Segmented and staged coating method for fresh water tank of box ship

By carrying out the installation and structural coating of freshwater tanks in the ship segmentation stage, the use of scaffolding is avoided, the problems of inconvenience and prolongation of cycles in the existing technology are solved, and an efficient and safe coating process is achieved, and a promotion of the coating process is promoted. Debugging of the cabin water supply system.

CN119018312APending Publication Date: 2024-11-26SHANGHAI WAIGAOQIAO SHIP BUILDING CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411145938.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the prior art, the coating construction of freshwater tanks of ships requires the installation of scaffolding, resulting in inconvenience of construction and extended cycles, and cross-operation during the entire ship stage increases safety risks and operation difficulty.

Method used

The freshwater tank is divided into complete tanks in the ship segmentation stage, and outfit installation and structural coating are carried out at this stage, avoiding the erection and removal of scaffolding, and the overall coating is used for solvent-free epoxy coating, and the docking is carried out. Perform water injection and soaking inspection inside.

Benefits of technology

It shortens the coating construction cycle, improves construction efficiency, reduces safety risks and resource usage, reduces paint usage, simplifies production preparation work, and promotes the debugging of the cabin water supply system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119018312A_ABST
    Figure CN119018312A_ABST
Patent Text Reader

Abstract

The invention provides a box ship fresh water tank segmented stage coating method which comprises the following steps: S1, in a ship segmentation stage, dividing a fresh water tank into an integral segment; s2, fitting-out completeness is carried out in the segmentation stage; s3, the structural integrity coating construction of the fresh water tank is carried out in the segmented stage; and S4, in the in-dock stage, the fresh water tank is subjected to water injection soaking inspection, and defective positions are repaired. According to the method, coating construction is conducted on the fresh water tank in the segmented stage, scaffold erection and disassembly are not needed, various production preparatory work is little, cross operation is reduced, the coating construction period is shortened, the overall construction efficiency is improved, conditions are created for debugging of a cabin water supply system in the dock, and comprehensive resource occupation is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of shipbuilding, relates to a painting stage of a fresh water tank of a container ship, and in particular to a segmented painting method of a fresh water tank of a container ship. Background Art

[0002] Fresh water tanks on ships include distilled water tanks and drinking water tanks. Solvent-free epoxy coatings are generally used for fresh water tank coating. There are usually two conventional fresh water tank coating construction schemes: one is to fully coat the cabin after sandblasting in the whole ship stage; the other is to apply a temporary protective paint after sandblasting in the section stage, and fully coat the cabin after grinding in the whole ship stage. However, in the dock or wharf stage, scaffolding is required for fresh water tank construction, which makes construction inconvenient and prolongs the construction period. Summary of the invention

[0003] In order to solve the above problems in the prior art, the present invention provides a method for painting a fresh water tank of a container ship in sections and stages, and the painting comprises the following steps:

[0004] S1: During the ship segmentation stage, the fresh water tanks are divided into one integral segment;

[0005] S2: Outfitting integrity at the block stage;

[0006] S3: Structural integrity painting of fresh water tanks is carried out in block stages;

[0007] S4: During the docking stage, the fresh water tanks are inspected by filling with water and immersing, and any defects are repaired.

[0008] In the above-mentioned method for painting the fresh water tank of a container ship in sections, in the step S1, the fresh water tank is arranged in the cargo hold area of ​​the ship so that the fresh water tank forms a complete cabin in structure.

[0009] In the above-mentioned container ship fresh water tank segmented stage painting method, in the step S1, the fresh water tank is arranged in a single segment on the left and right sides of the cargo hold area of ​​the ship, so that the fresh water tank forms a complete cabin in structure.

[0010] In the above-mentioned container ship fresh water tank segment-by-segment painting method, in the step S1, the step of dividing the fresh water tank into an integral segment at the ship segment stage also includes: completing the hull structure installation of the six-surface area of ​​the fresh water tank at the segment stage.

[0011] In the above-mentioned method for painting the fresh water tank of a container ship in sections, in the step S2, the step of performing outfitting integrity in the section stage includes: completing the installation of outfitting parts and tooling welding in the section stage.

