Hanging beam and hoisting method for hoisting double-spliced steel box beam section by using hoisting row
By designing the lifting beams and lifting methods for lifting double-combined steel box girder sections, the dynamic balance and unified lifting points problems in the lifting process of large steel box girder sections are solved, and uniform stress and balance are achieved during the lifting process. It improves construction safety and efficiency and is suitable for large-scale bridge projects.
Patent Information
- Application Number
- CN202411325653.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-11-26
AI Technical Summary
The existing lifting technology is difficult to achieve reasonable lifting point distribution, dynamic balance and vertical stress of large steel box girder sections, resulting in low construction risks and efficiency, and cannot meet the needs of large-scale and heavy-load lifting.
A hanging beam for sections of double-combined steel box beams with hanging rows is designed, including load-bearing pipes, horizontal reinforcement, vertical reinforcement, load-bearing plate, lateral sealing plate, intermediate sealing plate and balanced triangle plate, which is realized through structural combination Uniform force and balance, and simplify the number of lifting points through the design of the parallel hook and node plates in the lifting method to ensure dynamic balance and force uniformity during the lifting process.
It improves the stability and safety of lifting, reduces construction difficulty and safety hazards, and realizes the vertical lifting of the beam section and the internal balance of the lifting point. The structure is relatively simple, the self-weight is small, and the bearing capacity is large. It can carry a maximum load of 300t.
Smart Images

Figure CN119018758A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hoisting double-jointed steel box girder segments, and in particular to a hoisting beam and a hoisting method for hoisting double-jointed steel box girder segments. Background Art
[0002] In the field of bridge construction, with the continuous advancement of engineering technology, the manufacturing and hoisting technology of prefabricated beam segments has become a key factor in improving the efficiency of bridge construction. Modern bridge engineering pursues rapid construction, which requires prefabricated beam segments to not only adapt to large-scale in size and weight, but also to ensure the stability and safety of the structure during the hoisting process. At the same time, with the continuous development of the manufacturing level of prefabricated steel structures, the proportion of steel bridges in bridge construction continues to increase, and more and more shipbuilding companies have also joined the manufacturing sequence of steel bridges. Shipbuilding companies often continue to use heavy lifting equipment such as gantry cranes. In order to ensure the hoisting stability of large hull segments, hoisting operations are usually carried out using hoisting rows. Traditional hoisting technology has gradually exposed its limitations, especially when dealing with the hoisting of large steel box girder segments. Existing technologies are often difficult to meet the growing engineering needs.
[0003] Among the existing lifting technologies, hook lifting and roll-on / roll-off loading are common methods for the shipment of large-segment beam segments. There is no method for using lifting rows to lift double-jointed steel box beam segments. These existing methods have obvious shortcomings when dealing with large steel box beam segments. First, these technologies often cannot achieve a reasonable distribution of lifting points, resulting in uneven force on the beam segments during the lifting process, which increases the construction risk. Secondly, the existing technology has defects in achieving the unification of the lifting rows and the beam segment lifting points, and cannot ensure the vertical force on the beam segment during the lifting process, which not only affects the construction efficiency, but also poses a threat to the installation accuracy and structural safety of the beam segment. In addition, the existing technology also faces challenges in achieving the dynamic balance of the lifting rows. Large beam segments are prone to swinging during the lifting process, which increases the construction difficulty and safety hazards. The existence of these problems highlights the shortcomings of the existing technology in adapting to the needs of large-scale and heavy-load lifting, and a new technical solution is urgently needed to overcome these difficulties.
