Steel pipe column underpinning construction method for beam-column core joint in reverse construction method
By using the main support system and support structure in reverse construction, the problem of verticality control of steel pipe columns and construction safety is solved, the stability of the building structure and the high-quality forming of concrete columns are ensured, and the safety of the construction process is achieved Improved sex and efficiency.
Patent Information
- Application Number
- CN202411282380.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-11-22
AI Technical Summary
In reverse construction, it is difficult to control the verticality of the steel pipe column, resulting in frequent errors, affecting structural safety and usage functions, and the existing support system is prone to damage to the building structure during the demolition process.
The main support system and support structure are adopted to provide secondary support to the frame beam by setting up a support structure to prevent contact of cutting equipment, and to ensure the position accuracy and construction safety of the concrete columns through the positioning structure and the cast mold structure.
It effectively prevents direct contact between the cutting equipment and the frame beam, ensures the safety and stability of the construction process, and improves the structural strength and construction efficiency of the concrete column.
Smart Images

Figure CN118997539A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building construction, and in particular to a construction method for underpinning steel pipe columns at core nodes of beams and columns using a reverse construction method. Background Art
[0002] With the advancement of social productivity, human demand for underground building space continues to grow. Therefore, reverse construction has been increasingly widely used in dense urban foundation pits. As the core technology of reverse construction technology, pile-by-pillar construction has always been a difficult point and a key technical breakthrough. In particular, the verticality control of steel pipe columns in pile-by-pillar construction is the top priority of construction. However, errors in steel pipe column construction are difficult to avoid. Once a large deviation in verticality occurs, the entire steel pipe column must be replaced layer by layer, otherwise it will seriously affect the use function and safety of the structure.
[0003] In the steel pipe column replacement project, a support system is required to support the frame beams and floor slabs. Therefore, the accuracy, stability and reliability of the support system are particularly important. Once the support system is unqualified, it may cause irreversible damage to the floor structure.
[0004] Among the common support systems currently used, jacks and steel pipe support structures are often used, which can provide good support for frame beams and floor slabs. Then the floor slabs, secondary beams, main beams, and steel pipe columns can be removed in turn.
[0005] However, since medium and large equipment such as cutting machines are used when dismantling steel pipe columns, it is easy to cause damage to the building structure. In particular, the position of the frame beam close to the steel pipe column is more likely to come into contact with dismantling equipment such as cutting machines, thereby affecting the safety of the building structure. Summary of the invention
[0006] The present application provides a construction method for replacing steel pipe columns at the core nodes of beams and columns in a reverse construction method, which can effectively ensure the safety and stability of the frame beams close to the steel pipe columns, thereby ensuring the safety of the building structure, and adopts the following technical solutions: A construction method for underpinning a steel pipe column at a core node of a beam-column in a reverse construction method, comprising the following construction steps: Installation of the main support system; the main support system is installed on the poured floor slab and is used to support the frame beam; Removal of frame beams and original steel tube concrete columns; first, the frame beams around the original steel tube concrete columns are removed, then a support structure is set on the side of the frame beam facing the original steel tube concrete column and the frame beam is supported for a second time, and the frame beam is connected to the main support system through the support structure, and finally the original steel tube concrete column is removed; Install and pour new concrete columns at the location of the original steel tube concrete columns; Curing of new concrete columns and removal of main support system.
[0007] By adopting the above technical solution, the original steel tube concrete column can be safely removed, and a new concrete column can be installed and poured at the original location at the same time to ensure safety and stability during the construction process. The installation of the main support system can pre-support the frame beam to prevent structural instability when the original steel tube concrete column is removed. Setting up a support structure and protecting the side of the frame beam close to the steel tube concrete column can effectively prevent direct contact between the cutting equipment and the frame beam. At the same time, the support structure can further enhance the stability of the frame beam, ensuring that the frame beam will not deform or collapse during the removal of the original steel tube concrete column.
[0008] Preferably, the support structure comprises a steel casing, the steel casing is fixedly connected to the end of the frame beam, a plurality of the steel casings are provided and are arranged around the circumference of the original steel tube concrete column, each steel casing is connected to the frame beam at a different position, and the plurality of steel casings are connected to each other; The support structure also includes a top rod assembly, one end of which is hinged to the steel casing, and the other end of which is hinged to the main support system to support the steel casing.
