Virtual power plant distributed energy storage optimization configuration method oriented to multiple power services

By building a distributed and robust virtual power plant distributed energy storage optimization configuration model, the problems of heterogeneous distributed resource management and diversified power service market mechanism are solved, the efficient operation of virtual power plant systems and market competitiveness are achieved, and the electricity is optimized Configuration and operating mode of chemical energy storage equipment.

CN119010137AActive Publication Date: 2024-11-22NORTH CHINA ELECTRIC POWER UNIV

Patent Information

Application Number
CN202411061584.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-22
Estimated Expiration
2044-08-05

AI Technical Summary

Technical Problem

The existing technology lacks effective energy management methods for a large number of heterogeneous distributed resources. The market mechanism for distributed resources to participate in diversified power services is incomplete, and it does not involve multiple types of distributed energy storage optimization configuration models under the diversified market model, resulting in energy storage. The system has high cost, low efficiency and short life cycle, which affects the operating efficiency and market competitiveness of virtual power plants.

Method used

A method for distributed energy storage optimization configuration of virtual power plants for diversified power services is proposed. Based on a distributed and robust virtual power plant distributed energy storage refined selection and capacity optimization configuration model for participating in diversified power services, by constructing uncertain variables The calculation model and decision variables are optimized to optimize the configuration of electrochemical energy storage equipment, and maximize the returns of virtual power plants and improve market competitiveness.

Benefits of technology

It realizes flexible regulation of distributed resources in virtual power plant systems, improves the market returns of each aggregation object and the competitiveness of virtual power plants, clarifies the joint operation mode of distributed wind and light generator sets and electrochemical energy storage equipment, and builds multiple types The personalized operation model and incentive mechanism of energy storage equipment have improved the application efficiency of energy storage systems and market participation benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119010137A_ABST
    Figure CN119010137A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-element power service-oriented virtual power plant distributed energy storage optimal configuration method, which comprises the following steps of: constructing a calculation model of an uncertainty variable and a decision variable, obtaining an optimization direction of maximizing the income within a preset time, and further constructing a distributed robust optimal configuration model; obtaining a historical data sample set of a second uncertainty variable, constructing a fuzzy set of the second uncertainty variable by adopting Wasserstein measurement, obtaining a reconstructed min-sup-shaped objective function and a data-driven uncertainty set boundary in combination with a duality theory, and converting an uncertainty error probability constraint into a determinacy error probability constraint; and solving the distribution robust optimization configuration model, obtaining a number set of decision variables, and configuring the electrochemical energy storage equipment. According to the method, a large number of heterogeneous distributed resources participate in flexible regulation and control of the virtual power plant, the operation efficiency and the active support capability are improved, and the benefits obtained by each aggregation object participating in the market and the competitive capacity of the virtual power plant participating in the power market are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of distributed energy storage planning, and in particular to a distributed energy storage optimization configuration method for a virtual power plant for multiple power services. Background Art

[0002] Distributed power generation technology is developing rapidly. Distributed power sources such as photovoltaics and wind turbines are connected to the distribution network on a large scale, and non-fossil energy power generation has become the development trend of the future power grid. However, distributed power generation is greatly affected by environmental factors, and the output has a large degree of randomness and volatility. After large-scale access to the power grid, it will have a certain impact on the stability of the power system, power quality, and operation planning.

[0003] As a technology for coordinated operation and management of distributed power sources, virtual power plant (VPP) provides a new method to solve the above problems. VPP can aggregate distributed generators, battery energy storage systems and controllable loads as a controllable power generator to participate in grid dispatching and power market transactions. It can better distribute load directional consumption, improve renewable energy consumption, and improve the stability of power system operation. Among them, power storage technology can enable VPP to better participate in diversified power market transactions through its flexible adjustment capabilities, which can effectively improve the flexibility and reliability of renewable energy consumption and grid operation control. However, the current energy storage system has problems such as high cost, low efficiency and short life cycle, which leads to certain limitations in its application in the power system. In order to give full play to the role of energy storage system in VPP and improve the operating income of VPP, it is necessary to optimize the configuration of energy storage system in VPP.

[0004] Defects and shortcomings of the existing technology:

[0005] Lack of effective energy management methods for a large number of heterogeneous distributed resources: VPP contains a large number of distributed generators, distributed energy storage and controllable loads with small capacity, large number and wide distribution. Distributed energy resources may belong to different industrial user interest groups. The effects and interests of different groups should be taken into account in the process of energy management. How to coordinate a large number of heterogeneous distributed resources to participate in VPP regulation and control and improve operational efficiency and active support capabilities is a difficult problem.

[0006] The market mechanism for distributed resources to participate in diversified power services is not yet perfect: Since VPP contains abundant photovoltaic, storage and charging resources, it can participate in diversified power markets such as demand response, peak load regulation and frequency regulation to obtain superimposed benefits. However, multiple factors such as cost, risk and synergy will affect the economic benefits of distributed resources participating in the market. There is an unfair distribution of risks and benefits. The market mechanism for multiple subjects to jointly participate in diversified power services needs further exploration.

[0007] The study of the optimal configuration model of multiple types of distributed energy storage under the multi-market model is not involved: on the one hand, in response to the differentiated needs of different electricity markets, how to effectively take into account the differences in time scales and resource time domain response performance of different electricity markets, and effectively aggregate and optimize distributed resources with multi-terminal randomness is a major challenge; on the other hand, the time-varying relationship between the energy storage demand characteristics and energy storage benefits of different electricity services, the coupling of energy storage at different times to assist VPP distributed resources in participating in multiple services, and the aggregation and reuse methods and benefit mechanisms of multiple types of distributed energy storage power and energy have not yet been clarified. Summary of the invention

[0008] In order to solve the above-mentioned problems in the prior art, the present invention provides a distributed energy storage optimization configuration method for a virtual power plant for diversified power services, and proposes a distributed energy storage refined selection and capacity optimization configuration model for virtual power plants participating in diversified power services based on distributed blue bars, so as to flexibly coordinate a large number of heterogeneous distributed resources to participate in virtual power plants for regulation, improve operating efficiency and active support capabilities, and at the same time improve the benefits of each aggregated object participating in the market and the competitiveness of virtual power plants in participating in the power market.

[0009] In order to achieve the above-mentioned object of the invention, the present invention provides a distributed energy storage optimization configuration method for a virtual power plant for multiple power services, comprising the following steps:

[0010] A first uncertainty variable is obtained based on the real-time electricity price, the frequency regulation service price and the load electricity selling price; a second uncertainty variable is obtained based on the output of the distributed wind and photovoltaic generators and the load of the controllable load;

[0011] Constructing a calculation model of uncertainty variables based on the first uncertainty variable and the second uncertainty variable;

[0012] Constructing decision variables; the virtual power plant includes the distributed wind and photovoltaic generators, the electrochemical energy storage device and the controllable load, and the decision variables are at least used to configure the electrochemical energy storage device;

[0013] Obtaining an optimization direction based on the calculation model of the uncertainty variable and the decision variable, wherein the optimization direction is to maximize the profit of the virtual power plant within a preset time;

[0014] Based on the optimization direction and the calculation model of the uncertainty variable, a distributed energy storage distributed blue-robust optimization configuration model of a virtual power plant for multiple power services is constructed, wherein the distributed blue-robust optimization configuration model includes a min-sup type objective function and constraints, wherein the constraints include deterministic constraints and uncertainty error probability constraints, the virtual power plant includes an electrochemical energy storage device, and the decision variables of the optimization configuration model are at least used to configure the electrochemical energy storage device;

[0015] Acquire a historical data sample set, where the data in the historical data sample set includes historical data of the second uncertainty variable;

[0016] Based on the historical data sample set, a fuzzy set of a second uncertainty variable is constructed using Wasserstein metric;

[0017] Based on the fuzzy set and duality theory of the second uncertainty variable, a reconstructed min-sup type objective function is obtained, and a data-driven uncertainty set boundary is obtained;

[0018] Based on the data-driven uncertainty set boundary, converting the uncertainty error probability constraint into a deterministic error probability constraint;

[0019] The distributed robust optimization configuration model is solved based on the deterministic constraints, the deterministic error probability constraints and the reconstructed min-sup type objective function to obtain a set of decision variables.

