Micro bubble generating device
By alternately implementing gas introduction operations in the micro bubble generation device, the alternating problem of gas introduction and micro bubble generation operation control in the prior art is solved, and the continuous and stable generation of micro bubbles in the liquid tank liquid is achieved.
Patent Information
- Application Number
- CN202410314757.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2023-05-23
- Filing Date
- 2024-03-19
- Publication Date
- 2024-11-26
Smart Images

Figure CN119015914A_ABST
Abstract
Description
Technical Field
[0001] The technology disclosed in this specification relates to a fine bubble generating apparatus. Background Art
[0002] Patent document 1 discloses a micro-bubble generating device, which comprises: a storage tank, which dissolves gas in liquid under pressure; a storage tank supply path, which supplies the liquid to the storage tank; a pressure pump, which is arranged on the storage tank supply path; a storage tank discharge path, which discharges the liquid in which the gas is pressurized and dissolved from the storage tank to a liquid tank; a micro-bubble generating nozzle, which is arranged on the storage tank discharge path and decompresses the liquid in which the gas is pressurized and dissolved to generate micro-bubbles; a gas supply path, which supplies the gas to the storage tank; an opening and closing valve, which is arranged on the gas supply path; and a control device. The control device alternately implements gas introduction operation control and micro-bubble generation operation control, wherein the gas introduction operation control refers to supplying the liquid from the storage tank to the liquid tank while the on-off valve is open, thereby introducing the gas into the storage tank; the micro-bubble generation operation control refers to driving the pressure pump to pressurize the liquid and supply it from the storage tank supply path to the storage tank while the on-off valve is closed, and supplying the pressurized liquid dissolved with the gas from the storage tank to the liquid tank via the storage tank discharge path. Prior art Patent Literature
[0003] Patent Document 1: Japanese Patent Publication No. 2009-18118 Summary of the invention [Technical problem to be solved by the invention]
[0004] In the micro-bubble generating device of Patent Document 1, it is not possible to implement the gas introduction operation control and the micro-bubble generation operation control at the same time. In the gas introduction operation control, gas is supplied to the storage tank, and in the micro-bubble generation operation control, gas is consumed from the storage tank. Therefore, the gas introduction operation control and the micro-bubble generation operation control must be implemented alternately. However, in the process of implementing the gas introduction operation control, it is impossible to generate micro-bubbles in the liquid supplied from the storage tank to the liquid tank. Therefore, the micro-bubbles generated in the liquid of the liquid tank in the micro-bubble generation operation control will disappear in the process of implementing the gas introduction operation control, making it difficult to continuously and stably generate micro-bubbles in the liquid of the liquid tank. In this specification, a technology that can continuously and stably generate micro-bubbles in the liquid of the liquid tank is provided. [Technical means for solving technical problems]
[0005] In the first mode of the present technology, the micro-bubble generating device may have a tank, a tank supply path, a pressure pump, a tank discharge path, a micro-bubble generating nozzle, a gas-liquid replacement path, a first opening and closing valve, a second opening and closing valve and a control device, wherein the tank is used to pressurize and dissolve the gas in the liquid; the tank supply path is used to supply the liquid to the tank; the pressure pump is arranged in the tank supply path; the tank discharge path is used to discharge the liquid in which the gas is pressurized and dissolved from the tank to the liquid tank; the micro-bubble generating nozzle is arranged in the tank discharge path, and is used to generate micro-bubbles by decompressing the liquid in which the gas is pressurized and dissolved; the gas-liquid replacement path is used to discharge the liquid from the tank and supply the gas to the tank; the first opening and closing valve is arranged in the gas-liquid replacement path; the second opening and closing valve is arranged in the gas-liquid replacement path at a position farther away from the tank than the first opening and closing valve in the gas-liquid replacement path. The control device may also be capable of implementing micro-bubble generation operation control, which refers to: driving the pressure pump to pressurize the liquid from the tank supply path to the tank, and supplying the liquid in which the gas is pressurized and dissolved from the tank to the liquid tank via the tank discharge path. The control device may also be capable of implementing gas introduction operation control during the implementation of the micro-bubble generation operation control, which refers to: alternately implementing the first gas introduction action and the second gas introduction action. The control device may also be configured to: in the first gas introduction action, in the state where the first opening and closing valve is closed (closed) and the second opening and closing valve is opened, discharge the liquid from the gas-liquid replacement path and introduce the gas into the gas-liquid replacement path. The control device may also be configured to: in the second gas introduction action, in the state where the first opening and closing valve is opened and the second opening and closing valve is closed, discharge the liquid from the tank to the gas-liquid replacement path and introduce the gas from the gas-liquid replacement path to the tank.
[0006] In the above-mentioned micro-bubble generating device, during the process of implementing the micro-bubble generating operation control, the gas introduction operation control is implemented, and the gas can be supplied to the storage tank by alternately implementing the first gas introduction action and the second gas introduction action. Therefore, there is no need to interrupt the micro-bubble generating operation control in order to supply gas to the storage tank, and the micro-bubble generating operation control can be continuously implemented. By adopting this structure, micro-bubbles can be continuously and stably generated in the liquid of the liquid tank.
[0007] In the second mode, based on the above-mentioned first mode, the micro-bubble generating device may also have a first liquid level sensor, and the first liquid level sensor is used to detect whether the liquid level of the storage tank is above the first liquid level. The liquid level of the portion where the gas-liquid replacement path is connected to the storage tank may also be lower than the first liquid level. The control device may also be configured to start the gas introduction operation control when the liquid level of the storage tank changes from below the first liquid level to above the first liquid level when the micro-bubble generating operation control is being implemented and the gas introduction operation control is not being implemented.
[0008] When the micro-bubble generation operation control is being implemented and the gas introduction operation control is not being implemented, the amount of gas in the storage tank decreases, so the liquid level of the storage tank rises. In addition, when the micro-bubble generation operation control is being implemented and the gas introduction operation control is being implemented, the amount of gas in the storage tank increases, so the liquid level of the storage tank decreases. According to the above structure, during the process of implementing the micro-bubble generation operation control, the liquid level of the storage tank can be suppressed from exceeding the first liquid level and rising excessively.
[0009] In the third mode, based on the above-mentioned second mode, the control device can also be constructed as follows: when the micro-bubble generation operation control is being implemented and the gas introduction operation control is being implemented, when the liquid level of the storage tank changes from above the first liquid level to below the first liquid level, and the liquid level of the storage tank remains below the first liquid level for a first specified time, the gas introduction operation control is stopped.
[0010] According to the above-mentioned structure, during the process of implementing the micro-bubble generation operation control, it is possible to suppress the liquid level of the tank from dropping excessively.
[0011] In a fourth embodiment, based on the first embodiment, the micro-bubble generating device may further include a second liquid level sensor for detecting whether the liquid level of the storage tank is above a second liquid level. The liquid level of the portion where the gas-liquid replacement path is connected to the storage tank may also be lower than the second liquid level. The control device may also be configured to stop the gas introduction operation control when the liquid level of the storage tank changes from above the second liquid level to below the second liquid level while the micro-bubble generating operation control is being implemented and the gas introduction operation control is being implemented.
[0012] According to the above-described configuration, during the execution of the micro-bubble generation operation control, it is possible to suppress the liquid level of the tank from falling below the second liquid level and excessively decreasing.
[0013] In the fifth mode, based on the above-mentioned fourth mode, the control device can also be constructed as follows: when the micro-bubble generation operation control is being implemented and the gas introduction operation control is not being implemented, when the liquid level of the storage tank changes from below the second liquid level to above the second liquid level, and the liquid level of the storage tank remains above the second liquid level for a second specified time, the gas introduction operation control is started.
[0014] According to the above-mentioned configuration, it is possible to suppress an excessive rise in the liquid level of the tank during the execution of the micro-bubble generating operation control.
[0015] In the sixth mode, on the basis of the first mode, the micro-bubble generating device may also further include a first liquid level sensor and a second liquid level sensor, wherein the first liquid level sensor is used to detect whether the liquid level of the storage tank is above the first liquid level; and the second liquid level sensor is used to detect whether the liquid level of the storage tank is above the second liquid level which is lower than the first liquid level. The liquid level of the portion where the gas-liquid replacement path is connected to the storage tank may also be lower than the second liquid level. The control device may also be configured to: when the micro-bubble generating operation control is being implemented and the gas introduction operation control is not being implemented, when the liquid level of the storage tank changes from below the first liquid level to above the first liquid level, start the gas introduction operation control. The control device may also be configured to: when the micro-bubble generating operation control is being implemented and the gas introduction operation control is being implemented, when the liquid level of the storage tank changes from above the second liquid level to below the second liquid level, stop the gas introduction operation control.
