High slope road construction method

By forming a three-dimensional reinforcement system during high-ramp road construction, the problems of slope slip and collapse during and after completion are solved, and construction safety and long-term stability of the road are improved.

CN118996936AActive Publication Date: 2024-11-22CHINA CONSTR SEVENTH ENG DIVISION CORP LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410892078.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-11-22
Estimated Expiration
2044-07-04

AI Technical Summary

Technical Problem

During the construction of high-ramp roads and after completion, slippage and collapse are prone to occur on the side near the slope, affecting traffic safety.

Method used

A high-ramp road construction method is adopted, including roadbed excavation, support base excavation, reinforcement of support base, setting up retaining walls and protective piles, laying backfill and surface layers, and pouring protective piles to form a three-dimensional reinforcement system to Resist slope pressure, reduce the concentration of stress in a single structure, and improve stability.

Benefits of technology

It effectively avoids soil slippage and collapse at the edge of the road shoulder, improves construction safety, enhances horizontal stability and long-term stability on the side of the road, and prevents horizontal slippage and local instability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118996936A_ABST
    Figure CN118996936A_ABST
Patent Text Reader

Abstract

The invention relates to a high slope road construction method, which relates to the technical field of road construction, and comprises the following steps: S100, roadbed excavation, S200, support base layer excavation, S300, support base layer reinforcement, S400, retaining wall arrangement, S500, backfill layer laying, S600, surface layer laying, 104, and S700, guard pile pouring. The protective piles are used for forming the safety protection effect on the side of a road, the traditional method that edge soil is reserved as a road shoulder and a protective fence is arranged on the road shoulder is replaced, and the problems that in the construction process, due to construction operation, the edge soil on the road shoulder slips and collapses can be effectively solved; a three-dimensional reinforcing system is formed through combination of the road foundation pit, the supporting foundation pit, the retaining wall, the protection piles and the anchor rods, the system provides powerful support in the vertical direction and the horizontal direction, the pressure of a slope soil body is effectively dispersed, stress concentration of a single structure is reduced, local instability is prevented, and the stability of the slope is improved. And the long-term stability and safety of the road are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of road construction, and in particular to a high slope road construction method. Background Art

[0002] A high slope road refers to a road with a steep downward slope on at least one side. It is usually built on hillsides or hilly areas, such as winding mountain sections and slope sections. The soil and rock layers in these areas have poor natural stability due to the steep terrain, and gravity makes the soil and rocks tend to slide to lower places. This tendency is particularly obvious during the rainy season or under the influence of external forces such as earthquakes.

[0003] During the construction of high-slope roads, a certain amount of marginal soil is usually reserved near the slope as the shoulder for setting up safety facilities such as guardrails. However, during the road construction process, excavation, filling, compaction and other steps will disturb the surface and destroy the natural stability, especially the excavation and compaction of the roadbed. The width of the shoulder is usually thin due to the space limited by the mountain road. That is to say, when digging the road foundation pit downward, the thickness of the marginal soil on the side of the foundation pit close to the slope is thin, making the shoulder easy to lose its support force. When compacting the roadbed, vibration will be generated, which can easily cause the marginal soil at the shoulder to slide sideways or even collapse, causing safety accidents.

[0004] Even after the construction is completed, the side of the high-slope road close to the slope, especially the marginal soil at the shoulder, is very likely to gradually become unstable due to traffic loads and environmental changes (such as rainfall, snowmelt, and earthquakes), and eventually slip or even collapse, affecting traffic safety.

[0005] Based on this, it is necessary to study a high slope road construction method. Summary of the invention

[0006] In view of this, the object of the present invention is to provide a high slope road construction method, which can effectively solve the problem that the high slope road is prone to slippage and collapse on the side adjacent to the slope during and after the construction.

