Freezing control method for splitting grouting diffusion and reinforcement range of water-rich soft rock stratum
By applying frozen curtains and permanent cement water-blocking curtains in water-rich soft rocks, the problem of difficult material waste and reinforcement range control in split grouting treatment is solved, and efficient reinforcement and targeted transport of split slurry veins are achieved. , reducing the risk of material waste and groundwater penetration.
Patent Information
- Application Number
- CN202411051199.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-22
AI Technical Summary
In tunnel and underground projects, conventional split grouting treatment faces the problem of waste of materials and difficulty in controlling the reinforcement range. If the grouting pressure is too small, it cannot form an effective split slurry vein. If the pressure is too large, the slurry diffusion range will be too far beyond the reinforcement range. Circle range.
By applying frozen curtains and permanent cement water-blocking curtains in water-rich soft rocks, the diffusion and reinforcement range of split slurry veins is controlled, and the frozen curtain is formed and grouting is carried out on the basis of them, reducing material waste and increasing the Governance efficiency.
Targeted migration and retention of split slurry veins is achieved, ensuring that the slurry is mainly retained within the target reinforcement circle, reducing material waste, and reducing the risk of groundwater penetration during subsequent construction and operation periods.
Smart Images

Figure CN118997767A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of splitting grouting control, and in particular to a method for controlling the freezing of the diffusion and reinforcement range of splitting grouting in a water-rich soft rock formation. Background Art
[0002] The statements in this section merely mention background art related to the present invention and do not necessarily constitute prior art.
[0003] In recent years, the construction of tunnels and underground projects has been in full swing. Due to the surge in the number of constructions and the difficulties encountered such as complex and diverse geological conditions and undulating topography, tunnels and underground projects inevitably need to pass through more complex adverse geological environments such as water-rich soft surrounding rocks. Among them, grouting treatment, as one of the important methods for sealing and reinforcing water-rich soft rocks, is widely used in the treatment of sudden mud and water gushing disasters.
[0004] However, conventional splitting grouting treatment often faces problems such as difficulty in saving material expenses, difficulty in controlling the diffusion and reinforcement range of slurry, and splitting grouting pressure. There is often a dilemma of "too little force to split, too much force to split too far". If the grouting pressure is too small, it will lead to the inability to form an effective splitting slurry vein, and it will only play a compacting role on the strata around the grouting hole, and the effective reinforcement range will be limited; if the grouting pressure is too large, a single continuous splitting grouting will often continue to develop in a single splitting direction, which will lead to a long range of slurry vein splitting and diffusion, exceeding the range of the grouting reinforcement circle and even a large amount of slurry running on the surface, which will waste slurry materials, but less slurry will remain in the reinforcement circle of the grouting circle, and the treatment effect will be poor. In engineering practice, the control of the diffusion and reinforcement range of splitting slurry veins has always been a technical problem that needs to be solved urgently. Summary of the invention
[0005] In order to address the deficiencies of the prior art, the present invention provides a method for freezing control of the diffusion and reinforcement range of splitting grouting in water-rich soft rock formations, which can effectively control the diffusion and reinforcement range of splitting slurry veins in water-rich soft rocks, achieve targeted migration and retention of splitting slurry injected into the formation, and make the slurry remain as much as possible within the target grouting reinforcement circle, thereby achieving efficient management and avoiding unnecessary material waste caused by the diffusion and reinforcement boundaries of the splitting slurry exceeding the target management range.
[0006] The present invention provides a method for controlling the freezing of the water-rich soft rock stratum splitting grouting diffusion and reinforcement range;
[0007] A method for controlling the freezing of the range of splitting grouting and reinforcement in a water-rich soft rock formation, comprising the following steps:
[0008] Obtain geological data of water-rich soft surrounding rock projects, conduct feasibility analysis of split grouting control methods, determine the scope of grouting reinforcement circle, the required freezing control circle scope and freezing construction parameters;
[0009] Based on the freezing construction parameters, freezing holes are made according to the freezing control circle range, and freezing is carried out through the freezing method until a freezing curtain is formed;
[0010] According to the scope of the grouting reinforcement circle, grouting holes are drilled and grouting treatment is implemented until the full-section split curtain grouting is completed; freezing is stopped and pressurized grouting is added to the freezing holes to form a permanent cement water-proof curtain.
