Prefabricated arched wall with functions of foundation pit enclosure and basement exterior wall and construction method
By using self-waterproof concrete arch slabs and conical wall corners, combined with static pressure construction, the problems of water leakage and overturning in the foundation pit support were solved, achieving efficient and low-cost integrated construction of foundation pit support and basement exterior walls.
Patent Information
- Application Number
- CN202411307073.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-19
- Publication Date
- 2024-11-19
AI Technical Summary
In existing foundation pit support projects, precast arch walls are prone to water leakage at the joints, and the installation of the base slab poses a risk of overturning. The additional installation of cast-in-place waterproof concrete walls increases the complexity and cost of construction.
The arch slab is made of self-waterproof concrete, combined with conical corners and connecting structures to enhance its impermeability and lateral force resistance. The static pressure method is used for construction, eliminating the need for water-stop curtains and positioning channel steel.
Precast arched walls with self-waterproofing properties reduce construction costs and time, improve lateral force resistance and construction efficiency, save materials, and conform to the concept of green environmental protection.
Smart Images

Figure CN118979517A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of foundation pit support and basement structure construction, and in particular to a prefabricated arched wall having both foundation pit support and basement exterior wall functions and a construction method. Background Art
[0002] Since the new century, due to the utilization of urban underground space, almost all urban buildings have basements. In areas with average soil conditions, underground excavation requires the design and construction of foundation pit support to ensure the safety of the foundation pit during the excavation process. The commonly used foundation pit support system mainly includes vertical water-stop curtains, vertical foundation pit enclosures, and horizontal supports and some components. After the foundation pit excavation is completed, the horizontal support needs to be removed, and the vertical support cannot be recycled. In today's urban construction projects, foundation pit support projects account for about 5%-15% of the project cost. The materials used do not enter the main structure, resulting in a large amount of waste of funds and resources, which is contrary to the concept of green environmental protection.
[0003] In the related art, the patent with publication number CN101914925A discloses a basement using an optimized composite prefabricated arch wall as an outer wall. It includes an outer wall, basement columns / column piles, horizontal support beams, connecting beams / ring beams / lintels, floor slabs, foundations and bottom basement slabs; it also includes an anti-arch plate located below the bottom basement slab; the outer wall is an optimized composite prefabricated arch wall composed of a prefabricated arch wall and a cast-in-place waterproof concrete wall; the connecting beams / ring beams / lintels are fixed on the optimized composite prefabricated arch wall of the floor, and the connecting beams / ring beams / lintels are pre-buried with drainage pipes; the foundation is a strip foundation located at the bottom of the optimized composite prefabricated arch wall, and the strip foundation is provided with a drainage trough; the foundation is butted with the anti-arch plate, and the concave surface of the anti-arch plate faces the bottom basement slab, and a drainage channel is formed between the two, and the drainage channel is connected to the water collection pool. The optimized composite prefabricated arch wall is combined with the underground main structure of a high-rise building, which can solve the problems of support bearing, construction safety, and displacement prevention, save foundation pit support funds by multiples, and have low resource and energy consumption.
[0004] With regard to the above-mentioned related technologies, the arch panels are assembled vertically in sequence to form a prefabricated arch wall, and water leakage may occur at the joints. At the same time, the bottom end of the prefabricated arch wall formed by multiple arch panels is directly connected to the foundation, and the bottom plate is installed on the foundation. When the prefabricated arch wall is subjected to the pressure of the external soil, it has a greater risk of overturning. In order to solve the above problems, the related technology is to set an additional cast-in-place waterproof concrete wall on the outside of the prefabricated arch wall, which will make the construction complicated, the construction period longer, and the construction cost higher. Summary of the invention
[0005] In order to achieve cost and material savings, and to achieve low cost and green environmental protection, the present application provides a prefabricated arched wall and a construction method that has both foundation pit enclosure and basement exterior wall functions.
