Protective structure for avoiding water and soil loss of river bank building support pile foundation

By designing the connection between the protective structure and the pile foundation of the support pile, combined with the floating mechanism and the barrier network, the damage problem of the support piles on the river bank building under the erosion of the river is solved, and the effect of reducing soil erosion and providing survival equipment is achieved.

CN118979524AInactive Publication Date: 2024-11-19CHONGQING WUXI COUNTY ARCHITECTURAL ENG DESIGN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411222854.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, river bank building support piles are prone to damage under the erosion of river water, resulting in pile foundation fracture and soil erosion, and lack of effective protective measures.

Method used

A protective structure is designed, including the first guard plate and the second guard plate, and is equipped with a connecting plate and a floating mechanism, combined with the barrier net and the discharge port, and is connected to the pile foundation of the supporting pile through the protective mechanism to reduce river water erosion. , and use the floating mechanism to determine the water level and provide survival equipment.

Benefits of technology

It effectively reduces the erosion of river water on pile foundations, extends the service life of support piles, and buffers the impact force when the river water impacts, providing a chance for those who fall into the water to survive.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979524A_ABST
    Figure CN118979524A_ABST
Patent Text Reader

Abstract

The invention provides a protection structure for avoiding water and soil loss of a river bank building support pile foundation, and belongs to the technical field of pile foundation protection. The protection structure comprises a first protection plate, a second protection plate and a protection mechanism, a first connecting plate is installed on the surface of the first protection plate, a second connecting plate is installed on the surface of the second protection plate, and floating mechanisms are installed on the outer side of the first connecting plate and the outer side of the second connecting plate correspondingly; the first mounting ring is mounted at the bottom of the second connecting plate, the second mounting ring is mounted at the bottom of the first mounting ring, and the inserting cylinder is mounted at the bottom of the second mounting ring. And therefore, the protection mechanism can be conveniently matched with the first protection plate and the second protection plate to protect the pile foundation of the supporting pile, erosion of river water to the pile foundation is reduced, and the situation that the service life of the pile foundation is shortened due to river water erosion is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pile foundation protection, and in particular to a protection structure for preventing water and soil loss from the foundation of river bank building support piles. Background Art

[0002] Riverbank buildings are not only an important part of the urban landscape, but also an important carrier of urban culture. With their unique architectural style and historical background, they have become the symbol and emblem of urban culture. Riverbank buildings require the use of supporting piles, and the supporting piles are mainly piles that bear lateral thrust. They are generally used for foundation pit support, slope support and landslide control, bearing horizontal soil pressure or landslide thrust. Generally, they require higher reinforcement than foundation piles that bear vertical force. Support piles can not only make the river bank more beautiful, but also block the impact force of the river flow, and can play a role in preventing soil erosion.

[0003] However, in the prior art, since the water in the river channel is always flowing, the river water in the river channel will impact the supporting piles when flowing, causing the supporting piles to be damaged under the long-term scouring of the river water, resulting in fractures at the connection between the supporting piles and the pile foundations, causing the supporting piles to topple over, and the river water impacting the river bank, causing soil erosion on the river bank. Therefore, it is necessary to protect the supporting piles and the pile foundations. Summary of the invention

[0004] In order to make up for the above deficiencies, the present invention provides a protective structure for preventing water and soil erosion of the foundation of riverbank building support piles, which overcomes the above technical problems or at least partially solves the above problems.

[0005] The present invention is achieved in that: The present invention provides a protective structure for preventing water and soil loss of a pile foundation of a riverbank building support pile, comprising a first guard plate and a second guard plate, wherein a first connecting plate is installed at the bottom of the first guard plate and the second guard plate, a first connecting plate is installed at the surface of the first guard plate, a second connecting plate is installed at the surface of the second guard plate, a fixing ring is installed at the bottom of the first connecting plate, and a floating mechanism is installed at the outer sides of the first connecting plate and the second connecting plate; A protection mechanism, the protection mechanism comprising: A second connecting plate, wherein two sets of the second connecting plates are provided, and the second connecting plates are respectively mounted on the bottom of the first connecting plate and the second connecting plate; a first mounting ring, the first mounting ring being mounted on the bottom of the second connection plate; A second mounting ring, wherein the second mounting ring is mounted on the bottom of the first mounting ring, a threaded barrel is mounted on the top of the second mounting ring, and the threaded barrel is threadedly connected to the first mounting ring; The plug-in sleeve is installed at the bottom of the second installation ring.

[0006] In a preferred embodiment, the floating mechanism includes a first floating board, and the first floating board is installed on the front side of the first connecting plate, and the second floating board is installed on the back side of the second connecting plate, the first mounting plate is installed on the bottom of the first floating board and the second floating board, a floating ball is installed on the bottom of the first mounting plate, and there are several floating balls, the outer sides of the first floating board and the second floating board are provided with plug-in grooves, and there are several plug-in grooves, and a plug-in block is installed on the top of the first mounting plate, and the plug-in block is plug-matched with the plug-in groove.