[0011] Compared with the prior art, the present invention has the following beneficial effects:
[0012] 1. The technical solution provided by the present invention controls the diffusion and reinforcement range of the splitting slurry veins within the grouting reinforcement circle by applying a short-term freezing curtain and a permanent cement waterproof curtain at the boundary of the conventional grouting curtain, thereby achieving efficient reinforcement of the target treatment area; avoiding the loss of slurry materials caused by the excessive diffusion range of conventional single splitting grouting, thereby reducing the waste of grouting materials; and avoiding economic losses such as linear construction period occupancy and power loss caused by long-term continuous implementation of active freezing by the freezing method.
[0013] 2. The technical solution provided by the present invention is to slowly increase the pressure and perform compaction grouting in the freezing hole after the full-section curtain grouting is completed, so as to further reduce the permeability coefficient of the area around the hole, form a permanent cement waterproof curtain at the same position as the freezing curtain, and block the penetration of water pressure outside the cement slurry curtain, thereby reducing the risk of groundwater infiltration and damage during the subsequent construction and operation of the tunnel; slow pressurized compaction grouting is used in the outermost freezing hole to achieve effective compaction reinforcement of the boundary of the grouting reinforcement range, and at the same time avoid the adverse effects of high-pressure splitting grouting on the grouted and treated strata or existing tunnel support structures. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0015] Figure 1 A schematic longitudinal section diagram of the on-site implementation of the method for controlling the freezing range of the water-rich soft rock stratum splitting grouting diffusion and reinforcement provided by the embodiment of the present invention;
[0016] Figure 2 A schematic cross-sectional view of a method for controlling the freezing range of water-rich soft rock strata splitting grouting diffusion and reinforcement provided by an embodiment of the present invention for on-site implementation;
[0017] Figure 3 A flowchart of the implementation of the method for controlling the freezing range of the water-rich soft rock formation splitting grouting diffusion and reinforcement provided by the embodiment of the present invention;
[0018] In the figure: 1. Grouting hole; 2. Freezing hole; 3. Grouting reinforcement circle; 4. Freezing control circle; 5. Tunnel excavation contour line; 6. Excavated tunnel section; 7. Grout stop wall; 8. Water-rich soft surrounding rock. DETAILED DESCRIPTION
[0019] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0020] In the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.
[0021] Conventional splitting grouting technology faces problems such as difficulty in saving material expenses, difficulty in controlling the diffusion and reinforcement range of slurry, and difficulty in setting the splitting grouting pressure. There is often a dilemma of "small force cannot split, and large force splits too far". Therefore, the present invention provides a method for freezing control of the diffusion and reinforcement range of splitting grouting in water-rich soft rock formations. Through the freezing method, active freezing is implemented in the water-rich soft surrounding rock 8 outside the grouting reinforcement circle 3 to form a freezing curtain, which can effectively realize the control of the diffusion and reinforcement range of splitting grouting.
[0022] Next, combine Figure 1-Figure 3 , a method for controlling the freezing range of a water-rich soft rock formation splitting grouting diffusion and reinforcement disclosed in this embodiment is described in detail. The method for controlling the freezing range of a water-rich soft rock formation splitting grouting diffusion and reinforcement includes the following steps:
[0023] Step 1: Obtain engineering geological data of water-rich soft surrounding rock 8, conduct feasibility analysis of splitting grouting control method, and determine the scope of grouting reinforcement circle 3, the scope of freezing control circle 4 and freezing construction parameters.
[0024] In order to ensure the smooth progress of the grouting construction, in this embodiment, firstly, a construction feasibility analysis is performed through step 1.
[0025] Specifically, the engineering geological data of the water-rich soft surrounding rock 8 is obtained, including but not limited to engineering geological survey data, advanced geophysical analysis, previous engineering excavation experience and other existing geological condition data, as well as the construction conditions such as the engineering construction plan, geological conditions, groundwater storage environment and so on ahead of the tunnel excavation.
[0026] For example, the specific process is as follows:
[0027] Step 101, determining the thickness of the freezing curtain according to the occurrence environment of the water-rich soft surrounding rock 8.
[0028] Furthermore, according to the geostress environment and groundwater conditions of the face, the effective freezing cylinder range required to be formed by a single freezing hole 2 is determined to meet the minimum requirement of overlapping the effective freezing cylinder range formed by every two adjacent freezing holes 2. Here, the diameter of the effective freezing cylinder range is the thickness of the freezing curtain.