[0006] The present application provides a prefabricated arched wall having both foundation pit enclosure and basement exterior wall functions and a construction method adopting the following technical solutions: First aspect A prefabricated arched wall with both foundation pit enclosure and basement exterior wall functions, comprising an arch plate integrally formed vertically, the arch plate being cast with self-waterproof concrete, a connecting structure being arranged between adjacent arch plates, and a plurality of arch plates being horizontally spliced through the connecting structure to form an arched wall body, wherein when soil compresses the arched outer side of the arch plate, the adjacent arch plates compress the connecting structure; The bottom end of the arch plate is provided with a tapered wall corner, the size of the tapered wall corner gradually increases from bottom to top toward the outside of the arch plate, the tapered wall corner extends beyond the thickness of the arch plate, and the upward side of the tapered wall corner is provided with a first pressure surface, wherein the soil body applies downward extrusion force to the arch plate through the first pressure surface; A bottom plate connection position is arranged on the inner side of the arch plate, and the bottom plate connection position is located above the tapered wall corner, and a preset distance is provided between the bottom plate connection position and the tapered wall corner.
[0007] By adopting the above technical solution, the arch plate is formed in one piece along the vertical direction, and the arch plate is cast with self-waterproof concrete. The arch plate itself has good anti-seepage performance. Under the pressure of the soil, the adjacent arch plates are compressed along the horizontal axis, so that the connection structure has good anti-seepage performance; at the same time, the setting of the tapered wall corners is conducive to the sinking construction of the arch plate on the one hand, and on the other hand, after the arch plate sinks to the preset depth, the soil gives the arch plate downward pressure through the tapered wall corners, further improving the lateral force resistance and deformation resistance of the arch wall. The prefabricated arch wall in this application meets the needs of foundation pit support and the requirements of structural design for the exterior wall of the basement, replacing traditional support forms such as pile rows and construction piles. It has a simple structure but has stronger lateral force resistance, and the prefabricated arch wall has self-waterproof performance, eliminating the construction of water-stop curtains, saving costs, and shortening construction period.
[0008] Optionally, the bottom plate connection position is connected to the bottom plate, a water stop groove is provided at the bottom plate connection position, a water stop end is provided on the side of the bottom plate, a notch is provided below the water stop end, the water stop end is embedded in the water stop groove and the inner wall of the notch abuts against the inner wall of the arch plate, the water stop end is provided with a second pressure surface facing upwards, and the second pressure surface abuts against the inner wall of the water stop groove.
[0009] By adopting the above technical solution, in the patent with publication number CN101914925A, when the soil body exerts lateral pressure on the prefabricated arch wall, the prefabricated arch wall has a tendency to overturn inwards due to the bottom plate arranged at the bottom of the prefabricated arch wall. This overturning tendency will cause the prefabricated arch wall to pull the bottom plate outwards, causing the bottom plate to have a risk of cracking from the center to the side. In the present application, the soil body exerts downward pressure on the arch plate through the tapered wall corners, and this pressure can be transmitted to the bottom plate, so that the bottom plate has a certain anti-cracking performance.
[0010] Optionally, the first pressure-bearing surface is parallel to the second pressure-bearing surface.
[0011] By adopting the above technical solution, the tightness of the connection between the bottom plate and the arch plate can be strengthened, so that the arch plate and the bottom plate can have good anti-seepage performance under the pressure of the soil.
[0012] Optionally, the connecting structure includes a convex strip arranged on one side of the arch plate, and a groove is opened on the opposite side of the adjacent arch plate, the convex strip and the groove both extend vertically, the convex strip is inserted into the groove, and the convex strip and the groove can approach each other horizontally under the action of extrusion force.
[0013] By adopting the above technical solution, the anti-seepage performance of the joints is improved.
[0014] Optionally, the connection structure includes an H-shaped connecting member, both sides of which are provided with plug-in grooves, and the sides of the arch plate are provided with plug-in strips, the plug-in grooves and the plug-in strips both extend vertically, the plug-in strips are plugged into the plug-in grooves, and the H-shaped connecting member can be used as buttresses for the exterior walls of the basement.
[0015] By adopting the above technical solution, the depth of the H-type connecting member driven into the soil can be deeper than the outer wall, which can better control the deformation of the support system, and the H-type connecting member can act as a positioning channel steel, eliminating the construction steps of the positioning channel steel, shortening the construction period, and the H-type connecting member can be used as a buttress column on the outer wall of the basement to further enhance the lateral force resistance of the wall.
[0016] Optionally, the arch plate is infiltrated with a self-repairing material.
[0017] By adopting the above technical solution, the structure is self-waterproof and the anti-seepage performance is further improved.
