Construction method and construction equipment for improving bonding strength of pavement base

By using pavers and road rollers to form step-type joint surfaces during pavement base construction, the problem of unstable connection between the new paved base and the formed base is solved, which significantly improves the bonding strength of the pavement base, prevents longitudinal joint reflections, and improves the Road stability and load-bearing capacity.

CN118979426APending Publication Date: 2024-11-19XINJIANG BEIXIN ROAD & BRIDGE GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411155464.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

During the construction of the pavement base layer, the longitudinal joint connection between the newly paved base layer and the formed base layer is unstable, resulting in a longitudinal joint reflection easily during construction of the large-thick base layer, affecting the load-bearing capacity of the pavement.

Method used

By combining paver and road roller, the first pavement base layer is spread in the first direction on the roadbed and a groove is formed, and then the second pavement base layer is spread in the vertical direction to fill the grooves, and finally the roller is used to cross the mill. Press to form a step-type bonding surface to improve bonding strength.

Benefits of technology

It effectively improves the bonding strength of the base layer of the two adjacent pavements, prevents longitudinal reflection through the seams, and enhances the stability and load-bearing capacity of the pavement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979426A_ABST
    Figure CN118979426A_ABST
Patent Text Reader

Abstract

The invention provides a construction method and construction equipment for improving the bonding strength of a pavement base, and relates to the technical field of road construction. The construction method comprises the steps that a paver is used for conducting paving on a roadbed in the first direction to form a first pavement base layer, and the first pavement base layer forms a first groove in the movement path of a stop block; a second pavement base layer is formed on the roadbed in the first direction through paving of the paver, the second pavement base layer is located on one side of the first pavement base layer in the second direction, the first groove is filled with the second pavement base layer, and the second direction is perpendicular to the first direction; a road roller is utilized to stretch across the first pavement base layer and the second pavement base layer to conduct rolling in the first direction, and the bonding strength of the two adjacent pavement base layers can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of road construction, and in particular to a construction method and construction equipment for improving the bonding strength of a road base. Background Art

[0002] The pavement base is a layered structure that is paved in layers on the surface of the roadbed (or cushion layer) using a single material according to certain technical measures. The quality of its materials and quality directly affects the quality and performance of the road surface. The pavement base is the load-bearing layer of the entire road and plays a role in stabilizing the road surface. The width of the pavement base is the same as the width of the roadbed, and the paving of the pavement base is often carried out in sections according to the thickness and width.

[0003] During the construction of the pavement base, the boundary between the newly paved base and the formed base should be clear, so that there is a longitudinal joint between the newly paved base and the formed base. Finally, the longitudinal joint is statically pressed two to three times by a roller and then the rolling is ended. The defect of this construction method is that when a thick base is constructed, the connection between the two adjacent pavement bases at the longitudinal joint is unstable, and it is easy to form a longitudinal through-joint joint that is reflected on the pavement. Summary of the invention

[0004] The purpose of the present application includes, for example, providing a construction method for improving the bonding strength of a pavement base, which can improve the bonding strength of two adjacent pavement bases.

[0005] The purpose of the present application also includes providing a construction equipment that can improve the bonding strength between two adjacent road bases.

[0006] The embodiments of the present application can be implemented as follows:

[0007] The embodiment of the present application provides a construction method for improving the bonding strength of a road base, which is applied to a construction equipment, wherein the construction equipment includes a paver and a roller, a baffle is provided on one side of the screed of the paver, and a block is provided between the screed and the baffle;

[0008] The construction method comprises:

[0009] Using a paver to pave on a roadbed along a first direction to form a first pavement base layer, wherein the first pavement base layer forms a first groove on the movement path of the block;

[0010] Using a paver to pave on the roadbed along a first direction to form a second pavement base layer, wherein the second pavement base layer is located on one side of the first pavement base layer in the second direction, the second pavement base layer fills the first groove, and the second direction is perpendicular to the first direction;

[0011] A road roller is used to roll the first pavement base layer and the second pavement base layer along a first direction.

