Production method for heating steel rail blank by using walking beam furnace

By using low-nitrogen burner and calcium-based fixed bed desulfurization technology in the heating furnace, combined with combustion mechanism and air-fuel ratio adjustment, the problem that the existing heating furnace cannot meet ultra-low emission standards is solved, and efficient flue gas treatment and rails are achieved The blank heating reduces production costs and environmental pollution.

CN119020574APending Publication Date: 2024-11-26BAOTOU IRON & STEEL (GROUP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411122855.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The pollutant emission indicators of existing heating furnaces in flue gas cannot meet ultra-low emission standards, especially particulate matter, sulfur dioxide and nitrogen oxides, resulting in serious environmental pollution.

Method used

The low-nitrogen burner combined with calcium-based fixed bed desulfurization technology is used to improve the flue gas treatment efficiency by adjusting the burner's combustion mechanism and air-fuel ratio, and adjusting the furnace temperature and furnace pressure control, combining ultra-long flame conditions and heat exchanger protection Measures to reduce pollutant emissions in flue gas.

Benefits of technology

It achieves ultra-low emissions of nitrogen oxides, sulfur dioxide and particulate matter in the flue gas of the heating furnace, improves the heating efficiency and quality of the rail billet, reduces production costs, and meets the requirements of environmental protection and energy saving.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119020574A_ABST
    Figure CN119020574A_ABST
Patent Text Reader

Abstract

The invention discloses a production method for heating a steel rail blank by adopting a walking beam type heating furnace, which is characterized in that according to the working principle of a walking beam type combustion system, the working efficiency of the heating furnace is improved by adjusting the heat supply configuration of a burner and other methods, nitrogen oxides, sulfur dioxide and particulate matters discharged by flue gas are reduced, and the ultra-low emission requirement is met. By adjusting the process of the stepping heating furnace, the stepping heating furnace is used for heating the heavy rail steel billet after being put into use, the quality of the heated steel billet is good, the heating efficiency of the steel billet is better improved, and the production cost is effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of metallurgical materials, and in particular relates to a production method for heating a rail blank by using a walking beam heating furnace. Background Art

[0002] The walking beam heating furnace is a widely used type of mechanized furnace bottom heating furnace. It is the casting and forging industry and the steel rolling industry's requirements for continuous, automated, large-scale, multi-variety, and high-precision supporting heating equipment, and has a good market prospect. Whether the process design of the heating furnace is reasonable has an important impact on the quality of the workpiece, production efficiency, and energy utilization. The walking beam heating furnace requires a three-stage furnace temperature system, that is, the furnace temperature is divided into a preheating section, a heating section, and a soaking section.

[0003] With the rapid development of industry, the emission of a large amount of pollutants has caused the current environmental pollution to become more and more serious. For the sake of the earth, in recent years, the world has jointly called for energy conservation and emission reduction, and vigorously promoted the "dual carbon" work. The control of air pollution in the steel industry has become the current top priority. The "Steel Rolling Industry Air Pollutant Emission Standards" stipulates that the pollutant emission indicators of steel rolling heating furnaces are particulate matter, sulfur dioxide, and nitrogen oxides. Conventional heating furnaces and regenerative heating furnaces cannot guarantee that the pollutant indicators in the exhaust gas meet the specified standards by relying on the existing process control. Therefore, it is a future development trend to gradually upgrade the desulfurization and denitrification treatment technology to step-type heating furnaces to ensure that the heating furnaces meet the pollutant emission standards.

[0004] Baosteel Rail and Beam Plant keeps pace with the times and, in combination with its own production conditions, has introduced a walking beam heating furnace to heat the rail billets in the No. 1 heating furnace of the rail and beam plant. By adopting a series of advanced process optimization and technical improvement measures, the walking beam heating furnace has been optimized to meet production requirements, with good heating quality, increased service life, less oxidation and burning loss, and less decarburization. It is energy-saving, environmentally friendly, safe and reliable, with considerable economic benefits. At the same time, automated continuous production plays a significant role in saving energy and improving production efficiency. Summary of the invention

[0005] The purpose of the present invention is to provide a production method for heating rail billets using a walking-beam heating furnace. In combination with the current heating equipment, a low-nitrogen burner is used in conjunction with a flat-flame burner on the top of the soaking section. The flue gas treatment of the heating furnace adopts a combined process of low-nitrogen combustion + calcium-based fixed bed desulfurization. After implementation, the nitrogen oxides, sulfur dioxide and particulate matter emitted from the flue gas meet the ultra-low emission requirements.