[0004] In the face of the limitations of the prior art, the present invention aims to solve the key technical problems in the process of hoisting large steel box girder segments. Specifically, the technical problem to be solved by the present invention is how to achieve the dynamic balance of the hoisting row and ensure the uniformity of the number of hoisting points of the hoisting row and the steel box girder, so as to ensure that the beam segment can be vertically stressed during the hoisting process and improve the safety and efficiency of the construction. The solution to this technical problem is of great significance to the promotion of the development of bridge construction technology, and will also provide more reliable technical support for the construction of large-scale bridge projects. However, achieving this goal is not easy. It involves comprehensive considerations of multiple aspects such as structural design and mechanical analysis, and requires in-depth research and innovation to achieve breakthroughs. Summary of the invention
[0005] In order to solve the above problems, the present invention proposes a lifting beam and a lifting method for lifting double-jointed steel box girder segments, which solves the problem.
[0006] To achieve the above purpose, the technical solution adopted by the present invention is as follows:
[0007] A hanging beam for hanging and assembling double steel box beam segments, comprising a load-bearing tube, horizontal reinforcement, vertical reinforcement, a load-bearing plate, a lateral sealing plate, an intermediate sealing plate, and a balancing triangle plate. Figure 1-3 As shown. This design achieves load-bearing and balance through the combination of structures. Through this structural design, the uniform force of the hanging beam can be achieved, and the stability and safety of the hoisting can be improved.
[0008] The horizontal reinforcements and vertical reinforcements are arranged in pairs in vertical combination, and each combination of horizontal reinforcements and vertical reinforcements is vertically and evenly arranged on the outer wall of the load-bearing pipe, with the ends flush;
[0009] The load-bearing plates are symmetrically arranged in groups of two at the two ends of the load-bearing tube, the lateral sealing plates and the middle sealing plates are respectively arranged at the gap between the ends of the load-bearing tube and the load-bearing plates, and the balancing triangle plate is arranged at the lower part of the load-bearing plate through a pin shaft and a nut. This arrangement enhances the structural stability of the suspension beam and achieves better balance through symmetrical design.
[0010] One end of the load-bearing plate is inserted into the load-bearing tube to enhance the force. By inserting, the connection strength between the load-bearing plate and the load-bearing tube is improved, and the bearing capacity of the overall structure is increased.
[0011] After the bearing plate and the bearing tube are assembled, they are integrally bored to ensure coaxiality, thereby ensuring the precise matching of the hanging beam and improving the stability and reliability during hoisting.
[0012] When the load-bearing plate and the balance triangle plate are cut, a 5mm machining allowance is preset on one side. The preset machining allowance provides space for subsequent machining and adjustment, ensuring the machining accuracy of the hoisting hole.
[0013] The load-bearing plate and the balance triangle plate are the main load-bearing components. Before cutting the parts, the materials are inspected to avoid internal defects. Through material inspection, the quality and safety of the load-bearing components are ensured, and safety accidents caused by material defects are prevented.
[0014] The three vertices of the balancing triangle are all provided with holes;
[0015] The hole at the upper part of the balance triangle plate matches the hole at the lower part of one end of the load-bearing plate;
[0016] The distance between the two hole groups at the lower part of the balance triangle plate is consistent with the spacing size of the beam segment lifting ears, ensuring the precise docking of the hanging beam and the beam segment lifting ears, and improving the accuracy and balance of the lifting.
[0017] The hole on the upper part of the balancing triangle and the hole for hoisting the load-bearing plate are located at the center of the two hanging points on the beam section. The setting of the center position helps to achieve balance during the hoisting process and reduce structural deformation or damage caused by eccentric force.
[0018] Based on a method for lifting double steel box girder segments by hoisting rows, the hoisting row beam segments are arranged along the length direction, the two hoisting rows on one side of the upper trolley are connected to one side of the lifting point, and the lower trolley is connected to the other side. The hoisting row balance triangle is connected to the beam segment lifting ear through a steel wire rope, such as Figure 4-6 Through the specific arrangement and connection method, dynamic balance and uniform distribution of force during the lifting process are achieved.