[0012] Optionally, the step of using a paver to pave along the first direction on the roadbed to form a second road base layer includes:

[0013] A plurality of second pavement base layers are formed by paving on the roadbed along a first direction using a paver, wherein the plurality of second pavement base layers are arranged in sequence along a second direction, and each second pavement base layer forms a second groove on the movement path of the block, and in the second direction, the second pavement base layer adjacent to the first pavement base layer fills the first groove, and the latter second pavement base layer fills the second groove on the former second pavement base layer.

[0014] Optionally, after the step of using a paver to pave on the roadbed along the first direction to form a plurality of second pavement base layers, the method further includes:

[0015] A road roller is used to roll across two adjacent second pavement base layers.

[0016] Optionally, the step of rolling across two adjacent second pavement bases with a road roller includes:

[0017] Whenever a paver is used to pave the roadbed along a first direction to form two adjacent second pavement base layers, a roller is used to roll across the two adjacent second pavement base layers.

[0018] Optionally, after the step of rolling the first pavement base and the second pavement base along the first direction by a road roller, the method further includes:

[0019] A road roller is used to roll across the first pavement base layer and the second pavement base layer and across the adjacent second pavement base layer until the compacted thickness of the first pavement base layer and the second pavement base layer reaches a preset value.

[0020] The present application also provides a construction equipment for implementing the construction method, wherein the construction equipment includes a paver and a roller, a baffle is provided on one side of the ironing plate of the paver, and a block is provided between the ironing plate and the baffle.

[0021] Optionally, the ironing plate is perpendicular to the baffle, the bottom end of the baffle extends toward the roadbed, the block is simultaneously in contact with the ironing plate and the baffle, and the block is simultaneously connected to the ironing plate and the baffle.

[0022] Optionally, a first connecting portion is provided on the block, and a second connecting portion is provided on both the ironing plate and the baffle, and the first connecting portion is connected to the second connecting portion.

[0023] Optionally, the first connecting part is a nut, the second connecting part is a bolt, the surface where the block and the ironing plate are in contact and the surface where the block and the baffle are in contact both have the nut built in, the bolt on the ironing plate and the nut thread on the surface where the block and the ironing plate are in contact cooperate with each other, and the bolt on the baffle and the nut thread on the surface where the block and the baffle are in contact cooperate with each other.

[0024] Optionally, the block includes a plurality of steel plates, the plurality of steel plates are stacked in sequence, and adjacent steel plates are welded.

[0025] The beneficial effects of the construction method and construction equipment for improving the bonding strength of the pavement base provided by the embodiment of the present application include, for example: in order to improve the bonding strength of two adjacent pavement bases, a construction method for improving the bonding strength of the pavement base is designed, and the construction method is applied to the construction equipment, and the construction equipment includes a paver and a roller, and a baffle is provided on one side of the ironing plate of the paver, and a baffle is provided between the ironing plate and the baffle. The construction method includes: using the paver to pave along the first direction on the roadbed to form a first pavement base, wherein the first pavement base forms a first groove on the movement path of the baffle; using the paver to pave along the first direction on the roadbed to form a second pavement base, wherein the second pavement base is located on one side of the first pavement base in the second direction, the second pavement base fills the first groove, and the second direction is perpendicular to the first direction; using the roller to cross the first pavement base and the second pavement base and roll along the first direction. During the construction of the pavement base, a paver is first used to spread materials on the roadbed along a first direction to form a first pavement base, and a first groove is formed on the first pavement base on the movement path of the block; then the paver is used to spread materials on the roadbed along the first direction to form a second pavement base, and the second pavement base is located on one side of the first pavement base in the second direction, and the first groove is filled, forming a stepped bonding surface at the connection between the first pavement base and the second pavement base; finally, a roller is used to cross the first pavement base and the second pavement base to roll along the first direction, so that the stepped bonding surface formed between the first pavement base and the second pavement base is compacted tightly, thereby greatly improving the bonding strength of the two adjacent pavement bases, and it is not easy to form a longitudinal through seam between the first pavement base and the second pavement base to reflect to the road surface. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0027] Figure 1 This is a schematic diagram for showing the positional relationship between the stopper and the road base in the embodiment of the present application;

[0028] Figure 2 This is a schematic diagram for illustrating the connection relationship between the ironing plate, the baffle plate and the baffle block in the embodiment of the present application;

[0029] Figure 3 This is a flow chart of steps S1-S4 in the construction method of an embodiment of the present application;

[0030] Figure 4 This is a flowchart of sub-steps S21-S22 in the construction method of an embodiment of the present application.

