Stepped drain pipe connecting structure and connecting method

By setting the structural locking effect of annular sealed cavity and flexible outer cylinder in the drain pipe connection structure, the problem of insufficient sealing, stability and pull-out resistance in traditional drain pipe connections is solved, and more efficient sealing and stability are achieved , and improves the resistance to pulling.

CN118998474APending Publication Date: 2024-11-22JIANGXI BOYUAN COMPOSITE NEW MATERIALS CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411246464.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

There are problems of insufficient sealing, stability and pull-out resistance in traditional drainage pipe connection technology, which leads to problems such as water leakage and looseness, affecting the normal operation of the drainage system and environmental safety.

Method used

Adopting a step-type drain pipe connection structure, by providing the first and second connecting cylinders, a baffle and a flexible outer cylinder at the connection ends of the plug-in pipe and the receiving pipe, an annular sealed cavity is formed and glue is filled, and combined with the flexible outer cylinder. The wrinkled state and the structural locking effect of the flap protrusion and glue enhance sealing, stability and pull-out resistance.

Benefits of technology

It significantly improves the sealing, stability and pull-out resistance of drain pipe connections, prevents water leakage and loosening, and ensures the stability and resistance of the connection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118998474A_ABST
    Figure CN118998474A_ABST
Patent Text Reader

Abstract

The invention discloses a stepped drain pipe connecting structure and a connecting method, and relates to the technical field of drain pipelines, the stepped drain pipe connecting structure and the connecting method are used for connecting a stepped inserting pipe and an adapting pipe together, a first connecting cylinder is coaxially and integrally arranged at the inserting end of the inserting pipe, and the outer diameter of the first connecting cylinder is smaller than that of the inserting pipe; the outer surfaces of the two connecting rods are of a stepped structure; a blocking piece is coaxially and integrally arranged in the bearing end of the bearing pipe, the outer diameter of the blocking piece is equal to the inner diameter of the bearing pipe, a second connecting cylinder coaxially penetrates through the center of the blocking piece and protrudes towards the first connecting cylinder on the blocking piece, and the outer diameter of the second connecting cylinder is smaller than the inner diameter of the first connecting cylinder. The stepped drain pipe connecting structure and the stepped drain pipe connecting method aim at solving the problems of sealing performance, stability and pulling resistance in traditional drain pipe connection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of drainage pipes, and in particular to a structure for connecting stepped drainage pipes and a connection method thereof. Background Art

[0002] In traditional drainage pipe connection technology, the connection between stepped drainage pipes often faces the problem of insufficient sealing and stability. Due to the loose connection structure of the pipes, leakage and looseness often occur, which not only affects the normal operation of the drainage system, but also may cause waste of water resources and damage to the environment. In order to solve these problems, technicians have conducted a lot of research and improvements, but it is still difficult to fully meet the needs of practical applications.

[0003] The existing drainage pipe connection technology has the following limitations:

[0004] Poor sealing: Traditional connection structures often have difficulty in forming effective seals, which leads to water leakage at the connection points. This not only affects the normal operation of the drainage system, but may also cause damage to the building and the surrounding environment.

[0005] Insufficient stability: Due to the loose connection between pipes, the traditional drainage pipe connection structure is prone to loosening or even falling off when subjected to external forces. This not only increases the difficulty and cost of maintenance, but also threatens the overall stability of the drainage system.

[0006] Poor pull-out resistance: In drainage systems, pipe connections often need to withstand a certain amount of tension. However, the pull-out resistance of traditional connection structures is poor and it is difficult to meet this requirement.

[0007] Therefore, there is a need in the market for a stepped drainage pipe connection structure and a connection method that can take into account sealing, stability and pull-out resistance. Summary of the invention

[0008] The purpose of the present invention is to provide a stepped drainage pipe connection structure and a connection method, aiming to solve the problems of sealing, stability and pull-out resistance existing in traditional drainage pipe connections.