[0007] To achieve the above purpose, the technical solution adopted by the present invention is: A high slope road construction method comprises the following steps: S100: roadbed excavation; Pre-treat the construction area to obtain a smooth road working surface; Dig downward from the road working surface, and extend the excavation surface to the right to the slope to form an L-shaped road foundation pit; Compact the bottom of the road foundation pit to form a roadbed; S200: excavation of supporting base; On the right side of the roadbed, further excavation is carried out downward from the surface of the roadbed, and the excavation surface extends rightward to the slope, forming an L-shaped supporting foundation pit on the right side of the road foundation pit; Compact the bottom of the support pit to form a support base; S300: Strengthen the support base; Anchoring downward from the supporting base using a first anchor rod, wherein the upper end of the first anchor rod extends upward out of the supporting base; S400: Set up retaining wall; A retaining wall is vertically arranged on the supporting base, the bottom of the retaining wall is fixedly connected to the first anchor rod, a second anchor rod is pierced through the retaining wall and arranged obliquely downward, the end of the second anchor rod is anchored in the left wall of the supporting foundation pit, and the tail of the second anchor rod extends rightward out of the retaining wall; S500: Laying the backfill layer; Backfilling is performed on the roadbed using backfill materials to form a backfill layer, which is distributed between the left wall of the road foundation pit and the retaining wall; S600: Laying the surface layer; Laying the surface layer on the backfill layer; S700: Casting of protective piles; Continuous protective piles are poured on the support base, with the left side of the protective piles fitting the right side of the retaining wall, and the height of the protective piles being greater than the height of the surface layer; The upper end of the first anchor rod and the tail of the second anchor rod are both pre-buried in the protection pile.

[0008] Further, the retaining wall comprises an integrally formed wall body, a front toe and a rear toe; The wall is arranged vertically on the supporting base, the front toe is horizontally arranged on the left side of the bottom of the wall, and the rear toe is correspondingly horizontally arranged on the right side of the bottom of the wall, and the left and right width of the front toe is greater than the left and right width of the rear toe; The front toe is fitted with the side wall of the supporting foundation pit, so that a gap is formed between the wall and the side wall of the supporting foundation pit; In step S500, the backfill layer fills the gap between the wall and the side wall of the supporting foundation pit.

[0009] Furthermore, the upper end of the first anchor rod corresponding to the front toe or the rear toe passes through the front toe or the rear toe and is pre-buried in the backfill layer or the protective pile.

[0010] Furthermore, the steps S400 and S500 further include step S450: setting temporary support; A support rod is obliquely arranged on the support base, the bottom of the support rod is detachably fixedly connected to the first anchor rod, and the top of the support rod abuts against the right end surface of the retaining wall; The tail of the second anchor rod passes through the supporting rod and is detachably fixedly connected to the supporting rod.

[0011] Furthermore, the steps S450 and S500 further include step S460: setting up a construction platform; The construction platform includes a platform frame, pillars and guardrails; A plurality of pillars are vertically arranged on the support base, the bottom of each pillar is detachably fixedly connected to the upper end of the corresponding first anchor rod, the platform frame is horizontally fixed on the pillars, and a guardrail is arranged on one side of the platform frame close to the slope; In step S700, temporary supports and construction platforms are removed.

[0012] Furthermore, the support column is at the same height as the retaining wall, and the left end of the platform frame is mounted on the retaining wall.

[0013] Furthermore, the bottom of the support rod and the corresponding pillar are fixedly connected to the same first anchor rod, and the top of the support rod and the top of the pillar are fixedly connected with a diagonal brace rod.

[0014] Furthermore, the steps S500 and S600 further include step S550: setting a drainage layer; A water-permeable material is laid on the backfill layer to form a drainage layer; the right side of the drainage layer is connected to a drainage pipe, which passes through the retaining wall and extends to the right; In step S700, the drainage pipe is pre-buried in the protection pile, and the right end of the drainage pipe extends out of the protection pile and communicates with the outside.

[0015] Furthermore, a pressure foot is provided on the right end surface of the protection pile. The pressure foot is horizontally arranged on the supporting base layer and is integrally formed with the protection pile. The pressure foot is fixedly connected to the first anchor rod.

[0016] Furthermore, after step 700, the step S800 is further included: backfilling the slope protection; Backfill is performed on the support base to form a slope protection, the left end face of the slope protection is fitted with the right end face of the protection pile, the right end face of the slope protection is adapted to the slope inclination, and the height of the slope protection is lower than the protection pile; Before backfilling, the first anchor rod corresponding to the pressure foot is extended upward so that the first anchor rod extends upward out of the slope protection, and fasteners are used to anchor the slope protection, the pressure foot and the supporting base into a whole.