[0020] Furthermore, the steps of constructing the calculation model of the uncertainty variable are:

[0021] Based on the market operation information, the preset time is divided according to Formula 1, and the Formula 1 is:

[0022]

[0023] In the formula, π is the total number of time periods divided within the preset time, T is the preset time, and T E is the time interval for the market operator to release spot market information, κ is the total number of moments divided into each time period, T FR The time interval for the market operator to publish announcements on the demand for frequency regulation ancillary services;

[0024] Based on the formula 1, constructing a calculation model of the first uncertainty variable and a calculation model of the second uncertainty variable within the preset time respectively;

[0025] The calculation model of the first uncertainty variable includes:

[0026]

[0027]

[0028] The calculation model of the second uncertainty variable includes:

[0029]

[0030] In the formula, is the real-time electricity price at time t in period i, is the price of frequency modulation service at time t in period i, is the load electricity price at time t in period i, is the real-time electricity price forecast value at time t in period i, is the predicted value of the frequency modulation service price at time t in period i, is the predicted value of the load electricity price at time t in period i, is the real-time electricity price forecast deviation at time t in period i, is the forecast deviation of the frequency modulation service price at time i and time t, is the load electricity price forecast deviation at time i and time t, N(·,·) is a normal distribution, σ E is the standard deviation of the real-time electricity price forecast error, σ FR is the standard deviation of the frequency modulation service price forecast error, σ load is the standard deviation of the load electricity price forecast error, is the output of the x-th wind turbine at time t in period i, is the output of the yth photovoltaic array at time t in period i, is the load of the jth controllable load in period i and time t, is the output forecast value of the x-th wind turbine at time period i and time t, is the output forecast value of the yth photovoltaic array at time i and time t, is the load forecast value of the jth controllable load in period i and time t, is the output prediction deviation of the x-th wind turbine at time i and time t, is the output prediction deviation of the yth photovoltaic array at time i and time t, is the load forecast deviation of the jth controllable load in time period i and time t.

[0031] Furthermore, the steps of constructing the fuzzy set of the second uncertainty variable using Wasserstein metric are:

[0032] Obtain the support set of the second uncertainty variable, where the support set of the second uncertainty variable is:

[0033]

[0034] Where Ξ is the support set of the second uncertainty variable, is the support matrix, ω is the second uncertainty variable vector, is the support vector;

[0035] An empirical probability distribution model of a second uncertainty variable is constructed based on the historical data sample set. The empirical probability distribution model of the second uncertainty variable is:

[0036]

[0037] In the formula, is the empirical probability distribution of the second uncertainty variable, M is The number of historical data samples in , l is The serial number of the historical data sample in , for The Dirac measure of the lth historical data sample in is, for The lth historical data sample in is a sample set of historical data;

[0038] A distance measurement model based on Wasserstein metric is constructed according to the empirical probability distribution model of the second uncertainty variable. The distance measurement model based on Wasserstein metric is:

[0039]

[0040] In the formula, for and The distance is the true probability distribution of the second uncertainty variable, inf represents the lower bound function, Π is the probability distribution of the second uncertainty variable sample in Ξ and The joint probability distribution of historical data samples in and is the marginal probability distribution, k is the serial number of the second uncertainty variable sample in Ξ, is the number of samples of the second uncertainty variable in Ξ, ω k is the kth second uncertainty variable sample in Ξ, Π kl Take ω for Π k and The probability value when for Take ω k The probability value when ; st represents the constraint;

[0041] A confidence level is obtained, and a Wasserstein sphere radius is obtained according to the confidence level; the Wasserstein sphere radius is:

[0042]

[0043] In the formula, r(M,ε) is the radius of the Wasserstein ball, ε is the confidence level, and D is the diameter of the support of the uncertain variable;

[0044] The fuzzy set of the second uncertainty variable is obtained according to the Wasserstein sphere radius and the distance measurement model based on the Wasserstein metric; the fuzzy set of the second uncertainty variable is:

[0045]

[0046] In the formula, is the fuzzy set of the second uncertainty variable.

[0047] Furthermore, the min-sup objective function is:

[0048]

[0049] Where min is the minimization function, and min is the outer function of the min-sup objective function, sup is the upper limit function, and sup is the inner function of the min-sup objective function, χ is the decision variable vector, ω is the second uncertainty variable vector, is the true probability distribution of the second uncertainty variable, is the fuzzy set of the second uncertainty variable, represents expectation, G is the function of the opposite number of return;

[0050] The steps of obtaining the reconstructed min-sup type objective function are:

[0051] The first process function is obtained by rewriting the inner function of the min-sup objective function based on the fuzzy set of the second uncertainty variable; the first process function is:

[0052]

[0053] The first process function is transformed based on the duality theory to obtain the dual function of the first process function; the dual function of the first process function is:

[0054]

[0055] In the formula, λ, s l is the dual variable;

[0056] The function of the opposite number of the maximum benefit is rewritten as a piecewise linear convex function, which is:

[0057]

[0058] In the formula, J is a finite set, q is the sequence number of the function segment, max is the maximization function, and a q (χ) and b q (χ) is the coefficient of the affine function;

[0059] Obtain the auxiliary vector and the dual norm of the auxiliary vector;

[0060] The second process function is obtained by rewriting the dual function of the first process function based on the auxiliary vector, the dual norm of the auxiliary vector and the piecewise linear convex function; the second process function is:

[0061]

[0062] In the formula, is the auxiliary vector, for The dual norm of ;

[0063] The constraints of the second process function are transformed based on the duality theory to obtain the third process function; the third process function is:

[0064]

[0065] In the formula, r lq is the dual variable, the superscript represents transpose;

[0066] The reconstructed min-sup objective function is obtained according to the third process function and the outer layer function of the min-sup objective function; the reconstructed min-sup objective function is:

[0067]

[0068] Furthermore, the optimization direction is:

[0069] maxS=S E +S FR +S load -C curt -C re -C ba -C loss -C om -C ex ;

[0070] In the formula, max means maximization, S is the benefit, S E is the revenue from electricity sales to the virtual power plant grid, S FR The revenue of virtual power plants participating in the frequency regulation ancillary service market, S load is the revenue from selling electricity to the internal load of the virtual power plant, C curt is the demand response cost, C reis the standby cost, C ba is the energy storage regulation cost, C loss is the life loss cost, C om is the operation and maintenance cost, C EX To compensate for the cost of incentives;

[0071] The revenue from electricity sales of the virtual power plant grid is:

[0072]

[0073] In the formula, S E is the power sales revenue of the virtual power plant grid, π is the total number of time periods divided within the preset time, κ is the total number of moments divided within each time period, i is the time period number, t is the moment number, is the real-time electricity price at time t in period i, is the real-time electricity price in time period i and time 1~κ, is the amount of electricity sold by the virtual power plant to the spot market at time t during period i;

[0074] The revenue of the virtual power plant participating in the frequency regulation ancillary service market is:

[0075]

[0076] In the formula, S FR To benefit from the participation of virtual power plants in the frequency regulation ancillary service market, is the price of frequency modulation service at time t in period i, The frequency regulation capacity provided by the virtual power plant to the frequency regulation ancillary service market at time t during period i;

[0077] The revenue from selling electricity for the internal load of the virtual power plant is:

[0078]