[0016] According to the above structure, in the process of implementing the micro-bubble generation operation control, it is possible to suppress both the excessive rise of the liquid level of the storage tank exceeding the first liquid level and the excessive drop of the liquid level of the storage tank below the second liquid level. In addition, according to the above structure, the amount of gas supplied to the storage tank from the start to the end of the gas introduction operation control can be accurately managed.
[0017] In the 7th mode, in any one of the above-mentioned 1st to 6th modes, the micro-bubble generating device may also further have a gas introduction unit, which is constructed as follows: it is arranged between the 1st on-off valve and the 2nd on-off valve in the gas-liquid replacement path, and is used to introduce the gas into the gas-liquid replacement path.
[0018] According to the above configuration, when the gas introduction operation control is performed, liquid can be discharged from the gas-liquid replacement path and gas can be introduced into the gas-liquid replacement path more stably. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a diagram schematically showing the structure of the water heater 2 according to the first embodiment. Figure 2 1 is a diagram schematically showing a cross section of the bathtub adapter 132 of the water heater 2 according to the first embodiment. Figure 3 This is a flowchart of the processing performed by the control device 150 in the hot water injection operation control of the water heater 2 according to the first embodiment. Figure 4 This is a diagram schematically showing an example of the flow of water in the water heater 2 of the first embodiment. Figure 5 This is a diagram schematically showing another example of the flow of water in the water heater 2 of the first embodiment. Figure 6 This is a flowchart of the processing performed by the control device 150 in the fine bubble generation operation control of the water heater 2 according to the first embodiment. Figure 7 This is a diagram schematically showing still another example of the flow of water in the water heater 2 of the first embodiment. Figure 8 This is a diagram schematically showing still another example of the flow of water in the water heater 2 of the first embodiment. Fig. 9 This is a flowchart of the processing performed by the control device 150 in the air introduction operation control of the water heater 2 according to the first embodiment. Fig.10 This is a diagram schematically showing the structure of a water heater 202 according to the second embodiment. Fig.11 This is a flowchart of the processing performed by the control device 150 in the fine bubble generation operation control of the water heater 202 according to the second embodiment. Fig.12 This is a diagram schematically showing the structure of a water heater 302 according to the third embodiment. Fig.13 This is a flowchart of the processing performed by the control device 150 in the fine bubble generation operation control of the water heater 302 of the third embodiment. Fig.14 This is a diagram schematically showing the structure of a water heater 402 according to the fourth embodiment. Fig.15 This is a flowchart of the processing performed by the control device 150 in the fine bubble generation operation control of the water heater 402 of the fourth embodiment. Description of Reference Numerals 2: hot water device; 10: heat source unit; 12: first heat source; 14: second heat source; 16: water supply path; 18: hot water path; 18a: hot water temperature thermistor; 20: bypass path; 22: bypass servo mechanism; 24: hot water injection path; 26: hot water injection valve; 28: water volume sensor; 30: circulation path; 30a: circulation path thermistor; 32: circulation loop; 32a: circulation loop thermistor; 34: bathtub circulation pump; 36: water flow switch; 50: air heating Pressure dissolution unit; 52: storage tank; 52a: high water level electrode; 52b: low water level electrode; 52c: ground electrode; 52d: intermediate water level electrode; 60: heat source loop; 62: first bathtub water path; 64: storage tank outlet; 66: connecting path; 68: heat source outlet; 70: second bathtub water path; 74: storage tank loop; 74a: inlet; 80: first three-way valve; 82: second three-way valve; 84: one-way valve; 86: storage tank water supply valve; 88: first pressure pump; 90: second pressure pump; 92: Gas-liquid replacement path; 92a: outflow port; 94: 1st on-off valve; 96: 2nd on-off valve; 98: air introduction unit; 100: air introduction path; 102: one-way valve; 104: air pump; 130: bathtub; 130a: wall; 132: bathtub adapter; 132a: front surface; 132b: lower surface; 134a: 1st discharge port; 134b: 1st suction port; 134c: 2nd suction port; 134d: 2nd discharge port; 136: 1st water channel; 136a: 1st discharge port outlet path; 136b: 1st suction path; 138: 2nd water path; 138a: 2nd discharge path; 138b: 2nd suction path; 140a: check portion; 140b: check portion; 140c: check portion; 140d: check portion; 142: micro bubble generating nozzle; 150: control device; 152: memory; 154: remote control; 160: water supply source; 170: faucet; 180: drain; 202: hot water device; 302: hot water device; 402: hot water device. DETAILED DESCRIPTION
[0020] (Example 1) like Figure 1 As shown, the water heater 2 of this embodiment includes a heat source unit 10, an air pressure dissolving unit 50, a bathtub adapter 132, and a control device 150. The water heater 2 can heat water supplied from a water supply source 160 such as tap water, and supply the water heated to a desired temperature to a faucet 170 installed in a kitchen or the like, or to a bathtub 130 installed in a bathroom. In addition, the water heater 2 can generate fine bubbles in the water of the bathtub 130 used by the user for bathing.
[0021] (Structure of Heat Source Unit 10) The heat source unit 10 has a first heat source machine 12, a second heat source machine 14, a water supply path 16, a hot water path 18, a bypass path 20, a bypass servo mechanism 22, a hot water injection path 24, a hot water injection valve 26, a water volume sensor 28, a circulation outflow path 30, a circulation loop 32, a bathtub circulation pump 34 and a water flow switch 36.
[0022] The upstream end of the water supply path 16 is connected to the water supply source 160, and the downstream end of the water supply path 16 is connected to the first heat source machine 12. In addition, the upstream end of the hot water path 18 is connected to the first heat source machine 12, and the downstream end of the hot water path 18 is connected to the faucet 170. The first heat source machine 12 is, for example, a combustion heat source machine that heats water by burning fuel gas. The first heat source machine 12 heats the water flowing in from the water supply path 16 and sends the heated water to the hot water path 18.
[0023] The upstream end of the bypass path 20 is connected to the water supply path 16, and the downstream end of the bypass path 20 is connected to the hot water path 18. The bypass servo mechanism 22 is provided at the portion where the bypass path 20 is connected to the water supply path 16. The bypass servo mechanism 22 can adjust the ratio of the flow rate of water flowing from the water supply path 16 to the hot water path 18 via the first heat source machine 12 and the flow rate of water flowing from the water supply path 16 to the hot water path 18 via the bypass path 20 by adjusting the opening of the built-in valve body. By adjusting the opening of the bypass servo mechanism 22, water adjusted to a desired temperature by mixing high-temperature water flowing from the first heat source machine 12 and low-temperature water flowing from the bypass path 20 in a desired ratio is supplied to the hot water path 18 downstream of the portion connected to the bypass path 20. A hot water temperature thermistor 18a is provided in the hot water path 18 downstream of the portion connected to the bypass path 20, and the hot water temperature thermistor 18a detects the temperature of the water in the hot water path 18.
[0024] The upstream end of the hot water injection path 24 is connected to the hot water path 18 on the downstream side of the portion connected to the bypass path 20, and the downstream end of the hot water injection path 24 is connected to the circulation loop 32. The hot water injection valve 26 is provided in the hot water injection path 24 to open and close the hot water injection path 24. The hot water injection valve 26 is usually in a closed state. The water amount sensor 28 is provided in the hot water injection path 24 to detect the amount of water flowing through the hot water injection path 24.
[0025] The upstream end of the circulation loop 32 is connected to the heat source loop 60 of the air pressure dissolution unit 50, and the downstream end of the circulation loop 32 is connected to the second heat source machine 14. In addition, the upstream end of the circulation path 30 is connected to the second heat source machine 14, and the downstream end of the circulation path 30 is connected to the heat source path 68 of the air pressure dissolution unit 50. The second heat source machine 14 is, for example, a combustion heat source machine that heats water by burning fuel gas. The second heat source machine 14 heats the water flowing from the circulation loop 32 and sends the heated water to the circulation path 30. A circulation loop thermistor 32a for detecting the temperature of the water in the circulation loop 32 is provided near the upstream end of the circulation loop 32. A circulation path thermistor 30a for detecting the temperature of the water in the circulation path 30 is provided near the downstream end of the circulation path 30.
[0026] The bathtub circulation pump 34 is provided in the circulation loop 32 downstream of the connection portion of the hot water injection path 24, and delivers the water in the circulation loop 32 to the second heat source machine 14. The water flow switch 36 is provided in the circulation loop 32 between the bathtub circulation pump 34 and the second heat source machine 14, and detects whether water flows through the circulation loop 32.