[0019] The upper trolley has 2 hanging rows, 8 load-bearing pulleys, and 16 wire rope connectors. Figure 6 As shown, according to the force principle analysis of the hanging row, the dynamic balance of the hanging row force is achieved;
[0020] Simplify the force points of the hanging row, hook points 1 and 3 together to form point A, hook points 2 and 4 together to form point B, and form points CH in sequence according to this method. Use a wire rope to pass points A and B through the node plate, use a wire rope to pass points C and D through the node plate, connect points EH in sequence, simplify the upper trolley hanging row hanging point to 2 hanging points, achieve balance, and connect the two hanging points with wire ropes to achieve hooking, so as to avoid the two hanging points moving outwards after being subjected to lateral force. The internal pulley of a single hanging row is unevenly stressed, and the hanging row cannot maintain balance, such as Figure 7 As shown;
[0021] The lower trolley has a total of 1 hanging row, 4 load-bearing pulleys, and 8 wire rope connectors. Figure 6 As shown, the connection is simpler than that on the trolley;
[0022] Connect the No. 17 and No. 18 lifting points to a stress point on the node plate through shackles to achieve hooking, and then hook No. 19-24 points in sequence;
[0023] Optimized to form balance with 2 hanging points;
[0024] After the hook is connected, the node plates are connected to form a whole with the trolley to avoid the two lifting points moving outwards after being subjected to lateral force. The pulleys inside the single lifting row are unevenly stressed and the lifting row cannot maintain balance. Figure 8 shown.
[0025] The lifting method was further refined, including the connection method of the hoisting racks, pulleys and wire ropes of the upper and lower trolleys, to achieve dynamic balance of the force on the hoisting racks.
[0026] Through this connection and force design, the force distribution during lifting is optimized, structural damage caused by uneven force is prevented, and the safety and efficiency of lifting are improved.
[0027] The core principle of this solution is to achieve stability, balance and safety during the lifting process through structural design and force analysis, while simplifying the lifting operation and improving construction efficiency.
[0028] This scheme has a relatively simple structure, light weight and large bearing capacity. According to calculations, it can bear a maximum load of 300t.
[0029] Through the hook connection, node plate design and lifting beam of the hanging row, the number of lifting points is effectively simplified and unified into one lifting point. There are 16 lifting points on the upper trolley, 8 lifting points on the lower trolley, and 8 lifting points in 4 groups of steel box girders, while the internal balance of the hanging row is ensured.
[0030] The use of lifting beam triangles effectively ensures the balance of force on the lifting ears in each group of lifting points on the surface of the steel box beam.
[0031] The use of lifting beams effectively reduces the lifting height.
[0032] Before cutting the gusset plate parts, the material is tested to ensure that there are no defects inside the material. When cutting, a 5mm machining allowance is set on one side of the hole group. After cutting, the whole hole is bored. The center of the connection hole between the lower part of the node and the hoisting and hanging row, and the line connecting the non-hoisting holes on the hanging beam must pass through the center of the gusset plate. The gusset plate parts are shown in the figure below. Fig. 9 , 10 .
[0033] The hoisting is carried out along the length direction, and the distances between the hoisting points of the entire bridge in the width direction are consistent, which can meet the use requirements of the entire bridge and has strong versatility.
[0034] The lifting beam effectively reduces the lifting height and ensures the lifting angle between the lifting row and the lifting point, ensuring the vertical lifting of the beam section.
[0035] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention provides a lifting beam and lifting method for lifting double-jointed steel box girder segments by a lifting row, unifies the number of lifting points through the design of the hooks of the lifting row, the design of the lifting beam, and the design of the node plate, and realizes dynamic balance inside the lifting row; the lifting beam effectively reduces the lifting height, ensures the lifting angle of the lifting row, implements vertical lifting of the beam segment, realizes the balance inside each group of lifting points of the beam segment, and has a relatively simple structure, small deadweight, and large bearing capacity. The main materials subjected to lifting force are all probed, and the lifting holes are all bored to ensure uniform force inside the holes and ensure the safety of the lifting process. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.
[0037] Figure 1 It is a front view of a hanging beam according to an embodiment of the present invention.
[0038] Figure 2 It is a side view of a hanging beam according to an embodiment of the present invention.
