Construction method for turnover cushion layer through reverse building method

By using the reverse method of turning over the cushion layer in construction, the supporting structure of the steel pipe short rack and the ground firmware, combined with the drainage mechanism, and the use of slag and other fillers, the problems of high consumption and long construction period of the traditional cushion layer are solved. It achieves cost-effective, environmentally friendly and recyclable construction results.

CN119021185APending Publication Date: 2024-11-26NO 2 CONSTR GRP CO LTD OF SHANGHAI CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411322397.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

Traditional low-grade concrete cushions have high material consumption, long construction period, environmental protection problems and high demolition costs when dealing with soft foundations, which cannot meet the green construction indicators of modern society.

Method used

The construction method of the reverse-action turnover cushion layer is adopted. By setting up a steel pipe short rack and ground firmware on the soil, the ground firmware is used to support the steel pipe short rack and combined with the drainage mechanism to achieve rapid laying and dismantling, and using slag and waste concrete. Filling materials such as slag to reduce the use of concrete.

Benefits of technology

It has achieved cost-effective, short construction period, and environmentally friendly construction, which is convenient for demolition and recycling, meets green construction requirements, and reduces resource consumption and costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021185A_ABST
    Figure CN119021185A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for a turnover cushion layer through a reverse building method, and relates to the field of building construction. A soil body, a soil taking opening and a steel pipe short bent frame arranged above the soil body are included; the ground fixing piece is arranged on the surface of the soil body and used for supporting the steel pipe short bent frame, and a positioning mechanism used for limiting the steel pipe short bent frame is arranged at the top of the ground fixing piece; the positioning mechanism comprises a butt joint groove, a supporting plate and a limiting block, the butt joint groove is formed in the bottom of the steel pipe short bent frame, and the supporting plate is fixedly installed on the top of the ground fixing piece. According to the invention, the ground fixing piece is arranged, the ground fixing piece mainly takes blocks such as muck, waste concrete disintegrating slag, earthwork, stones and the like as fillers, concrete materials do not need to be consumed, and local materials are used, so that the ground fixing piece has the advantages of high cost performance, convenience in construction, short construction period, immediate use after paving and the like; a curing agent is not added, so that the environment requirement is better met; meanwhile, the floor fixing piece has the advantages of being convenient to disassemble and capable of being recycled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction, in particular to a construction method of a turnover cushion layer using a reverse construction method. Background Art

[0002] In the current field of building construction, the treatment of soft foundation has always been a critical and challenging issue. One of the common treatment methods is to use a low-grade concrete cushion.

[0003] However, this traditional treatment method has many obvious defects. First, it requires a large amount of concrete, which not only increases the material cost, but also causes a large consumption of natural resources. Secondly, the maintenance time after the construction is completed is long, which greatly slows down the progress of the entire project and leads to an extension of the construction period. Furthermore, when it is necessary to demolish it later, a large amount of garbage will be generated, and the cost of demolition work is quite high. In addition, more importantly, this method does not meet the green construction indicators required by the current policy, and cannot meet the pursuit of environmental protection and sustainable development in modern society.

[0004] Therefore, in order to overcome these problems, a new soft foundation treatment method is urgently needed to reduce unnecessary resource consumption during the construction process, shorten the construction period of the soft foundation treatment stage, and achieve the goal of cost savings. Summary of the invention

[0005] Based on this, the purpose of the present invention is to provide a construction method of a reversible cushion layer by reverse construction to solve the technical problem.

[0006] To achieve the above object, the present invention provides the following technical solutions: a construction system of a turnover cushion layer by reverse construction method, comprising a soil body, a soil taking opening and a short steel pipe rack arranged above the soil body;

[0007] The soil surface is provided with a ground fixture, the ground fixture is used to support the steel pipe short rack, and the top of the ground fixture is provided with a positioning mechanism for limiting the steel pipe short rack;

[0008] The positioning mechanism includes a docking groove, a support plate and a limit block. The docking groove is provided at the bottom of the steel pipe short row frame. The support plate is fixedly mounted on the top of the ground fastener. A limit block corresponding to the docking groove is mounted at the end of the support plate. The limit block is clamped in the docking groove.

[0009] The bottom of the ground fixture is in contact with the soil, and the limit block provided at the bottom of the ground fixture is inserted into the soil;

[0010] A drainage mechanism is arranged on the top of the ground fixture.