[0009] The above technical objectives of the present invention are achieved through the following technical solutions: a stepped drainage pipe connection structure, used to connect a stepped plug-in pipe with a receiving pipe, a first connecting tube is coaxially provided on the plug-in end of the plug-in pipe, the outer diameter of the first connecting tube is smaller than the plug-in pipe, the two are connected inside and the outer surface is a stepped structure;

[0010] A baffle is coaxially provided in the receiving end of the receiving tube, the outer diameter of the baffle is equal to the inner diameter of the receiving tube, a second connecting tube is coaxially provided through the center of the baffle, the second connecting tube protrudes on the baffle toward the direction of the first connecting tube, the outer diameter of the second connecting tube is smaller than the inner diameter of the first connecting tube, when the plug-in tube and the receiving tube are connected together, the second connecting tube is plugged and matched with the first connecting tube, and at the same time, the first connecting tube is against the baffle;

[0011] A flexible outer tube is coaxially provided on the receiving end of the receiving tube, and a plurality of slits are provided on the inner side wall of the flexible outer tube, and each slit forms a plurality of petals on the inner side wall of the flexible outer tube. When the flexible outer tube is not subjected to axial compression, each petal will be attached to the inner wall of the flexible outer tube, and each slit will also remain in a closed state. At this time, the inner wall of the flexible outer tube remains smooth. When the flexible outer tube is subjected to axial compression, the side wall of the flexible outer tube will be squeezed into a wrinkled state, each petal will be squeezed to bulge radially, and each slit will also remain in an open state. At this time, the inner wall of the flexible outer tube remains irregularly concave and convex. The inner diameter of the flexible outer tube is greater than the outer diameter of the first connecting tube. When the plug-in tube and the receiving tube are connected together, the plug-in end of the plug-in tube, the first connecting tube, the baffle and the flexible outer tube together form an annular closed cavity, and at this time, the flexible outer tube is excessively pressed against the plug-in end of the plug-in tube and remains in a wrinkled state.

[0012] The annular closed cavity is filled with glue.

[0013] In some embodiments, an inner convex ring protruding radially is provided at one end of the inner side wall of the first connecting tube away from the plug-in tube, and an outer convex ring protruding radially is provided at one end of the outer side wall of the second connecting tube away from the baffle, and the inner convex ring is snap-fitted with the outer convex ring. When the plug-in tube and the receiving tube are connected together and the flexible outer tube is kept in a wrinkled state, the inner convex ring is snap-fitted with the outer convex ring.

[0014] In some embodiments, a plurality of circles of fins protruding radially outward are provided on the outer side wall of the first connecting tube, and when the plug-in tube and the receiving tube are connected together, each of the fins is located in the annular closed cavity.

[0015] In some embodiments, the flexible outer tube is made of rubber.

[0016] A stepped drainage pipe connection method comprises the following steps:

[0017] a. Preparation stage: Ensure that the end surfaces of the plug-in pipe and the receiving pipe are flat, free of impurities and damage, and check that the first connecting tube, the second connecting tube, the flexible outer tube and the annular closed cavity are intact;

[0018] b. Insertion stage: insert the plug end of the plug tube into the receiving end of the receiving tube, so that the first connecting tube and the second connecting tube begin to be plugged and matched. At this time, the flexible outer tube begins to be axially squeezed, but its side wall has not yet completely formed a wrinkled state, and the inner wall remains smooth;

[0019] c. Glue injection stage: When the inner wall of the flexible outer cylinder remains smooth, glue is injected into the annular closed cavity through a specific glue injection port or gap;

[0020] d. Extrusion and shaping stage: Before the glue solidifies, continue to insert the plug tube, so that the flexible outer tube is subjected to greater axial extrusion, the side wall of the flexible outer tube begins to be squeezed into a wrinkled state, each petal protrudes radially, and the slit remains open;

[0021] e. Curing stage: Keep the plug-in tube and the receiving tube connected to allow the glue to gradually cure in the annular closed cavity. During the curing process, the outwardly convex petals and the pleated flexible outer tube are shaped and become one with the glue;

[0022] f. Inspection stage: After the glue is completely cured, the connection parts are visually inspected and functionally tested to ensure that there is no leakage or looseness, and that the connection has sufficient pull-out resistance.

[0023] In some embodiments, the glue injection stage further includes the following specific steps:

[0024] c1. Preparation for glue injection: Ensure that the glue injection equipment is connected correctly, the glue type matches the material of the connection structure, and the glue is at an applicable working viscosity;

[0025] c2. Initial glue injection: When the inner wall of the flexible outer cylinder remains smooth, slowly and evenly inject glue into the annular closed cavity through a specific glue injection port or gap, and observe the glue injection port or gap at the same time to ensure that the glue enters smoothly without bubbles or blockage;

[0026] c3. Glue injection amount control: Continue to inject glue until the glue in the annular closed cavity reaches the preset filling amount, ensuring that the glue fills the entire cavity but does not overflow excessively;

[0027] c4. Post-injection treatment: After the injection is completed, keep the injection port or gap open temporarily so that before the glue solidifies, the tiny air bubbles or excess glue that may be generated by squeezing can be discharged through this channel to ensure that the glue in the cavity is dense and has no voids;

[0028] c5. Glue injection inspection: Before entering the extrusion and shaping stage, conduct a preliminary inspection of the glue injection area to confirm that there is no leakage, insufficient injection or overflow, and ensure that the glue is evenly distributed.