[0018] Second aspect A basement construction method comprises the following steps: S1. Prefabricated exterior wall design and prefabricated component production and transportation; S2. On-site measurement, positioning and laying out; S3, statically press the arch plate to a preset depth using a static pressure method; S4. Excavate the earthwork in layers until it reaches the bottom plate elevation; S5. Waterproof the connection between the connecting components and the arch plate; S6. Retain a steel bar connector at the connection position of the bottom plate. After digging to a predetermined elevation, remove the concrete on the surface of the arch plate to expose the steel bar connector. Connect the bottom plate steel bars to the steel bar connector, and then pour self-waterproof concrete to form a whole with the bottom plate and the arch plate.
[0019] By adopting the above technical solution, this application adopts the static pressure method to complete the construction of the supporting wall before the foundation pit is excavated, which is more conducive to ensuring the safety of the foundation pit. This construction does not require backfilling of the fertilizer tank, which is more conducive to subsequent construction organization, shortening the construction period and saving costs.
[0020] Optionally, step S3 includes: S30, construction positioning channel steel: the positioning channel steel is set in a U shape, first sink the positioning channel steel 1m, re-measure the position of the positioning channel steel, and then continue to sink the positioning channel steel into the predetermined position; S31, inserting the connection structure between adjacent arch plates into the U-shaped inner side of the positioning channel steel from top to bottom, and sinking the arch plates to a preset depth by static pressure method; After step S4, the following steps are included: S41. Pull out the positioning channel steel.
[0021] By adopting the above technical solution, the positioning accuracy of the construction process is improved, and the relative position relationship of adjacent arch plates during the sinking process is controlled.
[0022] Optionally, the preset depth in step S2 is the arch plate height, the arch plate height is the sum of the embedded end depth and the basement outer wall height, and the embedded end depth is not less than the basement outer wall height.
[0023] By adopting the above technical solution, it is ensured that the prefabricated arch wall has sufficient lateral force resistance performance.
[0024] Optionally, a steel bar connection groove is pre-opened on the top of the arch plate; after step S4, the method further includes: S5. Insert the top plate steel bars into the steel bar connection grooves, cast concrete to form the basement top plate, and connect the basement top plate with the arch plate to form an integral structure.
[0025] By adopting the above technical solution, an integral basement structure is formed, which has stronger integrity and better anti-seepage performance.
[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. The arch plate is industrially processed, the on-site construction speed of the components is fast, and they have sufficient strength when they enter the site, which can significantly shorten the construction period of the enclosure.
[0027] 2. The arch slab, as the exterior wall of the basement, can be closer to the building red line and provide a larger basement building area.
[0028] 3. There is no need to backfill the fertilizer trough, which is more conducive to subsequent construction organization, shortening the construction period and saving costs.
[0029] 4. The arch plate has self-waterproof properties, eliminating the need for water-stop curtain construction, saving costs and shortening construction period.
[0030] 5. The retaining wall and the basement exterior wall are combined into one, saving total cost and materials, and being more energy-efficient and environmentally friendly.
[0031] 6. The two-in-one wall has self-waterproof properties, eliminating the need for external waterproofing of the basement side walls, saving costs, and at the same time solving the leakage problem caused by poor quality control of the basement side wall waterproofing construction.
[0032] 7. The depth of the H-type connection component driven into the soil can be deeper than the outer wall, which can better control the deformation of the support system. The H-type connection component can also act as a positioning channel steel, eliminating the construction steps of the positioning channel steel and shortening the construction period. The H-type connection component can also be used as a buttress column on the outer wall of the basement to further enhance the lateral force resistance of the wall. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a top view of the arch plate and the bottom plate of the overall structure of Example 1 of the present application after construction.
[0034] Figure 2 It is a longitudinal section view of the arch plate and the bottom plate of the overall structure of Example 1 of the present application after construction.
[0035] Figure 3 This is a top view of Example 2 of the present application, which mainly shows the H-shaped connecting component.
[0036] Figure 4 It is a schematic diagram of the status of the positioning channel steel construction process in Example 3 of the present application.