[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0007] The present invention provides a production method for heating a rail blank by using a walking beam heating furnace, comprising:

[0008] Before the transformation of the heating furnace, the particulate emission value was low, slightly exceeding the limit. The fixed bed desulfurization technology was selected. The granular desulfurizer has a dust removal function. Under the conditions of a certain particle layer thickness and a certain flow rate, the dust removal efficiency of the granular desulfurizer in the fixed bed can reach more than 90%; the calcium-based fixed bed has a certain effect of removing particulate matter. After the flue gas is treated by the calcium-based fixed bed, the particulate matter should be able to meet the requirements of ultra-low emissions;

[0009] The flame-adjusting burner adopts a two-stage combustion mechanism. The air consists of three parts: the central air, the primary combustion-supporting air and the secondary combustion-supporting air, which are supplied at the same time. The central air and the primary combustion-supporting air make the coal gas burn in an oxygen-deficient atmosphere, and the secondary combustion-supporting air makes the coal gas burn completely. When the secondary combustion-supporting air is sprayed into the furnace at a high speed, a suction effect occurs, which sucks the surrounding flue gas into the combustion-supporting air to reduce the oxygen concentration in the coal gas combustion area, prolong the coal gas combustion process, increase the flame length, and avoid local high temperature of the flame; increase the flame length, improve the uniformity of the furnace gas temperature along the furnace width, and improve the heating effect of the heating furnace;

[0010] Benchmark working condition: primary air supply accounts for 30%, secondary air supply accounts for 70%; that is, the primary air valve opening is 30%, the secondary air valve opening is 70%, and the central air valve opening is 100%;

[0011] Ultra-long flame working condition: when giving full play to its ultra-long flame and low NOX characteristics: primary air ratio: 0%, secondary air: 100%, that is, the primary air valve opening is 0%, the secondary air valve opening is 100%, and the central air valve opening is 100%;

[0012] Shortest flame condition: primary air ratio: 70%, secondary air ratio: 30%; that is, the primary air valve is 100% fully open, the secondary air valve opening is 20-30%, and the central air valve opening is 100%;

[0013] Considering that the flame length of the flame-adjusting burner during the baking period exceeds the 5th water beam, the flame length of the flame-adjusting burner only reaches the 4th water beam after adjustment according to the benchmark working condition during production. When the pressure before the burner fails to meet the design requirements, it is adjusted according to the super-long flame working condition;

[0014] Air-fuel ratio control:

[0015] The combustion control of the heating furnace configures the air / gas ratio based on the calorific value of the gas, and the oxygen content detected by zirconium oxide is used as the basis for adjustment. The oxygen content should be 2-3%;

[0016] Furnace temperature control: The upper limit of the furnace temperature in the soaking section is 1300℃, the second heating section is 1350℃, and the first heating section is 1200℃;

[0017] Furnace pressure control:

[0018] The furnace pressure should be 2-10Pa by adjusting the opening of the flue damper and the frequency of the induced draft fan;

[0019] Heat exchanger over-temperature protection control:

[0020] When the flue gas temperature before the heat exchanger is greater than 700℃, the cooling fan will be automatically started and the fan inlet shutter valve will be opened for rapid cooling.

[0021] Furthermore, the gas ball valve before the burner is a cut-off valve with a closing / opening function.

[0022] Furthermore, the gas butterfly valve in front of the burner is a regulating valve, which regulates the gas volume function of each burner.

[0023] Furthermore, the central air butterfly valve in front of the burner is generally not closed to ensure the safety of the burner.

[0024] Furthermore, the butterfly valves of the primary air and secondary air main pipes before the burner are regulating valves to adjust the air volume of each burner.

[0025] Furthermore, the primary air butterfly valve and the secondary air butterfly valve before the burner are proportional control valves, and do not need to be adjusted when the operating conditions of the heating furnace do not change significantly after setting.

[0026] Furthermore, based on the heating temperature of the steel billet, the air / gas supply is adjusted by adjusting the regulating valves of each section to achieve the purpose of adjusting the furnace temperature.

[0027] Compared with the prior art, the beneficial technical effects of the present invention are:

[0028] Through the above adjustments to the walking beam heating furnace process, it was tried for heating heavy rail billets after being put into use. The quality of the billets after heating was good, which better improved the heating efficiency of the billets and effectively reduced the production cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The present invention will be further described below in conjunction with the accompanying drawings.

