Nuclear pollution area nuclear radiation monitoring sampling vehicle
By designing a nuclear radiation monitoring sampling vehicle in nuclear pollution areas, combined with soil, plants and water sampling mechanisms, the function of efficiently collecting samples from different water depths on the shore is achieved, solving the problem of complex operation of existing equipment and lack of multifunctional sampling, and improving sampling Efficiency and safety.
Patent Information
- Application Number
- CN202411141163.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The prior art lacks multifunctional automated sampling equipment that can perform onshore, especially sampling water bodies at different water depths and locations. The existing equipment needs to wading to sample water, which is complex in operation and inefficient in efficiency.
A nuclear radiation monitoring sampling vehicle in nuclear pollution areas was designed, equipped with soil sampling mechanism, plant sampling mechanism and water sampling mechanism, including fixing frame, mounting cylinder, sampling chamber, underwater sampling assembly, pneumatic drainage assembly, ejection assembly and rope connection The component can collect water bodies at different water depths on the shore, and the classification and collection of water samples can be achieved through the pop-up component and the underwater sampling component.
It realizes convenient and efficient collection of water bodies in the nuclear radiation area on the shore at different water depths, fills the functional shortcomings of existing equipment, improves sampling efficiency and safety, and can pop out the sampling chamber to different locations according to needs, and Classified storage of water samples is achieved through pneumatic drainage components and communication drive components.
Smart Images

Figure CN119001820A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of nuclear radiation sampling and monitoring, and in particular to a nuclear radiation monitoring and sampling vehicle for a nuclear contaminated area. Background Art
[0002] At present, in order to detect the nuclear radiation situation in the nuclear leakage area, people need to enter the area to collect samples and conduct tests to obtain data for analysis. The personnel entering the area need to wear protective clothing and other protective tools to protect themselves from radiation hazards. Such sampling is very complicated. In the prior art, there are devices that use automatic sampling vehicles to enter the nuclear radiation area to collect samples from the radiation area. The existing sample collection equipment can usually only perform simple sampling work, and the types of samples are relatively small. The actual analysis of the impact of nuclear radiation in the area requires sampling and analysis of multiple samples such as water, soil, and plants. The existing equipment lacks equipment that can meet the needs. A sample collection and detection device for nuclear radiation areas shown in Chinese patent announcement number CN110686927A includes a sampler, a boss is fixed on the upper end of the sampler, a lifting chamber with an opening facing downward and an upper end wall extending into the boss is provided in the sampler, a cutting mechanism for collecting plant samples is provided in the left end wall of the lifting chamber, a lifting mechanism for collecting soil samples at different depths is provided in the lifting chamber, the lifting mechanism includes a spring chamber whose right end wall is connected to the lifting chamber, a collecting block for sampling is provided in the lifting chamber, a collecting chamber with an opening facing downward is provided in the collecting block, a liftable iron block and a supporting spring for supporting the iron block are provided in the spring chamber, the device has a simple structure and is easy to operate, and can automatically complete the sampling of soil at different depths in the area to be detected by mechanical means, and can also automatically complete the sampling and collection of plants at the same time, thereby ensuring the safety of the sampling personnel and having high efficiency.
[0003] Although the above-mentioned equipment can collect plant samples and soil samples, it lacks the operation of collecting water bodies. The prior art has equipment that can perform water sampling alone, but this type of equipment can only collect water bodies, and the equipment needs to be transported above the water body and sample the water body by falling, which requires the equipment to wade through water. When achieving a multi-functional collection effect, compared with equipment that can be modified to be able to wade through water, equipment that can perform water sampling functions at different water depths on shore is more practical. The prior art lacks multi-functional automated sampling equipment that can be used on shore and can sample water bodies at different water depths and locations. Summary of the invention
[0004] Based on this, it is necessary to provide a nuclear radiation monitoring sampling vehicle for nuclear contaminated areas in response to existing technical problems.
[0005] In order to solve the problems of the prior art, the technical solution adopted by the present invention is:
[0006] The invention provides a nuclear radiation monitoring sampling vehicle for nuclear contaminated areas, comprising a sampling vehicle body and a sampling and collecting mechanism, a soil sampling mechanism and a plant sampling mechanism arranged thereon, and also comprising a water body sampling mechanism. The sampling vehicle body is provided with the water body sampling mechanism and the sampling and collecting mechanism via an installation bottom plate, the water body sampling mechanism is located beside the sampling and collecting mechanism, the water body sampling mechanism comprises a fixing frame, a mounting tube, a sampling chamber, an underwater sampling component, a pneumatic drainage component, a pop-up component, a rope connection component and a connecting drive component, the fixing frame is fixedly mounted on the installation bottom plate, the mounting tube is horizontally arranged on the fixing frame, the sampling chamber is slidably arranged in the mounting tube, one end of the mounting tube is open, the pop-up component is arranged at the end of the mounting tube away from the opening, and the pop-up component is connected to the sampling chamber. Transmission connection, the rope connection assembly is fixedly mounted on the fixed frame, the rope connection assembly is connected to the sampling chamber, the pneumatic drainage assembly is mounted on one end of the fixed frame close to the opening of the mounting tube, the pneumatic drainage assembly is provided with two groups and are respectively located at the upper and lower ends of the fixed frame, the underwater sampling assembly is arranged inside the sampling chamber, the pneumatic drainage assembly can be connected with the underwater sampling assembly, the connecting drive assembly is provided with two groups and are respectively located at the upper and lower ends of the fixed frame, the two groups of connecting drive assemblies are respectively connected with the two groups of pneumatic drainage assemblies by transmission, the sampling and collecting mechanism comprises a collecting bracket, a turntable, a water sampling bottle and a lead shell, the turntable is mounted on the mounting base plate, the collecting bracket is arranged on the output end of the turntable, the water sampling bottle is mounted on the collecting bracket, and the lead shell is sleeved on the outside of the collecting bracket.