[0027] (Structure of air pressure dissolution unit 50) The air pressurized dissolution unit 50 has a storage tank 52, a heat source circuit 60, a heat source outlet 68, a storage tank circuit 74, a storage tank outlet 64, a connecting path 66, a first three-way valve 80, a second three-way valve 82, a one-way valve 84, a storage tank water supply valve 86, a first pressure pump 88, a second pressure pump 90, a gas-liquid replacement path 92, a first opening and closing valve 94, a second opening and closing valve 96 and an air introduction unit 98.
[0028] The storage tank 52 is capable of storing water inside. The storage tank 52 is used to pressurize air and dissolve it in water to generate air-dissolved water. A high water level electrode 52a, a low water level electrode 52b, and a ground electrode 52c for detecting the water level in the storage tank 52 are provided inside the storage tank 52. The water level detected by the low water level electrode 52b (hereinafter also referred to as the lower limit water level) is lower than the water level detected by the high water level electrode 52a (hereinafter also referred to as the upper limit water level). In a state where the low water level electrode 52b and the high water level electrode 52a are not in contact with the water surface of the water stored in the storage tank 52, no current flows between the low water level electrode 52b, the high water level electrode 52a and the ground electrode 52c, and a disconnection signal is output to the control device 150. In addition, when the low water level electrode 52b and the high water level electrode 52a are in contact with the water surface of the water stored in the storage tank 52, current flows between the low water level electrode 52b, the high water level electrode 52a and the ground electrode 52c, and an on signal is output to the control device 150.
[0029] One end of the heat source circuit 60 is connected to the communication path 66, and the other end of the heat source circuit 60 is connected to the circulation circuit 32 of the heat source unit 10. The communication path 66 connects the first three-way valve 80 and the second three-way valve 82. The communication path 66, the first bathtub water path 62 and the tank outlet path 64 are connected to the first three-way valve 80. The first three-way valve 80 can switch between the first communication state, the second communication state and the third communication state, wherein the first communication state is a state in which the tank outlet path 64 and the first bathtub water path 62 are connected (refer to Figure 7 , Figure 8 ), the second communication state is the state in which the tank outflow path 64 is connected to the communication path 66 (refer to Figure 1 ), the third connection state is the state in which the first bathtub water path 62, the tank outflow path 64 and the connection path 66 are connected (refer to Figure 4 , Figure 5 ). The upstream end of the tank outlet 64 is connected to the lower part of the tank 52, and the downstream end of the tank outlet 64 is connected to the first three-way valve 80. A one-way valve 84 is provided on the tank outlet 64, and the one-way valve 84 allows water to flow from the tank 52 to the first three-way valve 80, and prohibits water from flowing from the first three-way valve 80 to the tank 52. One end of the first bathtub water path 62 is connected to the first three-way valve 80, and the other end of the first bathtub water path 62 is connected to the bathtub adapter 132.
[0030] One end of the heat source outlet 68 is connected to the circulation outlet 30 of the heat source unit 10, and the other end of the heat source outlet 68 is connected to the second three-way valve 82. The second three-way valve 82 is connected to the communication path 66, the heat source outlet 68, and the second bathtub water path 70. The second three-way valve 82 can switch between the fourth communication state and the fifth communication state, wherein the fourth communication state is a state in which the second bathtub water path 70 and the communication path 66 are connected (refer to Figure 7 , Figure 8 ), the fifth connection state is the state where the heat source outflow path 68 and the second bathtub water path 70 are connected (refer to Figure 1 , Figure 4 , Figure 5 ). One end of the second bathtub water channel 70 is connected to the second three-way valve 82 , and the other end of the second bathtub water channel 70 is connected to the bathtub adapter 132 .
[0031] The upstream end of the tank loop 74 is connected to the heat source outflow path 68, and the downstream end of the tank loop 74 (hereinafter also referred to as the inlet 74a) is connected to the top of the tank 52. The water level at the part where the inlet 74a of the tank loop 74 is connected to the tank 52 is higher than the upper limit water level detected by the high water level electrode 52a. The tank water supply valve 86 is provided in the tank loop 74 to open and close the tank loop 74. The tank water supply valve 86 is normally in a closed state. The first pressure pump 88 and the second pressure pump 90 are provided in the tank loop 74 at a position downstream of the tank water supply valve 86. The first pressure pump 88 and the second pressure pump 90 pressurize the water in the tank loop 74 and send it to the tank 52. In the tank loop 74, the first pressure pump 88 is arranged at a position upstream of the second pressure pump 90. The water sent from the tank circuit 74 to the tank 52 flows into the tank 52 through the inlet 74 a.
[0032] One end of the gas-liquid replacement path 92 (hereinafter also referred to as the outflow port 92a) is connected to the bottom of the storage tank 52. The water level at the portion where the outflow port 92a of the gas-liquid replacement path 92 is connected to the storage tank 52 is lower than the lower limit water level detected by the low water level electrode 52b. The other end of the gas-liquid replacement path 92 is arranged to face the drain trough 180. The gas-liquid replacement path 92 is arranged so that its height decreases monotonically from one end to the other end (i.e., from the storage tank 52 to the drain trough 180) (i.e., there is no portion where the height increases). The first opening and closing valve 94 is provided on the gas-liquid replacement path 92 to open and close the gas-liquid replacement path 92. The second opening and closing valve 96 is provided on the gas-liquid replacement path 92 on the other end side (i.e., the side away from the storage tank 52) than the first opening and closing valve 94 to open and close the gas-liquid replacement path 92. The first opening and closing valve 94 and the second opening and closing valve 96 are usually in a closed state.
[0033] The air introduction unit 98 is provided in a position between the first opening and closing valve 94 and the second opening and closing valve 96 in the gas-liquid replacement path 92. The air introduction unit 98 includes an air introduction path 100, a one-way valve 102, and an air pump 104. One end of the air introduction path 100 is connected to the gas-liquid replacement path 92, and the other end is connected to the air pump 104. The air pump 104 supplies air to the air introduction path 100. The one-way valve 102 is provided in the air introduction path 100, allowing air to flow from the air pump 104 to the gas-liquid replacement path 92, and prohibiting water from flowing from the gas-liquid replacement path 92 to the air pump 104.
[0034] (Structure of bathtub adapter 132) Next, refer to Figure 2 (a) and (b) in FIG. 1 describe the bathtub adapter 132 provided on the wall portion 130a of the bathtub 130. FIG. Figure 2 (a) in FIG. 1 shows a state where water flows from the first bathtub water channel 62 to the bathtub 130 and water flows from the bathtub 130 to the second bathtub water channel 70 (for example, Figure 7 The flow of water in the bathtub adapter 132 in the state of ( ). Figure 2 (b) in FIG. 1 shows a state where water flows from the bathtub 130 to the first bathtub water channel 62 and water flows from the second bathtub water channel 70 to the bathtub 130 (for example, Figure 5 The flow of water in the bathtub adapter 132 in the state of ( ).
[0035] The bathtub adapter 132 has a first water channel 136 and a second water channel 138. The first water channel 136 is connected to the first bathtub water channel 62, and the second water channel 138 is connected to the second bathtub water channel 70. The first water channel 136 is branched into a first discharge channel 136a and a first suction channel 136b. The first discharge channel 136a is connected to a first discharge port 134a provided on the front surface 132a of the bathtub adapter 132. Water discharged from the first discharge port 134a to the bathtub 130 is discharged in the front of the wall 130a of the bathtub 130, that is, in a direction perpendicular to the wall 130a of the bathtub 130. The first discharge channel 136a is provided with a check portion 140a that prevents water from flowing from the bathtub 130 to the first bathtub water channel 62, and a micro-bubble generating nozzle 142 that is arranged at an upstream side (on the first bathtub water channel 62 side) of the check portion 140a. The micro-bubble generating nozzle 142 decompresses the water passing through the micro-bubble generating nozzle 142. The first suction path 136b is connected to the first suction port 134b provided on the front surface 132a of the bathtub adapter 132. The first suction path 136b is provided with a check portion 140b, which prevents water from flowing from the first bathtub water path 62 to the bathtub 130.
[0036] The second water path 138 is branched into a second discharge path 138a and a second suction path 138b. The second suction path 138b is connected to the second suction port 134c provided on the front surface 132a of the bathtub adapter 132. A check portion 140c is provided on the second suction path 138b, and the check portion 140c prevents water from flowing from the second bathtub water path 70 to the bathtub 130. The second discharge path 138a is connected to the second discharge port 134d provided on the lower surface 132b of the bathtub adapter 132. The water discharged from the second discharge port 134d is discharged downward, that is, in a direction parallel to the wall portion 130a of the bathtub 130. A check portion 140d is provided on the second discharge path 138a, and the check portion 140d prevents water from flowing from the bathtub 130 to the second bathtub water path 70.