[0029] In some embodiments, the slit production of the flexible outer tube includes the following specific steps:

[0030] g1. Preheating stage: Use an annular high-temperature mold to preheat the predetermined cutting area of ​​the flexible outer cylinder so that the material in this area reaches a temperature that is easy to melt and cut;

[0031] g2. Melting cutting: After preheating, the high-temperature mold is quickly and evenly pressed against the flexible outer cylinder, and the high-temperature edge of the mold is used to melt and cut the material to form a preset slit depth and width;

[0032] g3. Cooling and shaping: After the slitting is completed, the slitting area is immediately cooled;

[0033] g4. Cutting seam inspection: Check the appearance and size of the completed cutting seam.

[0034] In some embodiments, the inspection stage further comprises the following specific steps:

[0035] f1. Appearance inspection: After the glue is completely cured, conduct an appearance inspection on the connection parts to observe whether the connection between the plug-in pipe and the receiving pipe is flat, without cracks, deformation or glue overflow;

[0036] f2. Functional test: Conduct water leakage test and pull-out resistance test on the connection parts to ensure that there is no water leakage at the connection parts, and the connection between the plug-in pipe and the receiving pipe has sufficient pull-out resistance and can withstand a certain external force without being easily disconnected;

[0037] f3. Record and evaluate: record the inspection results and evaluate the connection quality according to the preset standards to ensure that the connection parts meet the design requirements and usage needs.

[0038] Compared with the prior art, the present invention has the following beneficial effects:

[0039] The present invention aims to solve the technical problems existing in the sealing, stability and pull-out resistance of the stepped drain pipe connection structure, and achieves a significant improvement in the sealing, stability and pull-out resistance of the stepped drain pipe connection structure. Its special connection structure and the glue filling design in the annular closed cavity effectively prevent water leakage and ensure the sealing of the connection. At the same time, the plug-in fit between the first connecting tube and the second connecting tube and the interference fit design of the flexible outer tube enhance the stability of the connection and effectively prevent the occurrence of looseness. In addition, the wrinkled state and petal protrusions formed by the flexible outer tube when it is axially squeezed, and the structural locking effect formed by the close combination of glue, greatly improve the pull-out resistance of the connection, making it difficult for the plug-in tube and the receiving tube to be disconnected when subjected to external force. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a schematic structural diagram of the plug-in pipe and the receiving pipe of the present invention when they are not connected;

[0041] Figure 2 It is a structural schematic diagram of the plug-in pipe and the receiving pipe of the present invention when they are initially connected;

[0042] Figure 3 It is a schematic structural diagram of the plug-in pipe and the receiving pipe of the present invention when they are in interference connection;

[0043] Figure 4 It is a schematic structural diagram of the plug-in pipe and the receiving pipe of the present invention after interference connection and glue injection.

[0044] In the figure: 100, plug-in tube; 200, receiving tube; 300, glue; 1, first connecting tube; 2, inner convex ring; 3, fin; 4, baffle; 5, second connecting tube; 6, outer convex ring; 7, flexible outer tube; 8, slit; 9, petal. DETAILED DESCRIPTION

[0045] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0046] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0047] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0048] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0049] See also Figure 1-4 This embodiment provides a stepped drainage pipe connection structure, which is used to connect a stepped plug-in pipe 100 with a receiving pipe 200. A first connecting tube 1 is coaxially provided on the plug-in end of the plug-in pipe 100. The outer diameter of the first connecting tube 1 is smaller than that of the plug-in pipe 100. The two are connected internally and the outer surface has a stepped structure.

[0050] A baffle 4 is coaxially provided in the receiving end of the receiving tube 200, and the outer diameter of the baffle 4 is equal to the inner diameter of the receiving tube 200. A second connecting tube 5 is coaxially provided through the center of the baffle 4. The second connecting tube 5 protrudes on the baffle 4 toward the direction of the first connecting tube 1. The outer diameter of the second connecting tube 5 is smaller than the inner diameter of the first connecting tube 1. When the plug-in tube 100 and the receiving tube 200 are connected together, the second connecting tube 5 is plugged and matched with the first connecting tube 1, and at the same time, the first connecting tube 1 is against the baffle 4.