[0079] In the formula, S load The revenue from selling electricity to the internal load of the virtual power plant. is the load electricity price at time t in period i, N load is the number of controllable loads aggregated in the virtual power plant, j is the sequence number of the controllable loads in the virtual power plant, is the load of the jth controllable load in time period i and time t;

[0080] The demand response cost is:

[0081]

[0082] In the formula, C curt is the demand response cost, is the interruption load compensation price of the jth controllable load in period i and time t, is the load interruption amount of the jth controllable load in time period i and time t;

[0083] The standby cost is:

[0084]

[0085] In the formula, C re is the standby cost, N Ti is the number of lithium titanate batteries aggregated in the virtual power plant, N Fe is the number of lithium iron phosphate batteries aggregated in the virtual power plant, m is the serial number of the lithium titanate battery in the virtual power plant, n is the serial number of the lithium iron phosphate battery in the virtual power plant, is the upper reserve capacity price of the mth lithium titanate battery, is the lower reserve capacity price of the mth lithium titanate battery, is the upper reserve capacity price of the nth lithium iron phosphate battery, is the lower reserve capacity price of the nth lithium iron phosphate battery; is the maximum reserve capacity of the mth lithium titanate battery at time i and time t, r i,t,m is the reserve capacity of the mth lithium titanate battery at time i and time t; is the maximum reserve capacity of the nth lithium iron phosphate battery at time t in period i, r i,t,n is the reserve capacity of the nth lithium iron phosphate battery at time i and time t;

[0086] The energy storage regulation cost is:

[0087]

[0088] In the formula, C ba Adjusting costs for energy storage, is the participation factor of the mth lithium titanate battery at time i and time t, is the participation factor of the nth lithium iron phosphate battery at time i and time t, is the unit adjustment cost of the mth lithium titanate battery, is the unit adjustment cost of the nth lithium iron phosphate battery; i,t is the total uncertainty of source and load within the virtual power plant at time i and time t; N W is the number of wind turbines aggregated in the virtual power plant, N PV is the number of photovoltaic arrays aggregated in the virtual power plant, x is the serial number of the wind turbine in the virtual power plant, y is the serial number of the photovoltaic array in the virtual power plant, is the output prediction deviation of the x-th wind turbine at time i and time t, is the output prediction deviation of the yth photovoltaic array at time i and time t, is the load forecast deviation of the jth controllable load at time i and time t;

[0089] The life loss cost is:

[0090]

[0091] In the formula, C loss is the life loss cost, is the unit charge and discharge power life loss cost coefficient of the mth lithium titanate battery, is the unit charge and discharge power life loss cost coefficient of the nth lithium iron phosphate battery; is the charging efficiency of the mth lithium titanate battery, is the discharge efficiency of the mth lithium titanate battery, is the charging efficiency of the nth lithium iron phosphate battery, Discharge efficiency of the nth lithium iron phosphate battery; is the charging power of the mth lithium titanate battery at time t in period i, is the discharge power of the mth lithium titanate battery at time t in period i, is the charging power of the nth lithium iron phosphate battery at time t in period i, is the discharge power of the nth lithium iron phosphate battery at time t in period i;

[0092] The operation and maintenance costs are:

[0093]

[0094] In the formula, C om For operation and maintenance costs, is the operation and maintenance cost coefficient of the mth lithium titanate battery, is the operation and maintenance cost coefficient of the nth lithium iron phosphate battery; is the unit capacity investment cost of the mth lithium titanate battery, is the unit capacity investment cost of the nth lithium iron phosphate battery; is the rated capacity of the mth lithium titanate battery, is the rated capacity of the nth lithium iron phosphate battery; is the discount rate of the mth lithium titanate battery, is the discount rate of the nth lithium iron phosphate battery; is the service life of the mth lithium titanate battery, is the service life of the nth lithium iron phosphate battery;

[0095] The incentive compensation cost is:

[0096]

[0097] In the formula, C EX To motivate compensation costs, is the incentive compensation price of the mth lithium titanate battery in period i and time t, is the incentive compensation price of the nth lithium iron phosphate battery at time i and time t, is the rated power of the mth lithium titanate battery, is the rated power of the nth lithium iron phosphate battery, As the basic incentive compensation price.

[0098] Furthermore, the deterministic constraints include power balance constraints, affine constraints, demand response constraints, energy storage equipment personalized operation constraints, market access constraints, and energy storage aggregation capacity constraints;

[0099] The power balance constraint is:

[0100]

[0101] The affine constraint is:

[0102]

[0103] The demand response constraints are:

[0104]

[0105] In the formula, is the load interruption of the jth controllable load in time period i and time (t+1), is the load of the jth controllable load at time (t+1) in period i, η max is the maximum call rate of controllable load at a single moment, It is the maximum value of the sum of the continuous call rates of the controllable loads at two adjacent moments;

[0106] The personalized operation constraints of the energy storage device are:

[0107]

[0108]

[0109] 2≤Δ Ti <Δ Fe <κ;

[0110] In the formula, is the state of charge of the mth lithium titanate battery at time i and time t, is the charge state of the nth lithium iron phosphate battery at time i and time t; is the self-discharge rate of the mth lithium titanate battery, is the self-discharge rate of the nth lithium iron phosphate battery; is the lower limit of the state of charge of the mth lithium titanate battery, The lower limit of the charge state of the nth lithium iron phosphate battery; is the upper limit of the state of charge of the mth lithium titanate battery, The upper limit of the state of charge of the nth lithium iron phosphate battery; is the Boolean variable of the mth lithium titanate battery at time i and time t, 1 means that the mth lithium titanate battery is in the charging state at time t during period i. 0 means that the mth lithium titanate battery is in the discharge state at time t in period i. is the Boolean variable of the nth lithium iron phosphate battery at time i and time t, 1 means that the nth lithium iron phosphate battery is in the charging state at time t during period i. 0 means that the nth lithium iron phosphate battery is in the discharge state at time t during period i, Δ Ti is the maximum continuous high power output time of the power type energy storage device, Δ Fe It is the maximum continuous high power output time of the energy storage device; The continuous Δ Ti The maximum value of the sum of load factors at any moment; The continuous Δ Fe The minimum value of the sum of load factors at all times;

[0111] The market access constraints are:

[0112]

[0113] In the formula, Adjust the capacity threshold for the aggregate upwards, is the aggregate charging power threshold; Adjust the capacity threshold downward for the aggregate, θ is the aggregate discharge power threshold;

[0114] The energy storage aggregation capacity constraint is:

[0115]

[0116] In the formula, φ Ti Configure the capacity limit for a single lithium titanate battery, φ Fe Configure the capacity limit for a single lithium iron phosphate battery; φ con It is the upper limit of the total aggregate capacity of energy storage equipment in the virtual power plant.

[0117] Furthermore, the uncertainty error probability constraint is:

[0118]

[0119] In the formula, inf represents the lower bound function, is the true probability distribution of the second uncertainty variable; β is the probability of violating the uncertainty error probability constraint.