[0037] (Structure of Control Device 150) Figure 1The control device 150 shown controls the operation of each component of the heat source unit 10 and the air pressure dissolution unit 50. The control device 150 is configured to be able to communicate with a remote controller 154 that can be controlled by a user. The control device 150 has a memory 152 that can store various settings such as a set temperature or a set water volume in the hot water injection operation control, and a set temperature in the reheating operation control input by the user. The user can instruct the start or end of the hot water injection operation control, the micro-bubble generation operation control, and the reheating operation control described later through the remote controller 154.
[0038] (Hot water injection operation control) The hot water injection operation control starts when the user instructs to start the hot water injection operation control through the remote controller 154. Alternatively, the hot water injection operation control can also start when the user pre-sets the start time of the hot water injection operation control through the remote controller 154 and the control device 150 determines that the start time of the hot water injection operation control has arrived. When the hot water injection operation control starts, the control device 150 sets the first three-way valve 80 and the second three-way valve 82 to the third connection state and the fifth connection state (see FIG. 1 ). Figure 4 , Figure 5 ). In this state, the control device 150 implements Figure 3 Processing shown.
[0039] In S2, the control device 150 performs exhaust processing. Specifically, the control device 150 opens the hot water injection valve 26 and starts heating water by the first heat source machine 12. Figure 4 As shown, water adjusted to a set temperature flows from the hot water path 18 through the hot water injection path 24 into the circulation loop 32. The water flowing into the circulation loop 32 is divided into flowing toward the upstream side (i.e., the heat source loop 60) and flowing toward the downstream side (i.e., the second heat source machine 14). The water flowing from the circulation loop 32 to the heat source loop 60 flows into the bathtub 130 via the connecting path 66, the first three-way valve 80, the first bathtub water path 62, and the bathtub adapter 132. In addition, the water flowing from the circulation loop 32 to the second heat source machine 14 flows into the bathtub 130 via the circulation outgoing path 30, the heat source outgoing path 68, the second three-way valve 82, the second bathtub water path 70, and the bathtub adapter 132. Accordingly, the inside of the first bathtub water path 62 and the second bathtub water path 70 is filled with water, and the air remaining in the first bathtub water path 62 and the second bathtub water path 70 is discharged to the bathtub 130. When the accumulated water volume detected by the water volume sensor 28 reaches a predetermined value (eg, 6 L), the control device 150 closes the hot water injection valve 26 , ends the heating of the first heat source unit 12 , and ends the exhaust process.
[0040] In S4, the control device 150 performs a remaining water detection process of the bathtub 130. Specifically, Figure 5As shown, the control device 150 drives the bathtub circulation pump 34, and determines whether there is residual water in the bathtub 130 based on whether the water flow switch 36 detects water flow. In the case where there is no residual water in the bathtub 130 and the bathtub adapter 132 is not immersed in water, the water flow switch 36 cannot detect water flow even if the bathtub circulation pump 34 is driven. On the contrary, in the case where there is residual water in the bathtub 130 and the bathtub adapter 132 is immersed in water, when the bathtub circulation pump 34 is driven, the water flow switch 36 detects water flow. In S4, if there is residual water in the bathtub 130 (if it is yes), the process proceeds to S6. In S4, if there is no residual water in the bathtub 130 (if it is no), the process proceeds to S10.
[0041] In S6, the control device 150 performs a process for determining the amount of water remaining in the bathtub 130. Specifically, the control device 150 drives the bathtub circulation pump 34 and stores the temperature detected by the circulation circuit thermistor 32a as the pre-heating temperature. Thereafter, the control device 150 starts heating the water by the second heat source machine 14. Figure 5 As shown, the remaining water in the bathtub 130 is delivered to the second heat source machine 14 via the bathtub adapter 132, the first bathtub water path 62, the first three-way valve 80, the connecting path 66, the heat source circuit 60, and the circulation circuit 32. The remaining water heated by the second heat source machine 14 returns to the bathtub 130 via the circulation outward path 30, the heat source outward path 68, the second three-way valve 82, the second bathtub water path 70, and the bathtub adapter 132. When the temperature detected by the circulation circuit thermistor 32a reaches or exceeds the set temperature, the control device 150 stores the temperature detected by the circulation circuit thermistor 32a as the heated temperature, stops the bathtub circulation pump 34, and ends the heating of the water by the second heat source machine 14. Then, the control device 150 calculates the remaining water amount in the bathtub 130 based on the temperature increase range of the pre-heating temperature subtracted from the heated temperature and the accumulated heating amount in the second heat source machine 14 in S6.
[0042] In S8 , the control device 150 subtracts the remaining water volume of the bathtub 130 determined in S6 from the set water volume in the hot water injection operation control, and updates the set water volume in the hot water injection operation control.
[0043] In S10, the control device 150 opens the hot water injection valve 26 to start heating by the first heat source unit 12. Figure 4As shown, water adjusted to a set temperature flows from the hot water path 18 into the circulation circuit 32 via the hot water injection path 24. The water flowing into the circulation circuit 32 is divided into flowing toward the upstream side (i.e., the heat source circuit 60) and flowing toward the downstream side (i.e., the second heat source machine 14). The water flowing from the circulation circuit 32 to the heat source circuit 60 flows into the bathtub 130 via the connecting path 66, the first three-way valve 80, the first bathtub water path 62, and the bathtub adapter 132. The water flowing from the circulation circuit 32 to the second heat source machine 14 flows into the bathtub 130 via the circulation outgoing path 30, the heat source outgoing path 68, the second three-way valve 82, the second bathtub water path 70, and the bathtub adapter 132.
[0044] In S12, the control device 150 waits until the cumulative water volume detected by the water volume sensor 28 reaches the set water volume in the hot water injection operation control. In addition, the cumulative water volume here refers to the cumulative water volume detected by the water volume sensor 28 in the exhaust process of S2 and the cumulative water volume after the hot water starts to be injected into the bathtub 130 in S10. When the cumulative water volume reaches the set water volume (when yes), the process enters S14.
[0045] In S14 , the control device 150 closes the hot water injection valve 26 , and ends the heating of water by the first heat source unit 12 .
[0046] In S16, the control device 150 drives the bathtub circulation pump 34 and obtains the temperature detected by the circulation loop thermistor 32a as the bathtub water temperature. Then, the control device 150 determines whether the bathtub water temperature is above the set temperature. If the bathtub water temperature has not reached the set temperature (if it is no), the process proceeds to S18. If the bathtub water temperature is above the set temperature (if it is yes), the process proceeds to S20.
[0047] In S18, the control device 150 performs a reheating process for the water in the bathtub 130. Specifically, the control device 150 drives the bathtub circulation pump 34 and starts heating the water by the second heat source machine 14. Figure 5 As shown, the water in the bathtub 130 is delivered to the second heat source machine 14 via the bathtub adapter 132, the first bathtub water path 62, the first three-way valve 80, the connecting path 66, the heat source circuit 60, and the circulation circuit 32. The water heated by the second heat source machine 14 returns to the bathtub 130 via the circulation outgoing path 30, the heat source outgoing path 68, the second three-way valve 82, the second bathtub water path 70, and the bathtub adapter 132. When the temperature detected by the circulation circuit thermistor 32a reaches a set temperature or above, the control device 150 stops the bathtub circulation pump 34 and stops the heating of the water by the second heat source machine 14.
[0048] In S20, the control device 150 informs the user through the remote controller 154 that the hot water injection operation control has ended. Figure 3 The processing is finished.
[0049] (Micro bubble generation operation control) The micro-bubble generation operation control starts when the user instructs to start the micro-bubble generation operation control using the remote controller 154. In addition, in the water heater 2 of the present embodiment, the micro-bubble generation operation control also starts automatically after the hot water injection operation control is completed. That is, the micro-bubble generation operation control is implemented in conjunction with the implementation of the hot water injection operation control. When the micro-bubble generation operation control starts, the control device 150 sets the first three-way valve 80 and the second three-way valve 82 to the third connection state and the fifth connection state, respectively (refer to Figure 4 , Figure 5 ). In this state, the control device 150 implements Figure 6 Processing shown.