[0017] The beneficial effects of the above technical solution are: (1) The road foundation pit and the supporting foundation pit of the present invention are excavated to the right to the slope, and the marginal soil in the direction of the slope is not reserved as the shoulder. Retaining walls and protective piles are used to resist the pressure on the right side of the road, and the protective piles are used to form a safety protection effect on the side of the road, which replaces the traditional method of reserving marginal soil as the shoulder and setting guardrails on the shoulder. The problem of reverse sliding and collapse of the marginal soil at the shoulder due to construction work during the construction process can be effectively avoided, thereby improving the safety of the construction process.

[0018] (2) The present invention further excavates downward on the right side of the road foundation pit to obtain a supporting foundation pit. The bottom height of the supporting foundation pit is lower than the bottom height of the road foundation pit, so that a side elevation is formed between the road foundation pit and the supporting foundation pit, which can not only reduce the soil on the right edge of the road, but also form a three-dimensional road side reinforcement structure, so that the pressure on the road side can be better transmitted and dispersed, reducing the force concentration of a single structure. In addition, the side elevation can provide an anchor point for the second anchor rod. The second anchor rod is obliquely inserted into the side elevation, which can better convert the horizontal pressure into the pull-out resistance of the second anchor rod, increase the horizontal stability of the overall structure, and prevent horizontal slippage.

[0019] (3) The retaining wall and the protection piles of the present invention are both arranged on the supporting foundation pit and are fixedly connected with the first anchor rod and the second anchor rod. Through the combination of the road foundation pit, the supporting foundation pit, the retaining wall, the protection piles and the anchor rods, a three-dimensional reinforcement system is formed. This system provides strong support in both vertical and horizontal directions, effectively disperses the pressure of the slope soil, reduces the force concentration of a single structure, prevents local instability, and ensures the long-term stability and safety of the road. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the road conditions before construction; Figure 2 This is the construction diagram after the roadbed is excavated; Figure 3 This is a construction diagram after excavation and reinforcement of the support base; Figure 4 This is a construction diagram after setting up and reinforcing the retaining wall; Figure 5 This is a construction diagram after laying the backfill layer; Figure 6 This is a schematic diagram of the road after the construction is completed; Figure 7 This is a construction diagram with temporary support and construction platform; Figure 8 Schematic diagram of a road with slope protection structure.

[0021] Figure numerals: 1 is the road working surface, 2 is the slope, 3 is the roadbed, 4 is the supporting base, 5 is the first anchor rod, 6 is the retaining wall, 7 is the second anchor rod, 8 is the protection pile, 9 is the supporting rod, 10 is the construction platform, 11 is the slope protection, 12 is the diagonal support rod, 101 is the road foundation pit, 102 is the supporting foundation pit, 103 is the backfill layer, 104 is the surface layer, 105 is the drainage layer, 106 is the drainage pipe, 601 is the wall, 602 is the front toe, 603 is the rear toe, 801 is the pressure foot, 1001 is the platform frame, 1002 is the pillar, and 1003 is the guardrail. DETAILED DESCRIPTION

[0022] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments: Embodiment 1, this embodiment aims to provide a high-slope road construction method, which is mainly used for the construction of a winding mountain road with a downward high slope on one side, and aims to solve the problem that the high-slope road is prone to slippage and collapse on the side adjacent to the slope during and after the construction.

[0023] A high slope road construction method comprises the following steps: S100: Excavation of roadbed 3; Before construction, geological surveys are required to understand geological conditions such as slope soil, rock formations, groundwater levels, assess potential risks, and develop detailed construction designs to ensure the feasibility and safety of the plan.

[0024] Then the construction area is pre-processed, which includes excavating the mountain or widening the initial road, clearing vegetation and debris, cleaning the loose soil on the surface, using a bulldozer to clean the road surface to make it flat, and performing precipitation and drainage treatment, etc., in order to obtain Figure 1 The flat road working surface 1, the specific pretreatment method is the existing technology and will not be repeated here.

