Detection and acceptance method for inverted siphon arch bridge cable hoisting device

Through the inspection and acceptance methods of the inverted siphon arch cable hoisting device, including no-load, static load, dynamic load test and soil resistivity measurement, the errors and safety defects that may arise during the acceptance process in the prior art are solved, and the correctness and accuracy of the problem of errors and safety defects can be achieved. Comprehensive performance inspection and safety guarantee of cable hoisting devices.

CN119000068APending Publication Date: 2024-11-22CHINA RAILWAY NO 3 GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411128768.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing engineering field lacks a unified inspection and acceptance method, which leads to possible errors and missing items during the acceptance process of cable hoisting devices, and safety defects.

Method used

Provide a method for testing and acceptance of inverted siphon arch bridge cable hoisting device, including no-load test, static load test, dynamic load test and pressure steel pipe hoisting working condition test. By comprehensively detecting the performance indicators of the cable hoisting device, the soil resistance rate is utilized. The measuring instrument detects the resistivity of the soil around the first ground anchor to ensure the accuracy and safety of acceptance.

Benefits of technology

It effectively reduces the possibility of safety defects in cable hoisting devices that pass the acceptance. Through multi-level tests and data comparison, the performance of cable hoisting devices is comprehensively tested to ensure its safety and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119000068A_ABST
    Figure CN119000068A_ABST
Patent Text Reader

Abstract

The invention relates to a detection and acceptance method for an inverted siphon arch bridge cable hoisting device, which comprises a detection and acceptance method for a hoisting installation system and comprises the following steps: S1, no-load test: carrying out the no-load test at the installation position of a hoisting cable, and observing the sag of a bearing main cable and the anchoring condition of a first ground anchor; s2, a static load test is conducted, specifically, the sports car stops at the initial installation position and the maximum transverse movement position respectively, the hoisting weight is hoisted away through the hoisting cable, and the sports car stops for 10-30 minutes; s3, dynamic load test: the sports car lifts a to-be-hoisted weight to the maximum height through the hoisting cable, then the sports car runs to the maximum running position of the left side corresponding to the hoisting weight for 10-30 minutes, all parts of the hoisting cable are comprehensively inspected, the sports car runs to the midspan of the cable crane and stays for 10-30 minutes, all parts of the hoisting cable are comprehensively inspected, and the sports car runs to the maximum running position of the right side and stays for 10-30 minutes; staying for 10-30 minutes, and comprehensively checking each part of the hoisting cable; and S4, a penstock hoisting working condition test is carried out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of cable hoisting, and in particular to a method for detecting and accepting a cable hoisting device for an inverted siphon arch bridge. Background Art

[0002] Cable lifting is used for small spans and complex terrain conditions, especially in deep canyons where large machinery and equipment cannot enter the construction site. It has the characteristics of easy operation, easy to master, convenient construction, simple process, low cost and safety.

[0003] For example, during the construction of the inverted siphon arch bridge over Longchuan River, the Longchuan River is located in a steep terrain and the construction site is narrow. The concrete prefabricated arch box and prefabricated columns on the arch, tie beams, cap beams, bridge deck metal structures and pressure steel pipes of the inverted siphon arch bridge are all hoisted and constructed using cable hoisting devices. The cable hoisting device includes a lifting and installation system, an arch box buckle system and a stabilization system. Specifically, the lifting and installation system consists of a tower, lifting cables (load-bearing main cables, lifting cables, traction cables), a first winch and a first anchor; the arch box buckle system consists of a buckle frame, a saddle, a buckle cable, a second winch and a second anchor; the stabilization system consists of a cable wind cable, a balance cable and a third anchor.

[0004] There is no unified inspection and acceptance method for cable hoisting devices in the existing engineering field. Different manufacturers and different installation acceptance units have different acceptance processes, which may lead to errors and omissions in the acceptance process. The cable hoisting devices that pass the acceptance may have safety defects. Therefore, a method for inspecting and accepting the cable hoisting device of an inverted siphon arch bridge is provided to solve the above problems. Summary of the invention

[0005] In order to reduce the possibility of safety defects in a cable hoisting device that has passed acceptance, the present application provides a method for detecting and accepting a cable hoisting device for an inverted siphon arch bridge.