[0012] In the above-mentioned method for painting the fresh water tank of a container ship in sections, in the step S2, the step of performing outfitting integrity in the section stage also includes: completing the outfitting pallet in the fresh water tank area.

[0013] In the above-mentioned method for painting the fresh water tank of a container ship in sections, the step S2 also includes completely installing the guide rails, ladders and handrails facing the cargo hold surface in the section stage.

[0014] In the above-mentioned method for painting the fresh water tank of a container ship in sections, the step S2 also includes installing the countersunk manhole cover in the second deck passage area in the section stage.

[0015] In the above-mentioned container ship fresh water tank segmented painting method, in step S3, the fresh water tank structural integrity painting construction in the segmented stage includes the following steps:

[0016] S31: After the fresh water tank is arranged inside the independent section, the fresh water tank is placed on its side during the section painting stage, and the surface of the fresh water tank is treated;

[0017] S32: coating the fresh water tank as a whole (i.e., spraying paint), controlling the temperature and humidity, and maintaining ventilation;

[0018] S33: Install countersunk hatch covers to seal the fresh water tanks after painting.

[0019] In the above-mentioned method for painting the fresh water tank of a container ship in sections, in the step S31, the fresh water tank is placed in a side state with the outer plate surface as a reference in the section painting stage.

[0020] In the above-mentioned container ship fresh water tank segmented painting method, in step S31, the surface treatment of the fresh water tank includes the following steps: segmented pre-sandwashing, structural defect treatment, whole tank sandwashing and salt content testing.

[0021] In the above-mentioned container ship fresh water tank segmented stage painting method, in the step S31, the fresh water tank is surface treated to Sa2 1 / 2.

[0022] In the above-mentioned container ship fresh water tank segmented stage painting method, in the step S32, the painting adopts solvent-free epoxy paint.

[0023] In the above-mentioned method for painting the fresh water tank of a container ship in sections, in the step S32, after the fresh water tank is painted as a whole, it also includes local repairs.

[0024] In the above-mentioned container ship fresh water tank segmented stage painting method, in the step S32, the ventilation time is more than 5 days.

[0025] In the above-mentioned container ship fresh water tank segmented stage painting method, in the step S32, the ventilation time at 23° C. is 5 to 9 days.

[0026] In the above-mentioned method for painting the fresh water tank of a container ship in sections, before the section painting in step S3, it is necessary to ensure that all the internal and external pyrotechnic operations of the hexahedron of the fresh water tank are completed.

[0027] The above-mentioned method of painting the fresh water tank of a container ship in sections and stages is suitable for civilian ships, cruise ships, offshore engineering ships and other types of ships, in which the fresh water tank is arranged in one section and is fully outfitted.

[0028] In the present invention, the above technical features can be freely combined to form a new technical solution without conflicting with each other.

[0029] Compared with the prior art, the technical solution of the present invention has the following beneficial effects:

[0030] (1) The present invention performs coating construction on the fresh water tank in sections, without the need to erect and dismantle scaffolding, with less production preparation work, reduced cross-operation, shortened coating construction period, improved overall construction efficiency, created conditions for debugging the engine room water supply system in the dock, and reduced comprehensive resource occupation;

[0031] (2) The present invention moves the fresh water tank forward to the stage for coating construction, and there is no cross operation, which reduces the safety risk;

[0032] (3) The present invention moves the fresh water tank painting construction forward to the segmentation stage. Compared with the whole ship painting construction, the operation difficulty is less, and the situation of cross-operation with other professional operations during the whole ship painting construction of the fresh water tank is avoided. The fresh water tank painting construction period can be shortened by about 50%;

[0033] (4) The present invention paints the fresh water tank in sections, and can directly use various fixed equipment in the painting plant. There is no need to set up or dismantle scaffolding in the tank, and other production preparation work is relatively simple, which reduces the resource occupation of various mobile equipment, reduces the intensity of painting construction, improves the painting operation environment, and improves the efficiency of painting construction;