[0025] like Figure 2 , excavating downward from the surface of the road working surface 1, the excavation surface extends to the right to the slope, and no shoulder is reserved on the side adjacent to the slope, forming an L-shaped road foundation pit 101 to prevent the shoulder from slipping and collapsing due to construction disturbance during the construction process.

[0026] Use a bulldozer or a grader to level the excavated support base 4 and compact it layer by layer to form a roadbed 3. The roadbed 3 can be reinforced according to the specific conditions of the mountain soil. The reinforcement method can adopt pile foundation techniques such as powder injection piles and reinforced concrete piles to ensure the density and stability of the roadbed 3.

[0027] S200: excavation of support base 4; like Figure 2, further excavation is carried out on the right side of the roadbed 3 and downward from the surface of the roadbed 3 to provide sufficient depth and width for the construction of supporting structures such as the retaining wall 6 and the second anchor rod 7. The excavation surface extends to the right to the slope 2, and an L-shaped supporting foundation pit 102 is formed on the right side of the road foundation pit 101; the bottom of the supporting foundation pit 102 is compacted to form a supporting base layer 4; excavating the supporting base layer 4 can not only reduce the marginal soil on the right side of the road, but also form a side elevation between the road foundation pit 101 and the supporting foundation pit 102, forming a three-dimensional road side reinforcement structure, so that the pressure on the road side can be better transmitted and dispersed, reducing the force concentration of a single structure.

[0028] S300: Strengthen support base 4; like Figure 3 The first anchor rod 5 is used to anchor vertically downward from the supporting base 4 to strengthen the stability of the supporting base 4. The upper end of the first anchor rod 5 extends upward from the supporting base 4 to form a plurality of fixed foundations.

[0029] S400: Setting a retaining wall 6; A retaining wall 6 is vertically arranged on the supporting base 4, and the retaining wall 6 can be cast-in-place or prefabricated; the retaining wall 6 includes an integrally formed wall body 601, a front toe 602 and a rear toe 603; the wall body 601 is vertically arranged on the supporting base 4, the front toe 602 is horizontally arranged on the left side of the bottom of the wall body 601, and the rear toe 603 is correspondingly horizontally arranged on the right side of the bottom of the wall body 601, and the left and right width of the front toe 602 is greater than the left and right width of the rear toe 603; the front toe 602 is fitted with the side wall of the supporting foundation pit 102, so that a gap is formed between the wall body 601 and the side wall of the supporting foundation pit 102; Figure 4 The upper end of the first anchor rod 5 corresponding to the front toe 602 or the rear toe 603 passes through the front toe 602 or the rear toe 603, so that the bottom of the retaining wall 6 is fixedly connected to the first anchor rod 5; the wall body 601 of the retaining wall 6 is penetrated by a second anchor rod 7 inclined downward, and the end of the second anchor rod 7 is anchored in the left side wall of the supporting foundation pit 102, and the tail of the second anchor rod 7 extends to the right out of the retaining wall 6.

[0030] S500: Laying a backfill layer 103; As shown in Fig. 5, backfill is performed on the roadbed 3 in steps and compacted in steps at the same time to finally form a backfill layer 103; the backfill should have good compaction performance and stability to ensure the overall effect of the backfill 103, and modified soil, clay, etc. can be used. It is better to use backfill with better impermeability to avoid water infiltration and cause soil loss of the anchor foundation.

[0031] The backfill layer 103 is distributed between the left side wall of the road foundation pit 101 and the retaining wall 6. The backfill layer 103 fills the gap between the wall 601 and the side wall of the supporting foundation pit 102, forms a gravity effect on the front toe 602 of the retaining wall 6, and enhances the stability of the retaining wall 6. The upper end of the first anchor rod 5 passing through the front toe 602 is pre-buried in the backfill layer 103 to increase the structural strength of the backfill layer 103.