[0039] Figure 3 It is a top view of the hanging beam according to an embodiment of the present invention.
[0040] Figure 4 This is a front view of the lifting system according to an embodiment of the present invention.
[0041] Figure 5 for Figure 4 AA lifting cross-section diagram.
[0042] Figure 6 for Figure 4 BB lifting cross-section diagram.
[0043] Figure 7 The figure is a schematic diagram of the design of the wire rope of the trolley in an embodiment of the present invention.
[0044] Figure 8 The figure is a schematic diagram of the design of the trolley wire rope according to an embodiment of the present invention.
[0045] Fig. 9 This is a schematic diagram of the node plate of the trolley according to an embodiment of the present invention.
[0046] Fig.10 Schematic diagram of the node plate of the trolley according to an embodiment of the present invention.
[0047] Among them, the accompanying drawings are marked as: 11, load-bearing tube; 12, horizontal reinforcement; 13, vertical reinforcement; 14, load-bearing plate; 15, lateral sealing plate; 16, middle sealing plate; 17, balancing triangle plate; 18, node plate. DETAILED DESCRIPTION
[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0049] like Figures 1 to 10 As shown, the present invention provides a hanging beam for hanging double steel box beam segments, comprising a load-bearing tube 11, horizontal reinforcement 12, vertical reinforcement 13, load-bearing plate 14, lateral sealing plate 15, middle sealing plate 16, and balance triangle plate 17. Figure 1-3 As shown. This design achieves load-bearing and balance through the combination of structures. Through this structural design, the uniform force of the hanging beam can be achieved, and the stability and safety of the hoisting can be improved.
[0050] The horizontal reinforcements 12 and the vertical reinforcements 13 are arranged in pairs in a vertical combination, and each combination of the horizontal reinforcement 12 and the vertical reinforcement 13 is vertically and evenly arranged on the outer wall of the load-bearing tube 11, and the ends are flush;
[0051] The load-bearing plates 14 are symmetrically arranged in pairs at the two ends of the load-bearing tube 11, the lateral sealing plates 15 and the middle sealing plates 16 are respectively arranged at the gap between the ends of the load-bearing tube 11 and the load-bearing plates 14, and the balancing triangle plate 17 is arranged at the lower part of the load-bearing plate 14 through a pin shaft and a nut. This arrangement enhances the structural stability of the suspension beam and achieves better balance through symmetrical design.
[0052] One end of the load-bearing plate 14 is inserted into the load-bearing tube 11 to enhance the force. By inserting, the connection strength between the load-bearing plate and the load-bearing tube is improved, and the bearing capacity of the overall structure is increased.
[0053] After the bearing plate 14 and the bearing pipe 11 are assembled, they are integrally bored to ensure coaxiality, thereby ensuring the precise matching of the hanging beam and improving the stability and reliability during the hoisting.
[0054] When the parts of the lifting holes on the load-bearing plate 14 and the balance triangle plate 17 are cut, a 5mm machining allowance is preset on one side. The preset machining allowance provides space for subsequent processing and adjustment, ensuring the machining accuracy of the lifting holes.
[0055] The load-bearing plate 14 and the balance triangle plate 17 are the main load-bearing components. Before the parts are cut, the materials are inspected to avoid internal defects. Through material inspection, the quality and safety of the load-bearing components are ensured, and safety accidents caused by material defects are prevented.
[0056] The three corners of the balancing triangle plate 17 are provided with holes;
[0057] The hole on the upper part of the balance triangle plate 17 matches the hole below one end of the load-bearing plate 14;
[0058] The distance between the two hole groups at the lower part of the balance triangle plate 17 is consistent with the distance between the beam segment lifting ears, which ensures the accurate docking of the hanging beam and the beam segment lifting ears, and improves the accuracy and balance of the hoisting.
[0059] The position of the hole on the upper part of the balance triangle plate 17 and the hoisting hole of the load-bearing plate 14 is located at the center of the two hanging points on the beam section. The setting of the center position helps to achieve balance during the hoisting process and reduce structural deformation or damage caused by eccentric force.
