MABR coupled MBR sewage treatment and use method thereof

By combining MABR and MBR technologies in urban sewage treatment plants, a linkage regulation system is built, which solves the problems of low nitrogen removal efficiency and sludge management in sewage treatment, and efficient water quality improvement and cost savings are achieved.

CN118993343AActive Publication Date: 2024-11-22TIANJIN HYDROKING SCI & TECH

Patent Information

Application Number
CN202411348876.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2024-11-22
Estimated Expiration
2044-09-26

AI Technical Summary

Technical Problem

Existing urban sewage treatment plants need to consume external carbon sources when improving denitrification efficiency, which increases costs and sludge production. In addition, there are problems of membrane blockage and sludge management during the use of MBR technology, and problems of incoordinated system regulation.

Method used

By combining MABR and MBR technology, by constructing a MABR membrane treatment unit and MBR filtration precipitation system, a linkage regulation system is established to reduce external carbon source injection and sludge production, eliminate the second sedimentation tank, and achieve efficient nitrogen removal treatment.

Benefits of technology

The effluent quality of urban sewage treatment plants has been improved, the sludge content and energy consumption have been reduced, external carbon source investment has been saved, and efficient quality improvement and efficiency of sewage treatment has been achieved.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention relates to sewage treatment by coupling MABR with MBR and a use method thereof, and relates to the technical field of water treatment.A pretreatment system of an original sewage treatment process is maintained, and MABR membrane treatment units and MBR membrane modules are placed at the rear half section of an anaerobic zone and the front ends of an anoxic zone and an aerobic zone to construct a precipitation and filtration system; the MABR membrane system is used for well adsorbing and degrading carbon and nitrogen in sewage, the MABR biological membrane has synchronous nitrification and denitrification effects, the nitrogen removal effect is remarkable, the nitrogen is better removed and the carbon source is saved under the condition of the same carbon-nitrogen ratio, the MBR has a good mud-water separation effect, and the operation parameters of the system are regulated, controlled and optimized by using the control system. Under the condition that the effluent quality index of the sewage is not changed, the capacity increase of the water inlet flow is realized, and under the condition that the water inlet flow is not changed, the effluent quality is improved. The sewage treatment and use method of the MABR coupled MBR has the advantages that the pollutant removal effect is good, the addition of an external carbon source is saved, the occupied area is saved, the energy consumption is low, and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of sewage treatment and relates to a sewage treatment method of a MABR coupled with an MBR and a use method thereof. Background Art

[0002] At present, with the continuous development of urbanization and the improvement of people's living standards, the urban population and water consumption are gradually increasing, and the sewage discharge in cities is also increasing. Urban sewage treatment plants are the key link in the end-of-pipe control of water pollution and the long-term cleanliness of the water environment. The core treatment structure in the sewage plant is the biochemical treatment unit. In order to better control pollutants and reduce the pollution to the water environment, more stringent discharge water quality index requirements are proposed for the effluent treated by urban sewage treatment plants. Therefore, most cities in the country have proposed more and more urban sewage treatment plant quality improvement and efficiency enhancement projects, especially the effluent index requirements for nitrogen are getting higher and higher. In order to improve the denitrification efficiency, it is necessary to consume external carbon sources, which increases costs and increases sludge production, adding burden to subsequent treatment processes.

[0003] The number of projects that apply membrane aerated biofilm reactor (MABR) technology to improve the quality and efficiency of urban sewage treatment is increasing. MABR technology low-carbon denitrification technology has been well applied, but the regulation of MABR technical parameters needs to be further strengthened. Biofilm reactor (MBR) technology replaces the terminal secondary sedimentation tank of traditional biological treatment technology with membrane components, maintains a high concentration of activated sludge in the bioreactor, increases the organic load of biological treatment, thereby reducing the area occupied by sewage treatment facilities, and reducing the amount of residual sludge by maintaining a low sludge load.

