Cold water pipe arrangement structure for concrete construction
By using horizontal and vertical cold water pipes combined with the layout structure of the external circulation system in large-volume concrete construction, the water temperature is monitored and controlled, and the crack problem caused by temperature difference during construction is solved, and efficient cooling of large-volume concrete and water resource conservation is achieved. Improved construction quality.
Patent Information
- Application Number
- CN202411334456.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-11-22
AI Technical Summary
In the construction of large-volume concrete, the existing technology is difficult to effectively control the temperature difference between the inside and outside concrete, resulting in crack problems. In addition, manual sprinklers lack linkage and recycling measures during the maintenance period, resulting in poor cooling effect and waste of water resources.
The construction cold water pipe layout structure consisting of horizontal and vertical cold water pipes is adopted, combined with the outer circulation system and the surface backfill concrete, the internal and external temperature is monitored through the temperature measurement point, the water temperature is controlled by the temperature control device, and the power device promotes water flow, achieving consistency between internal and external temperatures. and spray water flow through the opening of the vertical cold water pipe side to maintain surface humidity, and filter through the collection pipe and circulating system to reflow, replenish the water source.
Effectively prevent concrete from cracking due to temperature difference, improve construction quality, save water for curing, ensure the consistency of internal and external temperatures of large-volume concrete, prevent cracking, and reduce waste of water resources.
Smart Images

Figure CN118997160A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of civil engineering, relates to a mass concrete construction technology, and particularly relates to a cold water pipe arrangement and an overall construction method for mass concrete construction. Background Art
[0002] my country's "Massive Concrete Construction Standard" GB50496-2018 stipulates: Large-volume concrete with a minimum geometric dimension of not less than 1m, or concrete that is expected to cause harmful cracks due to temperature changes and shrinkage caused by hydration of cementitious materials in the concrete, is called massive concrete.
[0003] With the development of China's social economy, a large number of large and even super-large concrete building structures have emerged, involving high-rise building foundations, large equipment foundations, water conservancy dams, etc. One of the main characteristics of the above buildings is their large size, with the smallest section size in any direction greater than 1m. Since the surface coefficient of concrete is relatively small, the heat release of cement hydration is relatively concentrated, and the internal temperature rises relatively quickly. When the temperature difference between the inside and outside of concrete is large, temperature cracks will occur in the concrete, affecting the safety and normal use of the structure. Reasonable methods need to be adopted to control the temperature difference between the inside and outside of large-volume concrete during the construction period to ensure the construction quality of large-volume concrete.
[0004] At present, the method of laying cold water pipes inside the concrete and manually sprinkling water on the concrete surface during the curing period is often used to prevent cracking of large-volume concrete construction. For the method of laying cold water pipes, the cold water pipes are generally arranged in multiple layers (two or three layers), and the plane of each layer of cooling water pipes is arranged in a straight line in the shape of a "bow". Low-temperature cold water is injected from one side (water inlet) and water is discharged from the other side (water outlet). For artificial sprinkling, it is generally the on-site construction personnel who regularly sprinkle water on the concrete surface to cool down and prevent the surface concrete from cracking due to water loss and shrinkage. Generally speaking, in large-volume concrete construction, the two are carried out independently, and their timing, water temperature control, water flow (sprinkling) time, etc. are not linked, which often results in poor cooling effect on the hydration heat temperature of large-volume concrete. In addition, there is a lack of recycling measures for manually sprinkling water on the concrete surface during the curing period, which easily leads to waste of water resources. Summary of the invention
[0005] The main technical problem to be solved by the present invention is to provide a cold water pipe arrangement structure for concrete construction, which is suitable for a reasonable and economical cooling treatment method for large-volume concrete and improves the construction quality.
[0006] In order to solve the above technical problems, the present invention provides a cold water pipe arrangement structure for concrete construction, comprising: construction components, an external circulation system and surface backfill concrete;
[0007] The construction components include concrete and a cold water pipe system; wherein the upper surface of the concrete is subjected to uneven treatment; the cold water pipe system includes a horizontal cold water pipe and a vertical cold water pipe; wherein the horizontal cold water pipe is arranged in the concrete along the length direction of the concrete, and the vertical cold water pipe is divided into a plurality of groups arranged at intervals along the length direction of the concrete, and each group of vertical cold water pipes is divided into sub-cold water pipes arranged at intervals along the width direction of the concrete, and the sub-cold water pipes in each group of vertical cold water pipes are respectively connected to the horizontal cold water pipe;
[0008] One end of the horizontal cold water pipe is exposed outside the concrete and connected to the circulation system as the water inlet of the horizontal cold water pipe; the circulation system includes a water collecting pipe, a filtering device, a temperature control device, a power device and a water inlet of the circulation system; the water inlet of the circulation system is connected to the water inlet of the horizontal cold water pipe through the temperature control device and the power device in turn; the water inlet of the circulation system is also connected to the water collecting pipe through the filtering device;
[0009] The water collecting pipe is provided with side openings at intervals along the length direction, and the upper end of the sub-cooling water pipe is exposed outside the concrete and is provided with a sub-cooling water pipe side opening;
[0010] Temperature measuring points are also arranged on the upper surface and inside of the concrete, and a circulating water baffle is also arranged on one end of the upper surface of the concrete along the length direction.