[0007] Preferably, the underwater sampling assembly includes a first connecting tube, a first one-way valve, a first sampling tube and a second one-way valve, two first connecting tubes and two first one-way valves are respectively provided, and the first connecting tube and the first one-way valve are provided at both upper and lower ends of the sampling chamber, two partitions are provided in the middle of the sampling chamber, and an air chamber is separated by the two partitions, one end of the first connecting tube is connected to the outside of the sampling chamber, and the other end of the first connecting tube is connected to the inside of the air chamber, the first one-way valve is installed on the first connecting tube, and the conduction directions of the two first one-way valves are consistent, a plurality of first sampling tubes and second one-way valves are provided and are distributed in a ring around the axis of the sampling chamber, the two ends of the first sampling tube are respectively connected to the upper and lower ends of the sampling chamber, and each of the upper and lower ends of the first sampling tube is provided with a second one-way valve, and the conduction directions of the second one-way valves are consistent.
[0008] Preferably, the pop-up assembly includes a pop-up push plate, a spring, a permanent magnet, a first electromagnet and a second electromagnet, the pop-up push plate can be slidably arranged inside the mounting tube, the spring is arranged between the mounting tube and the pop-up push plate, one end of the spring is fixedly connected to the side wall of the pop-up push plate, and the other end of the spring is fixedly connected to the end of the mounting tube away from the opening, the permanent magnet is fixedly mounted on the side wall of the pop-up push plate close to the spring, the first electromagnet is fixedly mounted on the end of the mounting tube away from the opening, a plurality of second electromagnets are provided, and the plurality of second electromagnets are fixedly sleeved on the outer side wall of the mounting tube, the second electromagnets are arranged in sequence along the axial direction of the mounting tube, the pop-up push plate is transmission-connected to the sampling chamber, and a stop limit block for limiting the pop-up push plate is provided on the inner wall of the mounting tube.
[0009] Preferably, the pop-up assembly also includes a rope connecting seat, which is fixedly mounted at one end of the sampling chamber near the pop-up pushing plate, the rope connecting assembly includes a steel rope, a take-up drum, an axle connecting seat, a first rotating shaft, a second rotating shaft, a ratchet, a ratchet, a transmission disk and a first rotating driver, one end of the steel rope is fixedly connected to the sampling chamber through the rope connecting seat, the other end of the steel rope is wound around the take-up drum, and the take-up drum is rotatably mounted on the fixed frame through the axle connecting seat, the first rotating shaft is fixedly connected to the take-up drum, the first rotating shaft and the second rotating shaft are both rotatably arranged on the axle connecting seat, the second rotating shaft, the first rotating shaft and the take-up drum are all coaxially arranged, the transmission disk is coaxially fixedly connected to the second rotating shaft, the ratchet is coaxially fixedly connected to the first rotating shaft, the ratchet is elastically mounted on the transmission disk, the ratchet is snap-fitted with the ratchet, the first rotating driver is horizontally arranged, and the output end of the first rotating driver is fixedly connected to the end of the second rotating shaft.
[0010] Preferably, an air source is installed on the fixed frame, and the pneumatic drainage assembly includes a second connecting pipe, a third connecting pipe, an annular fixed sleeve, a rotating mounting disk and a fourth connecting pipe. One end of the second connecting pipe located at the top of the fixed frame is connected to the air source, and the other end of the second connecting pipe can be connected to the first connecting pipe at the top of the sampling chamber. One end of the second connecting pipe located at the bottom of the fixed frame can be connected to the first connecting pipe at the bottom of the sampling chamber, and the other end of the second connecting pipe extends outward from the outside of the equipment. The rotating mounting disk can be rotatably installed on the fixed frame, the connecting drive assembly is transmission-connected to the rotating mounting disk, and the third connecting pipe is arranged on the rotating mounting disk. On the movable mounting plate, the second connecting tube is installed at the center of the rotating mounting plate. The second connecting tube and the third connecting tube are both slidably matched with the rotating mounting plate. One end of the third connecting tube can be connected to the first sampling tube, and the other end of the third connecting tube is connected to the annular fixed sleeve. One end of the fourth connecting tube located on the upper side of the fixed frame is connected to the air source, and the other end is connected to the annular fixed sleeve. The annular fixed sleeve can be raised and lowered on the fixed frame. The annular fixed sleeve is coaxially arranged with the first connecting tube. One end of the fourth connecting tube located on the lower side of the fixed frame is connected to the annular fixed sleeve, and the other end can be inserted into the water sampling bottle.
[0011] Preferably, the connecting drive assembly includes a first mounting frame, a first lifting plate, a second mounting frame, a second rotating driver, a driving gear and a driven gear. The first mounting frame and the second mounting frame are both fixedly mounted on the fixed frame. The first lifting plate can be lifted and lowered on the first mounting frame. The second rotating driver is fixedly mounted on the second mounting frame. The driving gear is fixedly connected to the output end of the second rotating driver. The driving gear and the driven gear are meshed and transmitted through an intermediate gear. The driven gear is fixedly mounted on the rotating mounting disk and is coaxially arranged with the rotating mounting disk. The first lifting plate is fixedly connected to the end of the second connecting pipe and the annular fixed sleeve.