[0004] Both MABR technology and MBR technology have their unique advantages, but the problem of membrane clogging and membrane pollution must be considered during the use of MBR technology due to the high concentration of suspended solids. When MABR technology is used as a biological treatment unit, the amount of sludge produced is much less than that of conventional biological treatment methods, which greatly reduces the sludge content in the MBR tank. However, the system coordination and control methods in the process of combining the two technologies are particularly important. In view of this, a sewage treatment system combining MABR and MBR is developed and a control method is obtained, so as to achieve the coordination of the combination of the two technologies and realize the efficient treatment of urban sewage. Summary of the invention

[0005] The present invention utilizes MABR membrane treatment units to construct a biological treatment system, maintains the pretreatment system of the original sewage treatment process, places MABR membrane treatment units in the second half of the anaerobic zone, the anoxic zone, and the front end of the aerobic zone, utilizes MBR membrane components to construct a sedimentation and filtration system, eliminates the secondary sedimentation tank, and establishes a MABR and MBR linkage control system to reduce the addition of external carbon sources and reduce sludge production, thereby reducing the sludge content of the MBR system, achieving efficient denitrification treatment of sewage treatment, improving the effluent indicators of urban sewage treatment plants and increasing the amount of treated sewage, thereby completing the quality improvement and efficiency enhancement of urban sewage treatment plants.

[0006] The specific technical solutions are as follows: A MABR coupled MBR sewage treatment and a method of using the same, characterized in that the specific steps are as follows: (1) Construction of a primary MABR anaerobic treatment system: implant the MABR filler membrane treatment unit into the second half of the original anaerobic zone. After the water is completely introduced into the pool, stop the water inlet and start the aeration system. After 24 hours of aeration, stop aeration for 24 hours. Then gradually resume ventilation and increase the flow rate by 15%-20% per day for gradient water inlet. After 5-7 days, water is introduced at a normal flow rate and the dissolved oxygen is controlled to be less than 0.2 mg / L. Gradually, the outer surface of the MABR membrane fibers forms an anoxic / anaerobic biofilm structure from the inside to the outside, and the filler forms an anaerobic biofilm structure, completing the construction of an anaerobic-based MABR anaerobic treatment system with MABR anoxic treatment. (2) Construction of a secondary MABR anoxic treatment system: It is mainly composed of a MABR membrane treatment unit, a flow generator, an air supply system and a monitoring system. The MABR membrane treatment unit is implanted in the original anoxic zone, and the original anoxic zone is divided into two zones to form a single-zone mixed flow. The two zones are connected in series to form a flow generator. The flow generator is set at the head of the second zone. The pool receives the effluent from the primary MABR anaerobic treatment system. The air supply system is turned on. After 24 hours of aeration, the aeration volume is reduced to maintain the dissolved oxygen content of the pool in the anoxic zone at 0.2-0.5 mg / L. After 5-7 days, water is introduced at a normal flow rate to gradually complete the formation of an aerobic / anoxic biofilm structure from the inside to the outside of the MABR membrane fiber outer surface, degrading and removing carbon and nitrogen pollutants, and completing the construction of a MABR anoxic treatment system with anoxic treatment as the main component and MABR aerobic treatment. (3) Construction of MABR aerobic treatment system: It is mainly composed of MABR membrane treatment unit, air supply system and monitoring system. The MABR membrane treatment unit is implanted at the front end of the original aerobic zone, and the original aerobic zone is divided into two zones by a partition. The front half is the MABR aerobic zone, and the back half maintains the original aerobic zone. The air supply system continuously supplies air. The pool body receives the effluent from the secondary MABR anoxic treatment system. The air supply system is turned on and operates continuously to maintain the dissolved oxygen content of the aerobic zone pool body at 0.5-1.5 mg / L. After 5-7 days, water is introduced at a normal flow rate, and a low-aerobic biofilm structure is gradually formed on the outer surface of the MABR membrane fibers from the inside to the outside, degrading and removing carbon and nitrogen pollutants, completing the construction of the MABR aerobic treatment system. (4) Constructing the MBR filtration and sedimentation system: It is mainly composed of the MBR pool, MBR treatment unit, pump group, MBR aeration system, air supply system and monitoring system. The MBR treatment unit is set in the MBR pool, and the MBR aeration system is set at the bottom of the MBR pool. The sludge in the MBR pool comes from the aerobic treatment system, and the sludge concentration is maintained at 6000 mg / L or above; (5) System operation: After each system is constructed, it is put into operation, the hydraulic retention time is adjusted, and the data of the monitoring system in each tank is fed back to the central control system. The central control system adjusts the parameters of the gas supply pressure, dissolved oxygen content, hydraulic retention time, and MBR sludge concentration of each system to optimize the sewage treatment system and achieve standard discharge; The hydraulic retention time of the primary MABR anaerobic treatment system is 1-2h; The hydraulic retention time of the secondary MABR anoxic treatment system is 5-8h; The hydraulic retention time of the MABR aerobic treatment system is 8-12 hours; the filling ratio of the MABR membrane treatment unit is less than 1 / 3; The MABR treatment system is provided with mixed liquor reflux, and the end of the aerobic zone without MABR membrane treatment unit is refluxed to the front end of the secondary MABR anoxic treatment system, and the reflux ratio is 100%-300%; The gas supply system mainly includes gas supply equipment, gas supply pipelines and valves. The gas supply pipelines are connected to the MABR filler membrane treatment unit, MABR membrane treatment unit and MBR aeration system of each tank body, and gas is supplied to each system through the gas supply pipelines. The monitoring items of the monitoring system mainly include dissolved oxygen, temperature, gas supply pressure, chemical oxygen demand, ammonia nitrogen, total nitrogen and total phosphorus.

