Switchable train operation control method, device and equipment and storage medium
By setting up virtual sections for the track circuit and switching the target train control system in the hybrid train control system, the problem of insufficient redundancy in the train operation control system in the prior art when equipment failure is achieved, and higher stability is achieved and security.
Patent Information
- Application Number
- CN202411070252.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-08-06
AI Technical Summary
The existing rail transit train operation control system lacks redundancy when equipment fails, resulting in train stopping, affecting operation stability and safety.
By using the switchable train operation control method, by setting corresponding track circuit virtual sections for the physical section of the track circuit, the first train control system and the second train control system in the hybrid train control system are independent of each other, and according to the fault type Switch the target train control system to ensure that the train operates safely in physical or virtual sections of the track circuit.
It improves the redundancy and stability of the train control system, ensures that the train can still be driven safely and efficiently when the track circuit fails, reduces the pressure on maintenance personnel, and enhances the resilience and safety reliability of the system.
Smart Images

Figure CN118977755A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of rail transit technology, and in particular to a switchable train operation control method, device, equipment and storage medium. Background Art
[0002] In the existing rail transit, the following three train operation control modes are mainly adopted. First, the line without track occupancy inspection device (axle counter or track circuit) on the trackside of the section is represented by the existing CTCS-0 (Chinese Train Control System 0, China Train Control System Level 0) station interlocking system. In this train operation control mode, once any device of the system fails, the train will stop, lacking redundancy; second, the line with track occupancy inspection device on the trackside of the section, and the train operation control system adopts a single system, represented by the existing CTCS-0 four-display automatic blocking system. In this train operation control mode, once any device of the system fails, the train will stop, lacking redundancy; third, the line with track occupancy inspection device on the trackside of the section, and the train control system adopts a dual system, taking the existing high-speed rail CTCS-3 (Chinese Train Control System 3, China Train Control System Third Generation) system as an example, composed of CTCS-3 and CTCS-2 (Chinese Train Control System 2. China Train Control System (Second Generation) is composed of two systems with high redundancy. However, if a section track circuit fault occurs, the redundancy of the CTCS-3 and CTCS-2 dual systems will be lost, and the train will be braked to stop until the section track circuit fault is repaired. The train will then be allowed to continue running.
[0003] Therefore, there is an urgent need for a train operation control method to improve the redundancy and stability of the train control system. Summary of the invention
[0004] The present invention provides a switchable train operation control method, device, equipment and storage medium to improve the redundancy and stability of the train control system.
[0005] According to one aspect of the present invention, a switchable train operation control method is provided, and the switchable train operation control method is applied to a hybrid train control system, wherein the hybrid train control system includes a first train control system and a second train control system; the method includes:
[0006] Based on the track circuit physical section, a corresponding track circuit virtual section is set for each track circuit physical section; the track circuit virtual section and the track circuit physical section are used to indicate the same track area, and only the track circuit physical section has a corresponding physical device; the first train control system controls the train operation based on the track circuit physical section, and the second train control system controls the train operation based on the track circuit virtual section;
[0007] Based on the fault type of the hybrid train control system, a target train control system is determined in the first train control system and the second train control system to control the train to run within the physical section of the track circuit; the fault type includes signal trackside equipment failure and communication trackside equipment failure.
[0008] According to another aspect of the present invention, a switchable train operation control device is provided, which is applied to a hybrid train control system, wherein the hybrid train control system includes a first train control system and a second train control system; the device includes:
[0009] a virtual section setting module, configured to set a corresponding track circuit virtual section for each track circuit physical section based on the track circuit physical section; the track circuit virtual section and the track circuit physical section are used to indicate the same track area, and only the track circuit physical section has a corresponding physical device; the first train control system controls the train operation based on the track circuit physical section, and the second train control system controls the train operation based on the track circuit virtual section;
[0010] An operation control module is used to determine a target train control system in the first train control system and the second train control system based on the fault type of the hybrid train control system, and control the train to operate within the physical section of the track circuit; the fault type includes signal trackside equipment failure and communication trackside equipment failure.
[0011] According to another aspect of the present invention, there is provided an electronic device, the electronic device comprising:
[0012] at least one processor; and
[0013] a memory communicatively connected to the at least one processor; wherein,
[0014] The memory stores a computer program that can be executed by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the switchable train operation control method described in any embodiment of the present invention.