[0050] In S22, the control device 150 performs a cold water relief process. Specifically, when the temperature detected by the circulation outgoing path thermistor 30a and the circulation loop thermistor 32a is below a predetermined temperature, the control device 150 drives the bathtub circulation pump 34 and starts heating the water by the second heat source machine 14. When low-temperature water remains in the circulation outgoing path 30 and the circulation loop 32, the cold water relief process is performed. Figure 5 As shown, the low-temperature water flows into the bathtub adapter 132 via the heat source outflow path 68, the second three-way valve 82, and the second bathtub water path 70, and is discharged to the bathtub 130 from the second discharge port 134d on the lower surface 132b of the bathtub adapter 132. Therefore, even if the user is bathing in the bathtub 130, it is possible to prevent the low-temperature water from being directly discharged to the user's body. When a predetermined time has passed since the start of the cold water relief process, the control device 150 stops the bathtub circulation pump 34, and ends the heating of water by the second heat source machine 14, thereby ending the cold water relief process.
[0051] In S24, the control device 150 starts to supply air-dissolved water from the storage tank 52 to the bathtub 130. Specifically, Figure 7As shown, the control device 150 sets the first three-way valve 80 to the first communication state and the second three-way valve 82 to the fourth communication state, then opens the tank water supply valve 86 and drives the bathtub circulation pump 34, the first pressure pump 88 and the second pressure pump 90. Accordingly, the water in the bathtub 130 is supplied to the tank 52 via the bathtub adapter 132, the second bathtub water path 70, the second three-way valve 82, the communication path 66, the heat source circuit 60, the circulation circuit 32, the second heat source machine 14, the circulation outgoing path 30, the heat source outgoing path 68, and the tank circuit 74. At this time, the water pressurized by the first pressure pump 88 and the second pressure pump 90 is supplied to the tank 52. Accordingly, inside the tank 52, the air is pressurized and dissolved in the water. Then, the pressurized water containing dissolved air is supplied from the storage tank 52 to the bathtub 130 via the storage tank outflow path 64, the first three-way valve 80, the first bathtub water path 62, and the bathtub adapter 132. At this time, the pressurized water containing dissolved air is decompressed to below atmospheric pressure when passing through the micro-bubble generating nozzle 142 of the first discharge path 136a of the bathtub adapter 132, and is pressurized to atmospheric pressure when being ejected to the bathtub 130, so that micro-bubbles are generated in the water of the bathtub 130.
[0052] In S26, the control device 150 determines whether the water level of the storage tank 52 is above the lower limit water level based on the detection signal from the low water level electrode 52b. If the water level of the storage tank 52 is above the lower limit water level (if it is yes), the process proceeds to S28. If the water level of the storage tank 52 is lower than the lower limit water level (if it is no), the process proceeds to S34.
[0053] In S28, the control device 150 starts the air introduction operation control (see Fig. 9 The air introduction operation control will be described in detail later. While the air introduction operation control is being implemented, air is introduced into the storage tank 52.
[0054] In S30, the control device 150 determines whether the water level of the storage tank 52 is lower than the lower limit water level based on the detection signal from the low water level electrode 52b. In the present embodiment, the amount of air introduced into the storage tank 52 when the air introduction operation control is being implemented is greater than the amount of air of the tiny bubbles generated in the water of the bathtub 130. Therefore, in the state where the air introduction operation control is being implemented, the amount of air in the storage tank 52 increases and the water level of the storage tank 52 decreases. When the water level of the storage tank 52 is lower than the lower limit water level (in the case of yes), the process enters S32. When the water level of the storage tank 52 is above the lower limit water level (in the case of no), the process enters S34.
[0055] In S32, the control device 150 ends the air introduction operation control.
[0056] In S34, the control device 150 determines whether the water level of the tank 52 is above the upper water level based on the detection signal from the high water level electrode 52a. In a state where the air introduction operation control is not implemented, air is not introduced into the tank 52. Therefore, the amount of air in the tank 52 is reduced by generating micro bubbles in the water of the bathtub 130, and the water level of the tank 52 rises. When the water level of the tank 52 is above the upper water level (in the case of yes), the process proceeds to S36. When the water level of the tank 52 is lower than the upper water level (in the case of no), the process proceeds to S38.
[0057] In S36 , the control device 150 starts air introduction operation control.
[0058] In S38, the control device 150 determines whether the operation control time of the micro-bubble generation operation control has reached the set time. Here, the operation control time of the micro-bubble generation operation control is the elapsed time from the start of the micro-bubble generation operation control. In the water heater 2 of the present embodiment, when the micro-bubble generation operation control is implemented independently without being linked with the implementation of the hot water injection operation control, the set time is set to, for example, 10 minutes. In contrast, when the micro-bubble generation operation control is implemented in conjunction with the implementation of the hot water injection operation control, the set time is set to, for example, 30 minutes. When the operation control time has not reached the set time (when it is no), the process returns to S30. When the operation control time reaches the set time (when it becomes yes), the process enters S40.
[0059] In S40 , the control device 150 stops the bathtub circulation pump 34 , the first pressure pump 88 , and the second pressure pump 90 , thereby ending the supply of the air-dissolved water from the tank 52 to the bathtub 130 .
[0060] In S42 , the control device 150 ends the air introduction operation control when the air introduction operation control is being executed.
[0061] In S44, the control device 150 performs the tank cleaning process. Specifically, the control device 150 opens the hot water injection valve 26 and starts heating the water by the first heat source machine 12. Figure 8As shown, water adjusted to a set temperature flows from the hot water path 18 into the circulation loop 32 via the hot water injection path 24. The water flowing into the circulation loop 32 is divided into flowing toward the upstream side (i.e., the heat source loop 60) and flowing toward the downstream side (i.e., the second heat source machine 14). The water flowing from the circulation loop 32 to the heat source loop 60 flows into the bathtub 130 via the connecting path 66, the second three-way valve 82, the second bathtub water path 70, and the bathtub adapter 132. In addition, the water flowing from the circulation loop 32 to the second heat source machine 14 flows into the bathtub 130 via the circulation outlet 30, the heat source outlet 68, the tank loop 74, the tank 52, the tank outlet 64, the first three-way valve 80, the first bathtub water path 62, and the bathtub adapter 132. Accordingly, the interior of the tank 52 is cleaned. After S44, Figure 6 The processing is finished.
[0062] (Air introduction operation control) When Figure 6 When the air introduction operation control is started in S28 or S36, the control device 150 implements Fig. 9 Processing shown.
[0063] In S46, the control device 150 starts the first air introduction operation. Specifically, the control device 150 closes the first on-off valve 94 and opens the second on-off valve 96, and drives the air pump 104 in this state. Accordingly, the water in the gas-liquid replacement path 92 on the downstream side of the first on-off valve 94 is discharged to the drain tank 180, and the air sent into the air introduction path 100 by the air pump 104 is introduced into the gas-liquid replacement path 92 on the downstream side of the first on-off valve 94.
[0064] In S48, the control device 150 waits until the first operation time has passed since the first air introduction operation was started in S46. If the first operation time has passed (YES), the process proceeds to S50.
[0065] In S50 , the control device 150 ends the first air introduction operation. Specifically, the control device 150 closes the second on-off valve 96 and stops the air pump 104 .
[0066] In S52, the control device 150 starts the second air introduction operation. Specifically, the control device 150 closes the second on-off valve 96, stops the air pump 104, and opens the first on-off valve 94 in this state. Accordingly, the air stored in the portion between the first on-off valve 94 and the second on-off valve 96 of the gas-liquid replacement path 92 flows into the storage tank 52, and the water in the storage tank 52 flows into the gas-liquid replacement path 92.
[0067] In S54, the control device 150 waits until the second operation time has passed since the second air introduction operation was started in S52. If the second operation time has passed (YES), the process proceeds to S56.
[0068] In S56, the control device 150 ends the second air introduction operation. Specifically, the control device 150 closes the first on-off valve 94. After S56, the process returns to S46.
[0069] The control device 150 repeatedly performs Fig. 9 The processing shown until Figure 6 The air introduction operation control is terminated in S32 or S42 of the embodiment. Accordingly, during the period when the air introduction operation control is being implemented, the first air introduction action (S46-S50) and the second air introduction action (S52-S56) are repeatedly implemented to introduce air into the storage tank 52.