[0034] (5) The present invention paints the fresh water tank in sections, directly applying solvent-free epoxy paint without spraying temporary protective paint, thus reducing the amount of paint used;

[0035] (6) The present invention constructs the fresh water tank in sections, and water can be directly added to the tank during the shipbuilding stage in the dock. Various water supply system commissioning, such as fresh water pressure tank and drinking water pressure tank commissioning, can be carried out without using a mobile fresh water tank, thereby creating convenient conditions for advancing the commissioning progress of the engine room water supply system in the dock and shortening the overall construction period of the ship. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 A schematic diagram showing the position of the left area of ​​a fresh water tank in a segmented stage in Embodiment 1 of the present invention;

[0037] Figure 2 A schematic diagram showing the integrity of an outfitting component at a segmentation stage in Example 1 of the present invention;

[0038] Figure 3 A schematic diagram showing the side placement of a fresh water tank in a segmentation stage in Example 1 of the present invention;

[0039] in, Figure 1 The markings are: 1-main deck of cargo hold area, 2-steel top wall of second deck passage, 3-steel deck of second deck passage, 4-fresh water tank, 5-drinking water tank, 6-ballast tank. DETAILED DESCRIPTION

[0040] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0041] Some embodiments of the present invention provide a method for painting a fresh water tank of a container ship in sections and stages, wherein the painting comprises the following steps:

[0042] S1: During the ship segmentation stage, the fresh water tanks are divided into one integral segment;

[0043] S2: Outfitting integrity at the block stage;

[0044] S3: Structural integrity painting of fresh water tanks is carried out in block stages;

[0045] S4: During the docking stage, the fresh water tanks are inspected by filling with water and immersing, and any defects are repaired.

[0046] In some embodiments, in step S1, the fresh water tank is arranged in the cargo hold area of ​​the ship so that the fresh water tank forms a complete cabin in structure.

[0047] In some embodiments, in step S1, the fresh water tank is arranged in a single section on the port and starboard sides of the cargo hold area of ​​the ship, so that the fresh water tank forms a complete cabin in structure.

[0048] In some embodiments, in step S1, the step of dividing the fresh water tank into an integral section during the ship segmentation stage further includes: completing the installation of the hull structure of the six-side area of ​​the fresh water tank during the segmentation stage.

[0049] In some embodiments, in step S2, the step of performing outfitting integrity at the segmented stage includes: completing installation of outfitting parts and tooling welding at the segmented stage.

[0050] In some embodiments, in step S2, the step of performing outfitting integrity in the segmented stage further includes: completing the outfitting pallet in the fresh water tank area.

[0051] In the present invention, the welding and installation procedures of the hull structure, outfitting parts and tooling in the six-side area of ​​the fresh water tank are moved forward to the segmentation stage, and the outfitting pallet in the fresh water tank area is further improved to ensure that the structure and outfitting of the fresh water tank are complete in the segmentation stage, thereby avoiding damage to the coating during subsequent installation.

[0052] In some embodiments, step S2 further comprises installing the rails, ladders and handrails facing the cargo hold in a segmented stage.

[0053] In some embodiments, step S2 includes installing the countersunk manhole cover of the second deck passage area in a segmented stage.

[0054] In the present invention, the guide rails, ladders and handrails facing the cargo hold are fully installed in the segmentation stage, and the countersunk manhole cover in the second deck passage area is installed in the segmentation stage. These are installations of ship cargo hold accessories. Although they do not belong to fresh water tank outfitting parts, since these cargo hold accessories are adjacent to or located near the fresh water tank, the installation of these accessories requires high-temperature welding. If they are not installed in advance in the segmentation stage, and the conventional installation method in the dock is adopted, when these accessories are welded at high temperature, it is easy to burn the inner and outer surface finish (i.e., coating) of the fresh water tank adjacent to or close to them, thereby causing inevitable impact on the safe use of the fresh water tank. Therefore, the present invention installs the guide rails, ladders and handrails facing the cargo hold in the segmentation stage, and installs the countersunk manhole cover in the second deck passage area in the segmentation stage to ensure the integrity of the fresh water tank installation in the dock.