[0011] By adopting the above technical scheme, the present invention has the advantages of high cost performance, convenient construction, short construction period, and ready-to-use after laying. In addition, the present invention does not add any curing agent, which is more in line with environmental requirements. At the same time, the ground fasteners are easy to dismantle and can be recycled.

[0012] Furthermore, a plurality of groups of the ground fasteners are laid on the soil working surface, and a caulking material is arranged between two adjacent groups of the ground fasteners.

[0013] By adopting the above technical solution, it is ensured that the bottom of the steel pipe short row rack will be supported by corresponding ground fasteners.

[0014] Furthermore, the drainage mechanism includes a drainage frame, which is installed at the corners of the ground fixtures, and the outer walls on both sides of the drainage frame are connected to a group of corners of the ground fixtures, and the bottom of the drainage frame is in contact with the caulking material.

[0015] By adopting the above technical solution and setting the drainage frame, it is convenient to discharge water.

[0016] Furthermore, the drainage frame is provided between multiple groups of adjacent ground fasteners, and a baffle is installed at one end of the drainage frame.

[0017] By adopting the above technical solution, water entering the drainage frame will be restricted by the baffle, so that the water can only be discharged into the drainage ditch.

[0018] A construction method of a reversible cushion layer by reverse construction method comprises the following steps:

[0019] Step 1: Level the soil surface to form a working surface;

[0020] Step 2: transport the ground fasteners filled with fillers to the laying position on the soil working surface and start laying the ground fasteners;

[0021] Step 3: Compact the ground fasteners;

[0022] Step 4: After the ground fasteners are laid, fill the gaps;

[0023] Step 5: Construct the reverse steel pipe short rack, support the formwork and cast, and reserve the soil taking port;

[0024] Step 6: After the strength reaches the standard, remove the short steel pipe rack and take the ground fasteners back to the ground for arrangement;

[0025] Step 7: Excavate the next layer of earthwork, repeat steps 1 to 6, and continue construction.

[0026] Furthermore, the ground fixture is made of a soft linen fabric outer packaging bag with strong tear resistance, and the filler is slag.

[0027] Furthermore, the gaps in step 4 are filled with a caulking material, and the caulking material is crushed stone.

[0028] In summary, the present invention mainly has the following beneficial effects:

[0029] The present invention is provided with ground fasteners. Since the ground fasteners are mainly filled with slag, waste concrete debris, earth, gravel and other block materials, there is no need to consume concrete materials, and local materials are used. Therefore, the present invention has the advantages of high cost performance, convenient construction, short construction period, and ready-to-use after laying. In addition, the present invention does not add curing agents, which is more in line with environmental requirements. At the same time, the ground fasteners are easy to dismantle and can be recycled. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a structural schematic diagram of the present invention;

[0031] Figure 2 It is a schematic diagram of the local structure of the present invention;

[0032] Figure 3 For the present invention Figure 2 Enlarged view of point A in the middle;

[0033] Figure 4 It is a schematic diagram of the structure of the cutaway fastener of the present invention;

[0034] Figure 5 It is a schematic diagram of the three-dimensional structure of the drainage frame of the present invention;

[0035] Figure 6 It is a schematic diagram of the three-dimensional structure of the ground fixture of the present invention after partial sectioning;

[0036] Figure 7 It is a construction flow chart of the present invention.

[0037] In the figure: 1. soil; 2. soil taking port; 3. short rack of steel pipes; 4. docking groove; 5. ground fasteners; 51. filler; 52. caulking material; 53. support plate; 54. limit block; 6. drainage frame; 61. baffle. DETAILED DESCRIPTION

[0038] The following will disclose multiple embodiments of the present invention with drawings. For the purpose of clear description, many practical details will be described together in the following description. However, it should be understood that these practical details should not be used to limit the present invention. That is, in some embodiments of the present invention, these practical details are not necessary. In addition, for the purpose of simplifying the drawings, some conventional structures and components will be depicted in a simple schematic manner in the drawings.

[0039] In addition, in the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes, and do not specifically refer to the order or sequence, nor are they used to limit the present invention. They are only used to distinguish components or operations described with the same technical terms, and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0040] Embodiment 1

[0041] This embodiment provides a construction system for a revolving cushion layer using a reverse construction method, comprising a soil body 1 and a soil borrowing opening 2 .