[0032] In order to facilitate road drainage and prevent water from seeping down, the step S550 is also included: setting a drainage layer 105; like Figure 6 , permeable materials are laid on the backfill layer 103 to form a drainage layer 105, and the permeable materials can be crushed stone, gravel, etc.; the right side of the drainage layer 105 is connected to a drainage pipe 106, which passes through the retaining wall 6 and extends to the right.

[0033] In order to further prevent water from seeping in, a waterproof layer can be set between the drainage layer 105 and the backfill layer 103, and the drainage pipe 106 should be located above the waterproof layer; and in order to facilitate drainage, the waterproof layer and the drainage pipe 106 should have a slope toward the slope 2.

[0034] S600: laying the surface layer 104; like Figure 6 A surface layer 104 is laid on the drainage layer 105. The surface layer 104 is mainly the surface structure of the road. The surface layer 104 can include a gravel base layer, an asphalt layer, a concrete layer, etc. according to actual needs. The construction of the road surface layer 104 is mainly based on existing technology and will not be repeated here.

[0035] S700: Casting of protective piles 8; like Figure 6 , continuous protective piles 8 are cast along the length direction of the road on the supporting base layer 4, the left side of the protective pile 8 is in contact with the right side of the retaining wall 6 to form a supporting effect on the retaining wall 6, and the height of the protective pile 8 is greater than the height of the surface layer 104 to form a protective effect.

[0036] The upper end of the first anchor rod 5 and the tail of the second anchor rod 7 are both pre-buried in the protective pile 8, so that the road foundation pit 101, the supporting foundation pit 102, the retaining wall 6, the protective pile 8 and the anchor rod form a three-dimensional reinforcement system, which increases the structural strength of the side of the road adjacent to the slope 2 and effectively resists the slippage of the road side.

[0037] The drainage pipe 106 is pre-buried in the protection pile 8, and the right end of the drainage pipe 106 extends out of the protection pile 8 and communicates with the outside.

[0038] Embodiment 2: This embodiment is basically the same as Embodiment 1, except that temporary support is provided for the retaining wall 6 during construction, and a construction platform 10 is provided to facilitate construction. This embodiment further describes the structure.

[0039] In order to further improve the stability of the retaining wall 6 before the protection piles 8 are cast, step S450 is further included between steps S400 and S500: setting temporary support; like Figure 7 , a support rod 9 is obliquely arranged on the support base 4. Since the upper end of the first anchor rod 5 extends upward from the support base 4 and provides a fixed foundation, the bottom of the support rod 9 is detachably fixedly connected to the first anchor rod 5, and the top of the support rod 9 abuts against the right end surface of the retaining wall 6; the tail of the second anchor rod 7 passes through the support rod 9 and is detachably fixedly connected to the support rod 9, thereby increasing the integration of the support structure. In other embodiments, temporary support is not limited to the support rod 9, and the idea is to use the fixed foundation provided by the first anchor rod 5 and the second anchor rod 7 to fix the temporary support structure, so as to enhance the support effect and the integration of the structure.

[0040] Considering that the supporting foundation pit 102, the first anchor rod 5 and the second anchor rod 7 may affect the workers working on the side of the road close to the slope 2, for the convenience of this embodiment, step S460 is also included between steps S450 and S500: setting up a construction platform 10.

[0041] like Figure 7 , the construction platform 10 includes a platform frame 1001, a support column 1002 and a guardrail 1003; A plurality of pillars 1002 are vertically arranged on the supporting base layer 4 , and the bottom of each pillar 1002 is detachably fixedly connected to the upper end of the corresponding first anchor rod 5 , and the platform frame 1001 is horizontally fixed on the pillars 1002 . A guardrail 1003 is arranged on one side of the platform frame 1001 close to the slope 2 .

[0042] The support column 1002 is at the same height as the retaining wall 6 , so that the left end of the platform frame 1001 is mounted on the retaining wall 6 , which can not only provide additional support for the platform frame 1001 , but also provide vertical pressure for the retaining wall 6 , thereby enhancing the stability of the retaining wall 6 .

[0043] In step S700 , the temporary support and the construction platform 10 need to be removed before pouring the protection piles 8 .