[0051] A flexible outer tube 7 is coaxially provided on the receiving end of the receiving tube 200. A plurality of slits 8 are provided on the inner side wall of the flexible outer tube 7. Each slit 8 forms a plurality of petals 9 on the inner side wall of the flexible outer tube 7. When the flexible outer tube 7 is not axially squeezed, each petal 9 will be attached to the inner wall of the flexible outer tube 7, and each slit 8 will also remain in a closed state. At this time, the inner wall of the flexible outer tube 7 remains smooth. When the flexible outer tube 7 is axially squeezed, the side wall of the flexible outer tube 7 will be squeezed into a wrinkled state. Each petal 9 will be squeezed to bulge in the radial direction, and each slit 8 will also remain in an open state. At this time, the inner wall of the flexible outer tube 7 remains in an irregular concave-convex state, and the inner diameter of the flexible outer tube 7 is larger than the outer diameter of the first connecting tube 1. When the plug-in tube 100 and the receiving tube 200 are connected together, the plug-in end of the plug-in tube 100, the first connecting tube 1, the baffle 4 and the flexible outer tube 7 together form an annular closed cavity, and at this time, the flexible outer tube 7 is over-interference against the plug-in end of the plug-in tube 100 and remains in a wrinkled state;

[0052] The annular closed cavity is filled with glue 300.

[0053] When the plug-in tube 100 and the receiving tube 200 are connected, the plug-in end of the plug-in tube 100 is first inserted into the receiving end of the receiving tube 200. At this time, the first connecting tube 1 and the second connecting tube 5 begin to be plugged and matched, and the flexible outer tube 7 begins to be axially squeezed, but its side wall has not yet completely formed a wrinkled state, and the inner wall remains smooth. Then, when the inner wall of the flexible outer tube 7 remains smooth, glue 300 is injected into the annular closed cavity through a specific glue injection port or gap. At this time, the injection of glue 300 can reduce the resistance of the petal 9 to the glue 300, ensuring that the glue 300 smoothly fills the entire cavity. After the glue 300 fills the annular closed cavity, before the glue 300 solidifies, the plug-in tube 100 is continuously inserted, so that the flexible outer tube 7 is subjected to greater axial extrusion, and the side wall of the flexible outer tube 7 begins to be squeezed into a wrinkled state, each petal 9 protrudes radially, and the slit 8 remains open. This deformation increases the contact area between the inner wall of the flexible outer tube 7 and the glue 300, thereby effectively improving the adhesive effect. After that, the glue 300 gradually solidifies in the annular closed cavity, and forms a tight bonding force with the flexible outer tube 7, the first connecting tube 1, the second connecting tube 5, the plug-in tube 100 and the receiving tube 200. During the curing process, the petals 9 that protrude and expand outward and the wrinkled flexible outer tube 7 are shaped and form a whole with the glue 300. After curing, the glue 300 forms a tight bond with each component, achieving effective sealing and stable connection between the plug-in tube 100 and the receiving tube 200. The wrinkled state of the flexible outer tube 7 and the protrusion of the petal 9 play a role in enhancing sealing and stability after the glue 300 is cured. The shaped petal 9 and the wrinkled flexible outer tube 7 greatly improve the pull-out resistance of the plug-in tube 100 and the receiving tube 200 after connection, making it difficult for the two to disconnect. Specifically, when the flexible outer tube 7 is axially extruded, its side wall is squeezed into a wrinkled state, and a plurality of radially protruding petals 9 are formed at the same time. These wrinkles and petals 9 are not randomly distributed, but arranged according to a certain rule to form a specific structure. When the glue 300 is injected and cured, these wrinkles and petals 9 are tightly combined with the glue 300 to form a structural locking effect. This effect makes the connection between the flexible outer tube 7 and the plug-in tube 100 and the receiving tube 200 not just a simple contact connection, but a part of an integral structure. The formation of the folds and flaps 9 greatly increases the contact area between the inner wall of the flexible outer tube 7 and the outer wall of the plug tube 100. Compared with a smooth contact surface, this uneven contact surface can generate greater friction resistance. When trying to pull the plug tube 100 out of the receiving tube 200, it is necessary to overcome this increased friction resistance. Therefore, the shaped flaps 9 and the folded flexible outer tube 7 significantly improve the pull-out resistance of the connection.