[0007] In a preferred solution, a first fixed plate is installed on the top of the first floating plate and the second floating plate, and a sliding block is installed on the inner side of the first fixed plate, and a sliding frame is installed on the outer side of the first guard plate and the second guard plate, and a sliding groove is opened on the surface of the sliding frame, and the sliding block slides in cooperation with the sliding groove.

[0008] In a preferred solution, blocking nets are installed at the bottom of the first connecting plate and the bottom of the second connecting plate, discharge ports are opened at the bottom of the first connecting plate and the second connecting plate, and mounting plugs are installed through the inner cavity threads of the discharge ports.

[0009] In a preferred solution, first docking plates are installed on both sides of the first guard plate, second docking plates are installed on both sides of the second guard plate, mounting bolts are installed on the back side of the second docking plates, and the front side of the mounting bolts passes through the second docking plates and is threadedly connected to the first docking plates.

[0010] In a preferred embodiment, a first through hole is formed on the top of the first connecting plate and the top of the second connecting plate, a pressing plate is inserted into the inner cavity of the first through hole, a rotating ring is installed on the surface of the plug-in tube, a mounting frame is installed on the surface of the second mounting ring, and the pressing plate penetrates to the inner side of the mounting frame.

[0011] In a preferred embodiment, a mounting shaft is installed on the inner side of the mounting frame, a rotating frame is installed on the surface of the mounting shaft, a blocking block is installed on the inner side of the rotating frame, a pressing pad is installed on the outer side of the pressing plate, and the pressing pad contacts the surface of the rotating frame.

[0012] In a preferred solution, fixing frames are installed on both sides of the second mounting ring, a connecting frame is installed on the inner side of the fixing frame, a water-facing blade is installed on the front side of the connecting frame, a connecting shaft is installed on the front side of the water-facing blade, and the connecting shaft passes through the water-facing blade and passes through the back side of the connecting frame.

[0013] In a preferred embodiment, a gear is installed in the inner cavity of the connecting frame, and the gear is installed on the surface of the connecting shaft. A toothed plate that runs through the bottom of the connecting frame is inserted at the top of the connecting frame, and the toothed plate is meshed with the gear. A second fixed plate is installed at the bottom of the toothed plate, and a plug-in rod is installed at the bottom of the second fixed plate.

[0014] In a preferred embodiment, the floating mechanism includes a first floating plate, and the first floating plate is installed on the front side of the first connecting plate, and the second floating plate is installed on the back side of the second connecting plate, and the first mounting plate is installed on the bottom of the first floating plate and the second floating plate, and a floating ball is installed on the bottom of the first mounting plate, and there are several floating balls, and a rotating disk is installed on the top of the first floating plate, and a threaded column is installed on the bottom of the rotating disk, and the threaded column passes through the first floating plate and is threadedly connected to the first floating plate and the first mounting plate, and a rotating rod is installed on the surface of the rotating disk.

[0015] The present invention provides a protective structure for preventing water and soil loss in the foundation of riverbank building support piles, and its beneficial effects include: 1. By setting up a protective mechanism, the first guard plate and the second guard plate can be installed after the protective mechanism is installed, so that the protective mechanism cooperates with the first guard plate and the second guard plate to protect the pile foundation of the supporting pile, thereby reducing the erosion of the pile foundation by river water, thereby avoiding river water erosion, which leads to a reduction in the service life of the pile foundation.

[0016] 2. By setting up a floating mechanism, after the floating mechanism is installed, the floating mechanism can be lifted up by the river water, which makes it easier to judge the water level of the river. The floating mechanism installed on the first connecting plate and the second connecting plate can be removed, which makes it easier for people who fall into the water to remove the floating mechanism and survive and seek help through the floating mechanism.