[0009] By adopting the above technical solution, the steel casing can be installed on the end of the frame beam, thereby protecting the frame beam. In addition, through the coordinated use of the steel casing and the top rod assembly, the load can be effectively dispersed, the bearing capacity of the support structure can be improved, and the safety and stability during the construction process can be further ensured.
[0010] Preferably, when installing and pouring a new concrete column, a pouring mold structure is first set up, and the pouring mold structure includes a template and a column hoop arranged on the periphery of the template; A positioning structure is provided between the casting mold structure and the supporting structure, and the casting mold structure is connected to the supporting structure via the positioning structure.
[0011] By adopting the above technical solution, the setting of the template and column hoop can ensure the molding quality of the newly built concrete column, improve the construction efficiency and the structural strength of the newly built concrete column. The positioning structure can ensure the stability and position accuracy of the casting mold structure.
[0012] Preferably, the positioning structure includes a fixing plate and a connecting screw, and the fixing plate is fixedly connected to the supporting structure; one end of the connecting screw passes through the fixing plate and is provided with a limiting block, and the other end is screwed to the casting mold structure, and the adjusting screw is rotated to adjust the horizontal position of the casting mold structure.
[0013] By adopting the above technical solution, the position of the casting mold structure can be adjusted by adjusting the adjusting screw, so as to ensure the position accuracy of the casting mold structure and ensure the vertical accuracy of the newly built concrete column.
[0014] Preferably, the casting mold structure also includes a tension screw, which passes through the template and extends to the opposite sides of the template, and the column hoops located on the opposite sides of the template are connected by the tension screw; the positioning structure also includes a threaded sleeve, and the two ends of the threaded sleeve are respectively connected to the tension screw and the adjusting screw.
[0015] By adopting the above technical solution, the connection between the tension screw and the adjusting screw is achieved through the threaded sleeve, so that the positioning structure is combined with the casting mold structure, which effectively ensures the positioning accuracy of the casting mold structure and is easy to operate.
[0016] Preferably, a newly added axilla beam is cast between the newly built concrete column and the frame beam, a steel plate is provided inside the added axilla beam, and the steel plate is fixedly connected to the steel bars inside the newly built concrete column; the steel plate is fixedly connected to the steel casing.
[0017] By adopting the above technical solution, rigid concrete can be formed by setting up steel plates, thereby improving the performance of the axilla beams, and by connecting the steel plates with the steel casings, the connection strength between the axilla beams and the frame beams can be improved, thereby improving the strength of the building structure.
[0018] Preferably, the steel casing includes two relatively arranged C-shaped plates and a connecting plate arranged between the two C-shaped plates, and the connecting plate is detachably connected to the C-shaped plates; the connecting plate is welded to the internal steel bars of the frame beam; a steel plate is arranged inside the axilla beam, and the steel plate is welded to the connecting plate.
[0019] By adopting the above technical solution, the two C-shaped plates can be removed, and the steel plate is connected to the internal steel bars of the frame beam through the connecting plate, thereby effectively improving the connection strength between the steel plate and the frame beam.
[0020] Preferably, when dismantling the frame beam, the structural reinforcement in the beam is retained; when pouring the new concrete column, the longitudinal reinforcement of the beam is embedded in the new concrete column and a welding joint is provided, and the internal structural reinforcement of the frame beam is welded to the longitudinal reinforcement of the beam through the welding joint.
[0021] By adopting the above technical solution, the connection strength between the frame beam and the newly built concrete column can be effectively improved by connecting the longitudinal reinforcement of the beam with the structural reinforcement of the frame beam, thereby improving the structural strength of the building.