[0054] It can be seen that the present invention aims to solve the technical problems existing in the step-type drain pipe connection structure in terms of sealing, stability and pull-out resistance. The step-type drain pipe connection structure has achieved significant improvements in terms of sealing, stability and pull-out resistance. Its special connection structure and the design of filling glue 300 in the annular closed cavity effectively prevent water leakage and ensure the sealing of the connection. At the same time, the plug-in fit between the first connecting tube 1 and the second connecting tube 5 and the interference fit design of the flexible outer tube 7 enhance the stability of the connection and effectively prevent the occurrence of looseness. In addition, the wrinkled state formed by the flexible outer tube 7 when it is axially squeezed and the protrusion of the petal 9, and the structural locking effect formed by the close combination with the glue 300, greatly improve the pull-out resistance of the connection, making it difficult for the plug-in tube 100 and the receiving tube 200 to be disconnected when subjected to external force.

[0055] In some embodiments, a circle of inner convex ring 2 protruding in the radial direction is provided at one end of the inner side wall of the first connecting tube 1 away from the plug tube 100, and a circle of outer convex ring 6 protruding in the radial direction is provided at one end of the outer side wall of the second connecting tube 5 away from the baffle 4. The inner convex ring 2 and the outer convex ring 6 are snap-fitted. When the plug tube 100 and the receiving tube 200 are connected together and the flexible outer tube 7 is kept in a folded state, the inner convex ring 2 and the outer convex ring 6 are snap-fitted together. The snap-fitting of the inner convex ring 2 and the outer convex ring 6 further enhances the connection stability between the plug tube 100 and the receiving tube 200. Specifically, the snap-fitting of the inner convex ring 2 and the outer convex ring 6 forms a mechanical locking mechanism, which provides additional resistance when the plug tube 100 and the receiving tube 200 are connected, preventing the two tubes from moving relative to each other in the axial direction, thereby significantly enhancing the stability of the connection. The snap-fitting of the inner convex ring 2 and the outer convex ring 6 not only enhances the stability of the structure, but also further improves the sealing performance by reducing the connection gap. The snap-fit ​​makes the contact between the two pipes closer, reduces potential water leakage channels, and ensures the normal operation of the drainage system. The snap-fit ​​design of the inner convex ring 2 and the outer convex ring 6 also helps to evenly distribute the stress at the connection part, avoiding stress concentration, thereby extending the service life of the connection structure and reducing the risk of breakage caused by stress concentration. In addition, the design of the inner convex ring 2 and the outer convex ring 6 makes the installation process more intuitive and simple, and the operator can easily confirm whether the two pipes are correctly connected. At the same time, this design is also convenient for subsequent maintenance inspections, and can quickly identify whether the connection status is good.

[0056] In some embodiments, the outer wall of the first connecting tube 1 is provided with a plurality of circles of radially outwardly protruding fins 3. When the plug-in tube 100 and the receiving tube 200 are connected together, each fin 3 is located in an annular closed cavity. The design of the fin 3 increases the contact area between the outer wall of the first connecting tube 1 and the glue 300, so that the glue 300 can more fully penetrate into the gap between the fins 3 to form a stronger bonding force. This enhanced bonding force helps to maintain a tight connection between the plug-in tube 100 and the receiving tube 200, and prevents loosening caused by aging of the glue 300 or external force. Moreover, after the fin 3 and the glue 300 are tightly combined, a mechanical locking effect is formed, which significantly increases the pull-out resistance between the plug-in tube 100 and the receiving tube 200. When trying to pull the plug-in tube 100 out of the receiving tube 200, it is necessary to overcome the strong friction formed between the fin 3 and the glue 300, thereby improving the stability of the connection.

[0057] In some embodiments, the flexible outer tube 7 is made of rubber material, and the rubber material gives the flexible outer tube 7 good elasticity and deformation ability. When the plug tube 100 is connected to the receiving tube 200, the flexible outer tube 7 can be easily squeezed axially, and its side wall forms a wrinkled state. Each petal 9 protrudes radially and is tightly combined with the glue 300 to form a structural locking effect. This deformation ability ensures the tightness and stability of the connection. At the same time, the rubber material also has good sealing performance. After the flexible outer tube 7 is squeezed and deformed, the contact area between its inner wall and the outer wall of the plug tube 100 is greatly increased, forming an uneven contact surface. This contact surface can generate greater friction resistance and effectively prevent moisture penetration, thereby ensuring the sealing of the connection.