[0070] (Reheating operation control) The reheating operation control starts when the user instructs to start the reheating operation control via the remote controller 154. When the reheating operation control starts, the control device 150 sets the first three-way valve 80 to the third communication state and sets the second three-way valve 82 to the fifth communication state (see Figure 4 , Figure 5 ). In this state, the control device 150 drives the bathtub circulation pump 34, and starts heating the water by the second heat source machine 14. Figure 5 As shown, the water in the bathtub 130 is transported to the second heat source machine 14 via the bathtub adapter 132, the first bathtub water path 62, the first three-way valve 80, the connecting path 66, the heat source circuit 60, and the circulation circuit 32. The water heated by the second heat source machine 14 returns to the bathtub 130 via the circulation outgoing path 30, the heat source outgoing path 68, the second three-way valve 82, the second bathtub water path 70, and the bathtub adapter 132. When the temperature detected by the circulation circuit thermistor 32a reaches or exceeds the set temperature, the control device 150 stops the bathtub circulation pump 34 and ends the heating of the water by the second heat source machine 14. After that, the control device 150 notifies the user through the remote controller 154 that the reheating operation control is completed, and ends the reheating operation control.
[0071] (Example 2) like Fig.10 As shown, the water heater 202 of this embodiment has a substantially similar structure to the water heater 2 of the first embodiment. The water heater 202 of this embodiment has a high water level electrode 52a and a ground electrode 52c inside the storage tank 52, but does not have a low water level electrode 52b, and is different from the water heater 2 of the first embodiment in this respect. In addition, in the water heater 202 of this embodiment, when the micro-bubble generation operation control is implemented, the control device 150 replaces Figure 6 The processing shown is implemented Fig.11 Next, for Fig.11 The processing shown is to illustrate its Figure 6 The differences in processing are shown.
[0072] exist Fig.11 In the process shown, after S24 and in the case of No in S38, the process proceeds to S62. In S62, the control device 150 determines whether the water level of the storage tank 52 is above the upper water level based on the detection signal from the high water level electrode 52a. If the water level of the storage tank 52 is above the upper water level (if Yes), the process proceeds to S64. If the water level of the storage tank 52 is lower than the upper water level (if No), the process proceeds to S66.
[0073] In S64, the control device 150 starts the air introduction operation control (see Fig. 9 ).
[0074] In S66, the control device 150 determines whether the state in which the water level of the storage tank 52 is lower than the upper limit water level continues for the first prescribed time based on the detection signal from the high water level electrode 52a. The first prescribed time refers to the hypothetical time for the water level of the storage tank 52 to drop from the upper limit water level to the lower limit water level when the air introduction operation control is being implemented, which is a time shorter than the set time of S38. In the case where the state in which the water level of the storage tank 52 is lower than the upper limit water level continues for the first prescribed time (in the case of yes), the process enters S68. In the case where the state in which the water level of the storage tank 52 is lower than the upper limit water level does not continue for the first prescribed time (in the case of no), the process enters S38.
[0075] In S68, the control device 150 ends the air introduction operation control. After S68, the process proceeds to S38.
[0076] According to the water heater 202 of the present embodiment, the start and end of the air introduction operation control can be controlled by using the high water level electrode 52a instead of the low water level electrode 52b.
[0077] (Example 3) like Fig.12 As shown, the water heater 302 of this embodiment has a substantially similar structure to the water heater 2 of the first embodiment. The water heater 302 of this embodiment has a low water level electrode 52b and a ground electrode 52c inside the storage tank 52, but does not have a high water level electrode 52a, and is different from the water heater 2 of the first embodiment in this respect. In addition, in the water heater 302 of this embodiment, when executing the micro-bubble generation operation control, the control device 150 replaces Figure 6 The processing shown is implemented Fig.13 Next, for Fig.13 The processing shown is to illustrate its Figure 6 The differences in processing are shown.
[0078] exist Fig.13 In the process shown, after S24 and in the case of No in S38, the process enters S72. In S72, the control device 150 determines whether the state of the water level of the storage tank 52 being above the lower limit water level continues for the second prescribed time based on the detection signal from the low water level electrode 52b. The second prescribed time refers to the hypothetical time for the water level of the storage tank 52 to rise from the lower limit water level to the upper limit water level when the air introduction operation control is not implemented, which is a time shorter than the set time of S38. When the state of the water level of the storage tank 52 being above the lower limit water level continues for the second prescribed time (in the case of Yes), the process enters S74. When the state of the water level of the storage tank 52 being above the lower limit water level does not continue for the second prescribed time (in the case of No), the process enters S76.
[0079] In S74, the control device 150 starts the air introduction operation control (see Fig. 9 ).
[0080] In S76, the control device 150 determines whether the water level of the storage tank 52 is lower than the lower limit water level based on the detection signal from the low water level electrode 52b. If the water level of the storage tank 52 is lower than the lower limit water level (if yes), the process proceeds to S78. If the water level of the storage tank 52 is higher than the lower limit water level (if no), the process proceeds to S38.
[0081] In S78, the control device 150 ends the air introduction operation control. After S78, the process proceeds to S38.
[0082] According to the water heater 302 of the present embodiment, the start and end of the air introduction operation control can be controlled by using the low water level electrode 52b instead of the high water level electrode 52a.
[0083] (Example 4) like Fig.14 As shown, the water heater 402 of this embodiment has a structure substantially the same as that of the water heater 2 of the first embodiment. The water heater 302 of this embodiment does not have a high water level electrode 52a and a low water level electrode 52b inside the storage tank 52, but instead has an intermediate water level electrode 52d, which is different from the water heater 2 of the first embodiment. The water level detected by the intermediate water level electrode 52d (hereinafter also referred to as the intermediate water level) is lower than the upper limit water level and higher than the lower limit water level. In addition, in the water heater 402 of this embodiment, when the micro-bubble generation operation control is implemented, the control device 150 replaces the control device 150. Figure 6 The processing shown is implemented Fig.15Next, for Fig.15 The processing shown is to illustrate its Figure 6 The differences in processing are shown.
[0084] exist Fig.15 In the process shown, after S24 and in the case of No in S38, the process enters S82. In S82, the control device 150 determines whether the state of the water level of the storage tank 52 being above the intermediate water level continues for the third prescribed time based on the detection signal from the intermediate water level electrode 52d. The third prescribed time refers to the hypothetical time for the water level of the storage tank 52 to rise from the intermediate water level to the upper limit water level when the air introduction operation control is not implemented, which is a time shorter than the set time of S38. When the state of the water level of the storage tank 52 being above the intermediate water level continues for the third prescribed time (in the case of Yes), the process enters S84. When the state of the water level of the storage tank 52 being above the intermediate water level does not continue for the third prescribed time (in the case of No), the process enters S86.
[0085] In S84, the control device 150 starts the air introduction operation control (see Fig. 9 ).
[0086] In S86, the control device 150 determines whether the state of the water level of the storage tank 52 being lower than the middle water level continues for the fourth prescribed time based on the detection signal from the middle water level electrode 52d. The fourth prescribed time refers to the hypothetical time for the water level of the storage tank 52 to drop from the middle water level to the lower limit water level when the air introduction operation control is being implemented, which is a time shorter than the set time of S38. In the case that the state of the water level of the storage tank 52 being lower than the middle water level continues for the fourth prescribed time (in the case of yes), the process enters S88. In the case that the state of the water level of the storage tank 52 being lower than the middle water level does not continue for the fourth prescribed time (in the case of no), the process enters S38.
[0087] In S88, the control device 150 ends the air introduction operation control. After S88, the process proceeds to S38.
[0088] According to the water heater 402 of the present embodiment, the start and end of the air introduction operation control can be controlled by using the intermediate water level electrode 52 d instead of the high water level electrode 52 a and the low water level electrode 52 b .
[0089] (Variation Example) In the above-mentioned water heaters 2, 202, 302, and 402, the air introduction unit 98 may be provided with an exhaust valve (not shown) instead of the check valve 102 and the air pump 104. In addition, in the above-mentioned water heaters 2, 202, 302, and 402, when the other end of the gas-liquid replacement path 92 is opened to the atmosphere and sufficient air flows into the gas-liquid replacement path 92 as water is discharged from the gas-liquid replacement path 92 to the drain tank 180, the air introduction unit 98 may not be provided.
[0090] In the above-mentioned water heaters 2, 202, 302, 402, one end of the gas-liquid replacement path 92 may be connected to the tank 52 at a location other than the bottom of the tank 52, as long as the water level is lower than the lower limit water level.
[0091] In the above-mentioned hot water devices 2, 202, 302, 402, a water level sensor (such as an infrared sensor, etc.) of a type different from the water level electrodes (i.e., the high water level electrode 52a, the low water level electrode 52b, the ground electrode 52c, the middle water level electrode 52d) can be used to detect whether the water level of the storage tank 52 is above the upper water level, the lower water level and / or the middle water level.