[0022] In summary, the present invention includes at least one of the following beneficial technical effects: 1. This application provides a support structure to protect the side of the frame beam close to the steel tube concrete column, which can effectively prevent the cutting equipment from directly contacting the frame beam. At the same time, the support structure can further enhance the stability of the frame beam, ensuring that the frame beam will not deform or collapse during the removal of the original steel tube concrete column; 2. This application ensures the precise positioning between the casting mold structure and the supporting structure by setting up a positioning structure, further ensuring the position accuracy of the newly built concrete columns and effectively improving the project quality; 3. This application not only improves the construction efficiency by optimizing the construction steps and structural settings, but also ensures the safety of the construction process and the structural strength of the newly built concrete columns, and has important practical application value. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the overall structure of the building structure and the support system in step 1 of the embodiment of the present application; Figure 2 It is a schematic diagram of step 2 in the embodiment of the present application; Figure 3 It is a schematic diagram of step 4 in the embodiment of the present application; Figure 4 yes Figure 3 The partially enlarged schematic diagram of part A is used to show the connection relationship between the positioning structure, the supporting structure and the casting mold structure; Figure 5 It is a schematic diagram used to show the connection relationship between the longitudinal reinforcement of the beam and the frame beam; Figure 6 It is a schematic diagram used to show the structure with haunch beams.
[0024] Markings in the attached drawings: 1. Frame beam; 2. Floor slab; 3. Support system; 31. Support column; 32. Jack; 33. Horizontal brace; 4. Support structure; 41. Steel casing; 411. C-shaped plate; 412. Connecting plate; 42. Top rod assembly; 5. Positioning structure; 51. Fixing plate; 52. Connecting screw; 53. Threaded casing; 6. Original steel tube concrete column; 7. New concrete column; 71. Beam longitudinal reinforcement; 72. Add axillary beam; 8. Casting mold structure; 81. Formwork; 82. Column hoop; 83. Tension screw. DETAILED DESCRIPTION
[0025] The following is combined with Figure 1-6 The present invention is described in further detail.
[0026] This embodiment discloses a method for underpinning a steel pipe column at a core node of a beam-column in a reverse construction method. The method is mainly used in the field of building construction, especially in the case of underpinning a steel pipe column in a one-pile-one-column construction. The method comprises the following steps: Step 1: Reference Figure 1 , install the main support system 3. The main support system 3 is arranged on the poured floor slab 2, and is mainly used to support the upper frame beam 1 and the floor slab 2. This support system 3 can effectively bear various loads generated during the construction process, ensuring the safety and stability of the building construction.
[0027] The main support system 3 includes: a support column 31, a steel pad, a steel bracket, a jack 32, a steel bracket and a horizontal brace 33. The support column 31 is a steel pipe structure, and the steel pad is welded on the top and bottom of the support column 31. The steel pad on the top of the steel pad is fixed to the upper floor 2 by chemical anchor bolts, and the steel bracket is symmetrically welded on the bottom of the support column 31. The jack 32 is located at the bottom side of the support column 31 and abuts against the floor 2. Multiple support columns 31 are provided, and horizontal braces 33 are added between the support columns 31 to ensure the stability of the support columns 31.
[0028] The load is loaded and unloaded through the jack 32 until 90% of the theoretical load is reached and maintained for more than half an hour. After no problem is found, the jack 32 is locked. After the jack 32 (23) is installed, high-strength grouting material is poured at the position where the jack 32 contacts the floor slab 2.
[0029] Step 2: Reference Figure 2 , remove the frame beam 1 and set up a support structure 4. First, remove the frame beam 1 around the original steel tube concrete column 6. During the removal process, special attention should be paid to protecting the integrity of the structural steel bars in the beam for subsequent use. Then, in the vacant space after the frame beam 1 is removed, a support structure 4 is set toward one side of the original steel tube concrete column 6. The support structure 4 can not only provide secondary support for the frame beam 1, but also form a stable connection with the main support system 3 through the connecting structure, thereby greatly enhancing the stability and bearing capacity of the overall structure.
[0030] The support structure 4 includes a plurality of steel sleeves 41, which are fixedly connected to the frame beams 1 at different positions and are arranged around the circumference of the original steel tube concrete column 6. The steel sleeves 41 are firmly connected by connecting pieces to form an integral support frame.