[0006] The present application provides a method for testing and accepting an inverted siphon arch bridge cable hoisting device, which adopts the following technical solution: A detection and acceptance method for an inverted siphon arch bridge cable hoisting device, comprising a detection and acceptance method for a hoisting and installation system, a detection and acceptance method for an arch box buckle and hanging system, and a detection and acceptance method for a stabilization system; Among them, the inspection and acceptance method for the lifting and installation system includes the following steps: S1. No-load test: A no-load test is carried out at the installation position of the hoisting cable, that is, the sports car runs back and forth between the cable spans without adding counterweights, and the verticality of the load-bearing main cable and the anchorage of the first anchor are observed; S2. Static load test: In the operating area of ​​the maximum lifting weight within the scope of the inverted siphon arch bridge, the sports car stops at the initial installation position and the maximum lateral displacement position respectively, and the lifting weight is lifted 0.3m to 0.5m from the ground by the lifting cable. During this process, the sports car stops for 10 to 30 minutes after the brake test, and all parts of the lifting cable are comprehensively inspected to observe the verticality of the load-bearing main cable, the uniformity of the force of the load-bearing main cable, and the anchoring condition of the first anchor; S3, dynamic load test: the sports car lifts the test load to the maximum height through the lifting cable, and then the sports car runs to the maximum operating position on the left side corresponding to the load for 10 to 30 minutes, and comprehensively inspects all parts of the lifting cables, observes the verticality of the load-bearing main cable, the uniformity of the force of the load-bearing main cable, and the anchorage of the first anchor. If there is no abnormality, the sports car is run to the middle of the cable span and stays for 10 to 30 minutes. Comprehensively inspect all parts of the lifting cables, observe the verticality of the load-bearing main cable, the uniformity of the force of the load-bearing main cable, and the anchorage of the first anchor. If there is no abnormality, the sports car is run to the maximum operating position on the right side and stays for 10 to 30 minutes. Comprehensively inspect all parts of the lifting cables, observe the verticality of the load-bearing main cable, the uniformity of the force of the load-bearing main cable, and the anchorage of the first anchor. If there is no abnormality, the test load is returned to the middle of the span for unloading; S4. Penstock hoisting condition test: Penstocks are lighter in weight, but longer in length and have a wider operating range. To check whether the maximum operating position of the penstock hoisting meets the requirements, the penstock hoisting condition is tested and inspected. A full-coverage operation test is carried out in the actual penstock hoisting operation area, and various data are recorded.

[0007] By adopting the above technical solution, various performance indicators of the cable lifting device were comprehensively tested through no-load lifting tests, static load lifting tests and dynamic load lifting tests, effectively reducing the possibility of safety defects in the cable lifting device that has passed the acceptance inspection.

[0008] Preferably, the static load test and the dynamic load test are both loaded in three stages, wherein in the static load test, the static load test is loaded at 60%→100%→115% of the designed lifting weight, and in the dynamic load test, the dynamic load test is loaded at 60%→100%→110% of the designed lifting weight.

[0009] By adopting the above technical solution, static load tests and dynamic load tests are divided into three levels of gradual loading, and the test data under different loads are compared to comprehensively test the various performance indicators of the cable lifting device.

[0010] Preferably, after the penstock lifting condition test is completed, a load test of 110% of the penstock weight is carried out, and the test lifting weight is lifted, and the test lifting weight is a bundle of steel bars with the same weight as the counterweight.

[0011] Preferably, in the no-load test, static load test and dynamic load test, the sports car runs to the mid-span of the load-bearing main cables, and the sag of the load-bearing main cables is measured. The sag of the load-bearing main cables is measured using triangulation method, and the sag value is read using a total station.

[0012] By adopting the above technical solution, the verticality of the load-bearing main cables is measured to verify the designed lifting clearance height and the verticality and safety factor of the load-bearing main cables.

[0013] Preferably, in the no-load test, static load test and dynamic load test, the displacement of the first ground anchor is detected, two points are marked on each first ground anchor along the transverse bridge direction, and measurement is performed using a micrometer calibrated by the metrology department. Before the trial lifting, the micrometer is installed and fixed on the front and rear sides of the first ground anchor so that the top rod of the micrometer contacts the side wall of the first ground anchor. The initial reading of each micrometer is recorded, and the readings of the micrometer are observed and recorded during the trial lifting.

[0014] By adopting the above technical solution, by comparing the dial gauge reading before the test hoisting with the dial gauge reading after the test hoisting, it is directly detected whether the first ground anchor is displaced, thereby obtaining the anchoring condition of the first ground anchor.

[0015] Preferably, in the no-load test, the static load test and the dynamic load test, it is observed whether the soil around the first anchor is loose.

[0016] Preferably, in the no-load test, static load test and dynamic load test, the resistivity of the soil around the first ground anchor is measured by a soil resistivity meter using a four-electrode method. The soil resistivity meter includes a test host and a plurality of detection electrodes electrically connected to the test host. The detection electrodes are inserted into the soil around the first ground anchor to collect signals. The test host is used to measure and display the detection values. The multiple detection electrodes are distributed in a straight line and the spacing between two adjacent detection electrodes is the same, and the insertion depths of the multiple detection electrodes are the same.