[0031] Icon: 1-ironing plate; 2-baffle; 3-block; 4-pavement base; 5-roadbed; 6-bolt. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.

[0033] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0034] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0035] In the description of the present application, it should be noted that if the terms "upper", "lower", "inside", "outside", etc. appear to indicate an orientation or position relationship, it is based on the orientation or position relationship shown in the drawings, or is the orientation or position relationship in which the product of the invention is usually placed when used. It is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application.

[0036] In addition, the terms “first”, “second”, etc., if used, are merely used to distinguish between the descriptions and should not be understood as indicating or implying relative importance.

[0037] It should be noted that, in the absence of conflict, the features in the embodiments of the present application may be combined with each other.

[0038] The inventor of the present application has found that, during the construction of the road base, the boundary between the newly paved base and the formed base should be clear, so that there is a longitudinal seam between the newly paved base and the formed base, and finally the longitudinal seam is statically pressed two to three times by a roller before the rolling is finished. The defect of this construction method is that when a thick base is constructed, the connection between the two adjacent road bases is unstable at the longitudinal seam, and a longitudinal through seam is easily formed and reflected to the road surface. The embodiment of the present application provides a construction method and construction equipment for improving the bonding strength of the road base, at least for solving this technical problem.

[0039] Please refer to Figure 1 , Figure 2 The construction equipment provided in the embodiment of the present application includes a paver and a roller. A baffle 2 is provided on one side of the screed plate 1 of the paver, and a baffle 3 is provided between the screed plate 1 and the baffle 2.

[0040] The screed plate 1 is perpendicular to the baffle plate 2 , the bottom end of the baffle plate 2 extends toward the roadbed 5 , the block 3 is simultaneously attached to the screed plate 1 and the baffle plate 2 , and the block 3 is simultaneously connected to the screed plate 1 and the baffle plate 2 .

[0041] The screed plate 1 of the paver extends in the horizontal direction, and the baffle plate 2 is arranged on one side of the screed plate 1 in the horizontal direction; the block 3 is a rectangular body, one side surface of the block 3 is in contact with the screed plate 1, and the other side surface of the block 3 is in contact with the baffle plate 2, and the block 3 is connected to the screed plate 1 and the baffle plate 2 at the same time.

[0042] It should be noted that when a paver is used to pave on the roadbed 5 , the road base layer 4 paved on the roadbed 5 will form a groove on the moving path of the block 3 , and the cross-sectional shape of the groove matches the shape of the block 3 .

[0043] In this embodiment, a first connecting portion is provided on the stopper 3, and a second connecting portion is provided on both the ironing plate 1 and the baffle plate 2, and the first connecting portion is connected to the second connecting portion.

[0044] At least two first connection parts are arranged on the stopper 3, one of which is connected to the second connection part on the ironing plate 1, and the other is connected to the second connection part on the baffle 2, so that the stopper 3 is connected to the ironing plate 1 and the baffle 2 at the same time.

[0045] In this embodiment, the first connecting part is a nut (not shown), the second connecting part is a bolt 6, and nuts are built in the surface where the block 3 and the ironing plate 1 are in contact and the surface where the block 3 and the baffle plate 2 are in contact. The bolt 6 on the ironing plate 1 and the nut thread on the surface where the block 3 and the ironing plate 1 are in contact cooperate, and the bolt 6 on the baffle plate 2 and the nut thread on the surface where the block 3 and the baffle plate 2 are in contact cooperate.