[0012] Preferably, a horizontal slide groove is provided on the inner wall of the mounting cylinder, and a sliding limit block that slides in cooperation with the horizontal slide groove is provided on the outer wall of the sampling chamber.
[0013] Preferably, the outer shell of the sampling chamber is spherical in shape, and its upper and lower end surfaces are horizontal.
[0014] Preferably, the lead shell includes a bottom shell and an upper shell, the bottom shell is provided with a locking block, the top of the turntable is provided with a locking groove, the bottom shell and the turntable are clamped together by the locking block and the locking groove, the collecting bracket is arranged between the bottom shell and the upper shell, the bottom shell and the upper shell can be threadedly connected by a threaded connecting ring, and the sampling vehicle body is provided with a lifting and mounting assembly for clamping the upper shell for lifting and lowering.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] The device shown in the present invention can collect soil samples and plant samples through the soil sampling mechanism and the plant sampling mechanism installed in the body of the sampling vehicle, and can also collect water samples of different water depths in the nuclear radiation area through the water sampling mechanism, and the collection work is completed on the shore, without the need for equipment wading, and the operation is convenient and efficient, filling the functional gaps of the existing equipment. The pop-up component can eject the sampling chamber to different positions according to needs to realize the water collection function at different positions. The underwater sampling component can pre-store water bodies of different depths after the sampling chamber enters the water. After the collection is completed, the sampling chamber is pulled back through the rope connection component, and the water samples of different depths temporarily stored in the sampling chamber through the underwater sampling component are classified and introduced into different water sampling bottles of the sampling collection mechanism for storage in sequence through the connecting drive component and the pneumatic drainage component, thereby realizing the water classification collection function. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a three-dimensional structural diagram of a water sampling mechanism in a nuclear radiation monitoring sampling vehicle in a nuclear contaminated area;
[0018] Figure 2 It is a front view of a tube installed in a nuclear radiation monitoring sampling vehicle in a nuclear contaminated area;
[0019] Figure 3 It is a three-dimensional structural diagram of an ejection component in a nuclear radiation monitoring sampling vehicle in a nuclear contaminated area;
[0020] Figure 4 It is a cross-sectional view of an underwater sampling assembly in a nuclear radiation monitoring sampling vehicle in a nuclear contaminated area;
[0021] Figure 5 It is a three-dimensional structural schematic diagram of a rope connection assembly in a nuclear radiation monitoring sampling vehicle in a nuclear contaminated area;
[0022] Figure 6 It is a schematic diagram of a partial three-dimensional structure of a water sampling mechanism in a nuclear radiation monitoring sampling vehicle in a nuclear contaminated area;
[0023] Figure 7 It is a three-dimensional structural diagram of the connected drive components in a nuclear radiation monitoring sampling vehicle in a nuclear contaminated area;
[0024] Figure 8 It is a side view of a water sampling mechanism in a nuclear radiation monitoring sampling vehicle in a nuclear contaminated area;
[0025] Fig. 9 It is a three-dimensional structural schematic diagram of an underwater sampling component in a nuclear radiation monitoring sampling vehicle in a nuclear contaminated area;
[0026] Fig.10 The present invention is a three-dimensional structural diagram of a sampling and collecting mechanism in a nuclear radiation monitoring sampling vehicle in a nuclear contaminated area.
[0027] The numbers in the figure are:
[0028] 1. Water sampling mechanism; 11. Fixed frame; 12. Mounting cylinder; 121. Stop limit block; 122. Horizontal slide; 13. Sampling chamber; 131. Partition; 132. Sliding limit block; 14. Underwater sampling assembly; 141. First connecting pipe; 142. First one-way valve; 143. First sampling pipe; 144. Second one-way valve; 15. Pneumatic drainage assembly; 151. Second connecting pipe; 152. Third connecting pipe; 153. Annular fixed sleeve; 154. Rotating mounting plate; 155. Fourth connecting pipe; 16. Pop-up assembly; 161. Pop-up push plate; 162. Spring; 163. Permanent magnet; 164. First electromagnet; 165. Second electromagnet body; 166, rope connecting seat; 17, rope connecting assembly; 171, steel rope; 172, take-up drum; 173, shaft connecting seat; 174, first rotating shaft; 175, second rotating shaft; 176, ratchet; 177, ratchet; 178, transmission plate; 179, first rotating driver; 18, connecting drive assembly; 181, first mounting bracket; 182, first lifting plate; 183, second mounting bracket; 184, second rotating driver; 185, driving gear; 186, driven gear; 2, sampling and collecting mechanism; 21, collecting bracket; 22, turntable; 23, water sampling bottle; 24, lead shell; 241, bottom shell; 243, threaded connecting ring; 242, upper shell. DETAILED DESCRIPTION