[0015] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to implement the switchable train operation control method described in any embodiment of the present invention when executed by a processor.
[0016] According to another aspect of the present invention, a computer program product is provided, the computer program product comprising a computer program, and the computer program, when executed by a processor, implements the switchable train operation control method described in any embodiment of the present invention.
[0017] The technical solution of the embodiment of the present invention, by setting a one-to-one corresponding track circuit virtual section for the track circuit physical section, enables the first train control system to control the train operation based on the track circuit physical section, and enables the second train control system to control the train operation based on the track circuit virtual section, and based on the different types of faults in the hybrid train control system, determines different target train control systems to control the train operation, so that the first train control system and the second train control system are relatively independent, further improving the redundancy and stability of the train control system.
[0018] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0020] Figure 1a is a system architecture diagram of a hybrid train control system provided according to Embodiment 1 of the present invention;
[0021] Figure 1b is a flow chart of a switchable train operation control method provided according to Embodiment 1 of the present invention;
[0022] Figure 2 is a flow chart of a switchable train operation control method provided according to Embodiment 2 of the present invention;
[0023] Figure 3 is a structural schematic diagram of a switchable train operation control device provided according to Embodiment 3 of the present invention;
[0024] Figure 4It is a schematic diagram of the structure of an electronic device for implementing the switchable train operation control method according to an embodiment of the present invention. DETAILED DESCRIPTION
[0025] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0026] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0027] Embodiment 1
[0028] Figure 1a A system architecture diagram of a hybrid train control system provided in Embodiment 1 of the present invention, such as Figure 1aAs shown, the hybrid train control system includes on-board equipment, ground equipment and a ground wireless communication system; the on-board equipment may include EOT (End of Train Device) and ATP / ATO (Automatic Train Protection / Automatic Train Operation) units; the ground equipment may include transponders and track circuits, TSRS (Train Stop Recognition System), RBC (Radio Block Center), TIS (Train Information System), TCC (Train Communication and Control system), CTC (Centralized Traffic Control system) and CTC station extensions.
[0029] EOF can be used to collect wind pressure information at the end of the train and transmit it safely to the ATP at the head of the train for train integrity inspection; ATP can be used to monitor the train overspeed curve protection according to the driving permission information provided by the ground equipment, and it also has CTCS-N and CTCS-2 level functions; ATO can be used to complete the train automatic driving function under the ATP curve; TIS can be used to realize the station interlocking function, and control the signal machine, switch machine and other trackside equipment in the station through the target controller; RBC can be used to calculate MA (Movement Authority, driving permission) according to the station route information, section direction and train position in the jurisdiction provided by TIS, and send driving permission, line parameters and temporary speed limit command to ATP through wireless communication between train and ground; TSRS can be used to realize the temporary speed limit, electronic map and operation plan data management of trains in the section; CTC can be used to display the operation status information of trains, lines and stations, and provide train operation related operation functions; CTC station extension can refer to the station communication equipment or telephone system in CTC. It should be noted that the above equipment or system has the basic functions that can be realized by itself.
[0030] It should be noted that the hybrid train control system integrates the first train control system and the second train control system. For example, RBC is required by the second train control system, and the operation of the first train control system does not need to be based on RBC. The second train control system can use RBC to send wireless MA to ATP through the ground wireless communication system, and the first train control system can use track circuits to send track circuit MA to ATP in the form of coded information. Optionally, the first train control system can be set to CTCS-2, and the second train control system can be set to CTCS-N (Chinese Train Control System N, the latest version of the Chinese train control system).
[0031] Optionally, the hybrid train control system also includes LKJ (Locomotive Keying and Jumping, locomotive connection and accompanying control system), which integrates the CTCS-0 system.
[0032] The hybrid train control system architecture integrates the relevant equipment of the CTCS-2 system and the CTCS-N system. When the signal trackside equipment (track circuit) fails, the train can switch to the CTCS-N system; when the communication trackside equipment fails (for example, the train-ground wireless communication is interrupted), the train can switch to the CTCS-2 system; when the signal trackside equipment and the communication trackside equipment fail at the same time, it can also switch to the backup CTCS-0 system, which has extremely high redundancy and improves the resilience of the system's stable operation.