[0120] Furthermore, the step of converting the uncertainty error probability constraint into the deterministic error probability constraint is:

[0121] The uncertainty error probability constraint is rewritten based on Formula 2 to obtain a general mathematical expression for the uncertainty error probability constraint, where Formula 2 is:

[0122]

[0123] Where g(χ,ω) is the function expression of the event in {·};

[0124] The historical data sample set is processed according to the standardized equation to obtain the random variable sample set; the standardized equation is:

[0125]

[0126] In the formula, is the lth random variable sample, for The lth historical data sample in , Σ is the variance of the historical data sample set, is the mean of the historical data sample set;

[0127] Based on the random variable sample set, a random variable uncertainty set is constructed, and the random variable uncertainty set is:

[0128]

[0129] In the formula, is an uncertain set of random variables with τ as the boundary, σ is a random variable, R is a real number, and τ is the boundary of the uncertain set of random variables;

[0130] Based on the fuzzy set of the second uncertainty variable and the random variable uncertainty set, a random variable uncertainty set boundary solution model is constructed, and the random variable uncertainty set boundary solution model is:

[0131]

[0132] Based on the duality theory, the random variable uncertainty set boundary solution model is transformed to obtain a reconstructed random variable uncertainty set boundary solution model, and the reconstructed random variable uncertainty set boundary solution model is:

[0133]

[0134] The data-driven uncertainty set boundary solution model is solved according to the reconstructed random variable uncertainty set boundary solution model and formula three; the formula three is:

[0135]

[0136] Where ψ is the boundary of the data-driven uncertainty set;

[0137] The deterministic error probability constraint is obtained according to the data-driven uncertainty set boundary solution model and the uncertainty error probability constraint, and the deterministic error probability constraint is:

[0138] g(χ,ψ)≤0.

[0139] Furthermore, the electrochemical energy storage device includes a power type energy storage device and an energy type energy storage device, wherein the power type energy storage device includes N Ti A lithium titanate battery, wherein the energy storage device comprises N Fe Lithium iron phosphate battery, N Ti is the number of lithium titanate batteries aggregated in the virtual power plant, N Fe is the number of lithium iron phosphate batteries aggregated in the virtual power plant;

[0140] The decision variables include the real-time upper reserve capacity of the lithium titanate battery, the real-time lower reserve capacity of the lithium titanate battery, the real-time upper reserve capacity of the lithium iron phosphate battery, the real-time lower reserve capacity of the lithium iron phosphate battery, the real-time participation factor of the lithium titanate battery, the real-time participation factor of the lithium iron phosphate battery, the real-time charging power of the lithium titanate battery, the real-time discharge power of the lithium titanate battery, the real-time charging power of the lithium iron phosphate battery, the real-time discharge power of the lithium iron phosphate battery, the rated capacity of the lithium titanate battery, the rated capacity of the lithium iron phosphate battery, the rated power of the lithium titanate battery, the rated power of the lithium iron phosphate battery, the real-time state of charge of the lithium titanate battery, the real-time state of charge of the lithium iron phosphate battery, the real-time Boolean variable of the lithium titanate battery, and the real-time Boolean variable of the lithium iron phosphate battery.

[0141] Furthermore, the decision variables also include the real-time electricity sold by the virtual power plant to the spot market, the real-time frequency regulation capacity provided by the virtual power plant to the frequency regulation auxiliary service market, the real-time interruption load compensation price of the controllable load, the real-time load interruption amount of the controllable load, the real-time incentive compensation price of the lithium titanate battery, and the real-time incentive compensation price of the lithium iron phosphate battery.

[0142] The beneficial effects of the present invention are:

[0143] 1. The present invention develops a virtual power plant bidding framework and its coordinated operation mechanism under a diversified market environment, and clarifies the joint operation mode between distributed wind and photovoltaic power generation units and various types of electrochemical energy storage equipment and controllable loads within the virtual power plant.

[0144] 2. Aiming at the energy and power requirements of different types of power services, the present invention proposes an aggregation multiplexing method and incentive mechanism for distributed power-type energy storage devices and energy-type energy storage devices, and constructs a personalized operation model and cost model for multiple types of distributed electrochemical energy storage devices.

[0145] 3. The distributed energy storage distributed blue-robust optimization configuration model for virtual power plants for diversified power services constructed by the present invention can carry out refined selection and capacity optimization configuration of distributed electrochemical energy storage equipment participating in diversified power services of virtual power plant systems, realize flexible regulation of a large number of heterogeneous distributed resources participating in virtual power plants, and at the same time improve the benefits of each aggregated object participating in the market and the competitiveness of virtual power plants in participating in the power market. BRIEF DESCRIPTION OF THE DRAWINGS

[0146] Figure 1 It is a schematic diagram of the process of the present invention;

[0147] Figure 2 It is a schematic diagram of the principle of the present invention. DETAILED DESCRIPTION

[0148] In order to clearly illustrate the technical features of this solution, this solution is described below through a specific implementation method.

[0149] See also Figure 1 , 2 The embodiment of the present invention provides a distributed energy storage optimization configuration method for a virtual power plant for multiple power services, comprising the following steps:

[0150] A first uncertainty variable is obtained based on the real-time electricity price, the frequency regulation service price and the load electricity selling price; a second uncertainty variable is obtained based on the output of the distributed wind and photovoltaic generators and the load of the controllable load;

[0151] A computational model of uncertainty variables is constructed based on the first uncertainty variable and the second uncertainty variable; the multiple power markets in which the virtual power plant participates are the spot market and the frequency regulation auxiliary service market. In the market transaction process, the virtual power plant coordination and control center first predicts the real-time electricity price, frequency regulation service price, load electricity sales price, new energy output (distributed wind and photovoltaic power generation units include distributed wind turbines and distributed photovoltaic arrays, and new energy output includes distributed wind turbine output and distributed photovoltaic array output) and controllable load based on historical information, that is, constructs a computational model of uncertainty variables;

[0152] Constructing decision variables; the virtual power plant includes distributed wind and photovoltaic generators, electrochemical energy storage devices and controllable loads, and the decision variables are at least used to configure the electrochemical energy storage devices;

[0153] Assume that the time intervals between the market operation agency’s announcement of spot market information and the announcement of frequency regulation auxiliary service demand are T E (usually 15min) and T FR (usually 5 minutes), the preset time T can be assumed to be 24 hours a day and divided into π = T / T E time periods, each of which can be divided into κ=T E / T FR moments; based on market operation information, the preset time is divided according to Formula 1, which is:

[0154]

[0155] Based on formula 1, a calculation model of a first uncertainty variable and a calculation model of a second uncertainty variable within a preset time are respectively constructed;

[0156] The first uncertainty variable includes the real-time electricity price forecast deviation, the frequency regulation service price forecast deviation and the load power selling price forecast deviation. The real-time electricity price, frequency regulation service price and load power selling price forecast accuracy are high, so the forecast deviation corresponding to the three, i.e., the first uncertainty variable, can be accurately grasped, i.e., the first uncertainty variable obeys the normal distribution; the calculation model of the first uncertainty variable includes:

[0157]

[0158] The second uncertainty variable includes the prediction deviation of distributed wind turbine output, the prediction deviation of distributed photovoltaic array output and the load prediction deviation of controllable load. The prediction accuracy of distributed wind turbine output, distributed photovoltaic array output and controllable load is low. Therefore, the prediction deviation corresponding to the three, i.e., the second uncertainty variable, cannot be accurately grasped, that is, it is difficult to obtain the accurate probability distribution of the second uncertainty variable. The calculation model of the second uncertainty variable includes:

[0159]

[0160] Based on the calculation model and decision variables of uncertain variables, the optimization direction is obtained, and the optimization direction is to maximize the benefits of the virtual power plant within a preset time;

[0161] Based on the calculation model of optimization direction and uncertainty variables, a distributed energy storage distributed robust optimization configuration model for virtual power plants for multiple power services is constructed. The optimization direction is:

[0162] maxS=S E +S FR +S load -C curt -C re -C ba -C loss -C om -C ex ;

[0163] Among them, the revenue from electricity sales of the virtual power plant grid is:

[0164]

[0165] The benefits of virtual power plants participating in the frequency regulation ancillary service market are:

[0166]

[0167] The revenue from selling electricity from the internal load of the virtual power plant is:

[0168]

[0169] The cost of demand response is:

[0170]

[0171] In order not to affect the load comfort, the interruption load compensation price is associated with the load interruption amount. That is, the greater the interrupted load amount, the greater the compensation given by the virtual power plant. Its form is