[0031] Furthermore, the steel casing 41 includes two relatively arranged C-shaped plates 411 and a connecting plate 412 arranged between the two C-shaped plates 411. The edges of the two C-shaped plates 411 are connected to each other by bolts, and the connecting plate 412 is detachably connected to the C-shaped plates 411; the connecting plate 412 is welded to the internal steel bars of the frame beam 1 to enhance the connection strength between the steel casing 41 and the frame beam 1.
[0032] In addition, the support structure 4 also includes a top rod assembly 42, which includes a first top rod and a second top rod. The first top rod is hinged to the support column 31, and the second top rod is hinged to the steel casing 41. The first top rod and the second top rod are connected by a threaded sleeve, so that the distance between the first top rod and the second top rod can be adjusted by rotating the threaded sleeve to change the length of the top rod assembly 42, thereby achieving precise adjustment and stable support of the support frame. This not only greatly improves the safety and convenience during the construction process, but also provides a strong guarantee for the smooth progress of subsequent steps. Step 3: Dismantle the original steel tube concrete column 6. After the support structure 4 is set up and connected, the original steel tube concrete column 6 can be dismantled. In this process, it should be ensured that the dismantling operation does not have an adverse impact on the surrounding structure and support system, and the cleaning and recycling of the dismantled objects should be done well to reduce the generation of construction waste.
[0033] Step 4: Install and cast the new concrete column 7. Install and cast the new concrete column 7 at the location where the original steel tube concrete column 6 was removed. To ensure the position accuracy and construction quality of the new concrete column 7, a casting mold structure 8 should be set up before casting. The casting mold structure 8 consists of a template 81 and a column hoop 82 arranged around the template 81, which has sufficient rigidity and stability to withstand the lateral pressure and vibration force generated during the concrete casting process.
[0034] Specifically, refer to Figure 3 and Figure 4 The template 81 is a square frame structure, and concrete can be poured into the template 81. The column hoops 82 are formed by vertically overlapping round steel pipes. The casting mold structure 8 also includes a tension screw 83, which passes through the template 81 and extends to the opposite sides of the template 81. The column hoops 82 located on the opposite sides of the template 81 are connected by the tension screw 83.
[0035] In order to achieve the positioning of the casting mold structure 8 and thus ensure the construction quality of the new concrete column 7 , a positioning structure 5 is provided between the casting mold structure 8 and the supporting structure 4 , and the casting mold structure 8 is connected to the supporting structure 4 via the positioning structure 5 .
[0036] Specifically, the positioning structure 5 includes a fixed plate 51, a connecting screw 52 and a threaded sleeve 53. The fixed plate 51 is fixedly connected to the support structure 4. One end of the connecting screw 52 passes through the fixed plate 51 and is provided with a limiting block, and the other end is screwed to the threaded sleeve 53. The threaded sleeve 53 is screwed to the end of the tension screw 83, thereby realizing the connection between the casting mold structure 8 and the support structure 4, and the position of the casting mold structure 8 can be adjusted by rotating the threaded sleeve 53.
[0037] Reference Figure 5 and Figure 6When pouring the newly built concrete column 7, the beam longitudinal reinforcement 71 is embedded in the newly built concrete column 7 and a welding joint is set, and the internal structural reinforcement of the frame beam 1 is welded to the beam longitudinal reinforcement 71 through the welding joint, so as to realize the connection between the newly built concrete column 7 and the frame beam 1. And an additional haunch beam 72 is added between the newly built concrete column 7 and the frame beam 1.
[0038] A steel plate is also provided inside the axilla beam 72, one end of which is welded to the connecting plate 412, and the other end is connected to the inner steel bar of the newly built concrete column 7. Step 5: Maintain the newly built concrete column 7 and remove the main support system 3. After the newly built concrete column 7 is poured, maintenance work should be carried out in a timely manner to ensure that the concrete can reach the strength and durability required by the design. As the concrete strength gradually increases, the role of the main support system 3 gradually weakens. Finally, after the concrete reaches the design strength, the main support system 3 can be safely removed to complete the underpinning construction of the entire steel pipe column.