[0033] Figure 1b A flowchart of a switchable train operation control method is provided for the first embodiment of the present invention. This embodiment is applicable to the case where the train is operated and controlled after the train is started. The method is applied to a hybrid train control system including a first train control system and a second train control system. The method can be executed by a switchable train operation control device. The switchable train operation control device can be implemented in the form of hardware and / or software. The switchable train operation control device can be configured in various general-purpose computing devices. Figure 1b As shown, the method includes:
[0034] S110. Based on the track circuit physical sections, set a corresponding track circuit virtual section for each track circuit physical section.
[0035] Among them, the physical section of the track circuit may refer to a track area where a track circuit is set up, and the physical section of the track circuit has a corresponding physical device (track circuit). The virtual section of the track circuit may refer to a virtual section established for the track area where a track circuit is set up. In other words, the same track area may have a physical section of the track circuit and a virtual section of the track circuit, which are used to indicate the same track area (section), and only the physical section of the track circuit has a corresponding physical device, and the virtual section of the track circuit does not have a corresponding physical device.
[0036] It should be noted that the first train control system can control the train operation based on the physical section of the track circuit, and the second train control system can control the train operation based on the virtual section of the track circuit, decoupling to form different safety control logics under the same track circuit conditions.
[0037] In the embodiment of the present invention, a track circuit virtual section may be set in advance corresponding to each track circuit physical section, so that when a track circuit fails, the second train control system may be used to control the train operation based on the track circuit virtual section.
[0038] Optionally, when the usage status of the track circuit physical section is idle, the usage status of the track circuit virtual section corresponding to the track circuit physical section is idle; when the usage status of the track circuit physical section is occupied, if there is no communication train position report in the track circuit physical section and the safety logic check passes, the usage status of the track circuit virtual section corresponding to the track circuit physical section is updated to idle.
[0039] The usage state can be used to indicate whether a track circuit physical section or a track circuit virtual section allows trains to pass through, the idle state can indicate whether a track circuit physical section or a track circuit virtual section allows trains to pass through, and the occupied state can indicate whether a track circuit physical section or a track circuit virtual section does not allow trains to pass through. Optionally, the occupied state is also used to indicate that a track circuit physical section is a safety fault troubleshooting section (a faulty section).
[0040] Optionally, in an embodiment of the present invention, when the usage status of the physical section of the track circuit is occupied, it is necessary to first determine whether there is a communication train in the physical section of the track circuit. Since the train needs to consider the entire vehicle length range from the head to the end of the train, the specific judgment process can determine whether there is a communication train in the physical section of the track circuit based on the train position report of the communication train. In the case of the existence of a communication train, the train integrity is detected based on ATP and EOT, and the RBC can determine whether the communication train has cleared the physical section of the track circuit.
[0041] Among them, the safety logic check can be used to determine whether there is a non-communication train in the physical section of the track circuit. The safety logic check may include manually sending a section idle command or dispatching the first communication train to clean the physical section of the track circuit in the occupied state at a preset cleaning speed; the first communication train may refer to the communication train that is closest to the physical section of the track circuit in the occupied state and has not entered the physical section of the track circuit. It should be noted that non-communication trains cannot issue train position reports to determine their positions, so it is necessary to clean the physical section of the track circuit in the occupied state. Optionally, the preset cleaning speed can be adaptively set according to technical personnel in this field.
[0042] S120. Based on the fault type of the hybrid train control system, determine a target train control system in the first train control system and the second train control system, and control the train to run in the physical section of the track circuit.
[0043] Among them, the fault type may include signal trackside equipment fault and communication trackside equipment fault. It should be noted that trackside equipment fault may refer to a track circuit fault, and communication trackside equipment fault may refer to a train-ground wireless communication fault; the target train control system may refer to the train control system that controls the train operation after the hybrid train control system fails.
[0044] Specifically, during the operation of the train, the target train control system can be flexibly determined in the first train control system and the second train control system according to the type of fault occurring in the hybrid train control system, so as to control the train to operate in the track section to which the track circuit physical section belongs.
[0045] The technical solution of the embodiment of the present invention, by setting a one-to-one corresponding track circuit virtual section for the track circuit physical section, enables the first train control system to control the train operation based on the track circuit physical section, and enables the second train control system to control the train operation based on the track circuit virtual section, and based on the different types of faults in the hybrid train control system, determines different target train control systems to control the train operation, so that the first train control system and the second train control system are relatively independent, further improving the redundancy and stability of the train control system.