[0044] In order to further enhance the integration of the temporary support and the construction platform 10, the bottom of the support rod 9 and the corresponding pillar 1002 are fixedly connected to the same first anchor rod 5, and the top of the support rod 9 and the top of the pillar 1002 are fixedly connected with a diagonal brace rod 12 to form a triangular cross-frame structure. Figure 7In fact, the upper end of the support rod 9 is also provided with a ground plate in contact with the retaining wall 6, and a horizontal web member is also provided between the ground plate and the support column 1002 to further enrich the triangular cross frame structure.

[0045] Embodiment 3: This embodiment is basically the same as Embodiment 1, except that this embodiment further describes the structure.

[0046] In order to further improve the stability of the protection pile 8, Figure 8 A pressure foot 801 is provided on the right end face of the protection pile 8. The pressure foot 801 is horizontally arranged on the supporting base layer 4 and is integrally cast with the protection pile 8. The pressure foot 801 is fixedly connected to the first anchor rod 5.

[0047] In this embodiment, further, after step 700, step S800 is also included: backfilling the slope protection 11; Backfill is performed on the support base 4 to form a slope protection 11. The backfill material can be sand or the like, or can be backfilled by formwork casting or anchor spraying concrete, in order to enhance the stability of the slope 2 and apply gravity to the corners to enhance the stability of the protection piles 8. The left end face of the slope protection 11 fits with the right end face of the protection pile 8, and the right end face of the slope protection 11 matches the slope 2. The height of the slope protection 11 is lower than the protection pile 8, which avoids blocking the drainage pipe 106 and avoids excessive deadweight on the side.

[0048] Before backfilling, the first anchor rod 5 corresponding to the pressure foot 801 is extended upward so that the first anchor rod 5 extends upward out of the slope protection 11, and fasteners are used to anchor the slope protection 11, the pressure foot 801 and the supporting base 4 as a whole. The fasteners can be fastening nuts, used in conjunction with discs and gaskets, to form pressure on the surface of the slope 2 to enhance the stability of the structure.

Claims

1. A high slope road construction method, characterized in that: The following steps are involved: S100: roadbed (3) excavation; Pre-process the construction area to obtain a smooth road working surface (1); Excavating downward from the road working surface (1), with the excavation surface extending rightward to the slope (2) to form an L-shaped road foundation pit (101); Compacting the bottom of the road foundation pit (101) to form a roadbed (3); S200: Excavation of support base (4); Further excavation is performed downward from the surface of the roadbed (3) on the right side of the roadbed (3), with the excavation surface extending rightward to the slope (2), thereby forming an L-shaped supporting foundation pit (102) on the right side of the road foundation pit (101); Compacting the bottom of the supporting foundation pit (102) to form a supporting base layer (4); S300: Strengthen the support base (4); Using a first anchor rod (5) to anchor downward from the supporting base layer (4), the upper end of the first anchor rod (5) extending upward from the supporting base layer (4); S400: Setting a retaining wall (6); A retaining wall (6) is vertically arranged on the supporting base layer (4), the bottom of the retaining wall (6) is fixedly connected to the first anchor rod (5), a second anchor rod (7) is passed through the retaining wall (6) and is arranged obliquely downward, the end of the second anchor rod (7) is anchored in the left side wall of the supporting foundation pit (102), and the tail of the second anchor rod (7) extends rightward out of the retaining wall (6); S500: Laying a backfill layer (103); Backfilling the roadbed (3) with backfill material to form a backfill layer (103), wherein the backfill layer (103) is distributed between the left side wall of the road foundation pit (101) and the retaining wall (6); S600: laying the surface layer (104); Laying a surface layer (104) on the backfill layer (103); S700: Casting of protective piles (8); Casting continuous protective piles (8) on the supporting base layer (4), the left side of the protective pile (8) being in contact with the right side of the retaining wall (6), and the height of the protective pile (8) being greater than the height of the surface layer (104); The upper end of the first anchor rod (5) and the tail of the second anchor rod (7) are both pre-buried in the protection pile (8).