[0029] In order to further understand the features, technical means, specific objectives and functions of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0030] like Figure 1-10The nuclear radiation monitoring sampling vehicle for a nuclear contaminated area shown in the figure comprises a sampling vehicle body and a sampling and collecting mechanism 2, a soil sampling mechanism and a plant sampling mechanism arranged thereon, and also comprises a water body sampling mechanism 1. The sampling vehicle body is provided with the water body sampling mechanism 1 and the sampling and collecting mechanism 2 installed on the water body sampling mechanism 1 through an installation base plate. The water body sampling mechanism 1 is located beside the sampling and collecting mechanism 2. The water body sampling mechanism 1 comprises a fixing frame 11, a mounting tube 12, a sampling chamber 13, an underwater sampling component 14, a pneumatic drainage component 15, a pop-up component 16, a rope connection component 17 and a connecting drive component 18. The fixing frame 11 is fixedly mounted on the installation base plate, the mounting tube 12 is horizontally arranged on the fixing frame 11, the sampling chamber 13 is slidably arranged in the mounting tube 12, one end of the mounting tube 12 is open, the pop-up component 16 is arranged at the end of the mounting tube 12 away from the opening, the pop-up component 16 is transmission-connected to the sampling chamber 13, and the rope connection component 18 is connected to the sampling chamber 13. Component 17 is fixedly mounted on the fixed frame 11, the rope connection component 17 is connected to the sampling chamber 13, the pneumatic drainage component 15 is mounted on one end of the fixed frame 11 close to the opening of the mounting tube 12, the pneumatic drainage component 15 is provided with two groups and is respectively located at the upper and lower ends of the fixed frame 11, the underwater sampling component 14 is arranged inside the sampling chamber 13, the pneumatic drainage component 15 can be communicated with the underwater sampling component 14, the connecting drive component 18 is provided with two groups and is respectively located at the upper and lower ends of the fixed frame 11, the two groups of connecting drive components 18 are respectively connected to the two groups of pneumatic drainage components 15 in transmission, the sampling and collecting mechanism 2 includes a collecting bracket 21, a turntable 22, a water sampling bottle 23 and a lead shell 24, the turntable 22 is mounted on the mounting base plate, the collecting bracket 21 is arranged on the output end of the turntable 22, the water sampling bottle 23 is mounted on the collecting bracket 21, and the lead shell 24 is sleeved on the outside of the collecting bracket 21.
[0031] The device shown in the present invention can collect soil samples and plant samples through the soil sampling mechanism and plant sampling mechanism installed in the body of the sampling vehicle, and can also collect water samples of different water depths in the nuclear radiation area through the water sampling mechanism 1, and the collection work is completed on the shore, without the need for equipment wading, and the operation is convenient and efficient, filling the functional deficiencies of the existing equipment. The pop-up component 16 can eject the sampling chamber 13 to different positions according to needs to realize the water collection function at different positions. The underwater sampling component 14 can pre-store water bodies of different depths after the sampling chamber 13 enters the water. After the collection is completed, the sampling chamber 13 is pulled back by the rope connection component 17, and the connecting drive component 18 and the pneumatic drainage component 15 work to classify the water samples of different depths temporarily stored in the sampling chamber 13 by the underwater sampling component 14 and sequentially introduce them into the different water sampling bottles 23 of the sampling collection mechanism 2 for storage, thereby realizing the water classification collection function. The lead shell 24 can isolate the collection bracket 21 and the water sampling bottle 23 which may have nuclear radiation therein, making it easy for the operator to take out the sampling collection mechanism 2 as a whole, so as to protect the operator during the material collection process and improve safety.
[0032] The underwater sampling assembly 14 includes a first connecting pipe 141, a first one-way valve 142, a first sampling pipe 143 and a second one-way valve 144. The first connecting pipe 141 and the first one-way valve 142 are respectively provided with two, and the upper and lower ends of the sampling chamber 13 are provided with the first connecting pipe 141 and the first one-way valve 142. The middle part of the sampling chamber 13 is provided with two partitions 131, and an air chamber is separated between the two partitions 131. One end of the first connecting pipe 141 is connected to the outside of the sampling chamber 13, and the first connecting pipe 141 is connected to the outside of the sampling chamber 13. The other end of the tube 141 is connected to the gas chamber, and the first one-way valve 142 is installed on the first connecting tube 141. The conduction directions of the two first one-way valves 142 are consistent. There are several first sampling tubes 143 and second one-way valves 144, which are distributed in a ring around the axis of the sampling chamber 13. The two ends of the first sampling tube 143 are respectively connected to the upper and lower ends of the sampling chamber 13. A second one-way valve 144 is provided at the upper and lower ends of each first sampling tube 143, and the conduction directions of the second one-way valves 144 are consistent.
[0033] When the sampling chamber 13 enters the water, the air chamber provides buoyancy for the sampling chamber 13. When the sampling chamber 13 needs to take water samples from different water layers, the air chamber is filled with water and exhausted to realize the floating function of the equipment. The first one-way valve 142 controls the water inlet and exhaust speed and the amount of water inlet when the air chamber floats down, so as to control the diving depth. Preferably, a depth detection sensor can also be added to the sampling chamber 13 shown in the present invention to accurately control the diving depth. When the predetermined water depth is reached, the second one-way valve 144 is opened to introduce the water in the water layer into the first sampling tube 143 for sampling. Multiple first sampling tubes 143 can sample different water layers, thereby improving the efficiency of the sampling chamber 13 for single pop-up sampling.