[0011] In a preferred embodiment: the transverse cold water pipe is located in the middle of the concrete.
[0012] In a preferred embodiment: the plurality of groups of vertical cold water pipes are arranged at equal intervals along the length direction of the concrete.
[0013] In a preferred embodiment: the top of the sub-cold water pipe is closed, and a side opening of the sub-cold water pipe is provided on the side.
[0014] In a preferred embodiment: the height of the concrete on the side away from the circulation system is consistent with the designed height; and the height of the concrete on the side close to the circulation system is lower than the designed height.
[0015] In a preferred embodiment: the water retaining plate is arranged on the side of the concrete close to the circulation system.
[0016] In a preferred embodiment: the water retaining plate is cast together with concrete.
[0017] In a preferred embodiment: the water collecting pipe is placed on the inner side of the water retaining plate, and a plurality of side openings of the water collecting pipe are provided on the side of the water collecting pipe facing the concrete.
[0018] In a preferred embodiment: the temperature measuring point is used to measure the internal and surface temperature of the concrete, and is connected to the temperature control device via wired or wireless means.
[0019] In a preferred embodiment: the temperature control device controls the water temperature within the range between the internal temperature and the surface temperature of the large volume concrete by heating or cooling.
[0020] Compared with the prior art, the technical solution of the present invention has the following beneficial effects:
[0021] The present invention provides a cold water pipe arrangement structure and construction method for concrete construction. After the construction of large-volume concrete, the temperature measuring point monitors the temperature inside and outside the large-volume concrete, and then water is introduced from the water inlet of the circulation system. The water temperature is controlled between the internal and external temperatures of the large-volume concrete by a temperature control device, and the water is driven to flow to each cold water pipe by a power device. In this way, after the water flow is heated inside the concrete, it flows to the outer surface of the concrete with a lower temperature, so that the temperature inside the concrete decreases and the temperature on the surface increases, and the internal and external temperatures tend to be consistent, thereby preventing concrete cracking caused by the internal and external temperature difference. At the same time, after the water flow reaches the top of the vertical cold water pipe, it is sprayed out from the side opening of the vertical cold water pipe. Since the vertical cold water pipes are evenly distributed on the large-volume concrete, water with a temperature close to that of the large-volume concrete surface can be evenly distributed and covered on the large-volume concrete surface. On the one hand, it can further promote the heat preservation of the large-volume concrete surface, so that it tends to be consistent with the internal temperature, thereby preventing concrete cracking caused by uneven internal and external temperatures; on the other hand, it can play a role in moisturizing the concrete surface, thereby preventing the surface concrete from drying and cracking. At the same time, there is a height difference on both sides of the mass concrete, and the concrete surface is designed to be uneven, which increases the water storage time on the mass concrete surface and causes the water to flow slowly to the water collection pipe. After the water flow is collected by the water collection pipe, it is filtered and temperature-controlled by the circulation system and then returns to the cold water pipe again. Considering the evaporation and loss of water, the water inlet can play a role in replenishing water. After the mass concrete construction and maintenance is completed, a shallow surface backfill concrete is laid on the surface to complete the overall structure construction.
[0022] Therefore, the present invention can not only ensure the construction quality of large-volume concrete, but also save concrete curing water. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is the overall arrangement diagram of the present invention;
[0024] Figure 2 It is the layout diagram of the cold water pipe system and the external circulation system of the present invention;
[0025] Figure 3 This is a schematic diagram of the surface treatment of mass concrete of the present invention;
[0026] Figure 4 This is the overall arrangement diagram of mortar injection after the curing of the present invention is completed;
[0027] Figure 5This is the overall layout diagram after the mortar injection of the present invention is completed and the redundant components are removed;
[0028] Figure 6 This is the overall layout diagram after the surface concrete construction of the present invention is completed;
[0029] Figure 7 It is a schematic diagram of the water flow or mortar operation of the present invention. DETAILED DESCRIPTION
[0030] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings; it is obvious that the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making creative work are within the scope of protection of the present invention.