[0030] Figure 1 Thermal engineering system for heavy rail steel. DETAILED DESCRIPTION

[0031] The present invention is based on the working principle of the walking beam combustion system, and improves the working efficiency of the heating furnace by adjusting the heating configuration of the burner and other methods, reduces the nitrogen oxides, sulfur dioxide and particulate matter emitted from the flue gas, and meets the ultra-low emission requirements. A production method for heating a rail billet using a walking beam heating furnace is provided, and the specific process is as follows:

[0032] The particulate emission value of the heating furnace was low before the transformation, slightly exceeding the limit. In the fixed bed desulfurization technology selected this time, the granular desulfurizer has a dust removal function, and according to research, under the conditions of a certain particle layer thickness and a certain flow rate, the dust removal efficiency of the granular desulfurizer in the fixed bed can reach more than 90%. Therefore, the calcium-based fixed bed dry has a certain effect of removing particulate matter. After the flue gas is treated by the calcium-based fixed bed, the particulate matter should be able to meet the requirements of ultra-low emissions.

[0033] The flame-adjusting burner adopts a two-stage combustion mechanism. The air consists of three parts: the central air, the primary combustion air and the secondary combustion air, which are supplied at the same time. The central air and the primary combustion air make the coal gas burn in an oxygen-poor atmosphere. The secondary combustion air makes the coal gas burn completely. When the secondary combustion air is sprayed into the furnace at a high speed, it causes entrainment, entraining the surrounding flue gas into the combustion air to reduce the oxygen concentration in the coal gas combustion area, prolong the coal gas combustion process, increase the flame length, and avoid local high temperature of the flame. Increasing the flame length improves the uniformity of the furnace gas temperature along the furnace width and improves the heating effect of the heating furnace.

[0034] Benchmark working condition: primary air supply accounts for 30%, secondary air supply accounts for 70%; that is, the primary air valve opening is 30%, the secondary air valve opening is 70%, and the central air valve opening is 100%;

[0035] Ultra-long flame working condition: when giving full play to its ultra-long flame and low NOX characteristics: primary air ratio: 0%, secondary air: 100%, that is, the primary air valve opening is 0%, the secondary air valve opening is 100%, and the central air valve opening is 100%;

[0036] Shortest flame condition: primary air ratio: 70%, secondary air ratio: 30%; that is, the primary air valve is 100% fully open, the secondary air valve opening is 20-30%, and the central air valve opening is 100%;

[0037] Considering that the flame length of the flame-adjusting burner exceeds the 5th water beam during furnace baking, the flame length of the flame-adjusting burner only reaches the 4th water beam after adjustment according to the benchmark operating conditions during production. When the pressure before the burner fails to meet the design requirements, it is adjusted according to the extra-long flame operating conditions.

[0038] The ball valve in front of the burner is a cut-off valve with closing / opening function;

[0039] The gas butterfly valve in front of the burner is a regulating valve, which can adjust the gas volume of each burner;

[0040] The central air butterfly valve in front of the burner is usually not closed to ensure the safety of the burner;

[0041] The butterfly valves on the primary and secondary air mains before the burners are regulating valves to adjust the air volume of each burner;

[0042] The primary air butterfly valve and secondary air butterfly valve before the burner are proportional control valves. After setting, they do not need to be adjusted unless the operating conditions of the heating furnace change significantly.

[0043] Air-fuel ratio control:

[0044] The combustion control of the heating furnace configures the air / gas ratio based on the calorific value of the gas, and the oxygen content detected by zirconium oxide is used as the basis for adjustment. The oxygen content should be 2-3%.

[0045] Furnace temperature control: (Furnace temperature upper limit soaking section 1300℃, heating section 2 1350℃, heating section 1 1200℃)

[0046] Based on the heating temperature of the steel billet, the air / gas supply is adjusted by adjusting the regulating valves in each section to achieve the purpose of regulating the furnace temperature.

[0047] Furnace pressure control:

[0048] The furnace pressure should be 2-10Pa by adjusting the opening of the flue damper and the frequency of the induced draft fan;

[0049] Heat exchanger over-temperature protection control:

[0050] When the flue gas temperature before the heat exchanger is greater than 700℃, the cooling fan will be automatically started and the fan inlet shutter valve will be opened for rapid cooling.

[0051] At the same time, combined with the characteristics of the heating furnace itself, a heating system suitable for heavy rail billets is formulated to meet the heating requirements of the billets. For specific processes, see Figure 1 .