[0037] Description of reference numerals: 10. Arch plate; 11. Conical wall corner; 12. First pressure surface; 13. Water stop groove; 20. Connection structure; 21. Raised strip; 22. Groove; 23. H-shaped connection member; 231. Plug-in groove; 24. Plug-in strip; 30. Bottom plate; 31. Water stop end; 32. Notch; 33. Second pressure surface; 40. Positioning channel steel. DETAILED DESCRIPTION
[0038] The following is combined with Figure 1-4 This application is described in further detail.
[0039] In the present application, the inner side of the arch plate 10 refers to the side facing the center of the foundation pit, and the outer side of the arch plate 10 refers to the side away from the foundation pit.
[0040] Example 1 The present application embodiment provides a prefabricated arched wall having both the functions of foundation pit enclosure and basement exterior wall, and its structure is as follows: Figure 1 and Figure 2 The prefabricated arched wall is mainly composed of an arched plate 10 integrally formed in the vertical direction, and a plurality of arched plates 10 are closely spliced in the horizontal direction to form an arched wall body.
[0041] Preferably, the arch plate 10 is cast with self-waterproof concrete, and the arch plate 10 itself has good anti-seepage performance. The length of the arch plate 10 is 1 / 3 of the basement column distance and the length of the arch plate 10 is 2m-4m, the thickness is 200mm-400mm, the height of the arch plate 10 is based on the foundation pit enclosure design, and the recommended optional range is 6m-12m, and the curvature radius of the arch plate 10 is 2m-4m. The arch plate 10 is a prefabricated part, and the prefabricated arch plate 10 is preferably designed as a fixed modulus to increase the number of template turnovers.
[0042] The prefabricated arch slab 10 needs to be designed according to two different acceptance states: the retaining wall and the basement exterior wall, and the most unfavorable external force verification and reinforcement design should be considered respectively, and a double-layer bidirectional reinforcement design should be adopted.
[0043] Among them, a connection structure 20 is provided between adjacent arch panels 10. In this embodiment, the connection structure 20 includes a convex strip 21 provided on one side of the arch panel 10 and a groove 22 provided on the other side of the adjacent arch panel 10. Both the convex strip 21 and the groove 22 extend vertically along the arch panel 10. After the arch panel 10 sinks into the soil, the arched outer side of the arch panel 10 faces the soil. The arch panels 10 can approach each other along the horizontal axis under the pressure of the soil, so that the connection structure 20 has good anti-seepage performance.
[0044] In order to further improve the waterproof effect, an expansion water stop strip can be reserved inside the groove 22. The expansion water stop strip plays a role of filling and water stopping in the joint, effectively preventing moisture from penetrating into the interior of the arched wall through the joint, thereby ensuring its waterproof performance.
[0045] In addition, in order to improve the durability and repairability of the wall, a self-repairing material can be infiltrated into the arch plate 10. This material can automatically fill the cracks when the wall suffers minor damage, restore its integrity and usability, and extend the service life of the wall.
[0046] At the same time, the bottom of the arch plate 10 is designed as a tapered corner 11, the size of which gradually increases outward from bottom to top, and the tapered corner 11 extends beyond the thickness of the arch plate 10, and a first pressure surface 12 is provided on the upward side. The provision of the tapered corner 11 is conducive to the sinking construction of the arch plate 10. When the arch plate 10 sinks to a preset position, when the soil acts on the arch plate 10, part of the pressure of the soil can be converted into a downward squeezing force through the first pressure surface 12, effectively using the weight of the soil itself to increase the stability of the arch plate 10 and reduce the possibility of its overturning.
[0047] Preferably, the first pressure surface 12 is arranged to be inclined upward away from the inner side of the arch plate 10, so that the soil has both downward squeezing force and squeezing force toward the inner side of the arch plate 10, thereby improving the anti-seepage performance and lateral force resistance performance of the arch wall.
[0048] The inner side of the arch plate 10 is provided with a bottom plate connection position for connecting with the bottom plate 30, and a water stop groove 13 is opened at the bottom plate connection position. When the bottom plate 30 is cast, a water stop end 31 is formed on the side of the bottom plate 30, and a notch 32 is provided below the water stop end 31. The water stop end 31 is embedded in the water stop groove 13 and the inner wall of the notch 32 abuts against the inner wall of the arch plate 10. The water stop end 31 is provided with a second pressure surface 33 facing upward, and the second pressure surface 33 abuts against the inner wall of the water stop groove 13.