[0017] By adopting the above technical solution, the resistivity of the soil around the first anchor is measured using a soil resistivity meter. The resistivity of the soil will change due to soil loosening. By measuring and comparing the soil resistivity data before and after the trial lifting, the stability of the soil can be judged. The distance and depth between the detection electrodes should be kept consistent to ensure the accuracy and comparability of the measurement.

[0018] Preferably, the detection electrode has a cooling channel, and the soil resistivity measuring instrument further comprises a cooling mechanism for introducing a cooling medium into the cooling channel of the detection electrode.

[0019] By adopting the above technical solution, when the detection electrode is energized for a long time, the current passing through the contact point between the detection electrode and the soil will generate heat, causing the local temperature of the soil to rise. The resistivity of the soil usually changes with temperature. When the temperature rises, the soil resistivity will decrease. The cooling medium can absorb the heat generated when the detection electrode is energized, keep the temperature of the detection electrode and the surrounding soil stable, and reduce the impact of temperature changes on soil resistivity measurements.

[0020] Preferably, the detection electrode comprises a conductive electrode body and an insulating core body inserted in the conductive electrode body, the upper end surface of the conductive electrode body is provided with an insertion cavity for inserting the insulating core body in the axial direction, and the cooling flow channel comprises a liquid inlet flow channel provided on one side of the upper part of the insulating core body, a liquid outlet flow channel provided on the other side of the upper part of the insulating core body, a transfer flow channel provided on the lower part of the insulating core body, a first cooling channel provided in the axial direction and connected between the liquid inlet flow channel and the transfer flow channel, and a cooling channel provided in the axial direction and connected between the liquid outlet flow channel and the transfer flow channel. A second cooling channel is formed between the two sides of the upper outer peripheral wall of the insulating core body, and a liquid inlet hole connected to the liquid inlet channel and a liquid outlet hole connected to the liquid outlet channel are radially opened respectively on the opposite sides of the upper outer peripheral wall of the insulating core body. The cooling mechanism includes a liquid storage tank for storing coolant, a liquid inlet pipe connected to the liquid storage tank, and a liquid outlet pipe connected to the liquid storage tank, the other end of the liquid inlet pipe is connected to the liquid inlet hole, and the other end of the liquid outlet pipe is connected to the liquid outlet hole. The liquid storage tank is provided with a condenser for cooling the coolant and a liquid pump for pumping the coolant to the cooling channel.

[0021] By adopting the above technical solution, the coolant in the liquid storage tank is pumped to the liquid inlet pipe by a liquid pump, the coolant enters the liquid inlet channel through the liquid inlet hole, passes through the first cooling channel, the transfer channel, the second cooling channel and the liquid outlet channel in sequence, and flows into the liquid storage tank through the liquid outlet hole and the liquid outlet pipe for circulation. The detection electrode includes a conductive electrode body and an insulating core body, and the cooling channel is arranged in the insulating core body to ensure the electrical and liquid isolation of the cooling channel and the conductive electrode body, so as to avoid measurement errors or electrode short circuits caused by the conduction of the coolant.

[0022] Preferably, the inner side wall of the plug-in cavity is radially provided with a socket, and a plurality of sockets are provided. The upper end surface of the insulating core is axially provided with an installation cavity, and the inner circumferential wall of the installation cavity is radially slidingly connected with a heat-conducting rod, and the heat-conducting rod is slidably inserted in the socket, and the insulating core is provided with a driving component for driving the heat-conducting rod to slide.

[0023] By adopting the above technical solution, in the initial state, the driving component drives the heat-conducting rod to slide in the direction close to the axis of the insulating core, so that the end of the heat-conducting rod does not protrude from the outer peripheral wall of the insulating core. After the insulating core is slidably inserted into the plug-in cavity, and the position of the plug hole corresponds to the position of the heat-conducting rod, the driving component drives the heat-conducting rod to slide in the direction away from the axis of the insulating core, so that the heat-conducting rod is slidably inserted into the plug hole, thereby increasing the contact area between the insulating core and the conductive electrode. The heat generated by the conductive electrode is transferred to the insulating core through the heat-conducting rod and is absorbed by the coolant, thereby improving the cooling effect.