[0017] 3. By setting up the blocking net, the discharge port and the installation plug, after the installation plug is removed from the discharge port, it is convenient to put sand and gravel into the blocking net, so that the blocking net can place the sand and gravel, thereby facilitating the sand and gravel to buffer the impact force of the river water when it flows, thereby reducing the impact force of the river water. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those skilled in the art, other relevant drawings can be obtained based on these drawings without creative work. Figure 1 It is an overall stereogram provided by an embodiment of the present invention; Figure 2A schematic diagram of a three-dimensional exploded structure of a first connecting plate provided in an embodiment of the present invention; Figure 3 A schematic diagram of the three-dimensional structure of a barrier net provided in an embodiment of the present invention; Figure 4 A schematic diagram of the three-dimensional coordination structure of the mounting frame provided in an embodiment of the present invention; Figure 5 A schematic diagram of a three-dimensional structure provided for an embodiment of the present invention; Figure 6 A schematic diagram of the floating state structure of a first floating board provided in an embodiment of the present invention; Figure 7 A schematic diagram of a three-dimensional side cross-sectional structure of a connection frame provided in an embodiment of the present invention; Figure 8 A schematic diagram of a three-dimensional cross-sectional structure of a first floating board in Example 2 provided in an embodiment of the present invention; Fig. 9 A schematic diagram of a three-dimensional cross-sectional structure of a first floating board in Example 1 provided for an implementation manner of the present invention; Fig.10 The embodiments of the present invention provide Figure 2 The enlarged structural diagram at A in the middle; Fig.11 A schematic diagram of the three-dimensional structure of a first fixing ring provided in an embodiment of the present invention; Fig.12 A schematic diagram of a three-dimensional cross-sectional structure of a first mounting cylinder provided in an embodiment of the present invention; Fig.13 A schematic diagram of the three-dimensional structure of a plug-in rod provided in an embodiment of the present invention; Fig.14 A schematic diagram of a three-dimensional cross-sectional structure of a second mounting tube provided in an embodiment of the present invention; Fig.15 A schematic diagram of a three-dimensional cross-sectional structure of a connecting shaft provided in an embodiment of the present invention; 1. First guard plate; 2. Second guard plate; 3. First connecting plate; 4. First connecting plate; 5. Second connecting plate; 6. Fixed ring; 7. Floating mechanism; 701. First floating plate; 702. Second floating plate; 703. First mounting plate; 704. Floating ball; 705. Plug-in slot; 706. Plug-in block; 707. Rotating plate; 708. Threaded column; 709. Rotating rod; 8. Protective mechanism; 801. Second connecting plate; 802. First mounting ring; 803. Second mounting ring; 804. Threaded cylinder; 805. Plug-in cylinder; 9. First fixing plate; 10. Sliding block; 11. Sliding frame; 12. Sliding groove; 13. Blocking net; 14. Discharge port; 15. Mounting plug; 16. First docking plate; 17. Second docking plate; 18. Mounting bolt; 19. First penetration port; 20. Pressing plate; 21. Rotating plate Moving ring; 22, mounting frame; 23, mounting shaft; 24, rotating frame; 25, blocking block; 26, extrusion pad; 27, fixed frame; 28, connecting frame; 29, water-facing blade; 30, connecting shaft; 3001, connecting plate; 3002, first axis; 3003, second axis; 3004, connecting seat; 3005, axis groove; 3006, bushing; 3007, third spring; 3008, connecting block; 3009, connecting groove; 31, gear; 32, tooth plate; 33, second fixed plate; 34, plug-in rod; 35, fixed seat; 36, mounting frame; 37, fixed shaft; 38, rotating plate; 39, first mounting seat; 40, second mounting seat; 41, first movable rod; 42, first mounting tube; 43, first spring; 44, second mounting tube; 45, second movable rod; 46, pushing plate; 47, second spring. DETAILED DESCRIPTION

[0019] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] Reference Figure 1-Figure 15The present invention provides a technical solution: a protective structure for preventing water and soil erosion of a pile foundation of a riverbank building support pile, comprising a first guard plate 1, a second guard plate 2 and a protective mechanism 8, wherein a first connecting plate 3 is installed at the bottom of the first guard plate 1 and the second guard plate 2, a first connecting plate 4 is installed on the surface of the first guard plate 1, a second connecting plate 5 is installed on the surface of the second guard plate 2, a fixing ring 6 is installed at the bottom of the first connecting plate 3, and a floating mechanism 7 is installed on the outer sides of the first connecting plate 4 and the second connecting plate 5, so that the first guard plate 1 and the second guard plate 2 can be installed after the protective mechanism 8 is installed, so that the protective mechanism 8, the first guard plate 1 and the second guard plate 2 can be installed, so that the pile foundation can be protected conveniently, the erosion of the pile foundation by the river water can be reduced, and the service life of the support pile foundation can be extended, and at the same time, after the floating mechanism 7 is installed, the floating mechanism 7 is lifted by the river water, so that the water level of the river water can be judged conveniently, and the floating mechanism 7 installed on the first connecting plate 4 and the second connecting plate 5 can be removed, so that the person who falls into the water can remove the floating mechanism 7 conveniently, so that the floating mechanism 7 can be used for survival and rescue.

[0021] In addition, docking grooves are provided on both sides of the top of the first connecting plate 4, and docking blocks are installed on both sides of the front of the second connecting plate 5, and the docking blocks are plugged into the docking grooves. The docking blocks are made of magnets, which can connect the first connecting plate 4 and the second connecting plate 5, and then align the first guard plate 1 and the second guard plate 2, so as to facilitate the connection after the first guard plate 1 and the second guard plate 2 are aligned.

[0022] Reference Figure 1-Figure 6 In a preferred embodiment, a protective mechanism 8 is provided, the protective mechanism 8 includes a second connecting plate 801, a first mounting ring 802, a second mounting ring 803, a threaded barrel 804 and a plug-in barrel 805. The second connecting plate 801 is provided with two groups, and the second connecting plate 801 is respectively installed at the bottom of the first connecting plate 4 and the second connecting plate 5, the first mounting ring 802 is installed at the bottom of the second connecting plate 801, the second mounting ring 803 is installed at the bottom of the first mounting ring 802, and the threaded barrel 804 is installed on the top of the second mounting ring 803, and the threaded barrel 804 is threadedly connected with the first mounting ring 802. The plug-in tube 805 is installed at the bottom of the second mounting ring 803, so that the second connecting plate 801 can be installed after the first connecting plate 4 and the second connecting plate 5 are installed, and then the first mounting ring 802 can be installed, so that the second mounting ring 803 can be installed to the bottom of the first mounting ring 802 through the threaded tube 804, so that the plug-in tube 805 can be inserted into the soil, and the first guard plate 1 and the second guard plate 2 can be installed through the first mounting ring 802, the second mounting ring 803 and the second connecting plate 801, so as to facilitate the protection of the supporting piles and effectively reduce the erosion of the supporting piles by river water.