[0029] Specifically, when the ground stress environment near the face is high, the corresponding splitting grouting pressure should increase accordingly. At this time, a thicker freezing curtain is needed to achieve control of the high-pressure slurry fluid. Otherwise, a slightly thinner freezing curtain can be used. When there is enough groundwater near the excavation face, there is enough free water to form a frozen column, that is, the range of the frozen column is large, and the thickness of the curtain increases accordingly. Otherwise, there is not enough free water to form a frozen column, that is, the range of the frozen column is limited, and the thickness of the curtain decreases accordingly.
[0030] Meanwhile, in actual construction, the effective freezing cylinder range is dynamically adjusted according to construction experience, and the effective freezing cylinder range finally determined needs to satisfy the overlap of the effective freezing cylinder ranges formed by every two adjacent freezing holes 2.
[0031] It should be noted that the freezing method was often used in vertical shaft construction in the early stage, which belonged to vertical freezing method construction; later the freezing method was developed to tunnel construction, which belonged to horizontal freezing method construction. At present, the freezing method has been well applied in vertical and horizontal tunnel excavation construction.
[0032] Step 102: Determine the range of the grouting reinforcement circle 3 and the range of the freezing control circle 4 according to the diameter of the excavated tunnel section 6.
[0033] Among them, the diameter of the grouting reinforcement circle 3 is three to four times the diameter of the tunnel; according to the range of the grouting reinforcement circle 3, the range of the freezing control circle 4 is determined, and the boundary of the freezing control circle 4 is appropriately larger than the grouting reinforcement circle 3.
[0034] For example, the radius of the freezing control circle 4 - the radius of the grouting reinforcement circle 3 is greater than 1 / 2 of the freezing curtain thickness, and the distance between the boundary of the freezing circle and the reinforcement circle can be appropriately increased to avoid the influence of excessively low temperature near the freezing hole 2 on the solidification effect of the slurry.
[0035] Step 103, according to the determined range of the freezing control circle 4, determine the necessary construction parameters for the specific construction of each freezing hole 2 in the outer circle of the face, including but not limited to the hole position coordinates and their precise coordinates, drilling depth and drilling inclination angle. The specific parameters need to be dynamically adjusted in combination with the geological conditions of the on-site water-rich soft surrounding rock 8 so that the above parameters meet the requirements for forming an effective freezing curtain.
[0036] Usually, the number of grouting holes 1 and their exact coordinates are as follows: Figure 1As shown in FIG. 1 , the final hole depth is determined according to the size of the grouting reinforcement circle 3. When the grouting reinforcement circle 3 is large, the number of grouting holes 1 needs to be increased to cover the target grouting reinforcement circle 3 range. The drilling depth needs to be determined according to the distance between the front end of the grouting reinforcement circle 3 and the tunnel face. The drilling inclination is as shown in FIG. Figure 2 As shown, the spatial angle is calculated based on the coordinates of the final hole position and the starting coordinates of the grouting hole 1 on the tunnel face.
[0037] Step 2: Based on the freezing construction parameters, the freezing holes 2 are constructed according to the range of the freezing control circle 4, and freezing is performed by the freezing method until a freezing curtain is formed.
[0038] In this embodiment, the main construction sequence for constructing the freezing hole 2 includes: testing of tools such as drilling rigs → drilling of freezing hole 2 → fixing the wall of freezing hole 2 → installing freezing pipes → testing of freezing system → installing freezing refrigeration system → continuing active freezing construction → forming a freezing curtain → maintaining freezing construction until the grouting is completed.
[0039] For example, first, a freezing hole 2 is constructed based on the determined grouting reinforcement range (i.e., the radius range of the grouting reinforcement circle 3) and the freezing range (i.e., the radius range of the freezing control circle 4). The drilling rig used must have a hole-making capacity of more than 50m, and can control the deviation of the drilling angle, and a freezing pipe can be used as a drill rod; the formed frozen borehole must ensure that the hole position deviation does not exceed 50mm, and the deviation angle of the borehole is less than 1%; in the implementation of the freezing hole 2 drilling construction, the drilling of the opening section is the key, and the drilling direction must be constantly checked within the first 10-20m drilling distance to avoid angle deviation.
