Method for increasing water flooding swept volume by using temporary plugging agent
By obtaining reservoir core data and injecting temporary plugging agent powder and chemical plugging agent in batches, the problem of poor water injection regulation and distribution in the prior art is solved, and the effect of balancing water injection profile and improving water dispersion and volume is achieved.
Patent Information
- Application Number
- CN202411105735.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-11-19
AI Technical Summary
Existing water injection chemical blocking agents cannot effectively seal advantageous channels such as cracks and high-permeability belts without blocking low-permeability channels, resulting in uneven water absorption profiles, affecting water dispersion, volume and final recovery.
By obtaining reservoir core data, determine the median diameter of the pore throat D50 and distribution, grind the temporary plugging agent powder within the range of 0 to D50, and inject it into the wellbore in batches according to the diameter from large to small, temporarily plug the small pore throat, and then follow up Inject chemical plugging agent to seal the large pore throat to achieve a balanced water injection profile.
It improves water dispersion, volume and oil field recovery rate, avoids low-permeability channel blockage, and enhances the water injection development effect.
Smart Images

Figure CN118979716A_ABST
Abstract
Description
Technical Field
[0001] The patent of this invention relates to the technical field of oil and gas field exploitation in the petroleum industry, and specifically to a method for increasing the water drive swept volume by using a temporary plugging agent. This method is suitable for increasing the water drive swept volume and ultimate recovery rate of vertical wells, inclined wells and horizontal wells. Background Art
[0002] The development of oil fields by water injection can improve the recovery rate of crude oil, but due to the influence of reservoir heterogeneity, the injected water is easy to flow along the dominant channels such as fractures or high permeability zones, resulting in uneven water absorption profiles, resulting in low oil displacement area, and affecting the effect of water injection development. In order to block the dominant flow channel and adjust the water absorption profile, the existing method is mainly to directly inject plugging agents to block the dominant channel, but the direct injection of chemical plugging agents has poor self-identification effect. While blocking the dominant channel, it will also block the low permeability channel, affecting the water injection profile adjustment effect and the water drive swept volume.
[0003] Therefore, in view of the defect of previous water injection profile control chemical plugging agents in blocking low-permeability channels, research on water injection well profile control methods based on temporary plugging agents to protect reservoir low-permeability flow channels is of great significance for improving the profile control effect of water injection wells and the water drive swept volume. Summary of the invention
[0004] The object of the present invention is to provide a method for increasing the swept volume of water flooding by using a temporary plugging agent, which can overcome the defects of existing water injection profile control, realize chemical plugging of advantageous channels such as cracks and high permeability zones without plugging low permeability channels, and ultimately achieve the purpose of balancing the water injection profile and increasing the swept volume of water flooding, which is beneficial to improving the final recovery rate.
[0005] In order to achieve the above technical objectives, the present invention is implemented through the following technical solutions:
[0006] A method for increasing water flooding swept volume using a temporary plugging agent comprises the following steps:
[0007] S1. Select an injection well in a water injection development oil field, and obtain the core data of the reservoir of the water injection target in the injection well, including the size, shape, distribution and connectivity between the pores and throats of the water absorption layer;
[0008] S2. Determine the median pore throat diameter D based on the reservoir core data for the water injection purpose 50 and the distribution of pore throat diameters;
[0009] S3. Grind the temporary plugging agent into a diameter distribution of 0~D 50 For powders within the range, the distribution of the temporary plugging agent powders with different diameters is consistent with the distribution of the pore throat diameters;
[0010] S4. The temporary plugging agent powder obtained by grinding is injected into the wellbore in batches in the order of injection from large to small diameter;
[0011] S5. When the diameter is between 0 and D 50 After the small pore throats within the range are filled with temporary plugging agent powder and completely temporarily plugged, the chemical plugging agent is injected into the wellbore and kept still for a period of T;
[0012] S6. After the static period, enter the normal water injection process.