[0058] See also Figure 1-4 This embodiment also provides a stepped drain pipe connection method, which is based on the above-mentioned stepped drain pipe connection structure and includes the following steps:

[0059] a. Preparation stage: Ensure that the end surfaces of the plug tube 100 and the receiving tube 200 are flat, free of impurities and damage, and check that the first connecting tube 1, the second connecting tube 5, the flexible outer tube 7 and the annular closed cavity are intact;

[0060] b. Insertion stage: insert the plug end of the plug tube 100 into the receiving end of the receiving tube 200, so that the first connecting tube 1 and the second connecting tube 5 begin to be plugged and matched. At this time, the flexible outer tube 7 begins to be axially squeezed, but its side wall has not yet completely formed a wrinkled state, and the inner wall remains smooth;

[0061] c. Glue injection stage: When the inner wall of the flexible outer cylinder 7 remains smooth, glue 300 is injected into the annular closed cavity through a specific glue injection port or gap to ensure that the glue 300 smoothly fills the entire cavity. At this time, the injection of glue 300 can reduce the resistance of the petal 9 to the glue 300;

[0062] d. Extrusion and shaping stage: before the glue 300 solidifies, the plug tube 100 is continuously inserted, so that the flexible outer tube 7 is subjected to greater axial extrusion, the side wall of the flexible outer tube 7 begins to be squeezed into a wrinkled state, each petal 9 protrudes radially, and the slit 8 remains open. This deformation increases the contact area between the inner wall of the flexible outer tube 7 and the glue 300, thereby effectively improving the bonding effect;

[0063] e. Curing stage: the plug-in tube 100 and the receiving tube 200 are kept connected, and the glue 300 is gradually cured in the annular closed cavity. During the curing process, the outwardly convex petals 9 and the pleated flexible outer tube 7 are shaped and integrated with the glue 300, so as to achieve effective sealing and stable connection between the plug-in tube 100 and the receiving tube 200;

[0064] f. Inspection stage: After the glue 300 is completely cured, the connection parts are visually inspected and functionally tested to ensure that there is no leakage or looseness, and that the connection has sufficient pull-out resistance.

[0065] In some embodiments, the glue injection stage further includes the following specific steps:

[0066] c1. Preparation for glue injection: Ensure that the glue injection equipment is connected correctly, the glue 300 type matches the material of the connection structure, and the glue 300 is at an applicable working viscosity;

[0067] c2. Initial glue injection: When the inner wall of the flexible outer cylinder 7 remains smooth, slowly and evenly inject glue 300 into the annular closed cavity through a specific glue injection port or gap, and observe the glue injection port or gap to ensure that the glue 300 enters smoothly without bubbles or blockage;

[0068] c3. Glue injection amount control: Continue to inject glue 300 until the glue 300 in the annular closed cavity reaches a preset filling amount, ensuring that the glue 300 fills the entire cavity but does not overflow excessively;

[0069] c4. Post-treatment of glue injection: After the glue injection is completed, the glue injection port or gap is temporarily kept open so that before the glue 300 is cured, the tiny air bubbles or excess glue 300 that may be generated by squeezing can be discharged through this channel to ensure that the glue 300 in the cavity is dense and has no voids;

[0070] c5. Glue injection inspection: Before entering the extrusion shaping stage, conduct a preliminary inspection of the glue injection area to confirm that there is no leakage, insufficient injection or overflow, and ensure that the glue 300 is evenly distributed, laying a good foundation for subsequent extrusion shaping and curing.

[0071] In some embodiments, the production of the slit 8 of the flexible outer tube 7 includes the following specific steps:

[0072] g1. Preheating stage: Use an annular high-temperature mold to preheat the predetermined slit area 8 of the flexible outer cylinder 7, so that the material in this area reaches a temperature that is easy to melt and cut, but avoid deformation of the overall structure;

[0073] g2. Melting and cutting: After preheating, the high-temperature mold is quickly and evenly pressed against the flexible outer cylinder 7, and the material is melted and cut by the high-temperature edge of the mold to form a preset slit 8 depth and width. During this process, the relative position of the mold and the flexible outer cylinder 7 should be kept stable to ensure the uniformity and accuracy of the slit 8;

[0074] g3 cooling and shaping: After the slit 8 is completed, the slit area 8 is immediately cooled to fix the shape and size of the slit 8 to prevent shape changes caused by residual heat;

[0075] g4. Inspection of the slit 8: Check the appearance and size of the finished slit 8 to ensure the continuity and uniformity of the slit 8 and compliance with the design requirements, without any melting residue or deformation, so as to provide a qualified basic structure for the subsequent formation of the petal 9 and injection of the glue 300.