[0007] Furthermore, the MABR filler membrane treatment unit is mainly composed of a MABR membrane assembly, a membrane frame, a curtain filler, a gas connecting pipe and a valve. The number of MABR filler membrane treatment units designed for the first-level MABR anaerobic treatment system is 2 or more.

[0008] Furthermore, the MABR membrane treatment unit is mainly composed of a MABR membrane assembly, a membrane frame, a gas connecting pipe and a valve. The number of MABR membrane treatment units designed for the secondary MABR anoxic treatment system is 4 or more, and the number of MABR membrane treatment units designed for the MABR aerobic treatment system is 5 or more.

[0009] The sewage treatment of a MABR coupled with MBR of the present invention and the use method thereof, utilize the MABR membrane system to perform good adsorption and degradation of carbon and nitrogen in sewage, and the MABR biofilm has a synchronous nitrification and denitrification effect, and the nitrogen removal effect is remarkable, and nitrogen is better removed under the same carbon-nitrogen ratio, and the carbon source is saved to a great extent. The MBR has a good mud-water separation effect, and saves land. The data obtained by the control system is used to control and optimize the operating parameters of the system. The MABR technology is coupled with the MBR technology for use. Under the condition that the effluent water quality index of the urban sewage treatment plant remains unchanged, the water inlet flow rate can be increased, and under the condition that the inlet flow rate remains unchanged, the effluent water quality can be well improved. The sewage treatment of the MABR coupled with MBR of the present invention and the use method thereof have the advantages of good pollutant removal effect, saving external carbon source addition, saving land, and low energy consumption. DETAILED DESCRIPTION

[0010] The present invention is further described in conjunction with the embodiments, and the comparative examples are implemented as follows: A certain urban sewage treatment plant has a treatment capacity of 25,000 m 3 / d, the influent water quality is as follows: COD150-450mg / L, ammonia nitrogen 20-40mg / L, total nitrogen 20-50mg / L, total phosphorus 1-4mg / L. Before quality improvement and efficiency enhancement, the effluent water quality indicators are required to meet the Class A standard of the Pollutant Discharge Standard for Urban Sewage Treatment Plants, and the main water quality indicators are COD≤50mg / L, ammonia nitrogen≤5 (8) mg / L, total nitrogen≤15mg / L, and total phosphorus≤0.5mg / L. After quality improvement and efficiency enhancement, the effluent water quality indicators are required to meet the Class IV standard of the Environmental Quality Standard for Surface Water when the treated water volume remains unchanged during the dry season, including COD≤30mg / L, ammonia nitrogen≤1.5mg / L, total nitrogen≤10mg / L, and total phosphorus≤0.3mg / L. In the rainy season, it meets the Class A standard of the Pollutant Discharge Standard for Urban Sewage Treatment Plants and the treated water volume increases to 30,000 m 3 / d.