[0046] At least two nuts are built into the surface where the stopper 3 and the screed plate 1 are in contact, and at least two bolts 6 are provided on the screed plate 1. The multiple bolts 6 on the screed plate 1 are threadedly matched with the multiple nuts built into the surface where the stopper 3 and the screed plate 1 are in contact. At least two nuts are built into the surface where the stopper 3 and the baffle plate 2 are in contact, and at least two bolts 6 are provided on the baffle plate 2. The multiple bolts 6 on the baffle plate 2 are threadedly matched with the multiple nuts built into the surface where the stopper 3 and the baffle plate 2 are in contact.

[0047] For example, two nuts are built into the surface where the stopper 3 and the screed plate 1 are in contact, and two bolts 6 are provided on the screed plate 1. The two bolts 6 on the screed plate 1 are respectively threadedly matched with the two nuts built into the surface where the stopper 3 and the screed plate 1 are in contact. Two nuts are built into the surface where the stopper 3 and the baffle plate 2 are in contact, and two bolts 6 are provided on the baffle plate 2. The two bolts 6 on the baffle plate 2 are respectively threadedly matched with the two nuts built into the surface where the stopper 3 and the baffle plate 2 are in contact.

[0048] In other embodiments, the first connecting portion is a pin, the second connecting portion is a socket, and the pin and the socket are interference fit, so that the stopper 3 can be connected to the ironing plate 1 and the baffle 2 at the same time.

[0049] In this embodiment, the stopper 3 includes a plurality of steel plates, which are stacked in sequence and adjacent steel plates are welded.

[0050] The steel plate is a rectangular plate, and multiple steel plates are stacked in sequence, and the edges of the multiple steel plates are aligned, and adjacent steel plates are welded to form a whole.

[0051] Exemplarily, the stopper 3 includes two steel plates, each of which has a height of 8 cm, a width of 15 cm, and a thickness of 10 cm. The stopper 3 formed after the two steel plates are welded has a height of 8 cm, a width of 15 cm, and a thickness of 20 cm.

[0052] See also Figure 3 The construction method for improving the bonding strength of the road base provided in the embodiment of the present application is applied to the above-mentioned construction equipment, and the construction method includes:

[0053] Step S1: paving on the roadbed 5 along a first direction using a paver to form a first pavement base layer, wherein the first pavement base layer forms a first groove on the movement path of the block 3.

[0054] In this step, a paver is used to pave the material along the first direction to form a first pavement base layer on the roadbed 5. The movement direction of the block 3 is also the first direction. On the movement path of the block 3, a first groove is formed in the first pavement base layer. The first groove extends along the first direction and is located at the edge of the first pavement base layer.

[0055] Before this step, a representative road section of 200-500 meters needs to be selected for experimental section construction to determine the main parameters of the compaction process. The main parameters include compaction machinery combination, compaction machinery specifications, loose paving thickness, number of rolling passes, rolling speed, etc.

[0056] Step S2: Use a paver to pave on the roadbed 5 along the first direction to form a second pavement base layer, wherein the second pavement base layer is located on one side of the first pavement base layer in the second direction, the second pavement base layer fills the first groove, and the second direction is perpendicular to the first direction.

[0057] After paving to form the first pavement base, the paver is used to pave the material along the first direction to form a second pavement base on the roadbed 5 that is adjacent to the first pavement base in the second direction, and the second pavement base fills the first groove to form a stepped bonding surface between the first pavement base and the second pavement base.

[0058] Step S3: using a road roller to roll the first pavement base and the second pavement base along a first direction.

[0059] After the first groove is filled in the second pavement base, a roller is used to cross the first pavement base and the second pavement base and roll them along the first direction. At this time, the roller can roll the stepped bonding surface formed between the first pavement base and the second pavement base. After the bonding surface formed between the first pavement base and the second pavement base is compacted tightly, the bonding strength between the first pavement base and the second pavement base can be greatly improved, and it is not easy to form a longitudinal through-crack between the first pavement base and the second pavement base to reflect to the pavement.

[0060] In steps S1-S2, one paver can be used to pave on the roadbed 5 along a first direction to form a first pavement base layer, while another paver can be used to pave on the roadbed 5 along the first direction to form a second pavement base layer. The two pavers pave the first pavement base layer and the second pavement base layer successively along the same direction, which can further improve construction efficiency.