[0172]

[0173] Electrochemical energy storage devices include power type energy storage devices and energy type energy storage devices. Power type energy storage devices include N Ti Lithium titanate battery, energy storage devices including N Fe Lithium iron phosphate battery, N Ti is the number of lithium titanate batteries aggregated in the virtual power plant, N Fe is the number of lithium iron phosphate batteries aggregated in the virtual power plant; all electrochemical energy storage devices have spare capacity to balance the uncertainty of source and load within the virtual power plant; the spare cost is:

[0174]

[0175] The energy storage regulation cost is the cost caused by the electrochemical energy storage equipment aggregated in the virtual power plant to balance the uncertainty of source and load:

[0176]

[0177]

[0178] Frequent charging and discharging will cause the service life of electrochemical energy storage equipment to decrease, so this phenomenon is punished. The life loss cost is:

[0179]

[0180] The virtual power plant needs to bear the operation and maintenance costs of the electrochemical energy storage equipment during the period of calling the electrochemical energy storage equipment. The operation and maintenance costs are:

[0181]

[0182] Each time the electrochemical energy storage device performs charging and discharging, it can obtain incentive compensation provided by the virtual power plant. The cost of incentive compensation is:

[0183]

[0184] Among them, in order to encourage energy storage operators to actively participate in the operation and regulation of virtual power plants, the incentive compensation price is linked to the charging and discharging power of electrochemical energy storage equipment. That is, the greater the charging and discharging power of the electrochemical energy storage equipment, the greater the incentive compensation given by the virtual power plant. Its form is:

[0185]

[0186] The distributed robust optimization configuration model includes a min-sup objective function and constraints. The core of the distributed robust optimization configuration model is to construct a min-sup objective function. The min-sup objective function is:

[0187]

[0188] In the formula, G is the function of the inverse of the return, that is, G(χ,ω)=-S(χ,ω);

[0189] The constraints include deterministic constraints and uncertain error probability constraints. Deterministic constraints include power balance constraints, affine constraints, demand response constraints, personalized operation constraints of energy storage equipment, market access constraints, and energy storage aggregation capacity constraints.

[0190] The power balance constraint is:

[0191]

[0192] At any time and period, the sum of the participation factors of all electrochemical energy storage devices in the virtual power plant that participate in balancing the uncertainty of source and load is 1, that is, all electrochemical energy storage devices in the virtual power plant are responsible for balancing the uncertainty of source and load. The affine constraint is:

[0193]

[0194] In order to reduce the impact on users within the virtual power plant, the continuous call time of the interruptible load is limited to prevent the load from maintaining a high call rate. The demand response constraint is:

[0195]

[0196] The personalized operation constraints of energy storage equipment constrain the state of charge and output of electrochemical energy storage equipment. The personalized operation constraints of energy storage equipment are:

[0197]

[0198] The ratio of the rated power of an electrochemical energy storage device to its rated capacity is usually 0.5:

[0199]

[0200] At the same time, electrochemical energy storage devices cannot be in the charging and discharging states at the same time:

[0201]

[0202]

[0203] Among them, power-type energy storage devices focus on providing high power output in a short period of time, and are suitable for scenarios that require high-power instantaneous output; while energy-type energy storage devices focus on continuous output of stable electric energy for a long time, and are suitable for applications that require longer working time and sustained power supply. Therefore, in order to reflect the differences in power supply capacity between power-type energy storage devices and energy-type energy storage devices, the continuous high-power output time and the sum of the load rates during the continuous output time of power-type energy storage devices and energy-type energy storage devices are distinguished, and the form is:

[0204]

[0205] 2≤Δ Ti <Δ Fe <κ;

[0206] Market access constraints require virtual power plants to participate in electricity market transactions and meet the minimum thresholds of aggregate regulation capacity and aggregate charging and discharging power:

[0207]

[0208] Due to the restrictions on floor space and investment amount, the aggregated energy storage capacity in the virtual power plant must meet the constraints of single capacity and total capacity. The aggregated energy storage capacity constraint is:

[0209]

[0210] At any time and period, all electrochemical energy storage devices in the virtual power plant can reserve sufficient spare capacity to balance the uncertainty of source and load at a certain confidence level; the uncertainty error probability constraint is:

[0211]

[0212]

[0213] Since the min-sup objective function and uncertainty error probability constraints in the distributed robust optimization configuration model have poor computability and high computational complexity, it is necessary to first transform the min-sup objective function and uncertainty error probability constraints to improve computability and reduce computational complexity.

[0214] Obtain a historical data sample set, the data in the historical data sample set includes the historical data of the second uncertainty variable; if you want to calculate the expected value of the function G of the opposite number of returns, the probability distribution of the second uncertainty variable is necessary. However, in practical applications, the true probability distribution of the second uncertainty variable is unknown, and only some known historical data samples can be obtained to construct the historical data sample set.

[0215] Based on the historical data sample set, the Wasserstein metric is used to construct a fuzzy set of the second uncertainty variable; in some preferred embodiments, the steps of constructing the fuzzy set of the second uncertainty variable using the Wasserstein metric are:

[0216] Get the support set of the second uncertainty variable. The support set of the second uncertainty variable contains The second uncertainty variable samples, the support set of the second uncertainty variable is:

[0217]

[0218] Based on the historical data sample set, an empirical probability distribution model of the second uncertainty variable is constructed. It can be regarded as extracting M historical data samples from the support set Ξ of the second uncertainty variable to construct a historical data sample set And under the empirical probability distribution of the second uncertainty variable, the probability of each historical data sample is 1 / M, and the unsampled The probability of a sample is 0, that is, the empirical probability distribution of the second uncertainty variable is uniformly distributed on the historical data sample set, and the empirical probability distribution model of the second uncertainty variable is:

[0219]

[0220] According to the empirical probability distribution model of the second uncertainty variable, a distance measurement model based on Wasserstein metric is constructed. The distance measurement model based on Wasserstein metric is:

[0221]

[0222] Can be seen as The Wasserstein sphere is centered and has a radius of r(M,ε). If the radius of the Wasserstein sphere is too large, Too many distributions are included, which leads to overly pessimistic optimization results; the radius of the Wasserstein sphere is too small, which may make Not included in internal.

[0223] Therefore, the Wasserstein sphere is required to convert Included in Internally, the confidence level is obtained, and the radius of the Wasserstein sphere is obtained according to the confidence level; the radius of the Wasserstein sphere is:

[0224]

[0225] The fuzzy set of the second uncertainty variable is obtained according to the Wasserstein sphere radius and the distance measurement model based on the Wasserstein metric; the fuzzy set of the second uncertainty variable is:

[0226]

[0227] Based on the fuzzy set and duality theory of the second uncertainty variable, a reconstructed min-sup objective function is obtained; in some preferred embodiments, the steps of obtaining the reconstructed min-sup objective function are:

[0228] The inner function of the min-sup objective function is rewritten based on the fuzzy set of the second uncertainty variable as follows:

[0229]

[0230] Simplify the above formula to obtain the first process function; the first process function is:

[0231]

[0232] The first process function contains decision variables and (M+1) constraints. If it tends to infinity, the decision variable tends to infinity. Based on the duality theory, the first process function is transformed to obtain the dual function of the first process function; the dual function of the first process function is:

[0233]

[0234] The function of the opposite number of the maximum benefit is rewritten as a piecewise linear convex function. In the present invention, the function of the opposite number of the benefit, that is, G(χ,ω), is a linear function of the second uncertain variable ω, and can therefore be rewritten as a piecewise linear convex function. The piecewise linear convex function is:

[0235]

[0236] Obtain the auxiliary vector and the dual norm of the auxiliary vector;

[0237] Based on the auxiliary vector, the dual norm of the auxiliary vector and the piecewise linear convex function, the dual function of the first process function is rewritten to obtain the second process function; the second process function is:

[0238]

[0239] Based on the duality theory, the constraints of the second process function are transformed to obtain the third process function; the third process function is:

[0240]

[0241] The reconstructed min-sup objective function is obtained according to the third process function and the outer function of the min-sup objective function; the reconstructed min-sup objective function is:

[0242]

[0243] The reconstructed min-sup objective function is a single-layer min-shaped function, which completes the transformation of the min-sup objective function in the distributed robust optimization configuration model, thereby improving computability and reducing computational complexity.