[0055] In some embodiments, in step S3, the coating construction of the fresh water tank structure integrity in the segmented stage includes the following steps:

[0056] S31: After the fresh water tank is arranged inside the independent section, the fresh water tank is placed on its side during the section painting stage, and the surface of the fresh water tank is treated;

[0057] S32: coating the fresh water tank as a whole (i.e., spraying paint), controlling the temperature and humidity, and maintaining ventilation;

[0058] S33: Install countersunk hatch covers to seal the fresh water tanks after painting.

[0059] The present invention does not specifically limit the type of paint used for the painting, and those skilled in the art can select conventional paints in the art to paint the fresh water tank as a whole.

[0060] In some embodiments, in step S31, the fresh water tank is placed in a side state with the outer panel surface as a reference during the segmented painting stage.

[0061] In the present invention, during the stage of segmented painting of the fresh water tank, the fresh water tank is placed on its side with a height of only about 2.2 meters, and there is no need to erect or dismantle scaffolding during painting construction.

[0062] In some embodiments, in step S31, surface treatment of the fresh water tank includes the following steps: segmented pre-sandwashing, structural defect treatment, whole tank sandwashing and salt testing.

[0063] The present invention does not specifically limit the degree of surface treatment of the fresh water tank, and those skilled in the art may select conventional surface treatment standards in the art. In some embodiments, in step S31, the fresh water tank is surface treated to Sa2 1 / 2.

[0064] In some embodiments, in step S32, the coating is performed using solvent-free epoxy paint.

[0065] The present invention does not specifically limit the temperature and humidity during the coating process, and those skilled in the art may control the temperature and humidity by conventional methods in the art.

[0066] In some embodiments, in the step S32, after the fresh water tank is entirely painted, local repair is also included.

[0067] In some embodiments, in step S32, the ventilation time is more than 5 days.

[0068] In the present invention, the fresh water tank adopts solvent-free epoxy coating, which is a special coating. In order to ensure that the coating is fully cured and meets the quality requirements, effective ventilation should be maintained in the coating area during and after the construction, and sufficient curing time should be reserved in the segmented cycle. Generally, ventilation is carried out for about 7 days after completion at 23°C.

[0069] In some embodiments, in step S32, the ventilation time at 23° C. is 5 to 9 days.

[0070] In some embodiments, before the segmented painting in step S3, it is necessary to ensure that all internal and external pyrotechnic operations of the fresh water tank hexahedron are completed.

[0071] In the present invention, before the segmented painting, while ensuring the integrity of the structure and outfitting, it is also necessary to ensure that all the internal and external pyrotechnic operations of the hexahedron are completed, otherwise the integrity of the paint of the fresh water tank will be destroyed later.

[0072] In addition, the paint on the cabins that have been painted must be protected, that is, the cabins must be sealed after the painting is completed in sections to prevent water, dust and other debris from entering the cabin.

[0073] In some embodiments, the coating method of the present invention is applicable to civilian ships, cruise ships, offshore vessels and other types of ships, wherein the fresh water tank is arranged in a section and the outfitting is complete.

[0074] Example 1

[0075] A method for painting a fresh water tank of a container ship in sections and stages, the painting comprising the following steps:

[0076] S1: During the ship segmentation stage, the fresh water tank 4 is arranged in a single segment on the left and right sides of the cargo hold area of ​​the ship, so that the fresh water tank is divided into an integral segment, ensuring that the fresh water tank forms a complete cabin in structure. Specifically, Figure 1 The left area position of the fresh water tank in the segmentation stage is shown, the fresh water tank 4 is located below the main deck 1 of the cargo hold area; the upper part thereof is the second deck passage steel deck 3 and the second deck passage steel top wall 2, and the side parallel to the position of the fresh water tank 4 is the drinking water tank 5 and the ballast tank 6, and the fresh water tank 4 is located in a single segment of the side of the cargo hold area of ​​the ship;

[0077] The hull structure of the six areas of the fresh water tank was installed in sections;