[0046] Embodiment 2
[0047] Figure 2This is a flow chart of a switchable train operation control method provided in the second embodiment of the present invention. This embodiment further refines the above embodiment and provides specific steps for determining the target train control system in the first train control system and the second train control system based on the fault type of the hybrid train control system, and controlling the train to run in the physical section of the track circuit. It should be noted that for the parts not described in detail in the embodiment of the present invention, please refer to the relevant descriptions of other embodiments, which will not be repeated here. Figure 2 As shown, the method includes:
[0048] S210. Based on the track circuit physical sections, set a corresponding track circuit virtual section for each track circuit physical section.
[0049] S220. When a signal trackside equipment failure occurs in the hybrid train control system, the second train control system is determined as the target train control system.
[0050] S230. Using the driving permit generated by the target train control system based on the usage status of the virtual section of the track circuit, control the train to run in the virtual section of the track circuit.
[0051] S240. When a communication trackside equipment failure occurs in the hybrid train control system, the first train control system is determined as the target train control system.
[0052] S250. Using the driving permit generated by the target train control system based on the usage status of the physical section of the track circuit, control the train to run within the physical section of the track circuit.
[0053] Optionally, after a signal trackside equipment failure occurs in the hybrid train control system, the method further includes: updating the usage status of a virtual section of the track circuit corresponding to the physical section of the track circuit where the failure occurs to an occupied status through a wireless block center.
[0054] In an embodiment of the present invention, in the case of a signal trackside equipment failure in a hybrid train control system, the use status of the track circuit physical section where the signal trackside equipment failure occurs can be updated to an occupied state through the radio block center, and the use status of the track circuit physical section prohibits the train from passing. At this time, the second train control system in the hybrid train control system can be switched to be determined as the target train control system, and the train is controlled to run in the track section to which the track virtual section belongs according to the driving permit generated by the use status of the track circuit virtual section; in the case of a communication trackside equipment failure in the hybrid train control system, the hybrid train control system cannot send the driving permit to ATP based on the vehicle-ground wireless communication. At this time, the first train control system in the hybrid train control system can be switched to be determined as the target train control system, and the driving permit generated according to the use status of the track circuit physical section is sent to ATP through the track circuit to control the train to run in the track section to which the track physical section belongs.
[0055] Optionally, the target train control system generates a driving permit based on the usage status of the virtual section of the track circuit to control the train to operate in the virtual section of the track circuit, including: when the safety logic check of the physical section of the track circuit where the signal trackside equipment failure occurs is passed, the usage status of the virtual section of the track circuit corresponding to the physical section of the track circuit is updated to an idle state; based on the wireless block center, a driving permit is generated according to the updated usage status of the virtual section of the track circuit to control the train to operate in the track section to which the virtual section of the track circuit belongs, and the usage status of the virtual section of the track circuit is updated to an occupied state; and after the train completes clearance in the physical section of the track circuit, the usage status of the virtual section of the track circuit is updated to an idle state.
[0056] Specifically, in the event of a signal trackside equipment failure, that is, when the use status of a physical section of the track circuit is occupied, if the track maintenance personnel can promptly confirm that the rails to which the physical section of the track circuit belongs are in good condition, that is, there are no abnormal conditions such as breakage of the rails in the physical section of the track circuit, a safety logic check can be issued to the physical section of the track circuit. If the safety logic check passes, the use status of the virtual section of the track circuit corresponding to the physical section of the track circuit is updated to an idle state through the wireless block center. At this time, since the track circuit in the physical section of the track circuit has not been inspected and repaired, the use status of the physical section of the track circuit is occupied, and the update status of the virtual section of the track circuit corresponding to the physical section of the track circuit has been updated to an idle state. Therefore, the wireless block center can generate a driving permit based on the use status of the virtual section of the track circuit to control the train in the track circuit. The train runs in the track section to which the virtual section of the track circuit belongs, and when the train runs in the physical section of the track circuit, the use status of the virtual section of the track circuit is updated from the idle state to the occupied state through the radio block center, and after the train completes the clearance in the physical section of the track circuit, the use status of the virtual section of the track circuit is updated to the idle state; if the track maintenance personnel cannot promptly confirm whether the rails belonging to the physical section of the track circuit are in good condition, that is, whether the rails in the physical section of the track circuit are broken or other abnormal conditions, the first communication train can be dispatched to clean the physical section of the track circuit with an occupied state at a preset cleaning speed, so that the use status of the virtual section of the track circuit corresponding to the physical section of the track circuit is updated to the idle state, and a speed limit instruction is sent to ATP through RBC to control the speed limit (up to 45km / h) of the train passing through the physical section of the track circuit where the signal trackside equipment failure occurs.