[0013] In this scheme, the median pore throat diameter D is determined by obtaining the core data of the reservoir for water injection. 50 and the distribution of pore throat diameters, and then according to the median pore throat diameter D 50 And the distribution of pore throat diameter Grinding 0 ~ D 50 The temporary plugging agent powder with a diameter within the range of 0 to 100 mm is injected into the wellbore in batches according to the injection order from large to small diameter. Since the temporary plugging agent powder is injected in batches according to the order from large to small diameter, the temporary plugging agent powder will only enter the pore throat with a pore throat diameter larger than the diameter of the temporary plugging agent powder, that is, the temporary plugging agent powder will only temporarily plug the pore throats with diameters of 0 to 100 mm when entering the reservoir. 50 Small pore throats within the range of 1.5 and larger than the median pore throat diameter D 50 The diameter of the temporary plugging agent powder is much smaller than that of the pore throat. There will be larger and more gaps between the temporary plugging agent powders. Subsequent chemical plugging agents can enter these pore throats and form long-term plugging. As time goes by, the temporary plugging agent gradually fails and degrades, and the chemical plugging agent forms and solidifies, with a final diameter of 0~D 50 The small pore throats within the range are released, while the large pore throats are blocked; during normal water injection, the injected water can only enter the small pore throats but not the large pore throats, thereby achieving the purpose of increasing the oil displacement area, water drive swept volume and the ultimate recovery rate of the oil field.
[0014] As a further solution of the present invention, in order to better achieve chemical plugging of cracks, high permeability zones and other advantageous channels without plugging low permeability channels, the pore throat diameters are D k5 >D k4 >D k3 >D k2 >D k1 The diameters of the temporary plugging agent powders are D z5 >D z4 >D z3 >D z2 >D z1 , where D 50 >D k5 >D z5 >D k4>D z4 >D k3 >D z3 >D k2 >D z2 >D k1 >D z1 .
[0015] As a further solution of the present invention, the specific steps of injecting temporary plugging agent powder into the wellbore in batches in step S4 are as follows:
[0016] S41. The first batch will have a diameter of D z5 The temporary plugging agent powder is injected into the wellbore with a diameter of D z5 The temporary plugging agent powder enters the k5 The pore throats are completely blocked temporarily;
[0017] S42. The second batch will have a diameter of D z4 The temporary plugging agent powder is injected into the wellbore with a diameter of D z4 The temporary plugging agent powder enters the k4 The pore throats are completely blocked temporarily;
[0018] S43. The third batch will have a diameter of D z3 The temporary plugging agent powder is injected into the wellbore with a diameter of D z3 The temporary plugging agent powder enters the k3 The pore throats are completely blocked temporarily;
[0019] S44. The fourth batch will have a diameter of D z2 The temporary plugging agent powder is injected into the wellbore with a diameter of D z2 The temporary plugging agent powder enters the k2 The pore throats are completely blocked temporarily;
[0020] S45. The fifth batch will have a diameter of D z1 The temporary plugging agent powder is injected into the wellbore with a diameter of D z1 The temporary plugging agent powder enters the k1 The pore throat of the temporary plugging agent is completely blocked, and the final temporary plugging diameter of the temporary plugging agent powder is D k5 , D k4 , D k3 , D k2 , D k1 pore throat.
[0021] Thus, diameter 0~D 50 The small pore throats within the range have been filled with temporary plugging agent powder and completely temporarily blocked. Chemical plugging agents can only enter the small pores with a diameter greater than D. 50The chemical plugging can enter the large pore throats but not the small diameter pore throats, thus achieving chemical plugging of fractures, high permeability zones and other advantageous channels without plugging low permeability channels.
[0022] As a further solution of the present invention, the temporary plugging agent in step S3 has a degradation rate greater than 90% under reservoir temperature conditions and a pressure bearing capacity greater than 20 MPa.
[0023] As a further solution of the present invention, the temporary plugging agent is a mixture of one or more of polycaprolactone, polyglycolic acid, polylactic acid, polybutylene butyrate polyglycolic acid, polyvinyl alcohol, acrylamide, bone glue powder and magnesium aluminum alloy.
[0024] As a further solution of the present invention, the chemical plugging agent in step S5 is one of a thixotropic plugging agent, an in-situ cross-linked polyester plugging agent, a gel plugging agent and an emulsion suspension plugging agent.
[0025] As a further solution of the present invention, when the chemical plugging agent is a denatured plugging agent, the continuous static period is 48 hours and the anti-extrusion strength is greater than 30 MPa.
[0026] As a further solution of the present invention, when the chemical plugging agent is an in-situ cross-linked polyester plugging agent, the initial setting time is greater than 8 hours, the continuous static period is 24 hours, and the solidification strength is 30MPa to 35MPa.
[0027] As a further solution of the present invention, when the chemical plugging agent is a gel plugging agent or an emulsion suspension plugging agent, the water phase plugging rate is greater than 90%.