[0023] In addition, a second through-hole is provided at the top of the first connecting plate 4, a scale plate is inserted into the inner cavity of the second through-hole, and scale lines are provided on the surface of the scale plate, so that the scale plate can be inserted into the second through-hole after the second through-hole is opened, and the scale plate can be inserted into the mud at the bottom of the river, so that the depth of the river water can be identified by the scale lines on the scale plate, and passers-by can be warned.

[0024] Reference Figure 1-Figure 10 In a preferred embodiment, a blocking net 13 is installed at the bottom of the first connecting plate 4 and the bottom of the second connecting plate 5, and a discharge port 14 is opened at the bottom of the first connecting plate 4 and the second connecting plate 5, and a mounting plug 15 is installed in the inner cavity thread of the discharge port 14. After the mounting plug 15 is removed from the discharge port 14, sand and gravel can be placed in the blocking net 13, so that the blocking net 13 can place the sand and gravel, so that the sand and gravel can buffer the impact force of the river water when it flows, thereby reducing the impact force of the river water, and thereby reducing the impact of the river water on the first connecting plate 4, and first docking plates 16 are installed on both sides of the first guard plate 1. Second docking plates 17 are installed on both sides of the second guard plate 2, and mounting bolts 18 are installed on the back of the second docking plate 17, and the front of the mounting bolts 18 passes through the second docking plate 17 and is threadedly connected to the first docking plate 16, so that the mounting bolts 18 can pass through the second docking plate 17 and the second docking plate 17, and then the mounting bolts 18 can be connected to the first docking plate 16 and the second docking plate 17, so that the first guard plate 1 and the second guard plate 2 can be connected, wherein the first docking plate 16 and the second docking plate 17 are both inlaid with docking sleeves, which can connect the mounting bolts 18 to the docking sleeves, so as to facilitate the connection of the first docking plate 16 and the second docking plate 17.

[0025] Reference Figure 1-Figure 4In a preferred embodiment, a first through hole 19 is provided on the top of the first connecting plate 4 and the top of the second connecting plate 5, a pressing plate 20 is inserted into the inner cavity of the first through hole 19, a rotating ring 21 is installed on the surface of the plug-in tube 805, a mounting frame 22 is installed on the surface of the rotating ring 21, and the pressing plate 20 penetrates to the inner side of the mounting frame 22, so that after the first through hole 19 is installed, the first through hole 19 can be used to install the pressing plate 20, and a limiting frame is installed on the surface of the second mounting ring 803, so that the limiting frame can limit the pressing plate 20, so that the pressing plate 20 can be stably moved downward, and the mounting frame 22 A mounting shaft 23 is installed on the inner side, and a rotating frame 24 is installed on the surface of the mounting shaft 23, a blocking block 25 is installed on the inner side of the rotating frame 24, and a pressing pad 26 is installed on the outer side of the pressing plate 20, and the pressing pad 26 is in contact with the surface of the rotating frame 24, so that the mounting shaft 23 can be installed after the mounting frame 22 is installed, so that the rotating frame 24 can be installed on the surface of the mounting shaft 23, so that after the pressing plate 20 is pressed downward, the pressing plate 20 drives the pressing pad 26 to move downward, so that the pressing pad 26 pushes the rotating frame 24, so that the rotating frame 24 can be unfolded, so that the installation stability of the first guard plate 1 and the second guard plate 2 can be improved.