[0031] In the description of the present invention, it should be noted that, unless otherwise clearly stipulated and limited, the terms "installed", "provided with", "mounted / connected", "connected", etc. should be understood in a broad sense. For example, "connection" can be a wall-mounted connection, a detachable connection, or an integral connection. It can be a mechanical connection or an electrical connection. It can be a direct connection or an indirect connection through an intermediate medium. It can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0032] refer to Figure 1-7 , this embodiment provides a cold water pipe arrangement for mass concrete construction, including construction components 1, an external circulation system 2 and surface backfill concrete 3. Among them, the construction component 1 includes mass concrete 1-1, unevenness treatment 1-1-1, cold water pipe system 1-2, horizontal cold water pipe 1-2-1, vertical cold water pipe 1-2-2, vertical cold water pipe side opening 1-2-2-1, temperature measuring point 1-3, circulating water baffle 1-4, cold water pipe water inlet 1-5. The circulation system 2 includes a water collecting pipe 2-1, a water collecting pipe side opening 2-1-1, a filter device 2-2, a temperature control device 2-3, a power device 2-4, and a circulation system water inlet 2-5. Ⅰ is one side of the mass concrete 1-1, Ⅱ is the other side of the mass concrete 1-1, Ⅲ is the upper surface of the mass concrete 1-1, and Ⅳ is the bottom surface of the mass concrete 1-1.
[0033] The horizontal cold water pipe 1-2-1 and the vertical cold water pipe 1-2-2 form a cold water pipe system 1-2, the vertical cold water pipe 1-2-2 is connected to the horizontal cold water pipe 1-2-1, and the horizontal cold water pipe 1-2-1 is located in the middle of the large volume concrete 1-1; the vertical cold water pipe 1-2-2 is arranged in an orderly manner at intervals, and extends upward from the upper surface III of the large volume concrete 1-1; the top of the vertical cold water pipe 1-2-2 is closed, and there is a vertical cold water pipe side opening 1-2-2-1 on the side to facilitate water outflow; the horizontal cold water pipe 1-2-1 is connected to the external circulation system 2 through the cold water pipe inlet 1-5; the height of the large volume concrete 1-1 on the side I far away from the external circulation system 2 is consistent with the design height; on the side II close to the external circulation system 2, its height is lower than the design height, and there is a small height difference on both sides, forming a small angle θ; the surface of the large volume concrete 1-1 is unevenly treated 1-1-1; the large volume concrete 1-1 is provided with an erected circulating water baffle 1-4 on the II side close to the external circulation system 2, and the baffle is cast together with the mass concrete 1-1, and is a concrete structure; the water collecting pipe 2-1 is placed on the inner side of the circulating water baffle 1-4, and a certain number of water collecting pipe side openings 2-1-1 are opened on the side of the water collecting pipe; the water collecting pipe 2-1, the filtering device 2-2, the temperature control device 2-3, and the power device 2-4 are connected in sequence, and the power device 2-4 is connected to the cold water pipe inlet 1-5, and the circulating system inlet 2-5 is between the filtering device 2-2 and the temperature control device 2-3; the temperature measuring point 1-3 measures the internal and surface temperature of the mass concrete 1-1, and is connected to the temperature control device 2-3 by wire or wireless means; the temperature control device 2-3 controls the water temperature in the range between the internal and surface temperature of the mass concrete 1-1 by heating or cooling; the backfill height of the surface backfill concrete 3 is equal to the design height.
[0034] When in use, first carry out the construction of large-volume concrete and cool it down through cold water pipes. After the curing is completed, mortar is introduced to level the surface of the large-volume concrete, and finally the surface backfill concrete is applied.