[0057] Optionally, in an embodiment of the present invention, in the event of a signal trackside equipment failure, if the physical section of the track circuit is isolated or cleared, the usage status of the physical section of the track circuit is still occupied, that is, the track circuit MA generated by the track circuit according to the usage status of the physical section of the track circuit is still prohibited for passage through the track section to which the physical section of the track circuit belongs, while the usage status of the virtual section of the track circuit corresponding to the physical section of the track circuit is idle, and the wireless MA generated by the RBC according to the usage status of the physical section of the track circuit allows passage through the track section to which the virtual section of the track circuit belongs. In order to avoid stopping due to taking the shorter driving permit terminal after redundant comparison of the two, it is necessary to add an on or off control function to the existing driving permit hyperbola comparison function.
[0058] Furthermore, RBC can send a command to turn off the existing driving permission hyperbola comparison function to the onboard equipment of the train within the preset transmission range. After the train leaves the track circuit physical section where the signal trackside equipment failure occurs, RBC can send a command to turn on the existing driving permission hyperbola comparison function to the onboard equipment of the train. The preset transmission range can be adaptively set according to those skilled in the art, for example, 6 block partitions away from the track circuit physical section where the signal trackside equipment failure occurs.
[0059] Optionally, in an embodiment of the present invention, regardless of whether the driving permit hyperbola comparison function is turned on or off, a new function will be added to the on-board equipment to verify the legitimacy of the wireless MA sent by the RBC, that is, TSRS is responsible for providing the position information of the current communication train to the on-board equipment, and ATP is responsible for verifying whether there are other communication trains within the range of the received wireless MA. If the verification finds that there are still communication train envelopes within the range of the wireless MA provided by RBC, ATP determines that the current wireless MA is illegal and disconnects the communication connection with RBC. The hybrid train control system automatically downgrades to the first train control system. If the MA is legal, ATP continues to compare with the existing track circuit information code sequence, selects a shorter driving permit endpoint, and controls the train operation.
[0060] By adding the function of verifying the legality of wireless MA to the on-board equipment, the safety and reliability of heterogeneous comparison is further enhanced, and the safety of train operation is improved, compared with the on-board equipment only comparing the wireless MA with the track circuit MA for driving permit hyperbolic comparison.
[0061] The technical solution of the embodiment of the present invention adopts the second train control system to control the train operation when the signal trackside equipment fails, and adopts the first train control system to control the train operation when the communication trackside equipment fails. This ensures safe and efficient operation after the track circuit fails, further improves the stability and redundancy of the train control system, and reduces the pressure on personnel to maintain line equipment.
[0062] Embodiment 3
[0063] Figure 3 This is a schematic diagram of the structure of a switchable train operation control device provided in Embodiment 3 of the present invention, which is applied to a hybrid train control system, which includes a first train control system and a second train control system. Figure 3 As shown, the device comprises:
[0064] The virtual section setting module 310 is used to set a corresponding track circuit virtual section for each track circuit physical section based on the track circuit physical section; the track circuit virtual section and the track circuit physical section are used to indicate the same track area, and only the track circuit physical section has a corresponding physical device; the first train control system controls the train operation based on the track circuit physical section, and the second train control system controls the train operation based on the track circuit virtual section;
[0065] The operation control module 320 is used to determine the target train control system in the first train control system and the second train control system based on the fault type of the hybrid train control system, and control the train to operate within the physical section of the track circuit; the fault type includes signal trackside equipment failure and communication trackside equipment failure.
[0066] The technical solution of the embodiment of the present invention, by setting a one-to-one corresponding track circuit virtual section for the track circuit physical section, enables the first train control system to control the train operation based on the track circuit physical section, and enables the second train control system to control the train operation based on the track circuit virtual section, and based on the different types of faults in the hybrid train control system, determines different target train control systems to control the train operation, so that the first train control system and the second train control system are relatively independent, further improving the redundancy and stability of the train control system.