[0244] The uncertainty error probability constraints in the constraints cannot be calculated directly. Based on the fuzzy set and duality theory of the second uncertainty variable, the data-driven uncertainty set boundary is obtained.

[0245] Preferably, without loss of generality, the uncertainty error probability constraint is rewritten based on Formula 2 to obtain a general mathematical expression of the uncertainty error probability constraint, and Formula 2 is:

[0246]

[0247] The random variable sample set is obtained by processing the historical data sample set according to the standardized equation; the standardized equation is:

[0248]

[0249] Based on the random variable sample set, a random variable uncertainty set is constructed. The random variable uncertainty set is:

[0250]

[0251] Based on the fuzzy set of the second uncertainty variable and the uncertain set of random variables, a random variable uncertainty set boundary solution model is constructed. The random variable uncertainty set boundary solution model is:

[0252]

[0253] Based on the duality theory, the random variable uncertainty set boundary solution model is transformed to obtain the reconstructed random variable uncertainty set boundary solution model. The reconstructed random variable uncertainty set boundary solution model is:

[0254]

[0255] The data-driven uncertainty set boundary solution model is solved according to the reconstructed random variable uncertainty set boundary solution model and formula 3; formula 3 is:

[0256]

[0257] Based on the data-driven uncertainty set boundary, the uncertainty error probability constraint is transformed into a deterministic error probability constraint; the deterministic error probability constraint is:

[0258] g(χ,ψ)≤0.

[0259] Converting the uncertainty error probability constraint into a deterministic error probability constraint can further improve the computability of the distributed robust optimization configuration model and reduce its computational complexity, thereby accelerating the realization of refined selection and capacity optimization configuration of distributed energy storage equipment in virtual power plants.

[0260] Based on deterministic constraints, deterministic error probability constraints and reconstructed min-sup objective function, the distributed robust optimization configuration model is solved to obtain the set of decision variables.

[0261] The decision variables include the real-time upper reserve capacity of lithium titanate batteries, the real-time lower reserve capacity of lithium titanate batteries, the real-time upper reserve capacity of lithium iron phosphate batteries, the real-time lower reserve capacity of lithium iron phosphate batteries, the real-time participation factor of lithium titanate batteries, the real-time participation factor of lithium iron phosphate batteries, the real-time charging power of lithium titanate batteries, the real-time discharge power of lithium titanate batteries, the real-time charging power of lithium iron phosphate batteries, the real-time discharge power of lithium iron phosphate batteries, the rated capacity of lithium titanate batteries, the rated capacity of lithium iron phosphate batteries, the rated power of lithium titanate batteries, the rated power of lithium iron phosphate batteries, the real-time state of charge of lithium titanate batteries, the real-time state of charge of lithium iron phosphate batteries, the real-time Boolean variables of lithium titanate batteries, and the real-time Boolean variables of lithium iron phosphate batteries.

[0262] Decision variables are also used to configure controllable loads, which includes optimizing the load interruption amount of controllable loads. Decision variables also include the real-time electricity sold by virtual power plants to the spot market, the real-time frequency regulation capacity provided by virtual power plants to the frequency regulation auxiliary service market, the real-time interruption load compensation price of controllable loads, the real-time load interruption amount of controllable loads, the real-time incentive compensation price of lithium titanate batteries, and the real-time incentive compensation price of lithium iron phosphate batteries.

[0263] The system embodiment described above is merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment. Those of ordinary skill in the art may understand and implement it without creative work.

[0264] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0265] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A distributed energy storage optimization configuration method for virtual power plants for diversified power services. It is characterized in that The following steps are involved: A first uncertainty variable is obtained based on the real-time electricity price, the frequency regulation service price and the load electricity selling price; a second uncertainty variable is obtained based on the output of the distributed wind and photovoltaic generators and the load of the controllable load; constructing a calculation model of uncertainty variables based on the first uncertainty variable and the second uncertainty variable; Constructing decision variables; the virtual power plant includes the distributed wind and photovoltaic generators, electrochemical energy storage equipment and the controllable load; The decision variables are at least used to configure the electrochemical energy storage device; Obtaining an optimization direction based on the calculation model of the uncertainty variable and the decision variable, wherein the optimization direction is to maximize the profit of the virtual power plant within a preset time; Based on the optimization direction and the calculation model of the uncertainty variable, a distributed energy storage distributed robust optimization configuration model of a virtual power plant for multiple power services is constructed, wherein the distributed robust optimization configuration model includes a min-sup type objective function and constraints, and the constraints include deterministic constraints and uncertainty error probability constraints; Acquire a historical data sample set, where the data in the historical data sample set includes historical data of the second uncertainty variable; Based on the historical data sample set, a fuzzy set of a second uncertainty variable is constructed using Wasserstein metric; Based on the fuzzy set and duality theory of the second uncertainty variable, a reconstructed min-sup type objective function is obtained, and a data-driven uncertainty set boundary is obtained; Based on the data-driven uncertainty set boundary, converting the uncertainty error probability constraint into a deterministic error probability constraint; The distributed robust optimization configuration model is solved based on the deterministic constraints, the deterministic error probability constraints and the reconstructed min-sup type objective function to obtain a set of decision variables.

2. The distributed energy storage optimization configuration method for virtual power plants for multiple power services according to claim 1, It is characterized in that The steps of constructing the calculation model of the uncertainty variable are: Based on the market operation information, the preset time is divided according to Formula 1, and the Formula 1 is: In the formula, π is the total number of time periods divided within the preset time, T is the preset time, and T E is the time interval for the market operator to release spot market information, κ is the total number of moments divided into each time period, T FR The time interval for the market operator to publish announcements on the demand for frequency regulation ancillary services; Based on the formula 1, constructing a calculation model of the first uncertainty variable and a calculation model of the second uncertainty variable within the preset time respectively; The calculation model of the first uncertainty variable includes: The calculation model of the second uncertainty variable includes: In the formula, is the real-time electricity price at time t in period i, is the price of frequency modulation service at time t in period i, is the load electricity price at time t in period i, is the real-time electricity price forecast value at time t in period i, is the predicted value of the frequency modulation service price at time t in period i, is the predicted value of the load electricity price at time t in period i, is the real-time electricity price forecast deviation at time t in period i, is the forecast deviation of the frequency modulation service price at time i and time t, is the load electricity price forecast deviation at time i and time t, N(·,·) is a normal distribution, σ E is the standard deviation of the real-time electricity price forecast error, σ FR is the standard deviation of the frequency modulation service price forecast error, σ load is the standard deviation of the load electricity price forecast error, is the output of the x-th wind turbine at time t in period i, is the output of the yth photovoltaic array at time t in period i, is the load of the jth controllable load in period i and time t, is the output forecast value of the x-th wind turbine at time period i and time t, is the output forecast value of the yth photovoltaic array at time i and time t, is the load forecast value of the jth controllable load in period i and time t, is the output prediction deviation of the x-th wind turbine at time i and time t, is the output prediction deviation of the yth photovoltaic array at time i and time t, is the load forecast deviation of the jth controllable load in time period i and time t.