[0092] In the above-mentioned hot water devices 2, 202, 302, 402, the control device 150 may also be Figure 6 , Fig.11 , Fig.13 , Fig.15 Before starting the air introduction operation control in S28, S36, S64, S74, S84 (for example, after starting the supply of air-dissolved water in S24, or after ending the air introduction operation control in S32, S68, S78, S88), implement Fig. 9 In this case, the control device 150 can skip the first air introduction action of S46-S50 when starting the air introduction operation control in S28, S36, S64, S74, and S84. Fig. 9 The first air introduction action of S46-S50 is started and the second air introduction action of S52-S56 is implemented.
[0093] In the above-mentioned hot water device 302, at the beginning Fig.13 In the process of S72 which is performed in a state where the air introduction operation control has not been started once after the process of , the control device 150 can determine whether the water level of the storage tank 52 is above the lower limit water level based on the detection signal from the low water level electrode 52b. In this case, if the water level of the storage tank 52 is above the lower limit water level (if yes), the process proceeds to S74, and if the water level of the storage tank 52 is below the lower limit water level (if no), the process proceeds to S76.
[0094] In the above-mentioned hot water device 402, at the beginning Fig.15 In the process of S82 which is performed in the state where the air introduction operation control has not been started once after the process of , the control device 150 may also determine whether the water level of the storage tank 52 is above the intermediate water level based on the detection signal from the intermediate water level electrode 52d. In this case, if the water level of the storage tank 52 is above the intermediate water level (if yes), the process proceeds to S84, and if the water level of the storage tank 52 is lower than the intermediate water level (if no), the process proceeds to S86.
[0095] In the above-mentioned hot water devices 2, 202, 302, 402, in the micro-bubble generation operation control which is executed in conjunction with the hot water injection operation control, the Figure 6 , Fig.11 , Fig.13 , Fig.15 Cold water relief treatment of S22.
[0096] In the above-mentioned hot water devices 2, 202, 302, 402, it is also possible to omit Figure 6 , Fig.11 , Fig.13 , Fig.15 The S44 tank cleaning process.
[0097] In the above-mentioned water heating devices 2, 202, 302, 402, Figure 6 , Fig.11 , Fig.13 , Fig.15 S38 may also replace the determination process of the operation control time, and instead of entering S40, return to S30 or S62, S72, S82 until the user instructs through the remote control 154 to end the micro-bubble generation operation control, so that the micro-bubble generation operation control continues. When the user instructs through the remote control 154 to end the micro-bubble generation operation control, enter S40.
[0098] In the above-mentioned hot water devices 2, 202, 302, 402, when the micro-bubble generation operation control is implemented in conjunction with the hot water injection operation control, it is also possible not to perform the hot water injection operation control at the end of the operation control. Figure 3 The hot water injection of S20 is completed, but it is carried out during the implementation of the micro-bubble generation operation control. Figure 3 In more detail, the hot water injection completion notification may be made after the operation control time of the micro-bubble generation operation control reaches a prescribed notification time (e.g., 2 minutes) that allows the water in the bathtub 130 to generate sufficient micro-bubbles. By adopting this structure, the time for the user to enter the bathroom can be delayed, thereby preventing the user from entering the bathroom before the water in the bathtub 130 generates sufficient micro-bubbles.
[0099] In the above-mentioned water heaters 2 , 202 , 302 , and 402 , a configuration may be adopted in which a user can switch, through the remote controller 154 , whether or not to implement the micro-bubble generation control in conjunction with the implementation of the hot water injection control.
[0100] In the above-mentioned hot water devices 2, 202, 302, 402, air is introduced into the storage tank 52, and instead of air, carbon dioxide, hydrogen, oxygen or other gas may be introduced into the storage tank 52. In this case, a gas filling tank (not shown) filled with gas may be connected to the air pump 104 of the air introduction unit 98.
[0101] In the above-mentioned water heaters 2, 202, 302, and 402, in the hot water injection operation control, a set amount of water is stored in the bathtub 130 according to the accumulated water amount detected by the water amount sensor 28. Alternatively, the water heaters 2, 202, 302, and 402 may be configured such that, for example, a water level sensor capable of detecting the water level of the bathtub 130 is provided, and in the hot water injection operation control, a set level of water is stored in the bathtub 130 according to the water level of the bathtub 130 detected by the water level sensor.
[0102] In the above-mentioned water heaters 2, 202, 302, and 402, the heat source unit 10 is connected to the faucet 170, and the air pressure dissolution unit 50 is connected to the bathtub 130. Alternatively, the heat source unit 10 may be connected to another heat utilization location, and the air pressure dissolution unit 50 may be connected to another liquid tank.
[0103] As described above, in one or more embodiments, the hot water device 2, 202, 302, 402 (an example of a micro-bubble generating device) has a tank 52, a tank circuit 74 (an example of a tank supply path), a first pressure pump 88, a second pressure pump 90 (an example of a pressure pump), a tank outlet 64, a first bathtub water path 62, a bathtub adapter 132 (an example of a tank discharge path), a micro-bubble generating nozzle 142, a gas-liquid replacement path 92, a first on-off valve 94, a second on-off valve 96 and a control device 150, wherein the tank 52 is used to pressurize and dissolve air (an example of a gas) in water (an example of a liquid); the tank circuit 74 is used to supply water to the tank 5. 2 supply water; the first pressure pump 88 and the second pressure pump 90 are arranged in the tank circuit 74; the tank outlet 64, the first bathtub water path 62, and the bathtub adapter 132 are used to discharge pressurized water dissolved with air from the tank 52 to the bathtub 130 (an example of a liquid tank); the micro-bubble generating nozzle 142 is arranged in the bathtub adapter 132, and is used to generate micro-bubbles by decompressing the pressurized water dissolved with air; the gas-liquid replacement path 92 is used to discharge water from the tank 52 and supply air to the tank 52; the first opening and closing valve 94 is arranged in the gas-liquid replacement path 92; the second opening and closing valve 96 is arranged in the gas-liquid replacement path 92 at a position farther from the tank 52 than the first opening and closing valve 94. The control device 150 can implement micro-bubble generation operation control, which means: driving the first pressure pump 88 and the second pressure pump 90 to pressurize and supply water from the tank circuit 74 to the tank 52, and supplying pressurized water dissolved with air from the tank 52 to the bathtub 130 via the tank outlet 64, the first bathtub water path 62, and the bathtub adapter 132. The control device 150 can implement air introduction operation control (an example of gas introduction operation control) during the implementation of the micro-bubble generation operation control, which means: alternately implementing the first air introduction action (an example of the first gas introduction action) and the second air introduction action (an example of the second gas introduction action). The control device 150 is configured to discharge water from the gas-liquid replacement path 92 and introduce air into the gas-liquid replacement path 92 in the first air introduction action, while the first opening and closing valve 94 is closed and the second opening and closing valve 96 is opened. The control device 150 is configured to discharge water from the storage tank 52 to the gas-liquid replacement path 92 and introduce air from the gas-liquid replacement path 92 to the storage tank 52 in the second air introduction operation, with the first opening and closing valve 94 opened and the second opening and closing valve 96 closed.
[0104] In the above-mentioned water heaters 2, 202, 302, and 402, the air introduction operation control is implemented during the fine bubble generation operation control, and the first air introduction operation and the second air introduction operation can be alternately implemented to supply air to the tank 52. Therefore, the fine bubble generation operation control does not need to be interrupted in order to supply air to the tank 52, and the fine bubble generation operation control can be continuously implemented. By adopting this structure, fine bubbles can be continuously and stably generated in the water of the bathtub 130.
[0105] In one or more embodiments, the water heater 2, 202 further includes a high water level electrode 52a (an example of a first liquid level sensor), which is used to detect whether the water level (an example of a liquid level) of the storage tank 52 is above the upper limit water level (an example of a first liquid level). The water level of the portion where the gas-liquid replacement path 92 is connected to the storage tank 52 is lower than the upper limit water level. The control device 150 is configured to start the air introduction operation control when the water level of the storage tank 52 changes from below the upper limit water level to above the upper limit water level while the micro-bubble generation operation control is being implemented and the air introduction operation control is not being implemented.
[0106] When the micro-bubble generation operation control is being implemented and the air introduction operation control is not being implemented, the amount of air in the storage tank 52 decreases, so the water level of the storage tank 52 rises. In addition, when the micro-bubble generation operation control is being implemented and the air introduction operation control is being implemented, the amount of air in the storage tank 52 increases, so the water level of the storage tank 52 decreases. According to the above-mentioned structure, during the process of implementing the micro-bubble generation operation control, it is possible to suppress the water level of the storage tank 52 from exceeding the upper limit water level and rising excessively.