[0067] Optionally, the operation control module 320 includes:
[0068] a second target system unit, configured to determine the second train control system as a target train control system in case a signal trackside equipment failure occurs in the hybrid train control system;
[0069] A second target system operation unit, configured to control the train to operate in the track circuit virtual section by using the driving permission generated by the target train control system based on the use status of the track circuit virtual section;
[0070] a first target system unit, configured to determine the first train control system as a target train control system in case a communication trackside equipment failure occurs in the hybrid train control system;
[0071] The first target system operation unit is used to control the train to operate in the track circuit physical section using the driving permit generated by the target train control system based on the usage status of the track circuit physical section.
[0072] Optionally, the second target system operation unit may be specifically used for: when the safety logic check of the track circuit physical section where the signal trackside equipment failure occurs is passed, updating the usage status of the track circuit virtual section corresponding to the track circuit physical section to an idle state; based on the wireless block center, generating a driving permit according to the updated usage status of the track circuit virtual section, controlling the train to run in the track circuit virtual section, and updating the usage status of the track circuit virtual section to an occupied state; and after the train has completed the clearance in the track circuit physical section, updating the usage status of the track circuit virtual section to an idle state.
[0073] Optionally, the operation control module 320 further includes:
[0074] The status updating unit is used to update the use status of the track circuit virtual section corresponding to the faulty track circuit physical section to an occupied state through the wireless block center by using the second train communication system after a signal trackside equipment failure occurs in the hybrid train control system.
[0075] Optionally, when the usage status of the track circuit physical section is idle, the usage status of the track circuit virtual section corresponding to the track circuit physical section is idle; when the usage status of the track circuit physical section is occupied, if there is no communication train position report in the track circuit physical section and the safety logic check passes, the usage status of the track circuit virtual section corresponding to the track circuit physical section is updated to idle; wherein, the safety logic check is used to determine whether there is a non-communication train in the track circuit physical section.
[0076] Optionally, the safety logic check includes manually sending a section idle command or dispatching the first communication train to clean the physical section of the track circuit in an occupied state at a preset cleaning speed; the first communication train refers to the communication train that is closest to the physical section of the track circuit in an occupied state and has not entered the physical section of the track circuit.
[0077] The switchable train operation control device provided in the embodiment of the present invention can execute the switchable train operation control method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0078] Embodiment 4
[0079] Figure 4A schematic diagram of an electronic device 410 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device may also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0080] like Figure 4 As shown, the electronic device 410 includes at least one processor 411, and a memory connected to the at least one processor 411 in communication, such as a read-only memory (ROM) 412, a random access memory (RAM) 413, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 411 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 412 or the computer program loaded from the storage unit 418 to the random access memory (RAM) 413. In the RAM 413, various programs and data required for the operation of the electronic device 410 can also be stored. The processor 411, the ROM 412, and the RAM 413 are connected to each other via a bus 414. An input / output (I / O) interface 415 is also connected to the bus 414.
[0081] Multiple components in the electronic device 410 are connected to the I / O interface 415, including: an input unit 416, such as a keyboard, a mouse, etc.; an output unit 417, such as various types of displays, speakers, etc.; a storage unit 418, such as a disk, an optical disk, etc.; and a communication unit 419, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 419 allows the electronic device 410 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0082] The processor 411 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 411 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 411 executes the various methods and processes described above, such as a switchable train operation control method.
[0083] In some embodiments, the switchable train operation control method may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 418. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 410 via the ROM 412 and / or the communication unit 419. When the computer program is loaded into the RAM 413 and executed by the processor 411, one or more steps of the switchable train operation control method described above may be performed. Alternatively, in other embodiments, the processor 411 may be configured to execute the switchable train operation control method in any other appropriate manner (e.g., by means of firmware).
[0084] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0085] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0086] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in conjunction with an instruction execution system, device, or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0087] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0088] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0089] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0090] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0091] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A switchable train operation control method, characterized in that: Applied to a hybrid train control system, the hybrid train control system includes a first train control system and a second train control system; the method includes: Based on the track circuit physical section, a corresponding track circuit virtual section is set for each track circuit physical section; the track circuit virtual section and the track circuit physical section are used to indicate the same track area, and only the track circuit physical section has a corresponding physical device; the first train control system controls the train operation based on the track circuit physical section, and the second train control system controls the train operation based on the track circuit virtual section; Based on the fault type of the hybrid train control system, a target train control system is determined in the first train control system and the second train control system to control the train to run within the physical section of the track circuit; the fault type includes signal trackside equipment failure and communication trackside equipment failure.