[0026] Reference Figure 1-Figure 7In a preferred embodiment, a fixing frame 27 is installed on both sides of the second mounting ring 803, a connecting frame 28 is installed on the inner side of the fixing frame 27, a water-facing blade 29 is installed on the front side of the connecting frame 28, a connecting shaft 30 is installed on the front side of the water-facing blade 29, and the connecting shaft 30 penetrates the water-facing blade 29 and penetrates to the back side of the connecting frame 28, so that after the fixing frame 27 is installed, the fixing frame 27 can be installed to install the connecting frame 28 by bolts, so that the water-facing blade 29 can be installed by the connecting shaft 30, so that the river water can flow to the water-facing blade 29. The water blade 29 is impacted, so that the water-facing blade 29 is easy to rotate, and the inner cavity of the connecting frame 28 is installed with a gear 31, and the gear 31 is installed on the surface of the connecting shaft 30, and the top of the connecting frame 28 is plugged with a tooth plate 32 that runs through the bottom of the connecting frame 28, and the tooth plate 32 is meshed with the gear 31, and the bottom of the tooth plate 32 is installed with a second fixing plate 33, and the bottom of the second fixing plate 33 is installed with a plug-in rod 34, which can make the water-facing blade 29 drive the connecting shaft 30 to rotate when rotating, so that the connecting shaft 30 drives the gear 31 to rotate, so that The gear 31 drives the tooth plate 32 to move, and can drive the second fixing plate 33 to move downward when the tooth plate 32 moves downward, so that the second fixing plate 33 drives the plug rod 34 to be inserted into the soil, so that it can be inserted into the soil to stabilize the soil. The installed plug rod 34 can block the river water, which is convenient for dispersing the river water, reducing the impact of the river water on the soil, and reducing the loss of water and soil. A blocking brush (not shown in the figure) is provided on the top of the fixing frame 27, which can make the blocking brush contact with the surface of the tooth plate 32, thereby preventing sand and gravel from entering. The movement of the tooth plate 32 into the fixed frame 27 is affected. It is worth mentioning again that a water level sensor is installed in the inner cavity of the plug-in rod 34, and a contact plate is installed at the bottom of the plug-in rod 34, which can enable the water level sensor to detect the water level of the river channel, thereby facilitating the judgment of whether soil erosion occurs on the river bank, and the installed contact plate can increase the contact area with the bottom of the river channel, thereby preventing the plug-in rod 34 from being inserted into the soil at the bottom of the river channel, causing the soil at the bottom of the river channel to loosen, causing the bottom area of ​​the plug-in rod 34 to be washed by river water, resulting in soil erosion.

[0027] Reference Figure 11-Figure 14In a preferred embodiment, a fixing seat 35 is installed on the surface of the second mounting ring 803, a mounting frame 36 is installed on the surface of the fixing seat 35, a fixing shaft 37 is installed on the inner wall of the mounting frame 36, a rotating plate 38 is installed on the surface of the fixing shaft 37, a first mounting seat 39 is installed on the surface of the second mounting ring 803, a second mounting seat 40 is installed on the back of the rotating plate 38, and a first mounting cylinder 42 is rotatably installed on the inner side of the first mounting seat 39, a first movable rod 41 is rotatably installed on the inner side of the second mounting seat 40, the first movable rod 41 is plugged and matched with the first mounting cylinder 42, and a first spring 43 is installed on the inner wall of the first mounting cylinder 42, and the left end of the first spring 43 is connected to the first spring 43. The right side of the movable rod 41 is connected, so that the mounting frame 36 can be installed after the fixing seat 35 is installed, so that the fixed shaft 37 can be installed in the inner cavity of the mounting frame 36, so that the rotating plate 38 can be installed on the surface of the fixed shaft 37, so that when the flow rate of the river water in the river channel increases, the river water can impact the rotating plate 38, so that the rotating plate 38 drives the first movable rod 41 to squeeze the first spring 43 through the second mounting seat 40, and then the rotating plate 38 is tilted, so that the rotating plate 38 guides the river water, and the river water can impact the water-facing blade 29, and the water-facing blade 29 can be rotated, so as to drive the plug-in rod 34 to move downward, so as to detect the water level of the river channel.

[0028] In addition, a second mounting tube 44 is installed on the top of the connecting frame 28, a second movable rod 45 is installed on the top of the second mounting tube 44, a push plate 46 is installed on the top of the second movable rod 45, the push plate 46 is connected to the tooth plate 32, and a second spring 47 is installed on the inner wall of the second mounting tube 44, and the top of the second spring 47 is connected to the bottom of the second movable rod 45, so that the second spring 47 installed in the second mounting tube 44 can push the second movable rod 45 upward, so that the second movable rod 45 drives the push plate 46 to move, and then it is convenient to reset the tooth plate 32 that moves downward upward, so that the tooth plate 32 can be moved downward again when the water flow in the river is large next time.

[0029] Reference Fig.11 and Fig.15In a preferred embodiment, the connecting shaft 30 includes a connecting disk 3001, a first axis 3002 is installed on the back of the connecting disk 3001, a second axis 3003 is installed on the back of the first axis 3002, a connecting seat 3004 is installed on the back of the connecting frame 28, and an axis groove 3005 is opened on the front of the connecting seat 3004, a shaft sleeve 3006 is installed in the inner cavity of the water-facing blade 29, and a third spring 3007 is installed in the inner cavity of the shaft sleeve 3006, and the third spring The front end of the spring 3007 is connected to the back of the first axis 3002, the third spring 3007 is sleeved on the surface of the second axis 3003, the back of the connecting plate 3001 is installed with a connecting block 3008, the front of the water-facing blade 29 is provided with a connecting groove 3009, and the connecting groove 3009 is provided with a plurality of connecting blocks 3008 and the connecting groove 3009 are plugged and matched, and can impact the connecting plate 3001 when the water flow is large, so that the connecting plate 3001 drives the connecting block 3008 and the first axis 3002 move, so that the first axis 3002 squeezes the third spring 3007, and then the first axis 3002 can drive the second axis 3003 to be inserted into the axis groove 3005, so that the second axis 3003 is connected to the connecting seat 3004, and when the connecting plate 3001 drives the connecting block 3008 to move, the connecting block 3008 can be inserted into the connecting groove 3009, so that when the water flow impacts the water-facing blade 29 and the water-facing blade 29 rotates, it can drive the sleeve 3006 and the connecting plate 3001 to rotate, and when the connecting plate 3001 rotates, the connecting seat 3004 can be driven to rotate through the first axis 3002 and the second axis 3003, so that the connecting seat 3004 drives the gear 31 to rotate, and then the gear 31 drives the tooth plate 32 to move, so that the water level sensor installed in the plug rod 34 moves downward to the bottom of the river channel to detect the water level of the river channel. Example