[0060] Based on a method for hoisting double-jointed steel box girder segments by hoisting rows, the hoisting row beam segments are arranged along the length direction, two hoisting rows on one side of the upper trolley are connected to one side of the hoisting point, and the lower trolley is connected to the other side. The hoisting row balance triangle plate 17 is connected to the beam segment lifting ear through a steel wire rope, such as Figure 4-6 Through the specific arrangement and connection method, dynamic balance and uniform distribution of force during the lifting process are achieved.
[0061] The upper trolley has 2 hanging rows, 8 load-bearing pulleys, and 16 wire rope connectors. Figure 6 As shown, according to the force principle analysis of the hanging row, the dynamic balance of the hanging row force is achieved;
[0062] The force points of the hanging row are simplified. Points 1 and 3 are hooked together to form point A, and points 2 and 4 are hooked together to form point B. According to this method, points CH are formed in sequence. A and B points are passed through the node plate 18 with a steel wire rope, and points C and D points are passed through the node plate 18 with a steel wire rope. Points EH are connected in sequence, and the upper trolley hanging row hanging point is simplified to 2 hanging points to achieve balance. The two hanging points are connected with a steel wire rope to achieve hooking, so as to avoid the two hanging points moving outwards after being subjected to lateral force. The inner pulley of a single hanging row is unevenly stressed, and the hanging row cannot maintain balance. Figure 7 As shown;
[0063] The lower trolley has a total of 1 hanging row, 4 load-bearing pulleys, and 8 wire rope connectors. Figure 6 As shown, the connection is simpler than that on the trolley;
[0064] Connect the No. 17 and No. 18 lifting points to a stress point of the node plate 18 through a shackle to achieve hooking, and then hook No. 19-24 points in turn;
[0065] Optimized to form balance with 2 hanging points;
[0066] After the hook is connected, the node plate 18 is connected to form a whole with the trolley to prevent the two suspension points from moving outwards after receiving the lateral force. The pulleys inside the single suspension row are unevenly stressed, and the suspension row cannot maintain balance. Figure 8 shown.
[0067] The lifting method was further refined, including the connection method of the hoisting racks, pulleys and wire ropes of the upper and lower trolleys, to achieve dynamic balance of the force on the hoisting racks.
[0068] Through this connection and force design, the force distribution during lifting is optimized, structural damage caused by uneven force is prevented, and the safety and efficiency of lifting are improved.
[0069] Example 2
[0070] On the basis of Example 1, a lifting beam for lifting double-jointed steel box girder segments is provided, comprising a load-bearing tube 11, horizontal reinforcement 12, vertical reinforcement 13, load-bearing plate 14, lateral sealing plate 15, middle sealing plate 16, and balancing triangle plate 17.
[0071] The horizontal reinforcements 12 and the vertical reinforcements 13 are arranged in pairs in vertical combination. Each combination of the horizontal reinforcement 12 and the vertical reinforcement 13 is vertically and evenly arranged on the outer wall of the load-bearing pipe 11, and the ends are flush.
[0072] Through the vertical combination of horizontal reinforcement and vertical reinforcement, a more stable structural frame is formed, which helps to improve the stiffness and bending resistance of the overall suspension beam.
[0073] Evenly spaced reinforcements can more effectively transfer loads to the load-bearing tubes, reducing local stress concentrations and, therefore, the risk of structural deformation and material fatigue.
[0074] The flush end design makes the connection between the reinforcement and the load-bearing pipe tighter, improves the strength of the connection point, and helps to resist various loads that may occur during lifting.
[0075] The flush arrangement of the ports simplifies the manufacturing and assembly process because the location and size of each rib can be precisely controlled, which helps improve production efficiency and product quality.
[0076] Evenly distributed reinforcement helps extend the service life of hanging beams because they can better withstand repeated load cycles, reducing material fatigue and damage caused by load concentration.