2. The method according to claim 1, characterized in that: Based on the fault type of the hybrid train control system, a target train control system is determined in the first train control system and the second train control system, and a train is controlled to run in the track circuit entity section, including: In the event of a signal trackside equipment failure in the hybrid train control system, determining the second train control system as a target train control system; Using the driving permission generated by the target train control system based on the use status of the track circuit virtual section, the train is controlled to run in the track circuit virtual section; In the event of a communication trackside equipment failure in the hybrid train control system, determining the first train control system as a target train control system; The target train control system uses the driving permission generated by the target train control system based on the usage status of the physical section of the track circuit to control the train to run within the physical section of the track circuit.
3. The method according to claim 2, characterized in that The target train control system generates a driving permit based on the use status of the track circuit virtual section to control the train to run in the track circuit virtual section, including: When the safety logic check of the track circuit physical section where the signal trackside equipment failure occurs passes, the use state of the track circuit virtual section corresponding to the track circuit physical section is updated to an idle state; Based on the radio block center, a driving permit is generated according to the updated usage status of the virtual section of the track circuit, and the train is controlled to run in the virtual section of the track circuit. At the same time, the usage status of the virtual section of the track circuit is updated to an occupied status; and after the train completes the clearance in the physical section of the track circuit, the usage status of the virtual section of the track circuit is updated to an idle status.
4. The method according to claim 2, characterized in that: After a signal trackside device failure occurs in the hybrid train control system, the method further includes: The second train communication system is used to update the usage status of the virtual section of the track circuit corresponding to the physical section of the track circuit where the fault occurs to an occupied status through the radio block center.
5. The method according to any one of claims 1 to 3, characterized in that: Also includes: When the use state of the track circuit physical section is an idle state, the use state of the track circuit virtual section corresponding to the track circuit physical section is an idle state; When the usage status of the physical section of the track circuit is occupied, if there is no communication train position report in the physical section of the track circuit and the safety logic check passes, the usage status of the virtual section of the track circuit corresponding to the physical section of the track circuit is updated to an idle state; wherein the safety logic check is used to determine whether there is a non-communication train in the physical section of the track circuit.
6. The method according to claim 5, characterized in that The safety logic check includes manually sending a section idle command or dispatching the first communication train to clean the physical section of the track circuit in an occupied state at a preset cleaning speed; the first communication train refers to the communication train that is closest to the physical section of the track circuit in an occupied state and has not entered the physical section of the track circuit.
7. A switchable train operation control device, characterized in that: Applied to a hybrid train control system, the hybrid train control system includes a first train control system and a second train control system; the device includes: a virtual section setting module, configured to set a corresponding track circuit virtual section for each track circuit physical section based on the track circuit physical section; the track circuit virtual section and the track circuit physical section are used to indicate the same track area, and only the track circuit physical section has a corresponding physical device; the first train control system controls the train operation based on the track circuit physical section, and the second train control system controls the train operation based on the track circuit virtual section; An operation control module is used to determine a target train control system in the first train control system and the second train control system based on the fault type of the hybrid train control system, and control the train to operate within the physical section of the track circuit; the fault type includes signal trackside equipment failure and communication trackside equipment failure.
8. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the switchable train operation control method according to any one of claims 1 to 6.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to implement the switchable train operation control method according to any one of claims 1 to 6 when executed by a processor.
10. A computer program product, characterized in that It comprises a computer program, which, when executed by a processor, implements the switchable train operation control method according to any one of claims 1 to 6.
Citation Information
Patent Citations
Train class conversion method and related device
CN102225695A
Shifting method and device for train control system
CN102387953A
Cross-line running method of two types of train control systems
CN106672018A
Train operation control system compatible with CTCS-2 and CBTC
CN112678034A
Implementation method of independent multi-mode train control system based on trackside platform
CN113022655A
Cited By
Method for transmitting low-frequency code sequence by train control center and method for processing low-frequency code sequence by vehicle-mounted equipment, and train control system
CN120529276A