[0061] See also Figure 4 , step S2 comprises:

[0062] Sub-step S21, using a paver to pave on the roadbed 5 along the first direction to form multiple second pavement base layers, wherein the multiple second pavement base layers are arranged in sequence along the second direction, and each second pavement base layer forms a second groove on the movement path of the block 3, and in the second direction, the second pavement base layer adjacent to the first pavement base layer fills the first groove, and the latter second pavement base layer fills the second groove on the former second pavement base layer.

[0063] In this step, one paver may be used to sequentially pave on the roadbed 5 to form multiple second pavement base layers, or multiple paver machines may be used to separately pave on the roadbed 5 to form multiple second pavement base layers.

[0064] The second groove is formed in a method basically the same as the first groove. In the second direction, the second pavement base layer adjacent to the first pavement base layer fills the first groove, so that a stepped bonding surface is formed between the first pavement base layer and the second pavement base layer adjacent to the first pavement base layer; the latter second pavement base layer fills the second groove on the former second pavement base layer, so that a stepped bonding surface is formed between two adjacent second pavement base layers.

[0065] Exemplarily, if a paver is used to pave along the first direction on the roadbed 5 to form two second pavement base layers, the first pavement base layer, the first second pavement base layer and the second second pavement base layer are arranged along the second direction, and the first second pavement base layer fills the first groove, so that a stepped bonding surface is formed between the first pavement base layer and the first second pavement base layer; the second second pavement base layer fills the second groove on the first second pavement base layer, so that a stepped bonding surface is formed between the first second pavement base layer and the second second pavement base layer.

[0066] It is understandable that this embodiment does not limit the number of second pavement base layers, which depends on actual working conditions.

[0067] After sub-step S21, the method further includes:

[0068] Sub-step S22: using a road roller to roll across two adjacent second pavement bases.

[0069] After the second groove on the previous second pavement base layer is filled with the latter second pavement base layer, a roller is used to cross the two adjacent second pavement base layers and roll them along the first direction. At this time, the roller can roll the stepped joint surface formed between the two adjacent second pavement base layers. After the joint surface formed between the two adjacent second pavement base layers is compacted tightly, the bonding strength between the two adjacent second pavement base layers can be greatly improved, and it is not easy to form a longitudinal through-crack between the two adjacent second pavement base layers and reflect it to the pavement.

[0070] Sub-step S22 includes:

[0071] Whenever the paver is used to pave the roadbed 5 along the first direction to form two adjacent second pavement base layers, the roller is used to roll across the two adjacent second pavement base layers.

[0072] Whenever a paver is used to pave along the first direction on the roadbed 5 to form two adjacent second pavement base layers, a stepped bonding surface is formed between the two adjacent second pavement base layers. At this time, a roller is used to cross the two adjacent second pavement base layers to compact the bonding surface formed between the two adjacent second pavement base layers.

[0073] In addition, after step S3, the method further includes:

[0074] Step S4: using a road roller to roll across the first pavement base and the second pavement base and across the adjacent second pavement base until the compacted thickness of the first pavement base and the second pavement base reaches a preset value.

[0075] In this step, the first pavement base and all the second pavement bases are paved, and finally the pavement base is compacted as a whole using a road roller, that is, it is compacted across the first pavement base and the second pavement base, and also across the adjacent second pavement base, until the compacted thickness of the first pavement base and the second pavement base reaches a preset value.

[0076] It should be noted that the specific preset value of the compaction thickness that needs to be achieved can be determined based on the actual working conditions. For example, assuming that the loose laying thickness of the first pavement base and the second pavement base is 31 cm, for the construction standard of the large thickness base, the compaction thickness of the first pavement base and the second pavement base needs to be greater than or equal to 25 cm.