[0077] The improvement of structural stability and connection strength is directly related to the safety of lifting operations. This design helps to reduce the risk of accidents that may occur during the lifting process.
[0078] This design allows the hanging beam to adapt to different sizes and shapes of load-bearing tubes, providing better flexibility and adaptability to meet different engineering needs.
[0079] Example 3
[0080] On the basis of Example 1, a detachable reinforcing rib is provided on the load-bearing plate 14, and the reinforcing rib can be adjusted or removed according to the weight and shape of the beam section. The reinforcing rib adopts a quick locking mechanism, which is convenient for quick installation or removal on site to meet the needs of different working conditions.
[0081] Removable reinforcing ribs provide greater flexibility and can quickly adjust the load-bearing capacity of the lifting beam according to actual lifting needs.
[0082] The quick locking mechanism improves the efficiency of on-site operations, reduces installation and disassembly time, and speeds up construction progress.
[0083] By adjusting the strengthening ribs, the load can be better distributed, local stress concentration can be reduced, and the stability and durability of the overall structure can be improved.
[0084] Example 4
[0085] In Example 4, the hoisting method is improved, especially in the arrangement and connection of the lifting points. A system for adjusting the position of the lifting points is provided, which allows the operator to fine-tune the position of the lifting points according to the specific size and weight of the beam section to achieve the best force distribution. In addition, a new type of connector is introduced, which can provide stronger connection strength and better durability without adding extra weight.
[0086] The system with adjustable lifting point positions makes the lifting method more flexible, able to adapt to beam sections of different sizes and weights, and optimize the force distribution.
[0087] The use of new connectors improves the reliability of the connection points and reduces the risk of connection failure, while maintaining the lightweight design of the beam.
[0088] By fine-tuning the position of the lifting points, more precise lifting operations can be achieved, reducing the swing of the beam sections during the lifting process, and improving the safety and efficiency of construction.
[0089] The systems that can adjust the suspension point position include:
[0090] Adjustment mechanism: The suspension point system includes a set of adjustment mechanisms that can slide along the axis of the load-bearing tube 11. These mechanisms can be a combination of guide rails and sliders, allowing the suspension point to move along the length of the tube.
[0091] Locking mechanism: Each adjustment mechanism is equipped with a locking device, such as a screw clamp or a wedge block, which is used to fix the lifting point in the desired position and ensure the stability of the lifting point position during the lifting process.
[0092] Adjustment indication: The system is equipped with scales or marks to indicate the current position of the lifting point, so that the operator can quickly adjust it to the appropriate lifting point position according to the size of the beam section.
[0093] Fine-tuning capability: In addition to overall movement, the adjustment mechanism also allows fine-tuning for more precise hanging point positioning.
[0094] Compatibility design: The adjustment mechanism is designed with compatibility with existing hanging beam structures in mind, ensuring that it can be easily installed on existing hanging beam systems.
[0095] New connectors include:
[0096] Material selection: New connectors are made of high-strength lightweight alloys or composite materials to provide high strength and durability while keeping the overall structure lightweight.
[0097] Geometric design: The geometry of the connector is designed to optimize the force distribution, for example, using a polyhedral shape or internal ribs to increase its tensile and torsional resistance.
[0098] Surface treatment: The surface of the connector is treated with special wear-resistant and corrosion-resistant coating or heat treatment to improve its performance and service life in harsh environments.
[0099] Quick-connect mechanism: Designed with a quick-connect and release mechanism, such as spring clips, wedge locks, or magnetic snap systems, for fast installation and removal.
[0100] Multi-directional connection capability: The connector design allows multi-directional connection to adapt to the force requirements in different directions and improve flexibility and stability during lifting.
[0101] Safety features: New connector designs include visual or tactile feedback mechanisms to ensure that operators can visually confirm that the connector is properly locked.
[0102] The combination of these structural features enables the system with adjustable lifting point positions and new connectors to provide greater operational flexibility and safety while maintaining structural stability and durability to meet the needs of different lifting operations.