2. A high slope road construction method according to claim 1, characterized in that: The retaining wall (6) comprises an integrally formed wall body (601), a front toe (602) and a rear toe (603); The wall (601) is arranged vertically on the supporting base layer (4), the front toe (602) is arranged horizontally on the left side of the bottom of the wall (601), and the rear toe (603) is arranged horizontally on the right side of the bottom of the wall (601), and the left-right width of the front toe (602) is greater than the left-right width of the rear toe (603); The front toe (602) is fitted with the side wall of the supporting foundation pit (102), so that a gap is formed between the wall (601) and the side wall of the supporting foundation pit (102); In the step S500, the backfill layer (103) fills the gap between the wall (601) and the side wall of the supporting foundation pit (102).

3. A high slope road construction method according to claim 2, characterized in that: The upper end of the first anchor rod (5) corresponding to the front toe (602) or the rear toe (603) passes through the front toe (602) or the rear toe (603) and is pre-buried in the backfill layer (103) or the protection pile (8).

4. A high slope road construction method according to claim 1, characterized in that: The steps S400 and S500 further include step S450: setting temporary support; A support rod (9) is obliquely arranged on the support base (4), the bottom of the support rod (9) is detachably fixedly connected to the first anchor rod (5), and the top of the support rod (9) abuts against the right end surface of the retaining wall (6); The tail of the second anchor rod (7) passes through the supporting rod (9) and is detachably fixedly connected to the supporting rod (9).

5. A high slope road construction method according to claim 4, characterized in that: The steps S450 and S500 further include step S460: setting up a construction platform (10); The construction platform (10) comprises a platform frame (1001), pillars (1002) and a guardrail (1003); A plurality of pillars (1002) are vertically arranged on the support base (4), the bottom of each pillar (1002) is detachably fixedly connected to the upper end of the corresponding first anchor rod (5), the platform frame (1001) is horizontally fixed on the pillars (1002), and a guardrail (1003) rod is arranged on one side of the platform frame (1001) close to the slope (2); In step S700, the temporary support and construction platform (10) are removed.

6. A high slope road construction method according to claim 5, characterized in that: The support column (1002) is at the same height as the retaining wall (6), and the left end of the platform frame (1001) is mounted on the retaining wall (6).

7. A high slope road construction method according to claim 5, characterized in that: The bottom of the support rod (9) and the corresponding pillar (1002) are fixedly connected to the same first anchor rod (5), and the top of the support rod (9) and the top of the pillar (1002) are fixedly connected via a diagonal brace rod (12).

8. A high slope road construction method according to claim 1, characterized in that: The steps S500 and S600 further include step S550: setting a drainage layer (105); A water-permeable material is laid on the backfill layer (103) to form a drainage layer (105); the right side of the drainage layer (105) is connected to a drainage pipe (106), and the drainage pipe (106) passes through the retaining wall (6) and extends to the right; In step S700, the drainage pipe (106) is pre-buried in the protection pile (8), and the right end of the drainage pipe (106) extends out of the protection pile (8) and is connected to the outside.

9. A high slope road construction method according to claim 1, characterized in that: The right end surface of the protection pile (8) is provided with a pressure foot (801), the pressure foot (801) is horizontally arranged on the supporting base layer (4) and is integrally formed with the protection pile (8), and the pressure foot (801) is fixedly connected to the first anchor rod (5).

10. A high slope road construction method according to claim 8, characterized in that: After step 700, the step S800 is also included: backfilling the slope protection (11); Backfilling is performed on the support base (4) to form a slope protection (11), wherein the left end surface of the slope protection (11) is in contact with the right end surface of the protection pile (8), the right end surface of the slope protection (11) is adapted to the slope (2), and the height of the slope protection (11) is lower than the protection pile (8); Before backfilling, the first anchor rod (5) corresponding to the pressure foot (801) is extended upwards so that the first anchor rod (5) extends upwards out of the slope protection (11), and fasteners are used to anchor the slope protection (11), the pressure foot (801) and the supporting base layer (4) into a whole.

Citation Information

Patent Citations

  • Ecological block retaining wall and construction method thereof

    CN110241779A

  • Supporting construction technology for deep foundation pit nearby road on complicated geological conditions

    CN110685286A

  • Disease treatment method for ultrahigh vertical reinforced soil embankment with panels

    CN114086534A