[0011] The original process system uses the AAO process. In order to achieve the total nitrogen standard, the input of external carbon source is relatively large. According to the project situation, the MABR technology is used to transform the biological treatment unit. The secondary sedimentation tank retains half of the original treatment capacity and is replaced by the MBR tank. A phosphorus removal device is added to the subsequent deep treatment. In the dry season, the main water quality indicators can reach the Quasi-Class IV standard of the "Surface Water Environmental Quality Standard", including COD≤30mg / L, ammonia nitrogen≤1.5mg / L, total nitrogen≤10mg / L, and total phosphorus≤0.3mg / L. The implementation plan of the transformation process is as follows: (1) 10 groups of MABR filler membrane treatment units are implanted in the rear 1 / 3 of the anaerobic tank, and the original anoxic tank is replaced with a secondary MABR anoxic treatment system, with a total of 220 groups of MABR membrane treatment units. 60 groups of MABR membrane treatment units are set in the front 1 / 3 of the aerobic tank, and part of the original secondary sedimentation tank is transformed into an MBR tank. The gas supply system maintains the original gas supply system, and the first-level MABR anaerobic treatment system gas supply pipeline and the MBR tank gas supply pipeline are added; the gas supply equipment maintains the original equipment, without adding, and can be frequency-controlled; (2) During the biofilm acclimation period, the primary MABR anaerobic treatment system and the secondary MABR anoxic treatment system are operated simultaneously. After the water inflow to the pool is completed, the water inflow is stopped and the aeration system is turned on. After 24 hours of aeration, aeration is stopped for 24 hours. The aeration system is gradually restored to aeration and the flow rate is increased by 15%-20% every day for gradient water inflow. After 5-7 days, the water is inflowed at a normal flow rate. The dissolved oxygen content of the primary MABR anaerobic treatment system is controlled to be less than 0.2 mg / L, and the dissolved oxygen content of the secondary MABR anoxic treatment system is 0.2-0.5 mg / L. The MABR aerobic treatment system starts biofilm acclimation one day later than the primary MABR anaerobic treatment system and the secondary MABR anoxic treatment system. The original aerobic area is divided into two areas by a partition. The first half is the MABR aerobic zone, and the second half maintains the original aerobic zone. The gas supply system continuously supplies gas, and the pool receives the effluent from the secondary MABR anoxic treatment system. The gas supply system is turned on and continuously operates to maintain the dissolved oxygen content of the aerobic zone pool at 0.5-1.5 mg / L. After 5-7 days, water enters at a normal flow rate. When the outer surface of the MABR membrane of the primary MABR anaerobic treatment system forms anoxic / anaerobic biofilm structure from the inside to the outside, and the filler forms an anaerobic biofilm structure, the outer surface of the MABR membrane of the secondary MABR anoxic treatment system forms an aerobic / anoxic biofilm structure from the inside to the outside, and the outer surface of the MABR membrane of the MABR aerobic treatment system forms an aerobic / anoxic biofilm structure from the inside to the outside, it indicates that the construction of each system is completed; (3) MBR filtration and sedimentation system: The original secondary sedimentation tank is partially transformed into an MBR system, which is mainly composed of an MBR tank, an MBR treatment unit, a pump group, an MBR aeration system, an air supply system and a monitoring system. The MBR treatment unit is set in the MBR tank, and the MBR aeration system is set at the bottom of the MBR tank. The sludge in the MBR tank comes from the aerobic treatment system, and the sludge concentration is maintained at 6000 mg / L or above; (4) Monitoring system: Each system maintains the original monitoring system, and adds monitoring indicators for dissolved oxygen, temperature, and gas supply pressure of the MBR pool. The data of each indicator can be fed back to the central control system; (5) Composition of each treatment unit: The gas supply system mainly includes gas supply equipment, gas supply pipelines and valves. The gas supply pipelines are connected to the MABR filler membrane treatment unit, MABR membrane treatment unit and MBR aeration system of each tank body, and gas is supplied to each system through the gas supply pipelines; the MABR filler membrane treatment unit is mainly composed of MABR membrane components, membrane frames, curtain fillers, gas connecting pipes and valves; the MABR membrane treatment unit is mainly composed of MABR membrane components, membrane frames, gas connecting pipes and valves; (6) System operation. After the construction of each system was completed, in the initial operation, the hydraulic retention time of the first-level MABR anaerobic treatment system was 2 h, the hydraulic retention time of the second-level MABR anoxic treatment system was 8 h, and the hydraulic retention time of the ABR aerobic treatment system was 12 h. The MABR aerobic treatment system was set up with mixed liquor reflux, and the end of the aerobic zone without MABR membrane treatment unit was refluxed to the front end of the second-level MABR anoxic treatment system. The reflux ratio was 300%, and the system operated stably to accumulate operation data.