[0030] Reference Figure 5 and Fig. 9In a preferred embodiment, the floating mechanism 7 includes a first floating board 701, and the first floating board 701 is installed on the front side of the first connecting board 4, and the second floating board 702 is installed on the back side of the second connecting board 5. The first mounting plate 703 is installed at the bottom of the first floating board 701 and the second floating board 702, and the bottom of the first mounting plate 703 is installed with a floating ball 704, and the floating ball 704 is provided with a plurality of floating balls. The outer sides of the first floating board 701 and the second floating board 702 are provided with a plug-in groove 705, and the plug-in groove 705 is provided with a plurality of plug-in grooves. A plug-in block 706 is installed on the top of the first mounting plate 703, and the plug-in block 706 is plugged and matched with the plug-in groove 705, so that the first connecting plate 4 and the second connecting plate 5 can install the first floating board 701 and the second floating board 702, so that the plug-in groove 705 After opening, the plug-in block 706 is inserted into the plug-in slot 705, so that the first mounting plate 703 can be installed, which is convenient for installing the floating ball 704, so as to avoid the impact of the floating ball 704 on the floating ball 704 when the river water flows, causing the floating ball 704 to float and separate from the first floating plate 701 and the second floating plate 702. In addition, when someone falls into the water, the height of the supporting piles will block the person who falls into the water, making it difficult for the person who falls into the water to get ashore. At this time, the floating ball 704 can be moved so that the floating ball 704 drives the first mounting plate 703 and the plug-in block 706 to move and separate from the first floating plate 701 or the second floating plate 702, and then the floating ball 704 can be removed, so as to facilitate helping the person who falls into the water to float, and enable the person who falls into the water to maintain his physical strength, so as to avoid the situation where the person who falls into the water becomes exhausted and drowns due to lack of rescue for a long time.

[0031] In addition, a first fixed plate 9 is installed on the top of the first floating plate 701 and the second floating plate 702, and a sliding block 10 is installed on the inner side of the first fixed plate 9, and a sliding frame 11 is installed on the outer side of the first guard plate 1 and the second guard plate 2, and a sliding groove 12 is opened on the surface of the sliding frame 11, and the sliding block 10 is slidably matched with the sliding groove 12, so that the sliding block 10 can be installed after the first fixed plate 9 is installed, and the first guard plate 1 and the second guard plate 2 can be installed on the sliding frame 11, so that the sliding block 10 can be slidably matched with the sliding groove 12, which is convenient for limiting the first floating plate 701 and the second floating plate 702, so that when the water level of the river rises, the buoyancy of the river water will lift the floating ball 704, and then it is convenient to float the first floating plate 701 and the second floating plate 702, so that the person who falls into the water can find the floating ball 704 in time and remove the floating ball 704 for use. Example

[0032] Reference Figure 1 and 8In a preferred embodiment, the floating mechanism 7 includes a first floating plate 701, and the first floating plate 701 is installed on the front side of the first connecting plate 4, and the second floating plate 702 is installed on the back side of the second connecting plate 5. The first mounting plate 703 is installed at the bottom of the first floating plate 701 and the second floating plate 702. The bottom of the first mounting plate 703 is installed with a floating ball 704, and the floating ball 704 is provided with a plurality of floating balls. A rotating disk 707 is installed at the top of the first floating plate 701, and a threaded column 708 is installed at the bottom of the rotating disk 707. The threaded column 708 penetrates the first floating plate 701 and is threadedly connected to the first floating plate 701 and the first mounting plate 703. A rotating rod 709 is installed on the surface of the rotating disk 707, which can rotate The movable rod 709 enables the rotating rod 709 to drive the rotating disk 707 to rotate, and the rotating disk 707 drives the threaded column 708 to rotate, so that the threaded column 708 is convenient for passing through the first floating plate 701 and being threadedly connected with the first mounting plate 703, thereby facilitating the installation of the first mounting plate 703, and can improve the installation stability of the first mounting plate 703, and avoid the violent river water from impacting the floating ball 704 after installing it in a river with a large flow or a fast current, causing the floating ball 704 to be washed away, and can adapt to the river with a fast current, and the person who falls into the water can rotate the threaded column 708 by rotating the rotating rod 709, so that the threaded column 708 is convenient for separating from the first mounting plate 703 after rotation, thereby facilitating the disassembly of the floating ball 704.