[0103] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A hanging beam for hanging double steel box girder segments, characterized in that: It comprises a load-bearing pipe (11), a horizontal reinforcement (12), a vertical reinforcement (13), a load-bearing plate (14), a lateral sealing plate (15), an intermediate sealing plate (16), and a balancing triangle plate (17).
2. The hanging beam for hanging double steel box girder segments according to claim 1 is characterized in that: The horizontal reinforcements (12) and vertical reinforcements (13) are arranged in pairs in vertical combination, and each combination of horizontal reinforcements (12) and vertical reinforcements (13) is vertically and evenly arranged on the outer wall of the load-bearing pipe (11), with the ends flush; The load-bearing plates (14) are symmetrically arranged in groups of two at the two ends of the load-bearing tube (11); the lateral sealing plates (15) and the middle sealing plates (16) are respectively arranged at the gaps between the ends of the load-bearing tube (11) and the load-bearing plates (14); and the balancing triangle plates (17) are arranged at the lower part of the load-bearing plates (14) through pins and nuts.
3. The hanging beam for hanging double steel box girder segments according to claim 1 is characterized in that: One end of the load-bearing plate (14) is inserted into the interior of the load-bearing tube (11) to enhance the force.
4. The hanging beam for hanging double steel box girder segments according to claim 3 is characterized in that: After the load-bearing plate (14) and the load-bearing tube (11) are assembled, they are integrally bored to ensure coaxiality.
5. The hanging beam for hanging double steel box girder segments according to claim 1 is characterized in that: When cutting the parts of the hanging holes on the load-bearing plate (14) and the balancing triangle plate (17), a 5mm machining allowance is preset on one side.
6. The hanging beam for hanging double steel box girder segments according to claim 1 is characterized in that: The load-bearing plate (14) and the balancing triangle plate (17) are main load-bearing components.
7. The hanging beam for hanging double steel box girder segments according to claim 2 is characterized in that: The three vertices of the balancing triangle plate (17) are all provided with holes; The hole on the upper part of the balancing triangle plate (17) matches the hole below one end of the bearing plate (14); The distance between the two hole groups at the lower part of the balancing triangle plate (17) is consistent with the distance between the beam section lifting ears.
8. The hanging beam for hanging double steel box girder segments according to claim 7 is characterized in that: The positions of the hole on the upper part of the balancing triangle plate (17) and the hoisting hole of the load-bearing plate (14) are located at the center of the two hanging points on the beam section.
9. A method for hoisting double-jointed steel box girder segments by hoisting rows according to claim 1, characterized in that: The hanging row beam section is arranged along the length direction, two hanging rows on one side of the upper trolley are connected to one side of the hanging point, and the lower trolley is connected to the other side, and the hanging row balance triangle plate (17) is connected to the beam section lifting lug through a steel wire rope.
10. A method for hoisting double-jointed steel box girder segments according to claim 9, characterized in that: The upper trolley has 2 hanging racks, 8 load-bearing pulleys, and 16 wire rope connectors; The force points of the hanging row are simplified, and points 1 and 3 are hooked together to form point A, and points 2 and 4 are hooked together to form point B. According to this method, points CH are formed in sequence, and points A and B are passed through the node plate (18) with a steel wire rope, and points C and D are passed through the node plate (18) with a steel wire rope. Points EH are connected in sequence, and the hanging points of the upper trolley hanging row are simplified to two hanging points, and balance is achieved. The two hanging points are connected with a steel wire rope to achieve hooking; The lower trolley has a total of 1 hanging row, 4 load-bearing pulleys, and 8 wire rope connectors; The No. 17 and No. 18 lifting points are connected to a force-bearing point of the node plate (18) through a shackle to achieve hooking, and the No. 19-24 points are hooked in sequence; Optimized to form balance with 2 hanging points; After the hooking is completed, the trolley is mounted to connect the node plates (18) to form a whole.