[0012] During the continuous operation, the hydraulic retention time of each system is adjusted at any time according to the water quality conditions. The main indicators of the effluent can meet the Quasi-Class IV standards of the "Surface Water Environmental Quality Standards", among which COD≤30mg / L, ammonia nitrogen≤1.5mg / L, total nitrogen≤10mg / L, and total phosphorus≤0.3mg / L.

[0013] During the rainy season, due to the increase in rainfall, the flow rate of urban sewage treatment increases. Without adding water treatment units, the water treatment process system after the above transformation is adjusted and operated as follows: (1) Adjustment of hydraulic retention time: The hydraulic retention time of the primary MABR anaerobic treatment system is 1 hour, the hydraulic retention time of the secondary MABR anoxic treatment system is 5 hours, and the hydraulic retention time of the MABR aerobic treatment system is 8 hours; (2) Adjustment of dissolved oxygen content: 0.2 mg / L dissolved oxygen in the first-stage MABR anaerobic treatment system, 0.5 mg / L dissolved oxygen in the second-stage MABR anoxic treatment system, and 1.5 mg / L dissolved oxygen in the MABR aerobic treatment system; (3) Adjustment of mixed liquor reflow ratio: The MABR treatment system is set up with mixed liquor reflow, and the end of the aerobic zone without MABR membrane treatment unit is recirculated to the front end of the secondary MABR anoxic treatment system, and the reflow ratio is 100%-200%.

[0014] During the continuous operation, the effluent quality meets the Class A standard of the Pollutant Discharge Standard for Urban Wastewater Treatment Plants, with the main water quality indicators being COD ≤ 50 mg / L, ammonia nitrogen ≤ 5 mg / L, total nitrogen ≤ 15 mg / L, and total phosphorus ≤ 0.5 mg / L. At the same time, the treated water volume increased to 30,000 m 3 / d.

[0015] After the above-mentioned process system is transformed, the effluent quality can be improved under the condition of the same treated water volume; when the effluent water quality conditions are met during the rainy season, the treated water volume can be increased by 20%.

[0016] After the transformation was completed, the MABR technology produced less sludge and had simultaneous nitrification and denitrification, which had a good nitrogen removal effect. The external carbon source addition was reduced by 90%, and no gas supply equipment was added. The MABR technology had a high oxygen utilization rate and the utilization of infiltrated oxygen reduced the use of gas supply equipment and saved 15% of gas.

[0017] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable ordinary technicians in the field to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any equivalent changes or modifications made based on the essence of the content of the present invention should be included in the protection scope of the present invention.