[0107] In one or more embodiments, the control device 150 of the hot water device 202 is configured to: when the micro-bubble generation operation control is being implemented and the air introduction operation control is being implemented, when the water level of the storage tank 52 changes from above the upper limit water level to below the upper limit water level, and the state of the water level of the storage tank 52 being below the upper limit water level continues for a first specified time, the air introduction operation control is stopped.
[0108] According to the above-described configuration, it is possible to suppress an excessive drop in the water level of the storage tank 52 during execution of the fine bubble generation operation control.
[0109] In one or more embodiments, the water heater 2, 302 further includes a low water level electrode 52b (an example of a second liquid level sensor), which is used to detect whether the water level (an example of a liquid level) of the storage tank 52 is above the lower limit water level (an example of a second liquid level). The water level of the portion where the gas-liquid replacement path 92 is connected to the storage tank 52 is lower than the lower limit water level. The control device 150 is configured to stop the air introduction operation control when the water level of the storage tank 52 changes from above the lower limit water level to below the lower limit water level while the micro-bubble generation operation control is being implemented and the air introduction operation control is being implemented.
[0110] According to the above-described configuration, during the execution of the fine bubble generation operation control, it is possible to suppress the water level of the storage tank 52 from falling below the lower limit water level and excessively decreasing.
[0111] In one or more embodiments, the control device 150 of the hot water device 302 is configured as follows: when the water level of the storage tank 52 changes from below the lower limit water level to above the lower limit water level, and the water level of the storage tank 52 remains above the lower limit water level for a second specified time, the air introduction operation control is started when the micro-bubble generation operation control is being implemented and the air introduction operation control is not being implemented.
[0112] According to the above-described configuration, it is possible to suppress an excessive rise in the water level of the storage tank 52 during execution of the fine bubble generation operation control.
[0113] In one or more embodiments, the water heater 2 further includes a high water level electrode 52a (an example of a first liquid level sensor) and a low water level electrode 52b (an example of a second liquid level sensor), wherein the high water level electrode 52a is used to detect whether the water level (an example of a liquid level) of the storage tank 52 is above the upper water level (an example of a first liquid level); and the low water level electrode 52b is used to detect whether the water level of the storage tank 52 is above the lower water level (an example of a second liquid level) lower than the upper water level. The water level of the portion where the gas-liquid replacement path 92 is connected to the storage tank 52 is lower than the lower water level. The control device 150 is configured to start the air introduction operation control when the water level of the storage tank 52 changes from below the upper water level to above the upper water level when the micro-bubble generation operation control is being implemented and the air introduction operation control is not being implemented. The control device 150 is configured to stop the air introduction operation control when the water level of the storage tank 52 changes from above the lower water level to below the lower water level when the micro-bubble generation operation control is being implemented and the air introduction operation control is being implemented.
[0114] According to the above structure, in the process of implementing the micro-bubble generation operation control, it is possible to suppress both the excessive rise of the water level in the storage tank 52 exceeding the upper limit water level and the excessive drop of the water level in the storage tank 52 below the lower limit water level. In addition, according to the above structure, the amount of air supplied to the storage tank 52 during the period from the start to the stop of the air introduction operation control can be accurately managed.
[0115] In one or more embodiments, the hot water device 2, 202, 302, 402 also has an air introduction unit 98 (an example of a gas introduction unit), which is configured as follows: being arranged between the first on-off valve 94 and the second on-off valve 96 in the gas-liquid replacement path 92, and being used to introduce air into the gas-liquid replacement path 92.
[0116] According to the above-described configuration, while the air introduction operation control is being performed, water can be discharged from the gas-liquid replacement passage 92 and air can be introduced into the gas-liquid replacement passage 92 in a more stable manner.
[0117] The above embodiments are described in detail, but these implementations are only examples and do not limit the scope of the technical solution. The technology described in the technical solution includes various deformations and changes to the specific examples exemplified above. The technical elements described in this specification or the drawings play a technical usefulness alone or in various combinations, and are not limited to the combinations recorded in the technical solution at the time of application. In addition, the technology exemplified in this specification or the drawings can achieve multiple purposes at the same time, and achieving one of the purposes itself has technical usefulness.
Claims
1. A micro bubble generating device, It is characterized in that It has a storage tank, a storage tank supply path, a pressure pump, a storage tank discharge path, a micro bubble generating nozzle, a gas-liquid replacement path, a first opening and closing valve, a second opening and closing valve and a control device, wherein: The storage tank is used to dissolve the gas in the liquid under pressure; The tank supply path is used to supply the liquid to the tank; The pressure pump is provided in the tank supply path; The tank discharge path is used to discharge the liquid containing the pressurized gas dissolved therein from the tank to the liquid tank; The micro-bubble generating nozzle is provided in the discharge path of the storage tank and is used to generate micro-bubbles by decompressing the liquid in which the gas is dissolved under pressure; The gas-liquid replacement path is used to discharge the liquid from the storage tank and supply the gas to the storage tank; The first on-off valve is provided in the gas-liquid replacement path; The second on-off valve is provided in the gas-liquid replacement path at a position farther from the storage tank than the first on-off valve. The control device is capable of implementing micro-bubble generation operation control, which refers to: driving the pressure pump to supply the liquid under pressure from the tank supply path to the tank, and supplying the liquid in which the gas is dissolved under pressure from the tank to the liquid tank via the tank discharge path, The control device can implement gas introduction operation control during the process of implementing the micro-bubble generation operation control, and the gas introduction operation control refers to: alternately implementing a first gas introduction action and a second gas introduction action, The control device is configured to discharge the liquid from the gas-liquid replacement path and introduce the gas into the gas-liquid replacement path in a state where the first opening and closing valve is closed and the second opening and closing valve is opened in the first gas introduction operation, The control device is configured to discharge the liquid from the storage tank to the gas-liquid replacement path and to introduce the gas from the gas-liquid replacement path to the storage tank in a state where the first opening and closing valve is opened and the second opening and closing valve is closed in the second gas introduction operation.
2. The micro-bubble generating device according to claim 1, It is characterized in that It also has a first liquid level sensor, which is used to detect whether the liquid level of the storage tank is above the first liquid level. The liquid level at the portion where the gas-liquid replacement path is connected to the storage tank is lower than the first liquid level. The control device is configured to start the gas introduction operation control when the liquid level of the storage tank changes from below the first liquid level to above the first liquid level while the micro-bubble generation operation control is being implemented and the gas introduction operation control is not being implemented.
3. The micro-bubble generating device according to claim 2, It is characterized in that The control device is configured to stop the gas introduction operation control when the liquid level of the storage tank changes from above the first liquid level to below the first liquid level and the liquid level of the storage tank remains below the first liquid level for a first specified time while the micro-bubble generation operation control and the gas introduction operation control are being implemented.
4. The micro-bubble generating device according to claim 1, It is characterized in that It also has a second liquid level sensor, which is used to detect whether the liquid level of the storage tank is above the second liquid level. The liquid level at the portion where the gas-liquid replacement path is connected to the storage tank is lower than the second liquid level. The control device is configured to stop the gas introduction operation control when the liquid level of the storage tank changes from above the second liquid level to below the second liquid level while the micro-bubble generation operation control and the gas introduction operation control are being implemented.
5. The micro-bubble generating device according to claim 4 The control device is configured as follows: when the micro-bubble generation operation control is being implemented and the gas introduction operation control is not being implemented, when the liquid level of the storage tank changes from below the second liquid level to above the second liquid level and the liquid level of the storage tank remains above the second liquid level for a second specified time, the gas introduction operation control is started.
6. The micro-bubble generating device according to claim 1, It is characterized in that It also has a first liquid level sensor and a second liquid level sensor, wherein: The first liquid level sensor is used to detect whether the liquid level of the storage tank is above the first liquid level; The second liquid level sensor is used to detect whether the liquid level of the storage tank is above a second liquid level lower than the first liquid level. The liquid level at the portion where the gas-liquid replacement path is connected to the storage tank is lower than the second liquid level. The control device is configured to start the gas introduction operation control when the liquid level of the storage tank changes from below the first liquid level to above the first liquid level while the micro-bubble generation operation control is being implemented and the gas introduction operation control is not being implemented, The control device is configured to stop the gas introduction operation control when the liquid level of the storage tank changes from above the second liquid level to below the second liquid level while the micro-bubble generation operation control and the gas introduction operation control are being implemented.
7. The micro-bubble generating device according to any one of claims 1 to 6, It is characterized in that A gas introduction unit is further provided. The gas introduction unit is configured to be disposed between the first opening and closing valve and the second opening and closing valve in the gas-liquid replacement path and to introduce the gas into the gas-liquid replacement path.