[0052] Through the above adjustments to the walking beam heating furnace process, it was tried for heating heavy rail billets after being put into use. The quality of the billets after heating was good, which better improved the heating efficiency of the billets and effectively reduced the production cost.

[0053] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A production method for heating rail blanks using a walking beam heating furnace, characterized in that: include: Before the transformation of the heating furnace, the particulate emission value was low, slightly exceeding the limit. The fixed bed desulfurization technology was selected. The granular desulfurizer has a dust removal function. Under the conditions of a certain particle layer thickness and a certain flow rate, the dust removal efficiency of the granular desulfurizer in the fixed bed can reach more than 90%; the calcium-based fixed bed has a certain effect of removing particulate matter. After the flue gas is treated by the calcium-based fixed bed, the particulate matter should be able to meet the requirements of ultra-low emissions; The flame-adjusting burner adopts a two-stage combustion mechanism. The air consists of three parts: the central air, the primary combustion-supporting air and the secondary combustion-supporting air, which are supplied at the same time. The central air and the primary combustion-supporting air make the coal gas burn in an oxygen-deficient atmosphere, and the secondary combustion-supporting air makes the coal gas burn completely. When the secondary combustion-supporting air is sprayed into the furnace at a high speed, a suction effect occurs, which sucks the surrounding flue gas into the combustion-supporting air to reduce the oxygen concentration in the coal gas combustion area, prolong the coal gas combustion process, increase the flame length, and avoid local high temperature of the flame; increase the flame length, improve the uniformity of the furnace gas temperature along the furnace width, and improve the heating effect of the heating furnace; Benchmark working condition: primary air supply accounts for 30%, secondary air supply accounts for 70%; that is, the primary air valve opening is 30%, the secondary air valve opening is 70%, and the central air valve opening is 100%; Ultra-long flame working condition: when giving full play to its ultra-long flame and low NOX characteristics: primary air ratio: 0%, secondary air: 100%, that is, the primary air valve opening is 0%, the secondary air valve opening is 100%, and the central air valve opening is 100%; The shortest flame condition: primary air ratio: 70%, secondary air ratio: 30%; that is, the primary air valve is 100% fully open, the secondary air valve opening is 20-30%, and the central air valve opening is 100%; Considering that the flame length of the flame-adjusting burner during the baking period exceeds the 5th water beam, the flame length of the flame-adjusting burner only reaches the 4th water beam after adjustment according to the benchmark working condition during production. When the pressure before the burner fails to meet the design requirements, it is adjusted according to the super-long flame working condition; Air-fuel ratio control: The combustion control of the heating furnace configures the air / gas ratio based on the calorific value of the gas, and the oxygen content detected by zirconium oxide is used as the basis for adjustment. The oxygen content should be 2-3%; Furnace temperature control: The upper limit of the furnace temperature in the soaking section is 1300℃, the second heating section is 1350℃, and the first heating section is 1200℃; Furnace pressure control: The furnace pressure should be 2-10Pa by adjusting the opening of the flue damper and the frequency of the induced draft fan; Heat exchanger over-temperature protection control: When the flue gas temperature before the heat exchanger is greater than 700℃, the cooling fan will be automatically started and the fan inlet shutter valve will be opened for rapid cooling.

2. The method for producing rail blanks by heating them in a walking beam heating furnace according to claim 1, characterized in that: The ball valve in front of the burner is a cut-off valve with closing / opening function.

3. The method for producing rail blanks by heating them in a walking beam heating furnace according to claim 1, characterized in that: The gas butterfly valve in front of the burner is a regulating valve, which regulates the gas volume function of each burner.

4. The method for producing rail blanks by heating them in a walking beam heating furnace according to claim 1, characterized in that: The central air butterfly valve in front of the burner is generally not closed to ensure the safety of the burner.

5. The production method of heating rail blanks by using a walking beam heating furnace according to claim 1, characterized in that: The butterfly valves on the primary and secondary air mains before the burner are regulating valves, which adjust the air volume of each burner.

6. The method for producing rail blanks by heating them in a walking beam heating furnace according to claim 1, characterized in that: The primary air butterfly valve and secondary air butterfly valve before the burner are proportional control valves. After setting, they do not need to be adjusted unless the operating conditions of the heating furnace change significantly.

7. The method for producing rail blanks by heating them in a walking beam heating furnace according to claim 1, characterized in that: Based on the heating temperature of the steel billet, the air / gas supply is adjusted by adjusting the regulating valves in each section to achieve the purpose of regulating the furnace temperature.