[0028] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0029] 1. The present invention solves the problem that chemical plugging agents cannot autonomously identify the type of flow channel by first injecting a temporary plugging agent to temporarily plug the throat of small pores, and then injecting a chemical plugging agent to plug the throat of large pores, thereby increasing the water injection and oil washing area and the swept volume of the oil field and improving the ultimate recovery rate of crude oil in the oil field.
[0030] 2. The present invention has wide applicability to well types, and is applicable to vertical wells, inclined wells and horizontal wells. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:
[0032] Figure 1 This is a core pore throat distribution diagram of a method for increasing water flooding swept volume using a temporary plugging agent according to the present invention. DETAILED DESCRIPTION
[0033] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0034] During the formation of sandstone, due to the continuous alternation of high-water and low-water seasons, heterogeneity is a significant feature of sandstone reservoirs, resulting in the distribution of oil and gas during accumulation being filled in accordance with the pore size of sandstone. After water injection development, as the degree of water flooding and water washing of oil and gas increases, high-permeability channels with larger pore sizes will be formed in the sandstone of the injection well group. The water flooding area gradually narrows with the formation of high-permeability channels, and the water flooding effect becomes worse.
[0035] Based on this, in order to achieve the purpose of increasing the oil displacement area, water flooding swept volume and the ultimate recovery of the oil field, temporary plugging agents of different sizes can be used to plug the small pore throats respectively, while the pore throats larger than the median diameter D 50 The diameter of the temporary plugging agent powder is much smaller than that of the pore throat. There will be larger and more gaps between the temporary plugging agent powders. Subsequent chemical plugging agents can enter these pore throats and form long-term plugging. As time goes by, the temporary plugging agent gradually fails and degrades, and the chemical plugging agent forms and solidifies, with a final diameter of 0~D 50 Small pore throats within the range are released, while large pore throats are blocked.
[0036] Specifically, the embodiments of the present invention are as follows:
[0037] Example 1
[0038] This embodiment 1 provides a method for increasing the swept volume of water flooding by using a temporary plugging agent, such as Figure 1 As shown, the following steps are included:
[0039] S1: Select an injection well in a water injection development oil field, and obtain the core data of the reservoir of the water injection target in the injection well, including the size, shape, distribution and connectivity between the pores and throats of the water absorption layer;
[0040] First, a target injection well is selected in the water injection development oil field, and the core analysis of the injection target reservoir of the injection well is carried out to clarify the size, shape, distribution and connectivity between the pores and throats of the water absorption layer, and determine the median diameter D of the pore throat. 50 , D 50 That is, the pore throat diameter corresponding to 50% of the cumulative frequency in the pore throat distribution diagram.
[0041] S2: Determine the median pore throat diameter D based on the reservoir core data for the water injection purpose 50 and the distribution of pore throat diameters;
[0042] In this step, in addition to the core analysis of the reservoir as mentioned above, for sandstone oil layers that have not been cored, the average pore throat diameter parameter index of the sandstone oil layer can be calculated by theoretical calculation or experience, or the average pore throat diameter index of the sand body can be obtained by analyzing adjacent sand bodies deposited during the same period.
[0043] S3. Grind the temporary plugging agent into a diameter distribution of 0~D 50 For powders within the range, the distribution of the temporary plugging agent powders with different diameters is consistent with the distribution of the pore throat diameters;
[0044] S4. The temporary plugging agent powder obtained by grinding is injected into the wellbore in batches in the order of injection from large to small diameter;
[0045] The specific operation is as follows: In the order of injection from large to small diameter, the temporary plugging agent powder is injected into the wellbore in batches. Since the temporary plugging agent powder is injected in batches in the order of large to small diameter, the temporary plugging agent powder will only enter the pore throats whose pore throat diameters are larger than the diameters of the temporary plugging agent powder. Arrange the pore throat diameters from large to small as D k5 >D k4 >D k3 >D k2 >D k1 , the diameters of temporary plugging agent powders are arranged from large to small as D z5 >D z4 >D z3 >D z2 >D z1 , where D 50 >D k5 >D z5 >D k 4>D z4 >D k3 >D z3 >D k2 >D z2 >D k1 >D z1 ; In the first batch, the diameter D z5 The temporary plugging agent powder is injected into the wellbore, D z5 The temporary plugging agent powder enters the k5 The pore throat of the pores is completely blocked; then in the second batch, the diameter of D z4 The temporary plugging agent powder is injected into the wellbore, D z4 The temporary plugging agent powder enters the k4 The pore throat of the pores is completely blocked; in the third batch, the diameter of D z3 The temporary plugging agent powder is injected into the wellbore, D z3 The temporary plugging agent powder enters the k3The pore throat of the pores is completely blocked; in the fourth batch, the diameter of D z2 The temporary plugging agent powder is injected into the wellbore, D z2 The temporary plugging agent powder enters the k2 The pore throat of the pores is completely blocked; in the fifth batch, the diameter of D z1 The temporary plugging agent powder is injected into the wellbore with a diameter of D z1 The temporary plugging agent powder enters the k1 The pore throat of the temporary plugging agent is completely blocked, and the final temporary plugging diameter of the temporary plugging agent powder is D k5 , D k4 , D k3 , D k2 , D k1 The temporary plugging results of the above batches of temporary plugging agent powder injection are shown in Table 1.