[0024] In summary, the present application includes at least one of the following beneficial technical effects: 1. Through no-load hoisting test, static load hoisting test and dynamic load hoisting test, the various performance indicators of the cable hoisting device are fully tested, effectively reducing the possibility of safety defects in the cable hoisting device that has passed the acceptance inspection; 2. Use a soil resistivity meter to measure the resistivity of the soil around the first anchor. The resistivity of the soil will change due to soil loosening. By measuring and comparing the soil resistivity data before and after the test hoisting, the stability of the soil can be determined. The distance and depth between the detection electrodes should be kept consistent to ensure the accuracy and comparability of the measurement. 3. When the detection electrode is energized for a long time, the current will generate heat when passing through the contact point between the detection electrode and the soil, causing the local temperature of the soil to rise. The resistivity of the soil usually changes with temperature. When the temperature rises, the soil resistivity will decrease. The cooling medium can absorb the heat generated when the detection electrode is energized, keep the temperature of the detection electrode and the surrounding soil stable, and reduce the impact of temperature changes on soil resistivity measurements. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 The present invention is a schematic diagram of a method for inspecting and accepting a cable hoisting device for an inverted siphon arch bridge.

[0026] Figure 2 It is a structural diagram of a soil resistivity measuring instrument.

[0027] Figure 3 It is a schematic diagram of the structure of the detection electrode and cooling mechanism.

[0028] Figure 4 It is a schematic diagram of the connection structure between the conductive electrode body and the screw head.

[0029] Figure 5 It is a schematic diagram of the connection structure between the conductive electrode body and the insulating core body.

[0030] Figure 6 yes Figure 5 A local enlarged schematic diagram at point A.

[0031] Explanation of the reference numerals: 1. test host; 2. detection electrode; 21. conductive electrode body; 211. plug-in cavity; 212. stop groove; 213. conductive electrode sheet; 214. conductive clip; 215. mounting screw hole; 22. insulating core; 221. sliding protrusion; 222. liquid inlet hole; 223. liquid outlet hole; 224. mounting cavity; 225. perforation; 226. heat-conducting rod; 3. cooling mechanism; 31. liquid storage tank; 32. liquid inlet pipe; 33. liquid outlet pipe; 34. liquid pump; 35. screw head; 4. liquid flow channel; 41. liquid inlet channel; 42. liquid outlet channel; 43. first cooling channel; 44. transfer channel; 45. second cooling channel; 5. driving assembly; 51. movable sealing plate; 52. driving rod; 53. hinged rod; 54. spring; 55. blocking column. DETAILED DESCRIPTION

[0032] The following is combined with Figure 1-6 This application is described in further detail.

[0033] The present application embodiment discloses a detection and acceptance method for an inverted siphon arch bridge cable hoisting device, referring to Figure 1 , including the inspection and acceptance methods for the lifting and installation system, the inspection and acceptance methods for the arch box hanging system, and the inspection and acceptance methods for the stability system.

[0034] Among them, the inspection and acceptance method for the lifting and installation system includes the following steps: S1. No-load test: A no-load test is carried out at the installation position of the lifting cable, that is, the sports car runs back and forth between the spans of the load-bearing main cables without adding counterweight loads, and the verticality of the load-bearing main cables, the anchoring condition of the first anchor, and the status of the cable operating equipment, electrical equipment and communication equipment are observed, and records are kept.

[0035] S2. Static load test: within the operating area of ​​the maximum lifting weight within the range of the inverted siphon arch bridge, the sports car stops at the initial installation position and the maximum lateral displacement position respectively, and the lifting weight is lifted 0.3m to 0.5m from the ground by the lifting rope on the sports car. During this process, the sports car stops for 10 to 30 minutes after the brake test, and all parts of the lifting cables are comprehensively inspected to observe the verticality of the load-bearing main cables, the uniformity of the force on the load-bearing main cables, the anchoring condition of the first anchor, and the status of the cable operation equipment, electrical equipment and communication equipment, and keep records.

[0036] In the static load test, loading is carried out stepwise in three levels. The static load test is loaded at 60%→100%→115% of the designed lifting weight. Each loading operation requires observation of the verticality of the load-bearing main cable, the uniformity of the force on the load-bearing main cable, the anchoring condition of the first anchor, and the status of the cable operating equipment, electrical equipment and communication equipment, and records must be kept.