[0035] During the specific construction and production, the specific steps are as follows:
[0036] (1) Laying of cold water pipe system;
[0037] (2) Place temperature measuring points;
[0038] (3) Connect the cold water pipe system to the external circulation system at the cold water pipe inlet;
[0039] (4) pouring large volumes of concrete;
[0040] (5) Water is passed through the water inlet of the circulation system and the water is heated at the temperature control device. The temperature depends on the median value of the internal and external temperatures of the mass concrete obtained at the temperature measuring point;
[0041] (6) When entering the mass concrete curing stage, the vertical cold water pipe drains water outward, and the water collecting pipe collects the water flowing down the surface of the mass concrete. After being filtered and heated by the circulation system, it enters the curing cycle again. The temperature rise depends on the median value of the internal and external temperatures of the mass concrete measured in real time by the temperature measuring point ( Figure 1 );
[0042] (7) When it is found that the water flow in the cold water pipe is low, water is added through the water inlet of the circulation system;
[0043] (8) Repeat the cycle until the mass concrete is cured;
[0044] (9) Stop the water flow to the water inlet of the circulation system and drain the water in the cold water pipe system;
[0045] (10) Removal of the circulatory system;
[0046] (11) Inject mortar from the cold water pipe inlet until mortar flows out of the vertical cold water pipe ( Figure 4 );
[0047] (12) Wait for the mortar to solidify;
[0048] (13) Cut off all cold water pipes and internal mortar exposed outside the large concrete volume, chisel off the circulating water baffle, and remove the temperature measuring points ( Figure 5 );
[0049] (14) Lay the surface backfill concrete and the construction is completed ( Figure 6 )
[0050] The above description is only a preferred specific implementation mode of the present invention, and does not limit the patent scope of the present invention. Any technical equivalent changes made using the contents of the present invention specification shall fall within the protection scope of the present invention.
Claims
1. A cold water pipe arrangement structure for concrete construction, characterized in that include: Construction components, external circulation system and surface backfill concrete; The construction components include concrete and a cold water pipe system; wherein the upper surface of the concrete is subjected to uneven treatment; the cold water pipe system includes a horizontal cold water pipe and a vertical cold water pipe; wherein the horizontal cold water pipe is arranged in the concrete along the length direction of the concrete, and the vertical cold water pipe is divided into a plurality of groups arranged at intervals along the length direction of the concrete, and each group of vertical cold water pipes is divided into sub-cold water pipes arranged at intervals along the width direction of the concrete, and the sub-cold water pipes in each group of vertical cold water pipes are respectively connected to the horizontal cold water pipe; One end of the horizontal cold water pipe is exposed outside the concrete and connected to the circulation system as the water inlet of the horizontal cold water pipe; the circulation system includes a water collecting pipe, a filtering device, a temperature control device, a power device and a water inlet of the circulation system; the water inlet of the circulation system is connected to the water inlet of the horizontal cold water pipe through the temperature control device and the power device in turn; the water inlet of the circulation system is also connected to the water collecting pipe through the filtering device; The water collecting pipe is provided with side openings at intervals along the length direction, and the upper end of the sub-cooling water pipe is exposed outside the concrete and is provided with a sub-cooling water pipe side opening; Temperature measuring points are also arranged on the upper surface and inside of the concrete, and a circulating water baffle is also arranged on one end of the upper surface of the concrete along the length direction.
2. A cold water pipe arrangement structure for concrete construction according to claim 1, characterized in that: The transverse cold water pipe is located in the middle of the concrete.
3. The cold water pipe arrangement structure for concrete construction according to claim 1, characterized in that: Multiple groups of vertical cold water pipes are arranged at equal intervals along the length direction of the concrete.
4. The cold water pipe arrangement structure for concrete construction according to claim 1, characterized in that: The top of the sub-cold water pipe is closed, and a side opening of the sub-cold water pipe is arranged on the side.
5. The cold water pipe arrangement structure for concrete construction according to claim 1, characterized in that: The height of the concrete on the side far from the circulation system is consistent with the designed height; and the height of the concrete on the side close to the circulation system is lower than the designed height.
6. A cold water pipe arrangement structure for concrete construction according to claim 5, characterized in that: The water retaining plate is arranged on the side of the concrete close to the circulation system.
7. A cold water pipe arrangement structure for concrete construction according to claim 6, characterized in that: The water retaining plate is cast together with the concrete.
8. The cold water pipe arrangement structure for concrete construction according to claim 7, characterized in that: The water collecting pipe is placed on the inner side of the water retaining plate, and a plurality of side openings of the water collecting pipe are arranged on the side of the water collecting pipe facing the concrete.
9. The cold water pipe arrangement structure for concrete construction according to claim 1, characterized in that: The temperature measuring points are used to measure the internal and surface temperatures of the concrete and are connected to the temperature control device via wired or wireless means.
10. A cold water pipe arrangement structure for concrete construction according to claim 9, characterized in that: The temperature control device controls the water temperature within a range between the internal temperature and the surface temperature of the large volume concrete by heating or cooling.
Citation Information
Patent Citations
Large-sized concrete automatic temperature control and maintenance device and method
CN103526761A
Large-volume concrete cooling method
CN118495988A
Bulky concrete holds water curing system
CN207686330U
Exchange Type Reduction Device of Concrete Temperature Gap by means of Pipe Cooling, Exchange Type Reduction Method using the Device and Structure using the Metho ...
KR1020120082559A
Cited By
Structural bottom plate and construction method thereof
CN119933178A