[0046] Table 1 Temporary plugging effect of temporary plugging agent powders with different diameters on pore throats
[0047]
[0048]
[0049] It is worth noting that the diameter D k5 , D k4 , D k3 , D k2 , D k1 The temporary plugging agent powder will also enter the 50 However, since the diameter of the temporary plugging agent powder is smaller than that of the pore throat, there will be larger and more gaps between the temporary plugging agent powders, and the subsequent chemical plugging agent can enter the pore throat and form a long-term blockage. 50 When entering the reservoir, it will only temporarily block the diameter 0~D 50 Small pore throats within the range of D 50 The large pore throat of D will not cause temporary blockage, and the chemical plugging agent can still enter the large pore throat of D 50 Large pore throat.
[0050] S5. When the diameter is between 0 and D 50 After the small pore throats within the range are filled with temporary plugging agent powder and completely temporarily plugged, the chemical plugging agent is injected into the wellbore and kept still for a period of T;
[0051] Inject chemical plugging agents into the wellbore. 50 The small pore throats within the range have been temporarily blocked, and chemical plugging agents can only enter the 50The chemical plugging can enter the large pore throats but not the small diameter pore throats, and can be left to stand for a period of T, thus achieving chemical plugging of fractures, high permeability zones and other advantageous channels without plugging low permeability channels.
[0052] S6. After the static period, the normal water injection process is started;
[0053] As time goes by, the temporary plugging agents in the small pore throats gradually become ineffective and degrade, and the chemical plugging agents in the large pore throats are formed and solidified, and eventually the small pore throats with diameters ranging from 0 to D50 are released. After following the above steps, most of the small pore throats are restored to their original state, while the large pore throats are blocked; during normal water injection, the injected water can only enter the small pore throats but not the large pore throats, which will greatly increase the oil displacement area, swept volume and the ultimate recovery rate of the oil field.
[0054] In this embodiment, the temporary plugging agent comprises a mixture of one or more of polycaprolactone, polyglycolic acid, polylactic acid, polybutylene butyrate polyglycolic acid, polyvinyl alcohol, acrylamide, bone glue powder, magnesium aluminum alloy and the like, wherein the temporary plugging agent has a degradation rate greater than 90% under reservoir temperature conditions and a pressure bearing capacity greater than 20 MPa;
[0055] The reaction mechanism of the temporary plugging agent is as follows: the high molecular weight polymer of the temporary plugging agent contains aromatic polymers of oxyphenylpropanol or its derivative structural units, and there are active groups such as aromatic groups, phenolic hydroxyl groups, alcoholic hydroxyl groups, carbon-based conjugated double bonds in its molecular structure. Different chemical reactions can be carried out in different environments, such as oxidation, reduction, hydrolysis, acidolysis, halogenation, polycondensation, grafting or copolymerization, etc., to generate some water-soluble substances that are continuously degraded and precipitated in the pores of the sandstone oil layer, thereby playing a temporary plugging role without causing harm to the formation environment.
[0056] In this embodiment, the above-mentioned chemical plugging agent is one of a thixotropic plugging agent, an in-situ cross-linked polyester plugging agent, a gel plugging agent and an emulsion suspension plugging agent; wherein, when the chemical plugging agent is a denatured plugging agent, the continuous standing period is 48 hours, and the anti-extrusion strength is greater than 30MPa; when the chemical plugging agent is an in-situ cross-linked polyester plugging agent, the initial setting time is greater than 8 hours, the continuous standing period is 24 hours, and the solidification strength is 30MPa~35MPa; when the chemical plugging agent is a gel plugging agent or an emulsion suspension plugging agent, the water phase plugging rate is greater than 90%.