[0034] The pop-up assembly 16 includes a pop-up push plate 161, a spring 162, a permanent magnet 163, a first electromagnet 164 and a second electromagnet 165. The pop-up push plate 161 can be slidably arranged inside the mounting tube 12. The spring 162 is arranged between the mounting tube 12 and the pop-up push plate 161. One end of the spring 162 is fixedly connected to the side wall of the pop-up push plate 161, and the other end of the spring 162 is fixedly connected to the end of the mounting tube 12 away from the opening. The permanent magnet 163 is fixedly mounted on the side wall of the pop-up push plate 161 close to the spring 162. The first electromagnet 164 is fixedly mounted on the end of the mounting tube 12 away from the opening. A plurality of second electromagnets 165 are provided, and the plurality of second electromagnets 165 are fixedly sleeved on the outer side wall of the mounting tube 12. The second electromagnets 165 are arranged in sequence along the axial direction of the mounting tube 12. The pop-up push plate 161 is transmission-connected to the sampling chamber 13. A stop limit block 121 for limiting the pop-up push plate 161 is provided on the inner wall of the mounting tube 12.
[0035] When the sampling chamber 13 needs to be ejected, the first electromagnet 164 is energized, the permanent magnet 163 and the first electromagnet 164 attract each other, and the permanent magnet 163 drives the ejection push plate 161 to compress the spring 162 so as to approach the first electromagnet 164. During the compression process of the ejection push plate 161, the sampling chamber 13 is always closely set on the ejection push plate 161. When it needs to be ejected, the first electromagnet 164 is powered off, and the spring 162 instantly releases its elastic force, and the ejection push plate 161 is quickly ejected outward, thereby pushing the sampling chamber 13 that is in contact with the ejection push plate 161 to be quickly ejected outward. In this process, when the permanent magnet 163 is close to the second electromagnet 165, the corresponding The second electromagnet 165 is energized, so that the second electromagnet 165 generates an attraction for the permanent magnet 163, thereby realizing the acceleration function of the permanent magnet 163. When the permanent magnet 163 is about to pass the second electromagnet 165 at the corresponding position, the second electromagnet 165 is powered off, and then the second electromagnet 165 at the side and rear is energized to realize the acceleration function similar to that of an electromagnetic gun, thereby further improving the ejection distance of the sampling chamber 13, so that the equipment can still eject the sampling chamber 13 into the water body at a distance far enough from the shore. According to the number of the second electromagnets 165 opened, the initial ejection speed of the ejection push plate 161 can be adjusted, and then the ejection distance can be adjusted according to demand, thereby improving the application range of the equipment.
[0036] The pop-up assembly 16 also includes a rope connection seat 166, which is fixedly mounted on one end of the sampling chamber 13 near the pop-up push plate 161. The rope connection assembly 17 includes a steel rope 171, a take-up drum 172, a shaft seat 173, a first rotating shaft 174, a second rotating shaft 175, a ratchet 176, a ratchet 177, a transmission disk 178 and a first rotating driver 179. One end of the steel rope 171 is fixedly connected to the sampling chamber 13 through the rope connection seat 166, and the other end of the steel rope 171 is wound around the take-up drum 172, and the take-up drum 172 is rotatably mounted on the fixed frame 11 through the shaft seat 173. The first rotating shaft 174 is fixedly connected to the take-up drum 172, the first rotating shaft 174 and the second rotating shaft 175 are both rotatably arranged on the shaft connection seat 173, the second rotating shaft 175, the first rotating shaft 174 and the take-up drum 172 are all coaxially arranged, the transmission disk 178 is coaxially fixedly connected to the second rotating shaft 175, the ratchet 176 is coaxially fixedly connected to the first rotating shaft 174, the ratchet 177 is elastically mounted on the transmission disk 178, the ratchet 177 is snap-fitted with the ratchet 176, the first rotating driver 179 is horizontally arranged, and the output end of the first rotating driver 179 is fixedly connected to the end of the second rotating shaft 175.
[0037] The cooperation of the ratchet 176 and the ratchet teeth 177 can realize the anti-reverse and transmission functions. The steel rope 171 is used to pull the sampling chamber 13. When the sampling chamber 13 is ejected, the steel rope 171 is pulled outward, and the take-up drum 172 rotates forward. At this time, the ratchet teeth 177 and the ratchet 176 are not engaged, and the first rotating shaft 174 can rotate normally without affecting the second rotating shaft 175. When the rope pulling operation is required, the second rotating shaft 175 connected thereto is driven to rotate through the output of the first rotating driver 179, and the second rotating shaft 175 drives the transmission disk 178 fixedly connected thereto to rotate. At this time, the ratchet teeth 177 rotates in the opposite direction, and the ratchet teeth 177 are engaged with the ratchet 176, which can drive the ratchet 176 and the ratchet teeth 177 to rotate synchronously, thereby driving the ratchet 176 to rotate. When the ratchet 176 rotates, it drives the first rotating shaft 174 and the take-up drum 172 fixedly connected thereto to rotate synchronously, thereby realizing the take-up function of the steel rope 171.