[0078] S2: Carry out outfitting integrity at the block stage; specifically, complete the installation of outfitting parts and tooling welding at the block stage, and further improve the outfitting pallet in the fresh water tank area; Figure 2 A schematic diagram showing the integrity of outfitting parts in the segmentation stage of this embodiment is shown;

[0079] S3: Before the block painting, ensure that all the internal and external pyrotechnic operations of the fresh water tank hexahedron are completed; then the structural integrity painting of the fresh water tank is carried out in the block stage; specifically, the following steps are included:

[0080] S31: After arranging the fresh water tank inside the independent block, place the fresh water tank in the side position with the outer plate surface as the reference during the block painting stage (such as Figure 3As shown), the height is 2.2 meters, and the surface treatment of the fresh water tank is performed without the use of scaffolding; the surface treatment includes the following steps: pre-sandwashing in sections, structural defect treatment, sandwashing of the entire tank and salt test; the surface of the fresh water tank is treated to Sa2 1 / 2;

[0081] S32: Use solvent-free epoxy paint to paint the fresh water tank as a whole, and repair any local defects; control the temperature and humidity, and keep ventilation at 23°C for 7 days;

[0082] S33: In order to protect the fresh water tank after painting and prevent dust and powder from entering the fresh water tank, a countersunk hatch cover is installed to seal the tank;

[0083] S4: During the docking stage, the fresh water tanks are inspected by filling with water and immersing, and any defects are repaired.

[0084] This embodiment further improves the outfitting pallet in the fresh water tank area by moving the welding and installation processes of the hull structure, outfitting parts and tooling in the six-sided area of ​​the fresh water tank forward to the segmentation stage, ensuring the integrity of the fresh water tank structure and outfitting in the segmentation stage, and avoiding damage to the coating during subsequent installation.

[0085] The section-by-section stage painting method for the fresh water tank of a container ship of this embodiment is applicable to civilian ships, cruise ships, offshore engineering ships and other types of ships, wherein the fresh water tank is arranged in one section and is fully outfitted.

[0086] Comparative Example 1

[0087] A coating method for a fresh water tank of a container ship comprises the following steps:

[0088] S1: Segmentation stage, including the following steps:

[0089] Set up the scaffolding inside the cabin, pre-sandblast in sections, and deal with structural defects; then install the six areas of the fresh water tank into a whole cabin, perform sandblasting on the whole cabin, and then pre-coat; then spray the whole cabin with temporary protective paint, and perform coating repair on the defective parts of the coating; after removing the scaffolding, further repair the coating defects; complete in sections;

[0090] S2: Shipbuilding stage: specifically including the following steps:

[0091] Set up a complete cabin scaffolding, roughen the temporary protective paint of the entire cabin, repair some primers, and then test the salt content. If the salt content exceeds the standard, use fresh water to clean it. Then spray the solvent-free epoxy on the entire cabin. After spraying, remove the scaffolding, repair the coating defects, and complete the entire cabin. Then conduct an immersion test on the cabin. If there are any defects, repair them.

[0092] By comparing and analyzing Example 1 with Comparative Example 1, it can be seen that the segmented stage painting method of the fresh water tank of a container ship provided in Example 1 of the present invention, by moving the welding and installation processes of the hull structure, outfitting parts and tooling of the six-sided area of ​​the fresh water tank to the segmented stage, further improves the outfitting pallet in the fresh water tank area, ensures the integrity of the fresh water tank structure and outfitting in the segmented stage, and avoids damage to the coating by subsequent installation. The present invention moves the fresh water tank to the segmented stage for painting construction. Compared with the painting construction in the whole ship stage, the operation difficulty is relatively small, and the situation of cross-operation with other professionals during the painting construction of the whole ship of the fresh water tank is avoided. The painting construction period of the fresh water tank can be shortened by about 50%, and the safety risk is low. The present invention paints the fresh water tank in sections, and can directly use various fixed equipment in the painting plant. There is no need to set up or dismantle scaffolding in the tank, and other production preparation work is relatively simple, which reduces the resource occupation of various mobile equipment, reduces the intensity of painting construction, improves the painting operation environment, and improves the efficiency of painting construction; in addition, the present invention paints the fresh water tank in sections, and directly applies solvent-free epoxy paint, and no temporary protective paint needs to be sprayed, which reduces the amount of paint used. Furthermore, the present invention constructs the fresh water tank in sections, and water can be directly added to the tank during the whole ship stage in the dock. There is no need to use a mobile fresh water tank to carry out the debugging of various water supply systems, such as the debugging of fresh water pressure tanks and drinking water pressure tanks, which creates convenient conditions for advancing the debugging progress of the engine room water supply system in the dock and shortens the overall construction period of the ship.