[0033] In addition, a first fixed plate 9 is installed on the top of the first floating plate 701 and the second floating plate 702, and a sliding block 10 is installed on the inner side of the first fixed plate 9, and a sliding frame 11 is installed on the outer side of the first guard plate 1 and the second guard plate 2, and a sliding groove 12 is opened on the surface of the sliding frame 11, and the sliding block 10 is slidably matched with the sliding groove 12, so that the sliding block 10 can be installed after the first fixed plate 9 is installed, and the first guard plate 1 and the second guard plate 2 can be installed on the sliding frame 11, so that the sliding block 10 can be slidably matched with the sliding groove 12, which is convenient for limiting the first floating plate 701 and the second floating plate 702, so that when the water level of the river rises, the buoyancy of the river water will lift the floating ball 704, and then it is convenient to float the first floating plate 701 and the second floating plate 702, so that the person who falls into the water can find the floating ball 704 in time and remove the floating ball 704 for use.

[0034] Specifically, the working process or working principle of the protective structure for preventing soil erosion in the foundation of riverbank building supporting piles is as follows: when in use, the first guard plate 1 and the second guard plate 2 are aligned, and the first docking plate 16 and the second docking plate 17 are connected by installing bolts 18, so that the first guard plate 1 and the second guard plate 2 can be docked, and then the first guard plate 1 and the second guard plate 2 are placed from the top of the supporting pile foundation to the surface of the pile foundation, and the first guard plate 1 and the second guard plate 2 can be located on the surface of the supporting pile, so as to protect the connection between the pile foundation and the supporting pile, and then The installation plug 15 is rotated to disassemble the installation plug 15, and sand and gravel are placed from the discharge port 14 into the blocking net 13, so that the sand and gravel are stored in the blocking net 13, and then the first guard plate 1 and the second guard plate 2 are pressed downward, so that the first guard plate 1 and the second guard plate 2 can drive the plug-in tube 805 to be inserted into the soil at the bottom of the river channel, which is convenient for installing the first guard plate 1 and the second guard plate 2, and then the pressing plate 20 is pressed downward, so that the pressing plate 20 drives the extrusion pad 26 to squeeze the rotating frame 24, so that the rotating frame 24 can be rotated outward, so that the rotating frame 24 is inserted into the soil at the bottom of the river channel. After the first mounting ring 802 and the second mounting ring 803 are inserted into the soil, the first mounting ring 802 and the second mounting ring 803 can be limited, so that the plug-in tube 805 can be installed more firmly, and the first guard plate 1 and the second guard plate 2 can be limited to avoid long-term scouring of river water causing the first guard plate 1 and the second guard plate 2 to be washed and floated. When the river water in the river channel hits the supporting pile, the sand and gravel in the blocking net 13 weaken the impact of the river water, thereby preventing the river water from directly impacting the pile foundation of the supporting pile, causing the pile foundation to be washed by the river water for a long time, resulting in damage to the pile foundation, and the second mounting ring 803 is far away from the river channel. The fixing frame 27 can be installed on the side, which is convenient for installing the connecting frame 28 through bolts. When the river water flows in the river channel, it can impact the water-facing blades 29, so that the water-facing blades 29 can rotate, so that the water-facing blades 29 can drive the gear 31 to rotate through the connecting shaft 30, so that the gear 31 drives the tooth plate 32 to move downward, and the tooth plate 32 drives the second fixing plate 33 and the plug-in rod 34 installed at the bottom of the second fixing plate 33 to move downward, so that the plug-in rod 34 can be inserted into the bottom of the river channel, and the first mounting ring 802 and the second mounting ring 803 can be limited.

[0035] In addition, when a passerby falls into the water, the person can swim to the nearest shore and lie on the first floating board 701 or the second floating board 702, so that the buoyancy provided by the floating ball 704 for the first floating board 701 and the second floating board 702 can support the person, so that the person can rest and conserve energy. The floating ball 704 can be disassembled so that the person can lie on the floating ball 704 and swim to a position where rescue is convenient, so as to avoid the person being unable to support himself until the moment of rescue due to lack of energy. The supporting piles can be protected while providing first aid equipment for the person.

Claims

1. A protective structure for preventing water and soil loss in the foundation of riverbank building support piles, comprising a first protective plate (1) and a second protective plate (2), characterized in that: A first connecting plate (3) is installed at the bottom of each of the first guard plate (1) and the second guard plate (2); a first connecting plate (4) is installed on the surface of the first guard plate (1); a second connecting plate (5) is installed on the surface of the second guard plate (2); a fixing ring (6) is installed at the bottom of the first connecting plate (3); and floating mechanisms (7) are installed on the outer sides of each of the first connecting plate (4) and the second connecting plate (5); A protection mechanism (8), wherein the protection mechanism (8) comprises: A second connecting plate (801), wherein two groups of the second connecting plates (801) are provided, and the second connecting plates (801) are respectively mounted on the bottom of the first connecting plate (4) and the second connecting plate (5); A first mounting ring (802), the first mounting ring (802) being mounted on the bottom of the second connection plate (801); A second mounting ring (803), the second mounting ring (803) being mounted on the bottom of the first mounting ring (802), a threaded barrel (804) being mounted on the top of the second mounting ring (803), and the threaded barrel (804) being threadedly connected to the first mounting ring (802); A plug-in tube (805) is installed at the bottom of the second installation ring (803).