[0038] An air source is installed on the fixed frame 11, and the pneumatic drainage component 15 includes a second connecting pipe 151, a third connecting pipe 152, an annular fixed sleeve 153, a rotating mounting disk 154 and a fourth connecting pipe 155. One end of the second connecting pipe 151 located at the top of the fixed frame 11 is connected to the air source, and the other end of the second connecting pipe 151 can be connected to the first connecting pipe 141 at the top of the sampling chamber 13. One end of the second connecting pipe 151 located at the bottom of the fixed frame 11 can be connected to the first connecting pipe 141 at the bottom of the sampling chamber 13, and the other end of the second connecting pipe 151 extends outward from the outside of the equipment. The rotating mounting disk 154 can be rotatably installed on the fixed frame 11, and the connecting drive component 18 is transmission-connected to the rotating mounting disk 154. The third connecting pipe 152 is arranged on the rotating mounting On the disk 154, the second connecting tube 151 is installed at the center of the rotating mounting disk 154, and the second connecting tube 151 and the third connecting tube 152 are both slidably matched with the rotating mounting disk 154. One end of the third connecting tube 152 can be connected to the first sampling tube 143, and the other end of the third connecting tube 152 is connected to the annular fixed sleeve 153. One end of the fourth connecting tube 155 located on the upper side of the fixed frame 11 is connected to the air source, and the other end is connected to the annular fixed sleeve 153. The annular fixed sleeve 153 can be raised and lowered on the fixed frame 11. The annular fixed sleeve 153 is coaxially arranged with the first connecting tube 141. One end of the fourth connecting tube 155 located on the lower side of the fixed frame 11 is connected to the annular fixed sleeve 153, and the other end can be inserted into the water sampling bottle 23.
[0039] When sampling transfer is required, the sampling chamber 13 moves to the sampling position in the mounting cylinder 12. At this time, the second connecting tube 151 and the third connecting tube 152 can be connected to the first connecting tube 141 and the first sampling tube 143 through the lifting and lowering of the second connecting tube 151 and the third connecting tube 152. Through the gas source, the second connecting tube 151 introduces the gas into the first connecting tube 141, and then introduces it into the gas warehouse through the first connecting tube 141, and the water in the gas warehouse is discharged to the outside from the second connecting tube 151 below, realizing the function of draining water and storing gas, which is convenient for the next sampling operation. The gas is introduced into the first sampling tube 143 through the third connecting tube 152, and the corresponding water sample in the first sampling tube 143 is discharged downward, and the gas source is supplied to the gas warehouse through the first connecting tube 141. The through tube 152 is introduced into the water sampling bottle 23, and finally the water sample storage operation is performed through the water sampling bottle 23. In this way, the underwater sampling component 14 in the sampling chamber 13 can be used repeatedly, and water sampling is performed at different positions to improve the efficiency and accuracy of sampling. The first sampling tube 143 can be cleaned pneumatically to ensure the accuracy of subsequent sampling. The rotating mounting plate 154 can drive the third connecting tube 152 connected thereto to rotate a certain angle, thereby facilitating the third connecting tube 152 to be inserted into the first sampling tubes 143 at different positions in the underwater sampling component 14, so that all the first sampling tubes 143 in the underwater sampling component 14 can realize the transfer function.
[0040] The connecting drive assembly 18 includes a first mounting frame 181, a first lifting plate 182, a second mounting frame 183, a second rotation driver 184, a driving gear 185 and a driven gear 186. The first mounting frame 181 and the second mounting frame 183 are both fixedly mounted on the fixed frame 11. The first lifting plate 182 is arranged on the first mounting frame 181 so as to be able to be lifted and lowered. The second rotation driver 184 is fixedly mounted on the second mounting frame 183. The driving gear 185 is fixedly connected to the output end of the second rotation driver 184. The driving gear 185 and the driven gear 186 are meshed and transmitted through an intermediate gear. The driven gear 186 is fixedly mounted on the rotating mounting disk 154 and is coaxially arranged with the rotating mounting disk 154. The first lifting plate 182 is fixedly connected to the end of the second connecting pipe 151 and the annular fixed sleeve 153.
[0041] When the connecting drive assembly 18 is working, the first lifting plate 182 drives the second connecting tube 151 and the annular fixed sleeve 153 fixedly connected thereto to perform lifting operations synchronously during lifting. The annular fixed sleeve 153 can drive the third connecting tube 152 connected thereto to perform lifting operations synchronously, thereby realizing the action of inserting or pulling out the second connecting tube 151 and the third connecting tube 152. The output of the second rotating driver 184 drives the driving gear 185 to rotate, thereby driving the driven gear 186 meshing with the driving gear 185 to rotate. When the driven gear 186 rotates, it drives the rotating mounting disk 154 fixedly connected thereto to rotate, thereby realizing the deflection driving function of the third connecting tube 152.
[0042] A horizontal slide groove 122 is provided on the inner wall of the installation cylinder 12 , and a sliding limit block 132 slidably matched with the horizontal slide groove 122 is provided on the outer wall of the sampling chamber 13 .
[0043] The horizontal slide groove 122 and the sliding limit block 132 can guide and limit the sampling chamber 13 when it slides in the installation tube 12, so that the sampling chamber 13 can be stably ejected, and when the sampling chamber 13 is recovered, it can also limit the position of the sampling chamber 13.
[0044] The outer shell of the sampling chamber 13 is spherical in shape, and its upper and lower end surfaces are horizontal.
[0045] The spherical shell shape can ensure that the sampling chamber 13 reduces resistance when the rope is pulled back, avoids getting stuck at sharp corners, etc., and can ensure the success of the recovery process. The horizontal upper and lower end surfaces are conducive to the subsequent sampling and transfer operations of the underwater sampling component 14.
[0046] The lead shell 24 includes a bottom shell 241 and an upper shell 242. A locking block is provided on the bottom shell 241. A locking groove is provided on the top of the turntable 22. The bottom shell 241 and the turntable 22 are clamped together by the locking block and the locking groove. The collecting bracket 21 is arranged between the bottom shell 241 and the upper shell 242. The bottom shell 241 and the upper shell 242 can be threadedly connected through a threaded connecting ring 243. A lifting and mounting assembly for clamping the upper shell 242 for lifting and lowering is provided on the body of the sampling vehicle.