[0076] In some embodiments, the inspection stage further comprises the following specific steps:

[0077] f1. Appearance inspection: After the glue 300 is completely cured, perform an appearance inspection on the connection part to observe whether the connection between the plug pipe 100 and the receiving pipe 200 is flat, without cracks, deformation or glue 300 overflowing;

[0078] f2. Functional test: Perform water leakage test and pull-out resistance test on the connection parts to ensure that there is no water leakage at the connection parts, and that the connection between the plug tube 100 and the receiving tube 200 has sufficient pull-out resistance and can withstand a certain external force without being easily disconnected;

[0079] f3. Record and evaluate: record the inspection results and evaluate the connection quality according to the preset standards to ensure that the connection parts meet the design requirements and usage needs.

[0080] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed. However, as long as they are within the scope of the claims of the present invention, they are protected by the patent law.

Claims

1. A stepped drainage pipe connection structure, used to connect a stepped plug-in pipe (100) and a receiving pipe (200) together. Features: A first connecting tube (1) is coaxially and integrally provided on the plug-in end of the plug-in tube (100); the outer diameter of the first connecting tube (1) is smaller than that of the plug-in tube (100); the two are internally connected and the outer surface has a stepped structure; A baffle (4) is coaxially arranged in an integral manner inside the receiving end of the receiving tube (200), the outer diameter of the baffle (4) being equal to the inner diameter of the receiving tube (200), a second connecting tube (5) is coaxially arranged through the center of the baffle (4), the second connecting tube (5) protrudes on the baffle (4) in the direction of the first connecting tube (1), the outer diameter of the second connecting tube (5) is smaller than the inner diameter of the first connecting tube (1), when the plug-in tube (100) and the receiving tube (200) are connected together, the second connecting tube (5) is plugged into and matched with the first connecting tube (1), and at the same time, the first connecting tube (1) and the baffle (4) are abutted against each other; A flexible outer tube (7) is coaxially provided on the receiving end of the receiving tube (200), and a plurality of slits (8) are provided on the inner side wall of the flexible outer tube (7), and each slit (8) forms a plurality of petals (9) on the inner side wall of the flexible outer tube (7). When the flexible outer tube (7) is not subjected to axial compression, each petal (9) will be attached to the inner wall of the flexible outer tube (7), and each slit (8) will also remain in a closed state. At this time, the inner wall of the flexible outer tube (7) remains smooth. When the flexible outer tube (7) is subjected to axial compression, the side wall of the flexible outer tube (7) will be squeezed into a wrinkled state. In this state, each of the petals (9) will be squeezed to bulge in the radial direction, and each of the slits (8) will also remain in an open state. At this time, the inner wall of the flexible outer tube (7) remains in an irregular concave-convex state, and the inner diameter of the flexible outer tube (7) is larger than the outer diameter of the first connecting tube (1). When the plug-in tube (100) and the receiving tube (200) are connected together, the plug-in end of the plug-in tube (100), the first connecting tube (1), the baffle (4) and the flexible outer tube (7) together form an annular closed cavity, and at this time, the flexible outer tube (7) is in interference fit against the plug-in end of the plug-in tube (100) and remains in a wrinkled state. The annular closed cavity is filled with glue (300).

2. The stepped drain pipe connection structure according to claim 1, Features: An inner convex ring (2) protruding in the radial direction is provided at one end of the inner wall of the first connecting tube (1) away from the plug-in tube (100), and an outer convex ring (6) protruding in the radial direction is provided at one end of the outer wall of the second connecting tube (5) away from the baffle (4). The inner convex ring (2) and the outer convex ring (6) are snap-fitted together. When the plug-in tube (100) and the receiving tube (200) are connected together and the flexible outer tube (7) is kept in a wrinkled state, the inner convex ring (2) and the outer convex ring (6) are snap-fitted together.

3. The stepped drain pipe connection structure according to claim 1, Features: The outer wall of the first connecting tube (1) is provided with a plurality of circles of fins (3) protruding radially outwards. When the plug-in tube (100) and the receiving tube (200) are connected together, each of the fins (3) is located in the annular closed cavity.

4. The stepped drain pipe connection structure according to claim 1, Features: The flexible outer cylinder (7) is made of rubber.