[0037] S3. Dynamic load test: The sports car lifts the test load to the maximum height through the lifting cable, and then the sports car runs to the maximum operating position on the left side corresponding to the load for 10 to 30 minutes, and comprehensively inspects all parts of the lifting cables, observes the verticality of the load-bearing main cables, the uniformity of the force on the load-bearing main cables, the anchoring condition of the first anchor, and the status of the cable operation equipment, electrical equipment and communication equipment. If there is no abnormality, the sports car is run to the middle of the cable span and stays for 10 to 30 minutes. Comprehensively inspect all parts of the lifting cables, observes the verticality of the load-bearing main cables, the uniformity of the force on the load-bearing main cables, the anchoring condition of the first anchor, and the status of the cable operation equipment, electrical equipment and communication equipment. If there is no abnormality, the sports car is run to the maximum operating position on the right side and stays for 10 to 30 minutes. Comprehensively inspect all parts of the lifting cables, observes the verticality of the load-bearing main cables, the uniformity of the force on the load-bearing main cables, the anchoring condition of the first anchor, and the status of the cable operation equipment, electrical equipment and communication equipment. If there is no abnormality, the test load is returned to the middle of the span for unloading.

[0038] In the dynamic load test, loading is carried out step by step in three levels, and the dynamic load test is loaded at 60%→100%→110% of the designed lifting weight. Each time the loading operation is carried out, it is necessary to observe the verticality of the load-bearing main cable, the uniformity of the force of the load-bearing main cable, the anchorage of the first anchor, and the status of the cable operation equipment, electrical equipment and communication equipment, and keep records.

[0039] S4. Penstock hoisting condition test: Penstock has a light weight, but is long and has a wider operating range. To check whether the maximum operating position of penstock hoisting meets the requirements, the penstock hoisting condition is tested and inspected. A full-coverage operation test is conducted in the actual penstock hoisting operation area, and various data are recorded. After the penstock hoisting condition test is completed, a load test of 110% of the penstock weight is conducted, and the test hoisting weight is lifted. The test hoisting weight is a bundle of steel bars with the same weight as the counterweight, and various data are recorded.

[0040] In the no-load test, static load test and dynamic load test, the sports car runs to the mid-span of the load-bearing main cables, and the sag of the load-bearing main cables is measured. The sag of the load-bearing main cables is measured by triangulation method, and the sag value is read with a total station.

[0041] In the no-load test, static load test and dynamic load test, the displacement of the first ground anchor is detected. Specifically, two points are marked on each first ground anchor along the transverse direction of the bridge, and the micrometer calibrated by the metrology department is used for measurement. Before the trial lifting, the micrometer is installed and fixed on the front and rear sides of the first ground anchor so that the top rod of the micrometer contacts the side wall of the first ground anchor. The initial reading of each micrometer is recorded, and the readings of the micrometer are observed and recorded during the trial lifting.

[0042] In the no-load test, static load test and dynamic load test, the inspection method of the cable operation equipment is to observe the working conditions of the lateral movement system, traction rope, lifting rope, pulley and the first winch. Specifically, observe the operation of the traction rope and lifting rope on each steering wheel, the deformation data and stability and safety of the first winch foundation, observe the power and operation speed of the running car, the lower hanging and the first winch, observe the tower displacement and the deflection of the load-bearing main rope; the inspection method of electrical equipment is to check whether the power supply system and the power equipment lines can meet the construction requirements when the cable operation equipment is running at full load, and check the current, voltage and wire temperature rise through instruments. The inspection method of communication equipment is to check whether the communication equipment is sufficient and can maintain clear conversations.

[0043] In the no-load test, static load test and dynamic load test, observe whether the soil around the first anchor is loose. In other embodiments, a dedicated person can inspect and observe whether there are abnormal phenomena such as cracks, bulges or settlement on the soil surface around the first anchor, so as to determine whether the soil around the first anchor is loose. In this embodiment, the resistivity of the soil around the first anchor is measured by a soil resistivity meter using a four-electrode method, and the soil resistivity meter is installed on both sides of the front and rear of the first anchor.

[0044] Reference Figure 2 Each set of soil resistivity measuring instruments includes a test host 1, a plurality of detection electrodes 2 electrically connected to the test host 1, and a plurality of cooling mechanisms 3 for cooling the detection electrodes 2. The detection electrodes 2 are inserted into the soil around the first anchor to collect signals. The detection electrodes 2 are electrically connected to the test host 1 through wires. The test host 1 is used to measure and display the detection values. The plurality of detection electrodes 2 are distributed in a straight line and the spacing between two adjacent detection electrodes 2 is the same. The insertion depths of the plurality of detection electrodes 2 are the same.

[0045] Reference Figure 3 , Figure 4 The detection electrode 2 includes a conductive electrode body 21 and an insulating core body 22 inserted in the conductive electrode body 21. The upper end surface of the conductive electrode body 21 is provided with an insertion cavity 211 for inserting the insulating core body 22 in the axial direction. The inner peripheral wall of the insertion cavity 211 is provided with a stop groove 212 in the axial direction, and the outer peripheral wall of the insulating core body 22 is protruding and fixed with a sliding protrusion 221 that is slidably connected to the stop groove 212. A conductive electrode sheet 213 is protruding and fixed on the upper peripheral wall of the conductive electrode body 21, and a conductive clip 214 clamped on the conductive electrode sheet 213 is provided at one end of the wire.