[0040] After the construction of the freezing hole 2 is completed, a freezing pipe is laid into the freezing hole 2, and a two-way circulation joint and a freezing pipe one-way check valve are installed at the end of the freezing pipe to connect the freezing refrigeration system with the freezing pipe.
[0041] Here, the refrigeration capacity of the freezing refrigeration system needs to determine the appropriate freezing power according to the freezing demand such as the groundwater storage environment, the thickness of the freezing curtain, and the freezing implementation cycle. When the groundwater storage environment is a dynamic water condition, the freezing power will increase accordingly; when the required freezing curtain thickness is larger and the freezing cycle increases, the required freezing power and power consumption will increase accordingly. The commonly used freezing refrigeration system is mainly a new type of brine Freon screw freezing unit. The system equipment mainly includes freezing units, brine circulation pumps, cooling water circulation pumps, cooling towers, brine tanks, brine main pipes, and liquid distribution pipes.
[0042] Then, set up temperature monitoring points, arrange one temperature measuring point every 3m along the longitudinal length of the freezing pipe, test each temperature measuring point to see if it can work normally, and connect the data recording equipment.
[0043] Continue to implement active freezing. After the freezing refrigeration system is turned on and operates normally, enter the active freezing stage. The brine temperature is required to be maintained below -20°C, and the coolant temperature is continuously adjusted according to the temperature monitoring points. It is necessary to ensure that an effective freezing curtain is continuously formed until the curtain grouting construction is completed, and execute step 3.
[0044] Step 3: within the grouting reinforcement circle 3, drill the grouting hole 1 and implement grouting treatment until the full-section split curtain grouting is completed.
[0045] Specifically, under the premise that an effective freezing curtain has been formed outside the grouting reinforcement ring 3, grouting holes 1 are drilled within the grouting wall 7, and the drilling spacing is determined according to the diffusion radius of the splitting grouting final hole, such as Figure 2 As shown in the figure, the grouting influence range of each grouting hole 1 must be overlapped, and the position of the grouting hole 1 must not deviate from the design by more than 50 mm. Among them, the actual effective diffusion radius of the final hole of the splitting grouting is often determined based on actual geological conditions and parameters such as splitting grouting pressure, based on engineering experience or engineering analogy due to the concealment and complexity of the grouting project.
[0046] When constructing the grouting holes 1, 1-2 drainage holes can be appropriately reserved according to the on-site drilling water gushing conditions to reduce the water pressure of the groundwater outside the tunnel excavation contour line 5 acting on the grout stop wall 7.
[0047] It should be noted that the splitting grouting parameters in the grouting control method based on the freezing method are different from those in the conventional splitting grouting. On the basis of active freezing outside the grouting reinforcement circle 3, the selected splitting grouting pressure can be appropriately reduced; the selected splitting grouting process can use repeated splitting grouting, and dynamically adjust the proportional relationship between the grouting interval time and the initial setting time of the slurry according to the storage environment of the water-rich soft surrounding rock 8. According to the latest research, the grouting time interval of multiple sequential repeated splitting grouting is preferably 40%-60% of the initial setting time of the slurry; the selected slurry material can be a typical quick-setting double-liquid slurry of cement-water glass. If a single-liquid cement slurry is used, it is necessary to consider adding conventional auxiliary additives such as an accelerator.
[0048] After completing the construction of all grouting holes 1, evacuate the freezing refrigeration system and execute step 4.
[0049] Step 4: stop freezing and slowly increase the pressure to compact and inject grout into the freezing hole 2 to form a permanent cement water-proof curtain.
[0050] Active freezing is only implemented until the full-section curtain grouting construction is completed. At this time, the splitting grouting slurry has solidified within the grouting reinforcement circle 3 and formed multiple effective splitting slurry veins. Its diffusion and reinforcement position have been constant. The full-section curtain grouting construction has achieved key reinforcement within the grouting reinforcement circle 3. If it is judged that the excavation standard can be met, it is not necessary to continue freezing until the tunnel excavation is completed. Its advantage is that it greatly shortens the time period for implementing active freezing, saving a lot of economic costs for electricity expenses and equipment losses.