2. A protective structure for preventing soil erosion of riverbank building support pile foundations according to claim 1, characterized in that: The floating mechanism (7) comprises a first floating plate (701), and the first floating plate (701) is mounted on the front side of a first connecting plate (4), and a second floating plate (702) is mounted on the back side of the second connecting plate (5); a first mounting plate (703) is mounted on the bottom of each of the first floating plate (701) and the second floating plate (702); a floating ball (704) is mounted on the bottom of each of the first mounting plate (703), and a plurality of floating balls (704) are provided; a plug-in slot (705) is provided on the outer side of each of the first floating plate (701) and the second floating plate (702), and a plurality of plug-in slots (705) are provided; a plug-in block (706) is mounted on the top of the first mounting plate (703), and the plug-in block (706) is plugged into and matched with the plug-in slot (705).

3. A protective structure for preventing soil erosion of riverbank building support pile foundations according to claim 2, characterized in that: A first fixing plate (9) is installed on the top of each of the first floating plate (701) and the second floating plate (702), and a sliding block (10) is installed on the inner side of the first fixing plate (9). A sliding frame (11) is installed on the outer side of the first guard plate (1) and the second guard plate (2). A sliding groove (12) is provided on the surface of the sliding frame (11), and the sliding block (10) is slidably matched with the sliding groove (12).

4. A protective structure for preventing soil erosion of riverbank building support pile foundations according to claim 1, characterized in that: The bottom of the first connecting plate (4) and the bottom of the second connecting plate (5) are both installed with a blocking net (13), the bottom of the first connecting plate (4) and the bottom of the second connecting plate (5) are both provided with a discharge port (14), and the inner cavity of the discharge port (14) is threadedly installed with a mounting plug (15).

5. The protective structure for preventing water and soil loss in the foundation of riverbank building support piles according to claim 1, characterized in that: First docking plates (16) are installed on both sides of the first guard plate (1), second docking plates (17) are installed on both sides of the second guard plate (2), mounting bolts (18) are installed on the back side of the second docking plates (17), and the front side of the mounting bolts (18) passes through the second docking plates (17) and is threadedly connected to the first docking plates (16).

6. A protective structure for preventing water and soil loss in the foundation of riverbank building support piles according to claim 1, characterized in that: A first through hole (19) is formed at the top of the first connecting plate (4) and the top of the second connecting plate (5); a pressing plate (20) is inserted into the inner cavity of the first through hole (19); a rotating ring (21) is installed on the surface of the plug-in tube (805); a mounting frame (22) is installed on the surface of the second mounting ring (803); and the pressing plate (20) penetrates to the inner side of the mounting frame (22).

7. A protective structure for preventing water and soil loss in the foundation of riverbank building support piles according to claim 6, characterized in that: A mounting shaft (23) is mounted on the inner side of the mounting frame (22), and a rotating frame (24) is mounted on the surface of the mounting shaft (23). A blocking block (25) is mounted on the inner side of the rotating frame (24). A pressing pad (26) is mounted on the outer side of the pressing plate (20), and the pressing pad (26) is in contact with the surface of the rotating frame (24).

8. The protective structure for preventing water and soil loss in the foundation of riverbank building support piles according to claim 1, characterized in that: A fixing frame (27) is installed on both sides of the second mounting ring (803), a connecting frame (28) is installed on the inner side of the fixing frame (27), a water-incoming blade (29) is installed on the front side of the connecting frame (28), a connecting shaft (30) is installed on the front side of the water-incoming blade (29), and the connecting shaft (30) passes through the water-incoming blade (29) and passes through the back side of the connecting frame (28).

9. A protective structure for preventing water and soil loss in the foundation of riverbank building support piles according to claim 8, characterized in that: A gear (31) is installed in the inner cavity of the connecting frame (28), and the gear (31) is installed on the surface of the connecting shaft (30). A toothed plate (32) is inserted into the top of the connecting frame (28) and extends through the bottom of the connecting frame (28), and the toothed plate (32) is meshed with the gear (31). A second fixing plate (33) is installed at the bottom of the toothed plate (32), and a plug-in rod (34) is installed at the bottom of the second fixing plate (33).

10. The protective structure for preventing water and soil loss in the foundation of riverbank building support piles according to claim 1, characterized in that: The floating mechanism (7) comprises a first floating plate (701), and the first floating plate (701) is mounted on the front side of a first connecting plate (4), and a second floating plate (702) is mounted on the back side of the second connecting plate (5), and a first mounting plate (703) is mounted on the bottom of each of the first floating plate (701) and the second floating plate (702), and a floating ball (704) is mounted on the bottom of the first mounting plate (703), and a plurality of floating balls (704) are provided, and a rotating disk (707) is mounted on the top of the first floating plate (701), and a threaded column (708) is mounted on the bottom of the rotating disk (707), and the threaded column (708) passes through the first floating plate (701) and is threadedly connected to the first floating plate (701) and the first mounting plate (703), and a rotating rod (709) is mounted on the surface of the rotating disk (707).