[0049] In a preferred embodiment, the second pressure surface 33 is parallel to the first pressure surface 12, so that the arch plate 10 has good anti-seepage performance between the arch plate 10 and the bottom plate 30 under the pressure of the soil. At the same time, waterproof material can also be arranged between the bottom plate 30 and the arch plate 10 to further improve the anti-seepage performance.
[0050] Among them, the bottom plate connection position is located above the tapered wall corner 11 and maintains a certain distance to divide the arch plate 10 into an embedded end and the basement outer wall. The sum of the embedded end depth and the basement outer wall height is equal to the arch plate 10 height, and the embedded end depth is not less than the basement outer wall height. The specific height of the arch plate 10 is determined according to the verification results.
[0051] The implementation principle of the prefabricated arched wall with both foundation pit enclosure and basement exterior wall functions in the embodiment of the present application is as follows: the arch plate 10 is formed in one piece along the vertical direction, and the arch plate 10 itself has good anti-seepage performance. Under the pressure of the soil, the adjacent arch plates 10 are compressed along the horizontal axis, so that the connection structure 20 has good anti-seepage performance; at the same time, the setting of the tapered wall corner 11 is conducive to the sinking construction of the arch plate 10 on the one hand, and on the other hand, after the arch plate 10 sinks to a preset depth, the soil gives the arch plate 10 downward pressure through the tapered wall corner 11, further improving the lateral force resistance and deformation resistance of the arched wall. The prefabricated arched wall in the present application meets the foundation pit support requirements and the structural design requirements for the basement exterior wall, replacing traditional support forms such as pile rows and construction piles. It has a simple structure but has stronger lateral force resistance, and the prefabricated arched wall has self-waterproof performance, eliminating the need for water-stop curtain construction, saving costs, and shortening construction period.
[0052] Example 2 The difference between this embodiment and embodiment 1 is that the connection structure 20 is different. Figure 3 In the embodiment of the present application, the connection structure 20 includes an H-shaped connection member 23, which can be an H-shaped steel. Plug-in grooves 231 are respectively provided on both sides of the H-shaped connection member 23, and a plug-in strip 24 is provided on the side of the arch plate 10. The plug-in groove 231 and the plug-in strip 24 both extend vertically. The plug-in strip 24 is plugged into the plug-in groove 231. The H-shaped connection member 23 can be used as a buttress column on the exterior wall of the basement.
[0053] During construction, the H-shaped connecting member 23 is first driven into the soil, and the H-shaped connecting member 23 is used as a positioning member. Then, the plug-in strips 24 of the arch panels 10 on both sides are plugged into the plug-in grooves 231 from top to bottom. Multiple arch panels 10 are spliced horizontally through the H-shaped connecting member 23 in sequence to form an arched wall.
[0054] In addition, an expansion water stop strip may be provided in the insertion groove 231 to further enhance the anti-seepage function.
[0055] In this embodiment, the depth of the H-shaped connecting member 23 driven into the soil can be deeper than the outer wall, which can better control the deformation of the support system, and the H-shaped connecting member 23 can act as a positioning channel steel 40, eliminating the construction steps of the positioning channel steel 40, shortening the construction period, and the H-shaped connecting member 23 can be used as a buttress column of the basement outer wall to further enhance the lateral force resistance of the wall.
[0056] Example 3 Based on the prefabricated arched wall in Example 1, this example describes in detail a basement construction method, referring to Figure 1 and Figure 2 , including the following specific steps: S1. Prefabricated exterior wall design and prefabricated component production and transportation.
[0057] The arch plate 10 and related accessories are transported to the construction site intact and in a timely manner, and stacking and protection measures are taken.
[0058] S2. On-site measurement, positioning and line laying.
[0059] First, use professional measuring tools to measure the on-site terrain, and determine the specific installation position of the arch plate 10 according to the design drawings. During the line laying process, the accuracy and visibility of the lines must be ensured to provide a clear reference for subsequent construction.
[0060] S21. Site leveling.
[0061] This includes removing obstacles on the ground, filling low-lying areas, and ensuring the flatness of the site to facilitate the smooth progress of subsequent construction.