3. The distributed energy storage optimization configuration method for virtual power plants for multiple power services according to claim 2, It is characterized in that The steps of constructing the fuzzy set of the second uncertainty variable using Wasserstein metric are: Obtain the support set of the second uncertainty variable, where the support set of the second uncertainty variable is: Where Ξ is the support set of the second uncertainty variable, is the support matrix, ω is the second uncertainty variable vector, is the support vector; An empirical probability distribution model of a second uncertainty variable is constructed based on the historical data sample set. The empirical probability distribution model of the second uncertainty variable is: In the formula, is the empirical probability distribution of the second uncertainty variable, M is The number of historical data samples in , l is The serial number of the historical data sample in , for The Dirac measure of the lth historical data sample in is, for The lth historical data sample in is a sample set of historical data; A distance measurement model based on Wasserstein metric is constructed according to the empirical probability distribution model of the second uncertainty variable. The distance measurement model based on Wasserstein metric is: In the formula, for and The distance is the true probability distribution of the second uncertainty variable, inf represents the lower bound function, Π is the probability distribution of the second uncertainty variable sample in Ξ and The joint probability distribution of historical data samples in and is the marginal probability distribution, k is the serial number of the second uncertainty variable sample in Ξ, is the number of samples of the second uncertainty variable in Ξ, ω k is the kth second uncertainty variable sample in Ξ, Π kl Take ω for Π k and The probability value when for Take ω k The probability value when ; st means constraint; A confidence level is obtained, and a Wasserstein sphere radius is obtained according to the confidence level; the Wasserstein sphere radius is: In the formula, r(M,ε) is the radius of the Wasserstein ball, ε is the confidence level, and D is the diameter of the support of the uncertain variable; The fuzzy set of the second uncertainty variable is obtained according to the Wasserstein sphere radius and the distance measurement model based on the Wasserstein metric; the fuzzy set of the second uncertainty variable is: In the formula, is the fuzzy set of the second uncertainty variable.

4. The distributed energy storage optimization configuration method for virtual power plants for multiple power services according to claim 3, It is characterized in that The min-sup objective function is: Where min is the minimization function, and min is the outer function of the min-sup objective function, sup is the upper limit function, and sup is the inner function of the min-sup objective function, χ is the decision variable vector, ω is the second uncertainty variable vector, is the true probability distribution of the second uncertainty variable, is the fuzzy set of the second uncertainty variable, represents expectation, G is the function of the opposite number of return; The steps of obtaining the reconstructed min-sup type objective function are: The first process function is obtained by rewriting the inner function of the min-sup objective function based on the fuzzy set of the second uncertainty variable; the first process function is: The first process function is transformed based on the duality theory to obtain the dual function of the first process function; the dual function of the first process function is: In the formula, λ, s l is the dual variable; The function of the opposite number of the maximum benefit is rewritten as a piecewise linear convex function, which is: In the formula, J is a finite set, q is the serial number of the function segment, and max is the maximization function. and is the affine function coefficient; Obtain the auxiliary vector and the dual norm of the auxiliary vector; The second process function is obtained by rewriting the dual function of the first process function based on the auxiliary vector, the dual norm of the auxiliary vector and the piecewise linear convex function; the second process function is: In the formula, is the auxiliary vector, for The dual norm of ; Based on the duality theory, the constraints of the second process function are transformed to obtain the third process function; the third process function is: In the formula, r lq is the dual variable, the superscript represents transpose; The reconstructed min-sup objective function is obtained according to the third process function and the outer layer function of the min-sup objective function; the reconstructed min-sup objective function is:

5. The distributed energy storage optimization configuration method for virtual power plants for multiple power services according to claim 2, It is characterized in that The optimization direction is: max S=S E +S FR +S load -C curt -C re -C ba -C loss -C om -C ex ; In the formula, max means maximization, S is the benefit, S E is the revenue from electricity sales to the virtual power plant grid, S FR The revenue of virtual power plants participating in the frequency regulation ancillary service market, S load is the revenue from selling electricity to the internal load of the virtual power plant, C curt is the demand response cost, C re is the standby cost, C ba is the energy storage regulation cost, C loss is the life loss cost, C om is the operation and maintenance cost, C EX To compensate for the cost of incentives; The revenue from electricity sales of the virtual power plant grid is: In the formula, S E is the power sales revenue of the virtual power plant grid, π is the total number of time periods divided within the preset time, κ is the total number of moments divided within each time period, i is the time period number, t is the moment number, is the real-time electricity price at time t in period i, is the real-time electricity price in time period i and time 1~κ, is the amount of electricity sold by the virtual power plant to the spot market at time t during period i; The revenue of the virtual power plant participating in the frequency regulation ancillary service market is: In the formula, S FR To benefit from the participation of virtual power plants in the frequency regulation ancillary service market, is the price of frequency modulation service at time t in period i, The frequency regulation capacity provided by the virtual power plant to the frequency regulation ancillary service market at time t during period i; The revenue from selling electricity for the internal load of the virtual power plant is: In the formula, S load The revenue from selling electricity to the internal load of the virtual power plant. is the load electricity price at time t in period i, N load is the number of controllable loads aggregated in the virtual power plant, j is the sequence number of the controllable loads in the virtual power plant, is the load of the jth controllable load in time period i and time t; The demand response cost is: In the formula, C curt is the demand response cost, is the interruption load compensation price of the jth controllable load in period i and time t, is the load interruption amount of the jth controllable load in time period i and time t; The standby cost is: In the formula, C re is the standby cost, N Ti is the number of lithium titanate batteries aggregated in the virtual power plant, N Fe is the number of lithium iron phosphate batteries aggregated in the virtual power plant, m is the serial number of the lithium titanate battery in the virtual power plant, n is the serial number of the lithium iron phosphate battery in the virtual power plant, is the upper reserve capacity price of the mth lithium titanate battery, is the lower reserve capacity price of the mth lithium titanate battery, is the upper reserve capacity price of the nth lithium iron phosphate battery, is the lower reserve capacity price of the nth lithium iron phosphate battery; is the maximum reserve capacity of the mth lithium titanate battery at time i and time t, r i,t,m is the reserve capacity of the mth lithium titanate battery at time i and time t; is the maximum reserve capacity of the nth lithium iron phosphate battery at time t in period i, r i,t,n is the reserve capacity of the nth lithium iron phosphate battery at time i and time t; The energy storage regulation cost is: In the formula, C ba Adjusting costs for energy storage, is the participation factor of the mth lithium titanate battery at time i and time t, is the participation factor of the nth lithium iron phosphate battery at time i and time t, is the unit adjustment cost of the mth lithium titanate battery, is the unit adjustment cost of the nth lithium iron phosphate battery; ξ i,t is the total uncertainty of source and load within the virtual power plant at time i and time t; N W is the number of wind turbines aggregated in the virtual power plant, N PV is the number of photovoltaic arrays aggregated in the virtual power plant, x is the serial number of the wind turbine in the virtual power plant, y is the serial number of the photovoltaic array in the virtual power plant, is the output prediction deviation of the x-th wind turbine at time i and time t, is the output prediction deviation of the yth photovoltaic array at time i and time t, is the load forecast deviation of the jth controllable load at time i and time t; The life loss cost is: In the formula, C loss is the life loss cost, is the unit charge and discharge power life loss cost coefficient of the mth lithium titanate battery, is the unit charge and discharge power life loss cost coefficient of the nth lithium iron phosphate battery; is the charging efficiency of the mth lithium titanate battery, is the discharge efficiency of the mth lithium titanate battery, is the charging efficiency of the nth lithium iron phosphate battery, Discharge efficiency of the nth lithium iron phosphate battery; is the charging power of the mth lithium titanate battery at time t in period i, is the discharge power of the mth lithium titanate battery at time t in period i, is the charging power of the nth lithium iron phosphate battery at time t in period i, is the discharge power of the nth lithium iron phosphate battery at time t in period i; The operation and maintenance costs are: In the formula, C om For operation and maintenance costs, is the operation and maintenance cost coefficient of the mth lithium titanate battery, is the operation and maintenance cost coefficient of the nth lithium iron phosphate battery; is the unit capacity investment cost of the mth lithium titanate battery, is the unit capacity investment cost of the nth lithium iron phosphate battery; is the rated capacity of the mth lithium titanate battery, is the rated capacity of the nth lithium iron phosphate battery; is the discount rate of the mth lithium titanate battery, is the discount rate of the nth lithium iron phosphate battery; is the service life of the mth lithium titanate battery, is the service life of the nth lithium iron phosphate battery; The incentive compensation cost is: In the formula, C EX To motivate compensation costs, is the incentive compensation price of the mth lithium titanate battery in period i and time t, is the incentive compensation price of the nth lithium iron phosphate battery at time i and time t, is the rated power of the mth lithium titanate battery, is the rated power of the nth lithium iron phosphate battery, As the basic incentive compensation price.