[0046] Reference Figure 4 , Figure 5The upper end surface of the insulating core 22 is coaxially provided with a mounting cavity 224, and the insulating core 22 has a cooling channel, which includes a liquid inlet channel 41 provided on one side of the upper portion of the insulating core 22, a liquid outlet channel 42 provided on the other side of the upper portion of the insulating core 22, a transfer channel 44 provided on the lower portion of the insulating core 22, a first cooling channel 43 provided along the axial direction and connected between the liquid inlet channel 41 and the transfer channel 44, and a second cooling channel 45 provided along the axial direction and connected between the liquid outlet channel 42 and the transfer channel 44. The liquid inlet channel 41 and the liquid outlet channel 42 are both arc-shaped channels, and the axes of the liquid inlet channel 41 and the liquid outlet channel 42 coincide with the axis of the mounting cavity 224. The transfer channel 44 is a circular channel, which is located below the mounting cavity 224 . A plurality of first cooling channels 43 are provided and distributed along the arc length direction of the liquid inlet channel 41 . A plurality of second cooling channels 45 are provided and distributed along the arc length direction of the liquid outlet channel 42 .

[0047] The upper peripheral wall of the insulating core 22 has a liquid inlet hole 222 connected to the liquid inlet channel 41 and a liquid outlet hole 223 connected to the liquid outlet channel 42 respectively opened radially on opposite sides, and the upper peripheral wall of the conductive electrode 21 has a mounting screw hole 215 connected to the liquid inlet hole 222 / liquid outlet hole 223 opened radially. The cooling mechanism 3 includes a liquid storage tank 31 for storing coolant, a liquid inlet pipe 32 connected to the liquid storage tank 31, and a liquid outlet pipe 33 connected to the liquid storage tank 31. The other end of the liquid inlet pipe 32 / liquid outlet pipe 33 is connected to a screw head 35, which is threadedly connected to the mounting screw hole 215, and the end of the screw head 35 is correspondingly inserted into the liquid inlet hole 222 / liquid outlet hole 223. The liquid storage tank 31 is provided with a condenser for cooling the coolant and a liquid pump 34 for pumping the coolant to the cooling channel.

[0048] Reference Figure 5 , Figure 6The inner wall of the plug-in cavity 211 is provided with a plug hole in the radial direction, and there are multiple plug holes. The inner peripheral wall of the installation cavity 224 is connected with a heat-conducting rod 226 in the radial direction. The outer peripheral wall of the insulating core 22 is provided with a through hole 225 for the heat-conducting rod 226 to slide in the radial direction, and the heat-conducting rod 226 is inserted in the plug hole in a sliding manner. The insulating core 22 is provided with a driving component 5 for driving the heat-conducting rod 226 to slide. The driving component 5 includes a movable sealing plate 51 that is axially slidably connected to the transfer channel 44, a driving rod 52 that is fixedly connected to the movable sealing plate 51 and built into the installation cavity 224, a hinged rod 53 that is hinged to the driving rod 52 at one end and hinged to the heat-conducting rod 226 at the other end, and a spring 54 that forces the movable sealing plate 51 to move upward to block the channel openings of the first cooling channel 43 and the second cooling channel 45 under normal conditions. The hinged rod 53 is built into the installation cavity 224, the lower end of the spring 54 is fixedly connected to the bottom inner wall of the transfer channel 44, and the upper end of the spring 54 is fixedly connected to the lower end surface of the movable sealing plate 51. Under normal conditions, the end of the heat-conducting rod 226 away from the axis of the insulating core 22 is retracted into the through hole 225, and the upper end surface of the movable sealing plate 51 protrudes and is fixed with a blocking column 55 that is slidably inserted in the first cooling channel 43 / second cooling channel 45.