[0051] Specifically, after the full-section curtain grouting construction is completed, the freezing refrigeration system is evacuated. The grouting hole device is modified at the freezing hole 2, and different grouting hole 1 valves are installed according to the single-liquid slurry or double-liquid slurry material characteristics of the grouting slurry. Slow pressurized compaction grouting construction is applied to all freezing holes 2, which can form a long-term and effective cement waterproof curtain at the same position of the freezing curtain after the freezing curtain fails, which can reduce the risk of groundwater infiltration damage during the subsequent construction and operation of the tunnel.
[0052] The use of slow pressurized compaction grouting in the outermost freezing hole 2 can achieve effective compaction reinforcement of the boundary of the grouting reinforcement range, while avoiding the adverse effects of high-pressure splitting grouting on the grouting-treated stratum or the existing tunnel support structure.
[0053] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for controlling the freezing range of splitting grouting diffusion and reinforcement in water-rich soft rock formations, characterized in that: The steps include: Obtain geological data of water-rich soft surrounding rock projects, conduct feasibility analysis of split grouting control methods, determine the scope of grouting reinforcement circle, the required freezing control circle scope and freezing construction parameters; Based on the freezing construction parameters, freezing holes are made according to the freezing control circle range, and freezing is carried out through the freezing method until a freezing curtain is formed; According to the scope of the grouting reinforcement circle, grouting holes are drilled and grouting treatment is implemented until the full-section split curtain grouting is completed; freezing is stopped and pressurized grouting is added to the freezing holes to form a permanent cement water-proof curtain.
2. The method for controlling the freezing range of the water-rich soft rock stratum splitting grouting diffusion and reinforcement as claimed in claim 1, characterized in that: The obtaining of engineering geological data of water-rich soft surrounding rock, conducting feasibility analysis of splitting grouting control method, and determining the range of grouting reinforcement circle and the required freezing control circle are specifically as follows: determining the range of grouting reinforcement circle according to the tunnel diameter; determining the required freezing control circle range according to the grouting reinforcement circle range.
3. The method for controlling the freezing range of the water-rich soft rock stratum splitting grouting diffusion and reinforcement as claimed in claim 1, characterized in that: The freezing method includes: Using a drilling rig to drill freezing holes on the basis of the grouting reinforcement circle range and the freezing control circle range, laying freezing pipes in the freezing holes, and connecting the freezing pipes with the freezing refrigeration system; Turn on the freeze refrigeration system to continuously implement active freezing through the freeze pipe.
4. The method for controlling the freezing range of the water-rich soft rock stratum splitting grouting diffusion and reinforcement as claimed in claim 3, characterized in that: The freezing holes are made based on the freezing construction parameters according to the range of the freezing control circle, and the freezing is implemented by the freezing method, which also includes: arranging temperature monitoring points.
5. The method for controlling the freezing range of the water-rich soft rock stratum splitting grouting diffusion and reinforcement as claimed in claim 1, characterized in that: When drilling grouting holes and injecting grout, the repeated splitting grouting process is used, and the interval time of repeated splitting grouting is dynamically adjusted according to the initial setting time of the slurry.
6. The method for controlling the freezing range of the water-rich soft rock stratum splitting grouting diffusion and reinforcement as claimed in claim 1, characterized in that: The method of pressurizing the freezing hole to form a permanent cement water-proof curtain specifically includes: slowly pressurizing the freezing hole to inject cement-water glass double slurry.
7. The method for controlling the freezing range of the water-rich soft rock stratum splitting grouting diffusion and reinforcement as claimed in claim 1, characterized in that: The thickness of the freezing curtain is determined according to the occurrence environment of the water-rich and weak surrounding rock.
8. The method for controlling the freezing range of the water-rich soft rock stratum splitting grouting diffusion and reinforcement as claimed in claim 1, characterized in that: The drilling depth of the freezing hole is equal to the drilling depth of the grouting hole.
9. The method for controlling the freezing range of the water-rich soft rock stratum splitting grouting diffusion and reinforcement as claimed in claim 1, characterized in that: The spacing between adjacent grouting holes is determined according to the final hole diffusion radius of the splitting grouting.
10. The method for controlling the freezing range of the water-rich soft rock stratum splitting grouting diffusion and reinforcement as claimed in claim 1, characterized in that: The freezing control circle range is larger than the grouting reinforcement circle range.
Citation Information
Cited By
Oval end hole splitting reinforcement range grouting design method and system in pore medium
CN121302501A
Grouting design method and system for reinforcement range of elliptical terminal hole splitting in porous medium
CN121302501B