Claims

1. A sewage treatment method and control method of MABR coupled with MBR, characterized in that: The specific steps are as follows: (1) Construction of a primary MABR anaerobic treatment system: implant the MABR filler membrane treatment unit into the second half of the original anaerobic zone. After the water is completely introduced into the pool, stop the water inlet and start the aeration system. After 24 hours of aeration, stop aeration for 24 hours. Then gradually resume ventilation and increase the flow rate by 15%-20% per day for gradient water inlet. After 5-7 days, water is introduced at a normal flow rate and the dissolved oxygen is controlled to be less than 0.2 mg / L. Gradually, the outer surface of the MABR membrane fibers forms an anoxic / anaerobic biofilm structure from the inside to the outside, and the filler forms an anaerobic biofilm structure, completing the construction of an anaerobic-based MABR anaerobic treatment system with MABR anoxic treatment. (2) Construction of a secondary MABR anoxic treatment system: It is mainly composed of a MABR membrane treatment unit, a flow generator, an air supply system and a monitoring system. The MABR membrane treatment unit is implanted in the original anoxic zone, and the original anoxic zone is divided into two zones to form a single-zone mixed flow. The two zones are connected in series to form a flow generator. The flow generator is set at the head of the second zone. The pool receives the effluent from the primary MABR anaerobic treatment system. The air supply system is turned on. After 24 hours of aeration, the aeration volume is reduced to maintain the dissolved oxygen content of the pool in the anoxic zone at 0.2-0.5 mg / L. After 5-7 days, water is introduced at a normal flow rate to gradually complete the formation of an aerobic / anoxic biofilm structure from the inside to the outside of the MABR membrane fiber outer surface, degrading and removing carbon and nitrogen pollutants, and completing the construction of a MABR anoxic treatment system with anoxic treatment as the main component and MABR aerobic treatment. (3) Construction of MABR aerobic treatment system: It is mainly composed of MABR membrane treatment unit, air supply system and monitoring system. The MABR membrane treatment unit is implanted at the front end of the original aerobic zone, and the original aerobic zone is divided into two zones by a partition. The front half is the MABR aerobic zone, and the back half maintains the original aerobic zone. The air supply system continuously supplies air. The pool body receives the effluent from the secondary MABR anoxic treatment system. The air supply system is turned on and operates continuously to maintain the dissolved oxygen content of the aerobic zone pool body at 0.5-1.5 mg / L. After 5-7 days, water is introduced at a normal flow rate, and a low-aerobic biofilm structure is gradually formed on the outer surface of the MABR membrane fibers from the inside to the outside, degrading and removing carbon and nitrogen pollutants, completing the construction of the MABR aerobic treatment system. (4) Constructing the MBR filtration and sedimentation system: It is mainly composed of the MBR pool, MBR treatment unit, pump group, MBR aeration system, air supply system and monitoring system. The MBR treatment unit is set in the MBR pool, and the MBR aeration system is set at the bottom of the MBR pool. The sludge in the MBR pool comes from the aerobic treatment system, and the sludge concentration is maintained at 6000 mg / L or above; (5) System operation: After each system is constructed, it is put into operation, the hydraulic retention time is adjusted, and the data of the monitoring system in each tank is fed back to the central control system. The central control system adjusts the parameters of the gas supply pressure, dissolved oxygen content, hydraulic retention time, and MBR sludge concentration of each system to optimize the sewage treatment system and achieve standard discharge; The hydraulic retention time of the primary MABR anaerobic treatment system is 1-2h; The hydraulic retention time of the secondary MABR anoxic treatment system is 5-8h; The hydraulic retention time of the MABR aerobic treatment system is 8-12 hours; the filling ratio of the MABR membrane treatment unit is less than 1 / 3; The MABR treatment system is provided with mixed liquor reflux, and the end of the aerobic zone without MABR membrane treatment unit is refluxed to the front end of the secondary MABR anoxic treatment system, and the reflux ratio is 100%-300%; The gas supply system mainly includes gas supply equipment, gas supply pipelines and valves. The gas supply pipelines are connected to the MABR filler membrane treatment unit, MABR membrane treatment unit and MBR aeration system of each tank body, and gas is supplied to each system through the gas supply pipelines. The monitoring items of the monitoring system mainly include dissolved oxygen, temperature, gas supply pressure, chemical oxygen demand, ammonia nitrogen, total nitrogen and total phosphorus.

2. A sewage treatment method and control method of a MABR coupled with MBR according to claim 1, characterized in that: The MABR filler membrane treatment unit is mainly composed of a MABR membrane assembly, a membrane frame, a curtain filler, a gas connecting pipe and a valve. The number of MABR filler membrane treatment units designed for a primary MABR anaerobic treatment system is 2 or more.

3. The sewage treatment and control method of a MABR coupled MBR according to claim 1, characterized in that: The MABR membrane treatment unit is mainly composed of a MABR membrane assembly, a membrane frame, a gas connecting pipe and a valve. The number of MABR membrane treatment units designed for the secondary MABR anoxic treatment system is 4 or more, and the number of MABR membrane treatment units designed for the MABR aerobic treatment system is 5 or more.

Citation Information

Patent Citations

  • MABR-MBR combined type sewage treatment device and treatment method

    CN104909520A

  • Dioxygen-layer biomembrane reactor for wastewater treatment and wastewater treatment method

    CN109734198A

  • MABR sewage treatment tank, MABR sewage treatment system and use method thereof

    CN110563142A

  • Sewage treatment system and method based on two-stage MABR and activated sludge process

    CN114249426A

  • MABR-based railway domestic sewage treatment system and use method thereof

    CN120349059A

Cited By

  • Series-connected multi-stage MABR reaction intelligent water treatment system

    CN120097515A

  • A series-connected multi-stage MABR intelligent water treatment system

    CN120097515B

  • MABR-based railway domestic sewage treatment system and use method thereof

    CN120349059A

  • MABR-based comprehensive treatment method for park water

    CN120681915A

  • Method for treating town sewage by MABR-MBBR coupling technology

    CN121318059A