[0049] After the conductive electrode body 21 is inserted into the soil, the insulating core body 22 is inserted into the conductive electrode body 21, the screw head 35 is threadedly connected to the mounting screw hole 215, and the coolant in the liquid storage tank 31 is pumped to the liquid inlet pipe 32 by the liquid pump 34, and the coolant enters the liquid inlet channel 41 and the first cooling channel 43 through the liquid inlet hole 222. When the pressure in the first cooling channel 43 is greater than the elastic force of the spring 54, the movable sealing plate 51 is forced to move downward, so that the blocking column 55 is out of the first cooling channel 43 and the second cooling channel 45, so that the first cooling channel 43, the transfer channel 44, the second cooling channel 45 and the liquid outlet channel 42 The coolant flows into the liquid storage tank 31 through the liquid outlet hole 223 and the liquid outlet pipe 33 for circulation. When the movable sealing plate 51 moves downward, the driving rod 52 is driven to move downward, and the heat-conducting rod 226 is pushed to slide in the direction away from the axis of the insulating core 22 through the hinge rod 53, so that the heat-conducting rod 226 is slidably inserted in the insertion hole, thereby increasing the contact area between the insulating core 22 and the conductive electrode 21. The heat generated by the conductive electrode 21 is transferred to the insulating core 22 through the heat-conducting rod 226 and is absorbed by the coolant, thereby improving the cooling effect, keeping the temperature of the detection electrode 2 and the surrounding soil stable, and reducing the influence of temperature changes on the soil resistivity measurement.

[0050] The inspection and acceptance method for the arch box hanging system includes the inspection method for the buckle frame, saddle and buckle rope. The inspection method for the buckle frame, saddle and buckle rope is the same as the inspection method for the lifting cables (load-bearing main cables, lifting cables and traction cables) in the lifting and installation system. The inspection method for the second ground anchor in the arch box hanging system is the same as the inspection method for the first ground anchor in the lifting and installation system, and the inspection method for the second winch in the arch box hanging system is the same as the inspection method for the first winch in the lifting and installation system.

[0051] The inspection and acceptance methods for the stabilization system include the inspection methods for wind cables and balancing cables. The inspection methods for wind cables and balancing cables are the same as the inspection methods for hoisting cables (load-bearing main cables, lifting cables, traction cables) in the lifting and installation system. The inspection method for the third anchor in the stabilization system is the same as the inspection method for the first anchor in the lifting and installation system. The inspection method for the third winch in the stabilization system is the same as the inspection method for the first winch in the lifting and installation system.

[0052] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A method for testing and accepting the cable hoisting device of an inverted siphon arch bridge. Features: Including the inspection and acceptance methods for the lifting and installation system, the inspection and acceptance methods for the arch box hanging system, and the inspection and acceptance methods for the stabilization system; Among them, the inspection and acceptance method for the lifting and installation system includes the following steps: S1. No-load test: A no-load test is carried out at the installation position of the hoisting cable, that is, the sports car runs back and forth between the cable spans without adding counterweights, and the verticality of the load-bearing main cable and the anchorage of the first anchor are observed; S2. Static load test: In the operating area of ​​the maximum lifting weight within the scope of the inverted siphon arch bridge, the sports car stops at the initial installation position and the maximum lateral displacement position respectively, and the lifting weight is lifted 0.3m to 0.5m from the ground by the lifting cable. During this process, the sports car stops for 10 to 30 minutes after the brake test, and all parts of the lifting cable are comprehensively inspected to observe the verticality of the load-bearing main cable, the uniformity of the force of the load-bearing main cable, and the anchoring condition of the first anchor; S3, dynamic load test: the sports car lifts the test load to the maximum height through the lifting cable, and then the sports car runs to the maximum operating position on the left side corresponding to the load for 10 to 30 minutes, and comprehensively inspects all parts of the lifting cables, observes the verticality of the load-bearing main cable, the uniformity of the force of the load-bearing main cable, and the anchorage of the first anchor. If there is no abnormality, the sports car is run to the middle of the cable span and stays for 10 to 30 minutes. Comprehensively inspect all parts of the lifting cables, observe the verticality of the load-bearing main cable, the uniformity of the force of the load-bearing main cable, and the anchorage of the first anchor. If there is no abnormality, the sports car is run to the maximum operating position on the right side and stays for 10 to 30 minutes. Comprehensively inspect all parts of the lifting cables, observe the verticality of the load-bearing main cable, the uniformity of the force of the load-bearing main cable, and the anchorage of the first anchor. If there is no abnormality, the test load is returned to the middle of the span for unloading; S4. Penstock hoisting condition test: Penstocks are lighter in weight, but longer in length and have a wider operating range. To check whether the maximum operating position of the penstock hoisting meets the requirements, the penstock hoisting condition is tested and inspected. A full-coverage operation test is carried out in the actual penstock hoisting operation area, and various data are recorded.

2. A detection and acceptance method for an inverted siphon arch bridge cable hoisting device according to claim 1, Features: The static load test and the dynamic load test are both loaded stepwise in three levels. In the static load test, the static load test is loaded at 60%→100%→115% of the designed lifting weight. In the dynamic load test, the dynamic load test is loaded at 60%→100%→110% of the designed lifting weight.