[0062] S3, statically press the arch plate 10 to a preset depth using a static pressure method. Figure 4 , specifically including: S30, construction positioning channel steel 40: The positioning channel steel 40 is set in a U shape, and the positioning channel steel 40 mainly plays the role of assisting the construction positioning of the arch plate 10 and ensuring the verticality. The positioning channel steel 40 can be first sunk by a hydraulic pile driver for 1m, and after re-measuring the position of the positioning channel steel 40, the positioning channel steel 40 is continued to be sunk to the predetermined position. The predetermined position can be designed and calculated according to the positioning accuracy requirements.
[0063] S31, inserting the connection structure 20 between adjacent arch plates 10 into the U-shaped inner side of the positioning channel steel 40 from top to bottom, and sinking the arch plates 10 to a preset depth by static pressure method.
[0064] The static pressure method is used to steadily sink the arch plate 10 to a predetermined depth using special engineering equipment. Specifically, the preset depth is the height of the arch plate 10, and the height of the arch plate 10 is the sum of the depth of the embedded end and the height of the basement outer wall. The depth of the embedded end is not less than the height of the basement outer wall.
[0065] During this process, the verticality and position of the arch plate 10 should be continuously monitored, and the verticality and positioning of the arch plate 10 should be re-measured every 2m-4m of sinking to ensure that it sinks accurately and avoids deviation or tilting.
[0066] S4. Excavate the earth in layers until it reaches a base plate elevation of 30.
[0067] After the arch plate 10 is sunk into place, the earthwork is excavated layer by layer. The excavation depth of each layer of earthwork should be strictly controlled according to soil conditions and engineering requirements, and it is ensured that the excavation reaches the designed elevation of the bottom plate 30. During the excavation process, the arch plate 10 should be protected to avoid damage to it due to earthwork operations.
[0068] S41. After the earth excavation is completed, the positioning channel steels 40 are pulled out in sequence using a hydraulic pile puller.
[0069] S5. Waterproof the connection between the connection member and the arch plate 10.
[0070] According to the design requirements, appropriate waterproof materials are used to treat the joints of the arch plate 10 to ensure that the waterproof function of the basement is effectively guaranteed. The waterproof materials may include but are not limited to waterproof tapes, waterproof coatings, etc. The specific selection should be determined according to the site conditions and waterproof requirements.
[0071] S6. Leave a steel bar connector at the connection position of the bottom plate. After digging to a predetermined elevation, chisel off the concrete on the surface of the arch plate 10 to expose the steel bar connector. Connect the steel bars of the bottom plate 30 to the steel bar connector, and then pour self-waterproof concrete to form a whole with the bottom plate 30 and the arch plate 10.
[0072] S7. Carry out basement roof construction.
[0073] After the construction of the bottom plate 30 is completed, the next step is the construction of the basement top plate. First, a steel bar connection groove is opened on the top of the arch plate 10 according to the design requirements. Then, the top plate steel bars are inserted into these connection grooves and fixed with fixings. Finally, the basement top plate is formed by pouring concrete in situ, so that it is tightly connected with the arch plate 10 to form an integral structure. In this process, the quality of the concrete and the uniformity of the pouring must be ensured to achieve the expected engineering effect.
[0074] Through the detailed implementation of the above steps, high-quality basement construction work can be completed. This method not only improves construction efficiency, but also simplifies the construction process, and ensures the stability and waterproof performance of the basement, meeting the high standards of modern buildings for underground space utilization.
[0075] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A prefabricated arched wall with both foundation pit enclosure and basement exterior wall functions, characterized in that: It comprises an arch plate (10) integrally formed in a vertical direction, the arch plate (10) being cast with self-waterproof concrete, a connecting structure (20) being provided between adjacent arch plates (10), a plurality of arch plates (10) being spliced in a horizontal direction through the connecting structure (20) to form an arched wall, wherein when soil compresses the arched outer side of the arch plate (10), the adjacent arch plates (10) compress the connecting structure (20); A conical wall corner (11) is provided at the bottom end of the arch plate (10), the size of the conical wall corner (11) gradually increases from bottom to top in the direction of the outside of the arch plate (10), the conical wall corner (11) extends beyond the thickness of the arch plate (10), and a first pressure surface (12) is provided on the upward side of the conical wall corner (11), wherein the soil body applies a downward extrusion force to the arch plate (10) through the first pressure surface (12); A bottom plate connection position is provided on the inner side of the arch plate (10), the bottom plate connection position is located above the tapered wall corner (11), and there is a preset distance between the bottom plate connection position and the tapered wall corner (11).