6. The distributed energy storage optimization configuration method for virtual power plants for multiple power services according to claim 5, It is characterized in that The deterministic constraints include power balance constraints, affine constraints, demand response constraints, energy storage equipment personalized operation constraints, market access constraints, and energy storage aggregation capacity constraints; The power balance constraint is: The affine constraint is: The demand response constraints are: In the formula, is the load interruption of the jth controllable load in time period i and time (t+1), is the load of the jth controllable load at time i (t+1), η max is the maximum call rate of controllable load at a single moment, It is the maximum value of the sum of the continuous call rates of the controllable loads at two adjacent moments; The personalized operation constraints of the energy storage device are: 2≤Δ Ti <D Fe <k; In the formula, is the state of charge of the mth lithium titanate battery at time i and time t, is the charge state of the nth lithium iron phosphate battery at time i and time t; is the self-discharge rate of the mth lithium titanate battery, is the self-discharge rate of the nth lithium iron phosphate battery; is the lower limit of the state of charge of the mth lithium titanate battery, The lower limit of the charge state of the nth lithium iron phosphate battery; is the upper limit of the state of charge of the mth lithium titanate battery, The upper limit of the state of charge of the nth lithium iron phosphate battery; is the Boolean variable of the mth lithium titanate battery at time i and time t, 1 means that the mth lithium titanate battery is in the charging state at time t during period i. 0 means that the mth lithium titanate battery is in the discharge state at time t in period i. is the Boolean variable of the nth lithium iron phosphate battery at time i and time t, 1 means that the nth lithium iron phosphate battery is in the charging state at time t during period i. 0 means that the nth lithium iron phosphate battery is in the discharge state at time t during period i, Δ Ti is the maximum continuous high power output time of the power type energy storage device, Δ Fe It is the maximum continuous high power output time of the energy storage device; The continuous Δ Ti The maximum value of the sum of load factors at any moment; The continuous Δ Fe The minimum value of the sum of load factors at all times; The market access constraints are: In the formula, Adjust the capacity threshold upward for the aggregate, is the aggregate charging power threshold; Adjust the capacity threshold downward for the aggregate, θ is the aggregate discharge power threshold; The energy storage aggregation capacity constraint is: In the formula, φ Ti Configure the capacity limit for a single lithium titanate battery, φ Fe Configure the capacity limit for a single lithium iron phosphate battery; φ con It is the upper limit of the total aggregate capacity of energy storage equipment in the virtual power plant.

7. The distributed energy storage optimization configuration method for virtual power plants for multiple power services according to claim 5, It is characterized in that The uncertainty error probability constraint is: In the formula, inf represents the lower bound function, is the true probability distribution of the second uncertainty variable; β is the probability of violating the uncertainty error probability constraint.

8. The distributed energy storage optimization configuration method for virtual power plants for multiple power services according to claim 7, It is characterized in that The steps of converting the uncertainty error probability constraint into the deterministic error probability constraint are: The uncertainty error probability constraint is rewritten based on Formula 2 to obtain a general mathematical expression for the uncertainty error probability constraint, where Formula 2 is: Where g(χ,ω) is the function expression of the event in {·}; The historical data sample set is processed according to the standardized equation to obtain the random variable sample set; the standardized equation is: In the formula, is the lth random variable sample, for The lth historical data sample in , Σ is the variance of the historical data sample set, is the mean of the historical data sample set; Based on the random variable sample set, a random variable uncertainty set is constructed, and the random variable uncertainty set is: In the formula, is an uncertain set of random variables with τ as the boundary, σ is a random variable, R is a real number, and τ is the boundary of the uncertain set of random variables; Based on the fuzzy set of the second uncertainty variable and the random variable uncertainty set, a random variable uncertainty set boundary solution model is constructed, and the random variable uncertainty set boundary solution model is: Based on the duality theory, the random variable uncertainty set boundary solution model is transformed to obtain a reconstructed random variable uncertainty set boundary solution model, and the reconstructed random variable uncertainty set boundary solution model is: The data-driven uncertainty set boundary solution model is solved according to the reconstructed random variable uncertainty set boundary solution model and formula three; the formula three is: Where ψ is the boundary of the data-driven uncertainty set; The deterministic error probability constraint is obtained according to the data-driven uncertainty set boundary solution model and the uncertainty error probability constraint, and the deterministic error probability constraint is: g(χ,ψ)≤0.

9. The distributed energy storage optimization configuration method for virtual power plants for multiple power services according to any one of claims 1 to 8, It is characterized in that The electrochemical energy storage device includes a power type energy storage device and an energy type energy storage device. The power type energy storage device includes N Ti A lithium titanate battery, the energy storage device comprising N Fe Lithium iron phosphate battery, N Ti is the number of lithium titanate batteries aggregated in the virtual power plant, N Fe is the number of lithium iron phosphate batteries aggregated in the virtual power plant; The decision variables include the real-time upper reserve capacity of the lithium titanate battery, the real-time lower reserve capacity of the lithium titanate battery, the real-time upper reserve capacity of the lithium iron phosphate battery, the real-time lower reserve capacity of the lithium iron phosphate battery, the real-time participation factor of the lithium titanate battery, the real-time participation factor of the lithium iron phosphate battery, the real-time charging power of the lithium titanate battery, the real-time discharge power of the lithium titanate battery, the real-time charging power of the lithium iron phosphate battery, the real-time discharge power of the lithium iron phosphate battery, the rated capacity of the lithium titanate battery, the rated capacity of the lithium iron phosphate battery, the rated power of the lithium titanate battery, the rated power of the lithium iron phosphate battery, the real-time state of charge of the lithium titanate battery, the real-time state of charge of the lithium iron phosphate battery, the real-time Boolean variable of the lithium titanate battery, and the real-time Boolean variable of the lithium iron phosphate battery.

10. The distributed energy storage optimization configuration method for virtual power plants for multiple power services according to claim 9, It is characterized in that The decision variables also include the real-time electricity sold by the virtual power plant to the spot market, the real-time frequency regulation capacity provided by the virtual power plant to the frequency regulation auxiliary service market, the real-time interruption load compensation price of the controllable load, the real-time load interruption amount of the controllable load, the real-time incentive compensation price of the lithium titanate battery, and the real-time incentive compensation price of the lithium iron phosphate battery.

Citation Information

Patent Citations

  • Virtual power plant energy management method based on cooperative game

    CN111682526A

  • Robust optimization virtual power plant optimization control system based on stochastic programming

    CN115422728A

  • Method for virtual power plant to participate in demand response based on uncertainty estimation

    CN117495438A

  • Virtual power plant cluster two-stage scheduling optimization method

    CN117592621A

Cited By

  • Virtual power plant load resource allocation method and system based on comprehensive energy storage

    CN121906533A