left semicircular hinge piece latch hole 211 and the right semicircular hinge piece latch hole 221 for hinge assembly, and the hinge latch rib 23 is fixed to the steel bars of the prefabricated pipe pile 1;
[0034] S2: Install the limiting rib 3 under the circular hinge 2, close to the circular hinge 2;
[0035] S3: After the prefabricated pipe pile 1 is centrifugally formed, the interior of the prefabricated pipe pile 1 is cleaned in the direction of closing the circular hinge 2;
[0036] S4: After the interior of the prefabricated pipe pile 1 is cleaned, a calculated amount of concrete is poured into the pouring inlet of the core-filling concrete portion 11 for core-filling.
[0037] In a specific implementation, the limiting ribs 3 and the hinge pin ribs 23 are cross-shaped.
[0038] In a specific implementation, the limiting ribs 3 are fixed to the adjacent pipe pile reinforcements when the reinforcements of the prefabricated pipe piles 1 are tied.
[0039] In a specific implementation, the circular hinge 2 is a one-way opening and closing structure.
[0040] In a specific embodiment, the closing direction of the circular hinge 2 points to the pouring section of the core-filled concrete part 11 .
[0041] In a specific implementation, when the circular hinge 2 is in an open state, the left semicircular hinge piece 21 and the right semicircular hinge piece 22 are held back by the limiting ribs 3 and are laid flat.
[0042] In a specific implementation, in S4, vibration is performed during the core filling process.
[0043] In a specific implementation, the circular hinge 2 is customized by a processing factory according to size requirements.
[0044] In a specific implementation, the diameter of the circular hinge 2 is 2 to 3 cm smaller than the inner diameter of the prefabricated pipe pile 1 to ensure normal opening and closing of the circular hinge 2 .
[0045] In a specific implementation, in S1, the circular hinge 2 is pre-embedded and installed at one end of the core-filled concrete portion 11 to be poured as a bottom template for concrete pouring.
[0046] Components not described in detail in this embodiment are all existing components that can be purchased through public channels.
[0047] The above description of the embodiments is to facilitate the understanding and use of the invention by those skilled in the art. It is obvious that those skilled in the art can easily make various modifications to these embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments, and improvements and modifications made by those skilled in the art based on the disclosure of the present invention without departing from the scope of the present invention should be within the scope of protection of the present invention.
Claims
1. A centrifugal prefabricated pile internal solid reinforcement integrated molding method, characterized in that: The following steps are involved: S1: The prefabricated pipe pile (1) is subjected to steel bar binding, and at this time, the circular hinge (2) is pre-buried and installed at one end of the core-filled concrete portion (11) to be poured; the circular hinge (2) comprises: a left semicircular hinge piece (21), a right semicircular hinge piece (22) and a hinge latch rib (23); the left semicircular hinge piece (21) is provided with a left semicircular hinge piece latch hole (211), and the right semicircular hinge piece (22) is provided with a right semicircular hinge piece latch hole (221); the hinge latch rib (23) passes through the left semicircular hinge piece latch hole (211) and the right semicircular hinge piece latch hole (221) for hinge assembly, and the hinge latch rib (23) is fixed to the steel bar of the prefabricated pipe pile (1); S2: Install the limiting rib (3) below the circular hinge (2) so that it is closely attached to the circular hinge (2); S3: After the prefabricated pipe pile (1) is centrifugally formed, the interior of the prefabricated pipe pile (1) is cleaned in the direction of closing the circular hinge (2); S4: After the interior of the prefabricated pipe pile (1) is cleaned, a calculated amount of concrete is poured into the pouring inlet of the core-filling concrete portion (11) to fill the core.
2. The method for forming a centrifugal prefabricated pile with solid internal reinforcement according to claim 1, characterized in that: The limiting ribs (3) and the hinge latch ribs (23) are cross-shaped.
3. The method for forming a centrifugal prefabricated pile with solid internal reinforcement according to claim 1, characterized in that: The limiting ribs (3) are fixed to the adjacent pipe pile reinforcements when the reinforcements of the prefabricated pipe piles (1) are tied.
4. The method for forming a centrifugal prefabricated pile with solid internal reinforcement according to claim 1, characterized in that: The circular hinge (2) is a one-way opening and closing structure.
5. The method for forming a centrifugal precast pile with solid internal reinforcement according to claim 4, characterized in that: The closing direction of the circular hinge (2) points to the pouring section of the core-filled concrete portion (11).
6. The method for forming a centrifugal precast pile with solid internal reinforcement according to claim 4, characterized in that: When the circular hinge (2) is in an open state, the left semicircular hinge piece (21) and the right semicircular hinge piece (22) are held against by the limiting ribs (3) and are laid flat.
7. The method for forming a centrifugal precast pile with solid internal reinforcement according to claim 1, characterized in that: In S4, vibration is performed during the core filling process.
8. The method for forming a centrifugal precast pile with solid internal reinforcement according to claim 1, characterized in that: The circular hinge (2) is customized by a processing factory according to size requirements.
9. The method for forming a centrifugal prefabricated pile with solid internal reinforcement according to claim 1, characterized in that: The diameter of the circular hinge (2) is 2 to 3 cm smaller than the inner diameter of the prefabricated pipe pile (1) to ensure the normal opening and closing of the circular hinge (2).
10. The method for forming a centrifugal precast pile with solid internal reinforcement according to claim 1, characterized in that: In S1, a circular hinge (2) is pre-embedded as a bottom template for concrete pouring at one end of a core-filled concrete portion (11) to be poured.