[0047] After sampling is completed, the entire collection bracket 21 needs to be placed in the lead shell 24 and sealed to prevent radiation leakage. At this time, the upper shell 242 is driven down by the lifting installation assembly, and the turntable 22 drives the bottom shell 241 to rotate. At this time, the bottom shell 241 and the upper shell 242 are threadedly connected through the threaded connection ring 243 to complete the lead sealing operation.
[0048] The above embodiments only express one or several implementation modes of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention patent shall be subject to the attached claims.
Claims
1. A nuclear radiation monitoring sampling vehicle for a nuclear contaminated area, comprising a sampling vehicle body and a sampling collection mechanism (2), a soil sampling mechanism and a plant sampling mechanism arranged thereon, characterized in that: The water sampling mechanism (1) is also included. The sampling vehicle body is provided with the water sampling mechanism (1) and the sampling collection mechanism (2) via a mounting base. The water sampling mechanism (1) is located beside the sampling collection mechanism (2). The water sampling mechanism (1) includes a fixing frame (11), a mounting tube (12), a sampling chamber (13), an underwater sampling component (14), a pneumatic drainage component (15), an ejection component (16), a rope connection component (17) and a communication drive component (18). The fixing frame (11) is fixedly mounted on the mounting base. The mounting tube (12) is horizontally arranged on the fixing frame (11). The sampling chamber (13) is slidably arranged in the mounting tube (12). One end of the mounting tube (12) is open. The ejection component (16) is arranged at an end of the mounting tube (12) away from the opening. The ejection component (16) is transmission-connected to the sampling chamber (13). The rope connection component (17) is fixedly mounted on the fixing frame (11). The rope connection component (17) is connected to the sampling chamber (13). (13), a pneumatic drainage component (15) is mounted on one end of the fixed frame (11) close to the opening of the mounting tube (12), two groups of the pneumatic drainage component (15) are respectively located at the upper and lower ends of the fixed frame (11), an underwater sampling component (14) is arranged inside the sampling chamber (13), the pneumatic drainage component (15) can be connected with the underwater sampling component (14), two groups of connecting drive components (18) are respectively located at the upper and lower ends of the fixed frame (11), the two groups of connecting drive components (18) are respectively connected to the two groups of pneumatic drainage components (15), and the sampling and collecting mechanism (2) comprises a collecting bracket (21), a rotating disk (22), a water sampling bottle (23) and a lead shell (24), the rotating disk (22) is mounted on the mounting bottom plate, the collecting bracket (21) is arranged on the output end of the rotating disk (22), the water sampling bottle (23) is mounted on the collecting bracket (21), and the lead shell (24) is sleeved on the outer side of the collecting bracket (21).
2. A nuclear radiation monitoring sampling vehicle for nuclear contaminated areas according to claim 1, characterized in that: The underwater sampling assembly (14) comprises a first connecting pipe (141), a first one-way valve (142), a first sampling pipe (143) and a second one-way valve (144). The first connecting pipe (141) and the first one-way valve (142) are respectively provided with two, and the first connecting pipe (141) and the first one-way valve (142) are provided at both upper and lower ends of the sampling chamber (13). Two partitions (131) are provided in the middle of the sampling chamber (13), and an air chamber is separated between the two partitions (131). One end of the first connecting pipe (141) is connected to the outside of the sampling chamber (13), and the second one-way valve (144) is provided at the bottom of the sampling chamber (13). The other end of a connecting pipe (141) is connected to the gas chamber. The first one-way valve (142) is installed on the first connecting pipe (141). The two first one-way valves (142) have the same conduction direction. A plurality of first sampling pipes (143) and second one-way valves (144) are provided and are distributed in a ring around the axis of the sampling chamber (13). The two ends of the first sampling pipe (143) are respectively connected to the upper and lower ends of the sampling chamber (13). The upper and lower ends of each first sampling pipe (143) are provided with a second one-way valve (144). The conduction directions of the second one-way valves (144) are the same.
3. A nuclear radiation monitoring sampling vehicle for nuclear contaminated areas according to claim 2, characterized in that: The pop-up assembly (16) comprises a pop-up push plate (161), a spring (162), a permanent magnet (163), a first electromagnet (164) and a second electromagnet (165). The pop-up push plate (161) is slidably arranged inside the mounting tube (12). The spring (162) is arranged between the mounting tube (12) and the pop-up push plate (161). One end of the spring (162) is fixedly connected to the side wall of the pop-up push plate (161). The other end of the spring (162) is fixedly connected to the end of the mounting tube (12) away from the opening. The permanent magnet (163) is fixedly installed on the pop-up push plate (164). A first electromagnet (164) is fixedly mounted on a side wall of the push plate (161) close to the spring (162) at one end of the mounting tube (12) away from the opening. A plurality of second electromagnets (165) are provided. The plurality of second electromagnets (165) are fixedly sleeved on the outer side wall of the mounting tube (12). The second electromagnets (165) are arranged in sequence along the axial direction of the mounting tube (12). The pop-up push plate (161) is transmission-connected to the sampling chamber (13). A stop block (121) for limiting the pop-up push plate (161) is provided on the inner wall of the mounting tube (12).