3. The detection and acceptance method of the cable hoisting device for an inverted siphon arch bridge according to claim 1, Features: After the penstock lifting condition test is completed, a load test of 110% of the penstock weight is carried out, and the test lifting weight is lifted. The test lifting weight uses bundles of steel bars with the same weight as the counterweight.

4. The detection and acceptance method of the cable hoisting device for an inverted siphon arch bridge according to claim 2, Features: In the no-load test, static load test and dynamic load test, the sports car runs to the mid-span of the load-bearing main cable, and the sag of the load-bearing main cable is measured. The sag of the load-bearing main cable is measured by triangulation method, and the sag value is read by a total station.

5. The detection and acceptance method of the cable hoisting device for an inverted siphon arch bridge according to claim 1, Features: In the no-load test, static load test and dynamic load test, the displacement of the first ground anchor is detected, two points are marked on each first ground anchor along the transverse bridge direction, and measurement is performed using a micrometer calibrated by the metrology department. Before the trial lifting, the micrometer is installed and fixed on the front and rear sides of the first ground anchor so that the top rod of the micrometer contacts the side wall of the first ground anchor. The initial reading of each micrometer is recorded, and the readings of the micrometer are observed and recorded during the trial lifting.

6. The detection and acceptance method of the cable hoisting device for an inverted siphon arch bridge according to claim 1, Features: In the no-load test, static load test and dynamic load test, it is observed whether the soil around the first anchor is loose.

7. A method for detecting and accepting a cable hoisting device for an inverted siphon arch bridge according to claim 6, Features: In the no-load test, static load test and dynamic load test, the resistivity of the soil around the first ground anchor is measured by a soil resistivity measuring instrument using a four-electrode method. The soil resistivity measuring instrument comprises a test host (1) and a plurality of detection electrodes (2) electrically connected to the test host (1). The detection electrodes (2) are inserted into the soil around the first ground anchor to collect signals. The test host (1) is used to measure and display the detection value. The plurality of detection electrodes (2) are distributed in a straight line and the spacing between two adjacent detection electrodes (2) is the same. The insertion depth of the plurality of detection electrodes (2) is the same.

8. A method for detecting and accepting a cable hoisting device for an inverted siphon arch bridge according to claim 7, Features: The detection electrode (2) has a cooling flow channel, and the soil resistivity measuring instrument further comprises a cooling mechanism (3) for introducing a cooling medium into the cooling flow channel of the detection electrode (2).

9. A method for detecting and accepting a cable hoisting device for an inverted siphon arch bridge according to claim 8, Features: The detection electrode (2) comprises a conductive electrode body (21) and an insulating core body (22) inserted into the conductive electrode body (21); an insertion cavity (211) for inserting the insulating core body (22) is axially provided on the upper end surface of the conductive electrode body (21); and a cooling channel comprises a liquid inlet channel (41) provided on one side of the upper portion of the insulating core body (22), a liquid outlet channel (42) provided on the other side of the upper portion of the insulating core body (22), a transfer channel (44) provided on the lower portion of the insulating core body (22), a first cooling channel (43) provided along the axial direction and connected between the liquid inlet channel (41) and the transfer channel (44), and a first cooling channel (43) provided along the axial direction and connected between the liquid outlet channel (42) and the transfer channel (44). Two cooling channels (45), the upper peripheral wall of the insulating core (22) is radially provided with a liquid inlet hole (222) connected to the liquid inlet channel (41) and a liquid outlet hole (223) connected to the liquid outlet channel (42) on opposite sides, the cooling mechanism (3) comprises a liquid storage tank (31) for storing cooling liquid, a liquid inlet pipe (32) connected to the liquid storage tank (31) and a liquid outlet pipe (33) connected to the liquid storage tank (31), the other end of the liquid inlet pipe (32) is connected to the liquid inlet hole (222), and the other end of the liquid outlet pipe (33) is connected to the liquid outlet hole (223), and the liquid storage tank (31) is provided with a condenser for cooling the cooling liquid and a liquid pump (34) for pumping the cooling liquid to the cooling channel.

10. A method for detecting and accepting a cable hoisting device for an inverted siphon arch bridge according to claim 9, Features: The inner side wall of the plug-in cavity (211) is provided with a plug hole in the radial direction, and a plurality of plug holes are provided. The upper end surface of the insulating core (22) is provided with a mounting cavity (224) in the axial direction. The inner peripheral wall of the mounting cavity (224) is connected to a heat-conducting rod (226) in a radially sliding manner. The heat-conducting rod (226) is slidably inserted in the plug hole. The insulating core (22) is provided with a driving component (5) for driving the heat-conducting rod (226) to slide.