[0057] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for increasing water flooding swept volume using a temporary plugging agent, characterized in that: The steps include: S1. Select an injection well in a water injection development oil field, and obtain the core data of the reservoir of the water injection target in the injection well, including the size, shape, distribution and connectivity between the pores and throats of the water absorption layer; S2. Determine the median pore throat diameter D based on the reservoir core data for the water injection purpose 50 and the distribution of pore throat diameters; S3. Grind the temporary plugging agent into a diameter distribution of 0~D 50 For powders within the range, the distribution of the temporary plugging agent powders with different diameters is consistent with the distribution of the pore throat diameters; S4. The temporary plugging agent powder obtained by grinding is injected into the wellbore in batches in the order of injection from large to small diameter; S5. When the diameter is between 0 and D 50 After the small pore throats within the range are filled with temporary plugging agent powder and completely temporarily plugged, the chemical plugging agent is injected into the wellbore and kept still for a period of T; S6. After the static period, enter the normal water injection process.
2. A method for increasing water flooding swept volume using a temporary plugging agent according to claim 1, characterized in that: The pore throat diameters from large to small are D k5 >D k4 >D k3 >D k2 >D k1 The diameters of the temporary plugging agent powders are D z5 >D z4 >D z3 >D z2 >D z1 , where D 50 >D k5 >D z5 >D k4 >D z4 >D k3 >D z3 >D k2 >D z2 > Dk1 >D z1 .
3. A method for increasing water flooding swept volume using a temporary plugging agent according to claim 2, characterized in that: The specific steps of injecting temporary plugging agent powder into the wellbore in batches in step S4 are as follows: S41. The first batch will have a diameter of D z5 The temporary plugging agent powder is injected into the wellbore with a diameter of D z5 The temporary plugging agent powder enters the k5 The pore throats are completely blocked temporarily; S42. The second batch will have a diameter of D z4 The temporary plugging agent powder is injected into the wellbore with a diameter of D z4 The temporary plugging agent powder enters the k4 The pore throats are completely blocked temporarily; S43. The third batch will have a diameter of D z3 The temporary plugging agent powder is injected into the wellbore with a diameter of D z3 The temporary plugging agent powder enters the k3 The pore throats are completely blocked temporarily; S44. The fourth batch will have a diameter of D z2 The temporary plugging agent powder is injected into the wellbore with a diameter of D z2 The temporary plugging agent powder enters the k2 The pore throats are completely blocked temporarily; S45. The fifth batch will have a diameter of D z1 The temporary plugging agent powder is injected into the wellbore with a diameter of D z1 The temporary plugging agent powder enters the k1 The pore throat of the temporary plugging agent is completely blocked, and the final temporary plugging diameter of the temporary plugging agent powder is D k5 , D k4 , D k3 , D k2 , D k1 pore throat.
4. A method for increasing water flooding swept volume using a temporary plugging agent according to claim 1, characterized in that: The temporary plugging agent in step S3 has a degradation rate greater than 90% under reservoir temperature conditions and a pressure bearing capacity greater than 20 MPa.
5. A method for increasing water flooding swept volume using a temporary plugging agent according to claim 4, characterized in that: The temporary plugging agent is a mixture of one or more of polycaprolactone, polyglycolic acid, polylactic acid, polybutylene butyrate, polyglycolic acid, polyvinyl alcohol, acrylamide, bone glue powder and magnesium aluminum alloy.
6. A method for increasing water flooding swept volume using a temporary plugging agent according to claim 1, characterized in that: The chemical plugging agent in step S5 is one of a thixotropic plugging agent, an in-situ cross-linked polyester plugging agent, a gel plugging agent and an emulsion suspension plugging agent.
7. A method for increasing water flooding swept volume using a temporary plugging agent according to claim 6, characterized in that: When the chemical plugging agent is a denatured plugging agent, the continuous static period is 48 hours and the anti-extrusion strength is greater than 30MPa.
8. The method for increasing water flooding swept volume using a temporary plugging agent according to claim 6, characterized in that: When the chemical plugging agent is an in-situ cross-linked polyester plugging agent, the initial setting time is greater than 8 hours, the continuous static period is 24 hours, and the solidification strength is 30MPa to 35MPa.
9. A method for increasing water flooding swept volume using a temporary plugging agent according to claim 6, characterized in that: When the chemical plugging agent is a gel plugging agent or an emulsion suspension plugging agent, the water phase plugging rate is greater than 90%.