4. A nuclear radiation monitoring sampling vehicle for nuclear contaminated areas according to claim 3, characterized in that: The pop-up assembly (16) further comprises a rope connection seat (166), the rope connection seat (166) being fixedly mounted on one end of the sampling chamber (13) close to the pop-up push plate (161), the rope connection assembly (17) comprising a steel rope (171), a take-up drum (172), an axle connection seat (173), a first rotating shaft (174), a second rotating shaft (175), a ratchet wheel (176), a ratchet tooth (177), a transmission disk (178) and a first rotating driver (179), one end of the steel rope (171) being fixedly connected to the sampling chamber (13) via the rope connection seat (166), the other end of the steel rope (171) being wound around the take-up drum (172), and the take-up drum (172) being rotatably mounted on the fixed frame (179) via the axle connection seat (173). 11), a first rotating shaft (174) is fixedly connected to a take-up drum (172), the first rotating shaft (174) and the second rotating shaft (175) are both rotatably arranged on a shaft connection seat (173), the second rotating shaft (175), the first rotating shaft (174) and the take-up drum (172) are all coaxially arranged, a transmission disk (178) is coaxially fixedly connected to the second rotating shaft (175), a ratchet (176) is coaxially fixedly connected to the first rotating shaft (174), a ratchet (177) is elastically mounted on the transmission disk (178), the ratchet (177) is engaged with the ratchet (176), a first rotating driver (179) is horizontally arranged, and an output end of the first rotating driver (179) is fixedly connected to an end of the second rotating shaft (175).
5. The nuclear radiation monitoring sampling vehicle for nuclear contaminated areas according to claim 4, characterized in that: An air source is installed on the fixed frame (11). The pneumatic drainage component (15) comprises a second connecting pipe (151), a third connecting pipe (152), an annular fixed sleeve (153), a rotating mounting plate (154) and a fourth connecting pipe (155). One end of the second connecting pipe (151) located at the top of the fixed frame (11) is connected to the air source. The other end of the second connecting pipe (151) can be connected to the first connecting pipe (141) at the top of the sampling chamber (13). One end of the second connecting pipe (151) located at the bottom of the fixed frame (11) can be connected to the first connecting pipe (141) at the bottom of the sampling chamber (13). The other end of the second connecting pipe (151) extends outwardly from the outside of the device. The rotating mounting plate (154) can be rotatably installed on the fixed frame (11). The communication drive component (18) is transmission-connected to the rotating mounting plate (154). The third connecting pipe (152) is arranged on the rotating mounting plate. On the mounting plate (154), the second connecting tube (151) is mounted at the center of the rotating mounting plate (154); the second connecting tube (151) and the third connecting tube (152) are both slidably matched with the rotating mounting plate (154); one end of the third connecting tube (152) can be connected to the first sampling tube (143); the other end of the third connecting tube (152) is connected to the annular fixed sleeve (153); one end of the fourth connecting tube (155) located on the upper side of the fixing frame (11) is connected to the gas source; the other end is connected to the annular fixed sleeve (153); the annular fixed sleeve (153) is arranged on the fixing frame (11) in a lifting manner; the annular fixed sleeve (153) and the first connecting tube (141) are arranged coaxially; one end of the fourth connecting tube (155) located on the lower side of the fixing frame (11) is connected to the annular fixed sleeve (153); the other end can be inserted into the water body sampling bottle (23).
6. A nuclear radiation monitoring sampling vehicle for nuclear contaminated areas according to claim 5, characterized in that: The communication drive assembly (18) comprises a first mounting frame (181), a first lifting plate (182), a second mounting frame (183), a second rotary driver (184), a driving gear (185) and a driven gear (186); the first mounting frame (181) and the second mounting frame (183) are both fixedly mounted on a fixed frame (11); the first lifting plate (182) is arranged on the first mounting frame (181) in a manner capable of being lifted and lowered; the second rotary driver (184) is fixedly mounted on the second mounting frame (183); the driving gear (185) is fixedly connected to an output end of the second rotary driver (184); the driving gear (185) and the driven gear (186) are meshed and driven via an intermediate gear; the driven gear (186) is fixedly mounted on a rotating mounting disk (154) and is coaxially arranged with the rotating mounting disk (154); the first lifting plate (182) is fixedly connected to an end of the second communication pipe (151) and an annular fixed sleeve (153).
7. A nuclear radiation monitoring sampling vehicle for nuclear contaminated areas according to claim 6, characterized in that: A horizontal slide groove (122) is provided on the inner wall of the installation cylinder (12), and a sliding limit block (132) that slidably cooperates with the horizontal slide groove (122) is provided on the outer wall of the sampling chamber (13).
8. The nuclear radiation monitoring sampling vehicle for nuclear contaminated areas according to claim 7, characterized in that: The outer shell of the sampling chamber (13) is spherical in shape, and its upper and lower end surfaces are horizontal.
9. The nuclear radiation monitoring sampling vehicle for nuclear contaminated areas according to claim 1, characterized in that: The lead shell (24) comprises a bottom shell (241) and an upper shell (242); a locking block is provided on the bottom shell (241); a locking groove is provided on the top of the turntable (22); the bottom shell (241) and the turntable (22) are clamped together by the locking block and the locking groove; the collecting bracket (21) is arranged between the bottom shell (241) and the upper shell (242); the bottom shell (241) and the upper shell (242) can be threadedly connected by a threaded connection ring (243); and a lifting and mounting assembly for clamping the upper shell (242) for lifting and lowering is provided on the body of the sampling vehicle.