5. A stepped drain pipe connection method, the method being based on the stepped drain pipe connection structure according to any one of claims 1 to 4, It is characterized in that The following steps are involved: a. Preparation stage: Ensure that the end surfaces of the plug tube (100) and the receiving tube (200) are flat, free of impurities and damage, and check that the first connecting tube (1), the second connecting tube (5), the flexible outer tube (7) and the annular closed cavity are intact; b. Insertion stage: insert the plug end of the plug tube (100) into the receiving end of the receiving tube (200), so that the first connecting tube (1) and the second connecting tube (5) begin to be plugged and matched. At this time, the flexible outer tube (7) begins to be axially squeezed, but its side wall has not yet completely formed a wrinkled state, and the inner wall remains smooth; c. Glue injection stage: When the inner wall of the flexible outer cylinder (7) remains smooth, glue (300) is injected into the annular closed cavity through a specific glue injection port or gap; d. Extrusion shaping stage: Before the glue (300) solidifies, the plug tube (100) is continuously inserted, so that the flexible outer tube (7) is subjected to greater axial extrusion, the side wall of the flexible outer tube (7) begins to be squeezed into a wrinkled state, each petal (9) protrudes radially, and the slit (8) remains open; e. Curing stage: the plug tube (100) and the receiving tube (200) are kept connected, so that the glue (300) is gradually cured in the annular closed cavity. During the curing process, the outwardly convex petals (9) and the folded flexible outer cylinder (7) are shaped and integrated with the glue (300); f. Inspection stage: After the glue (300) is completely cured, the connection parts are visually inspected and functionally tested to ensure that there is no leakage or looseness, and that the connection has sufficient pull-out resistance.

6. The step-type drainage pipe connection method according to claim 5, Features: The glue injection stage further includes the following specific steps: c1. Preparation for glue injection: Ensure that the glue injection equipment is connected correctly, the type of glue (300) matches the material of the connection structure, and the glue (300) is at an appropriate working viscosity; c2. Initial glue injection: When the inner wall of the flexible outer cylinder (7) remains smooth, slowly and evenly inject glue (300) into the annular closed cavity through a specific glue injection port or gap, and observe the glue injection port or gap to ensure that the glue (300) enters smoothly without bubbles or blockage; c3. Glue injection amount control: Continue to inject glue (300) until the glue (300) in the annular closed cavity reaches a preset filling amount, ensuring that the glue (300) fills the entire cavity but does not overflow excessively; c4. Post-injection treatment: After the injection is completed, the injection port or gap is temporarily kept open so that before the glue (300) solidifies, tiny air bubbles or excess glue (300) that may be generated by squeezing can be discharged through this channel to ensure that the glue (300) in the cavity is dense and has no voids; c5. Glue injection inspection: Before entering the extrusion and shaping stage, conduct a preliminary inspection of the glue injection area to confirm that there is no leakage, insufficient injection or overflow, and ensure that the glue (300) is evenly distributed.

7. The step-type drainage pipe connection method according to claim 5, Features: The production of the slits (8) of the flexible outer cylinder (7) comprises the following specific steps: g1 preheating stage: using a high temperature annular mold to preheat the flexible outer cylinder (7) of the predetermined slit (8) area, so that the material in the area reaches a temperature that is easy to melt and cut; g2 melt cutting: After preheating is completed, the high-temperature mold is quickly and evenly pressed against the flexible outer cylinder (7), and the material is melted and cut by the high-temperature edge of the mold to form a preset slit (8) depth and width; g3 cooling and shaping: After the slit (8) is completed, the slit (8) area is immediately cooled; g4. Inspection of the cut seam (8): Check the appearance and dimensions of the cut seam (8) after it is manufactured.

8. The step-type drainage pipe connection method according to claim 5, Features: The inspection stage further includes the following specific steps: f1. Appearance inspection: After the glue (300) is completely cured, the appearance of the connection part is inspected to see whether the connection between the plug tube (100) and the receiving tube (200) is smooth, without cracks, deformation or glue (300) overflow; f2. Functional test: Perform a water leakage test and a pull-out resistance test on the connection parts to ensure that there is no water leakage at the connection parts, and that the connection between the plug tube (100) and the receiving tube (200) has sufficient pull-out resistance and can withstand a certain external force without being easily disconnected; f3. Record and evaluate: record the inspection results and evaluate the connection quality according to the preset standards to ensure that the connection parts meet the design requirements and usage needs.