[0093] The above are preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as within the scope of protection of the present invention.

Claims

1. A method for painting fresh water tanks of container ships in sections, characterized in that: The coating process comprises the following steps: S1: During the ship segmentation stage, the fresh water tanks are divided into one integral segment; S2: Outfitting integrity at the block stage; S3: Structural integrity painting of fresh water tanks is carried out in block stages; S4: During the docking phase, the fresh water tanks are inspected by water filling and immersion, and defective locations are repaired.

2. The method for painting the fresh water tank of a container ship in sections according to claim 1 is characterized in that: In the step S1, the fresh water tank is arranged in the cargo hold area of ​​the ship so that the fresh water tank forms a complete cabin in structure.

3. The method for painting the fresh water tank of a container ship in sections according to claim 2 is characterized in that: In the step S1, the fresh water tank is arranged in a single section on the left and right sides of the cargo hold area of ​​the ship, so that the fresh water tank forms a complete cabin in structure.

4. The method for painting the fresh water tank of a container ship in sections according to claim 1 is characterized in that: In the step S1, the step of dividing the fresh water tank into an integral section during the ship segmentation stage also includes: completing the installation of the hull structure of the six-side area of ​​the fresh water tank during the segmentation stage.

5. The method for painting the fresh water tank of a container ship in sections according to claim 1 is characterized in that: In the step S2, the step of performing outfitting integrity in the segmented stage includes: completing the installation of outfitting parts and tooling welding in the segmented stage, and completing the outfitting pallet in the fresh water tank area.

6. The method for painting the fresh water tank of a container ship in sections according to claim 1 is characterized in that: The step S2 also includes completely installing the guide rails, ladders and handrails facing the cargo hold surface in the segmented stage, and installing the countersunk manhole cover in the second deck passage area in the segmented stage.

7. The method for painting the fresh water tank of a container ship in sections according to claim 1 is characterized in that: In step S3, the fresh water tank structural integrity coating construction in the segmented stage includes the following steps: S31: After the fresh water tank is arranged inside the independent section, the fresh water tank is placed on its side during the section painting stage, and the surface of the fresh water tank is treated; S32: The fresh water tank is painted as a whole, and the temperature and humidity are controlled and ventilation is maintained; S33: Install countersunk hatch covers to seal the fresh water tanks after painting.

8. The method for painting the fresh water tank of a container ship in sections according to claim 7 is characterized in that: In the step S31, the surface treatment of the fresh water tank includes the following steps: pre-sand flushing in sections, structural defect treatment, sand flushing of the entire tank and salt content testing.

9. The method for painting the fresh water tank of a container ship in sections according to claim 1 is characterized in that: In the step S32, after the fresh water tank is painted as a whole, local repair is also included; or Before the segmented painting in step S3, it is necessary to ensure that all internal and external pyrotechnic operations of the fresh water tank hexahedron are completed.

10. The method for painting the fresh water tank of a container ship in sections according to any one of claims 1 to 9, characterized in that: The coating method is applicable to civilian ships, cruise ships and offshore vessels, wherein the fresh water tank is arranged in one section and is fully outfitted.

Citation Information

Patent Citations

  • Bilge well coating method

    CN105890848A

  • Construction method of ship fresh water tank coating layer

    CN110238014A

  • Segmented outfitting integrity construction method for seawater tank of ship and seawater tank

    CN117246472A

  • Coating method of ship fuel cabin

    CN118122591A

  • Cargo tank building method for lpgc

    KR1020130053727A