[0039] The embodiments of this specific implementation method are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A construction method for replacing steel pipe columns at the core nodes of beams and columns in a reverse construction method. It is characterized in that The construction steps include: Installation of a main support system (3); the main support system (3) is arranged on the poured floor slab (2) and is used to support the frame beam (1); Removing the frame beam (1) and the original steel tube concrete column (6); first, the frame beam (1) on the side of the original steel tube concrete column (6) is removed, then a support structure (4) is arranged on the side of the frame beam (1) facing the original steel tube concrete column (6) and the frame beam (1) is supported secondary, and the frame beam (1) is connected to the main support system (3) through the support structure (4), and finally the original steel tube concrete column (6) is removed; Installing and pouring a new concrete column (7) at the location of the original steel tube concrete column (6); Maintenance of new concrete columns (7) and removal of the main support system (3).
2. According to the top-down construction method of claim 1, It is characterized in that The support structure (4) comprises a steel casing (41), wherein the steel casing (41) is fixedly connected to the end of the frame beam (1), a plurality of the steel casings (41) are provided and are arranged around the circumference of the original steel tube concrete column (6), each steel casing (41) is connected to the frame beam (1) at a different position, and the plurality of steel casings (41) are connected to each other; The support structure (4) further comprises a top rod assembly (42), one end of the top rod assembly (42) being hinged to the steel casing (41), and the other end of the top rod assembly (42) being hinged to the main support system (3) so as to support the steel casing (41).
3. The construction method for replacing steel pipe columns at the core nodes of beams and columns in the reverse construction method according to claim 2, It is characterized in that When installing and pouring a new concrete column (7), a pouring mold structure (8) is first set up, wherein the pouring mold structure (8) includes a template (81) and a column hoop (82) arranged on the periphery of the template (81); A positioning structure (5) is provided between the casting mold structure (8) and the supporting structure (4), and the casting mold structure (8) is connected to the supporting structure (4) via the positioning structure (5).
4. The construction method for replacing steel pipe columns at the core nodes of beams and columns in the reverse construction method according to claim 3, It is characterized in that The positioning structure (5) comprises a fixing plate (51) and a connecting screw (52), wherein the fixing plate (51) is fixedly connected to the supporting structure (4); one end of the connecting screw (52) passes through the fixing plate (51) and is provided with a limit block, and the other end is screwed to the casting mold structure (8), and the horizontal position of the casting mold structure (8) is adjusted by rotating the adjusting screw.
5. The construction method for replacing steel pipe columns at the core nodes of beams and columns in the top-down construction method according to claim 4, It is characterized in that The casting mold structure (8) further includes a tension screw (83), wherein the tension screw (83) passes through the template (81) and extends to two opposite sides of the template (81), and the column hoops (82) located on two opposite sides of the template (81) are connected via the tension screw (83); the positioning structure (5) further includes a threaded sleeve (53), and two ends of the threaded sleeve (53) are respectively connected to the tension screw (83) and the adjusting screw.
6. The construction method for replacing steel pipe columns at the core nodes of beams and columns in the reverse construction method according to claim 2, It is characterized in that A newly added axillar beam (72) is cast between the newly built concrete column (7) and the frame beam (1); a steel plate is provided inside the added axillar beam (72); the steel plate is fixedly connected to the steel bars inside the newly built concrete column (7); and the steel plate is fixedly connected to the steel casing (41).
7. The construction method for replacing steel pipe columns at the core nodes of beams and columns in the reverse construction method according to claim 6, It is characterized in that The steel casing (41) comprises two C-shaped plates (411) arranged opposite to each other and a connecting plate (412) arranged between the two C-shaped plates (411), wherein the connecting plate (412) is detachably connected to the C-shaped plates (411); the connecting plate (412) is welded to the internal steel bars of the frame beam (1); and a steel plate is arranged inside the axilla beam (72), and the steel plate is welded to the connecting plate (412).
8. The construction method for replacing steel pipe columns at the core nodes of beams and columns in the reverse construction method according to claim 1, It is characterized in that When the frame beam (1) is removed, the structural steel bars in the beam are retained; when the new concrete column (7) is cast, the beam longitudinal bars (71) are embedded in the new concrete column (7) and a welding joint is provided, and the structural steel bars inside the frame beam (1) are welded to the beam longitudinal bars (71) via the welding joint.