[0077] In summary, the embodiments of the present application provide a construction method and construction equipment for improving the bonding strength of a pavement base layer. During the construction of the pavement base layer, a paver is first used to pave materials on the roadbed 5 along a first direction to form a first pavement base layer, and a first groove is formed on the first pavement base layer on the movement path of the block 3; then, the paver is used to pave materials on the roadbed 5 along the first direction to form a second pavement base layer, and the second pavement base layer is located on one side of the first pavement base layer in the second direction, and the first groove is filled, forming a stepped bonding surface at the connection between the first pavement base layer and the second pavement base layer; finally, a roller is used to cross the first pavement base layer and the second pavement base layer and roll them along the first direction, so that the stepped bonding surface formed between the first pavement base layer and the second pavement base layer is compacted tightly, thereby greatly improving the bonding strength of the two adjacent pavement base layers.

[0078] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.

Claims

1. A construction method for improving the bonding strength of a road base, characterized in that: Applicable to construction equipment, the construction equipment includes a paver and a road roller, a baffle is provided on one side of the ironing plate of the paver, and a block is provided between the ironing plate and the baffle; The construction method comprises: Using a paver to pave on a roadbed along a first direction to form a first pavement base layer, wherein the first pavement base layer forms a first groove on the movement path of the block; Using a paver to pave on the roadbed along a first direction to form a second pavement base layer, wherein the second pavement base layer is located on one side of the first pavement base layer in the second direction, the second pavement base layer fills the first groove, and the second direction is perpendicular to the first direction; A road roller is used to roll the first pavement base layer and the second pavement base layer along a first direction.

2. The construction method for improving the bonding strength of a road base according to claim 1, characterized in that: The steps of using a paver to pave along a first direction on a roadbed to form a second road base layer include: A plurality of second pavement base layers are formed by paving on the roadbed along a first direction using a paver, wherein the plurality of second pavement base layers are arranged in sequence along a second direction, and each second pavement base layer forms a second groove on the movement path of the block, and in the second direction, the second pavement base layer adjacent to the first pavement base layer fills the first groove, and the latter second pavement base layer fills the second groove on the former second pavement base layer.

3. The construction method for improving the bonding strength of the road base according to claim 2, characterized in that: After the step of using a paver to pave on the roadbed along the first direction to form a plurality of second pavement base layers, the method further includes: A road roller is used to roll across two adjacent second pavement base layers.

4. The construction method for improving the bonding strength of a road base according to claim 3, characterized in that: The step of rolling across two adjacent second road surface bases using a road roller comprises: Whenever a paver is used to pave the roadbed along a first direction to form two adjacent second pavement base layers, a roller is used to roll across the two adjacent second pavement base layers.

5. The construction method for improving the bonding strength of a road base according to claim 2, characterized in that: After the step of rolling the first pavement base and the second pavement base along the first direction by a road roller, the method further includes: A road roller is used to roll across the first pavement base layer and the second pavement base layer and across the adjacent second pavement base layer until the compacted thickness of the first pavement base layer and the second pavement base layer reaches a preset value.

6. A construction equipment, characterized in that: Used to implement the construction method described in any one of claims 1 to 5, the construction equipment includes a paver and a roller, a baffle is provided on one side of the ironing plate of the paver, and a block is provided between the ironing plate and the baffle.

7. The construction equipment according to claim 6, characterized in that: The screed plate is perpendicular to the baffle plate, the bottom end of the baffle plate extends toward the roadbed, the block is simultaneously attached to the screed plate and the baffle plate, and the block is simultaneously connected to the screed plate and the baffle plate.

8. The construction equipment according to claim 7, characterized in that: The block is provided with a first connection portion, the ironing plate and the baffle are both provided with a second connection portion, and the first connection portion is connected to the second connection portion.

9. The construction equipment according to claim 8, characterized in that: The first connecting part is a nut, the second connecting part is a bolt, the surface of the block that contacts the ironing plate and the surface of the block that contacts the baffle plate are both equipped with the nuts, the bolt on the ironing plate and the nut thread on the surface of the block that contacts the ironing plate are matched, and the bolt on the baffle plate and the nut thread on the surface of the block that contacts the baffle plate are matched.

10. The construction equipment according to claim 6, characterized in that: The stopper includes a plurality of steel plates, which are stacked in sequence and adjacent to each other and are welded.