2. The prefabricated arched wall having both the functions of foundation pit enclosure and basement exterior wall according to claim 1 is characterized in that: The bottom plate connection position is connected to a bottom plate (30), a water stop groove (13) is provided at the bottom plate connection position, a water stop end (31) is provided on the side of the bottom plate (30), a notch (32) is provided below the water stop end (31), the water stop end (31) is embedded in the water stop groove (13) and the inner wall of the notch (32) abuts against the inner wall of the arch plate (10), the water stop end (31) is provided with a second pressure surface (33) facing upwards, and the second pressure surface (33) abuts against the inner wall of the water stop groove (13).
3. The prefabricated arched wall having both the functions of foundation pit enclosure and basement exterior wall according to claim 2 is characterized in that: The first pressure-bearing surface (12) is parallel to the second pressure-bearing surface (33).
4. The prefabricated arched wall having both the functions of foundation pit enclosure and basement exterior wall according to claim 1 is characterized in that: The connection structure (20) comprises a convex strip (21) arranged on one side of the arch plate (10), and a groove (22) is provided on the opposite side of the adjacent arch plate (10), the convex strip (21) and the groove (22) both extend vertically, the convex strip (21) is inserted into the groove (22), and the convex strip (21) and the groove (22) can approach each other in the horizontal direction under the action of a squeezing force.
5. The prefabricated arched wall having both the functions of foundation pit enclosure and basement exterior wall according to claim 1 is characterized in that: The connection structure (20) comprises an H-shaped connection member (23), both sides of the H-shaped connection member (23) are respectively provided with plug-in grooves (231), the side edge of the arch plate (10) is provided with a plug-in strip (24), the plug-in groove (231) and the plug-in strip (24) both extend vertically, the plug-in strip (24) is plugged into the plug-in groove (231), and the H-shaped connection member (23) can be used as a buttress column of the basement exterior wall.
6. The prefabricated arched wall having both the functions of foundation pit enclosure and basement exterior wall according to claim 1 is characterized in that: The arch plate (10) is infiltrated with a self-repairing material.
7. A basement construction method, based on the prefabricated arched wall with both foundation pit enclosure and basement exterior wall functions as claimed in any one of claims 1 to 6, characterized in that: The following steps are involved: S1. Prefabricated exterior wall design and prefabricated component production and transportation; S2. On-site measurement, positioning and laying out; S3, using a static pressure method to statically press the arch plate (10) to a preset depth; S4, excavate the earthwork in layers until it reaches the elevation of the bottom plate (30); S5. Waterproofing the connection between the connecting member and the arch plate (10); S6. A steel bar connector is left at the connection position of the bottom plate. After digging to a predetermined elevation, the concrete on the surface of the arch plate (10) is chiseled off to expose the steel bar connector. The steel bars of the bottom plate (30) are connected to the steel bar connector. Self-waterproof concrete is then poured to form a whole with the bottom plate (30) and the arch plate (10).
8. A basement construction method according to claim 7, characterized in that: The step S3 comprises: S30, construction of the positioning channel steel (40): the positioning channel steel (40) is arranged in a U shape, the positioning channel steel (40) is first sunk 1m, the position of the positioning channel steel (40) is re-measured, and then the positioning channel steel (40) is further sunk into the predetermined position; S31, inserting the connection structure (20) between adjacent arch plates (10) into the U-shaped inner side of the positioning channel steel (40) from top to bottom, and sinking the arch plates (10) to a preset depth by static pressure method; After step S4, the following steps are included: S41. Pull out the positioning channel steel (40).
9. A basement construction method according to claim 7, characterized in that: The preset depth in step S2 is the height of the arch plate (10), the height of the arch plate (10) being the sum of the depth of the embedded end and the height of the outer wall of the basement, and the depth of the embedded end being not less than the height of the outer wall of the basement.
10. A basement construction method according to claim 7, characterized in that: A steel bar connection groove is pre-opened on the top of the arch plate (10); after step S6, the process further includes: S7, inserting the top plate steel bars into the steel bar connection grooves, and casting concrete to form the basement top plate so that the basement top plate is connected to the arch plate (10) to form an integral structure.