[0042] Exemplary, combined Figures 1 to 5 In this embodiment, a short-row steel pipe frame 3 is provided above the soil body 1 for subsequent formwork pouring, and a ground fixture 5 is provided on the surface of the soil body 1. The ground fixture 5 is used to support the short-row steel pipe frame 3 to ensure the stability of the short-row steel pipe frame 3 when in use. At the same time, a positioning mechanism for limiting the short-row steel pipe frame 3 is provided on the top of the ground fixture 5;

[0043] The positioning mechanism in this embodiment includes a docking groove 4, a support plate 53 and a limit block 54;

[0044] The docking groove 4 is provided at the bottom of the steel pipe short row frame 3, the support plate 53 is fixedly installed on the top of the ground fastener 5, and a limit block 54 corresponding to the docking groove 4 is installed at the end of the support plate 53, and the limit block 54 is clamped in the docking groove 4;

[0045] When in use, the limit block 54 will enter the docking groove 4, so that the position of the bottom of the steel pipe short row frame 3 will be restricted. The position of the ground fastener 5 on the surface of the soil 1 is fixed, thereby ensuring the stability of the position of the steel pipe short row frame 3 and ensuring that the subsequent formwork casting can be carried out smoothly.

[0046] Exemplarily, in this embodiment, multiple groups of ground fasteners 5 are laid on the working surface of the soil body 1, and at the same time, the laying position of the ground fasteners 5 corresponds to the construction position of the steel pipe short rack 3, ensuring that the bottom of the steel pipe short rack 3 will have corresponding ground fasteners 5 to support it, further ensuring the stability of the steel pipe short rack 3 when in use;

[0047] It should be noted in this embodiment that a caulking material 52 is provided between two adjacent groups of ground fasteners 5 in this embodiment, so as to ensure the stability between the multiple groups of ground fasteners 5, ensure that the multiple groups of ground fasteners 5 will support each other under the action of the caulking material 52, and further ensure the stability of the ground fasteners 5 when supporting the steel pipe short rack 3.

[0048] Illustratively, in this embodiment, the bottom of the ground fastener 5 is in contact with the soil 1, and the limit block 54 provided at the bottom of the ground fastener 5 is inserted into the soil 1, so that the friction between the ground fastener 5 and the soil 1 is increased, so that the position of the ground fastener 5 will be limited by the limit block 54 and the soil 1, further ensuring the fixed position of the ground fastener 5 when in use.

[0049] In some examples, the support plate 53 and the limit block 54 are both made of a rigid material, and the support plate 53 and the limit block 54 are both rigid hard plastic supports.

[0050] Of course, in other examples, the support plate 53 and the limit block 54 may both be made of rigid wood products, and the disclosed embodiment does not specifically limit the materials of the support plate 53 and the limit block 54 .

[0051] In some examples, combined Figure 2 and Figure 4 A drainage mechanism is provided on the top of the ground fixture 5, and the drainage mechanism includes a drainage frame 6 and a baffle 61;

[0052] Exemplarily, the drainage frame 6 in the drainage mechanism is installed at the corners of the ground fasteners 5, and the outer walls on both sides of the drainage frame 6 are connected to a group of corners of the ground fasteners 5. The corners of the ground fasteners 5 will limit the position of the drainage frame 6. At the same time, the cross-section of the drainage frame 6 is V-shaped, and the bottom of the drainage frame 6 is in contact with the caulking material 52, so that when water enters, the drainage frame 6 will gather the water to the bottom corner inside it, and then guide the water to facilitate the discharge of the water.

[0053] It should be noted that a drainage ditch corresponding to the drainage frame 6 is provided on the soil body 1, so that the water guided out by the drainage frame 6 will flow to the drainage ditch to play a role in drainage.

[0054] Exemplarily, the drainage frame 6 is arranged between multiple groups of adjacent ground fasteners 5, and a baffle 61 is installed at one end of the drainage frame 6. At the same time, the baffle 61 is installed at the end of the drainage frame 6 away from the drainage ditch, so that after water enters the drainage frame 6, it will be restricted by the baffle 61, so that the water can only be discharged into the drainage ditch.

[0055] Embodiment 2

[0056] This embodiment provides a construction method of a reversible cushion layer by reverse construction, such as Figure 6 As shown, the following steps are included:

[0057] Step 1: leveling the surface of the soil 1 to form a working surface;

[0058] Step 2: Use conveying equipment to quickly and smoothly transport the ground fasteners 5 filled with fillers 51 to the laying position on the working surface of the soil body 1, and start to accurately lay the ground fasteners 5 according to the predetermined design plan to reduce laying errors;

[0059] Step 3: Use compaction equipment to compact the ground fastener 5. According to different geological conditions and types of ground fasteners 5, adjust the compaction strength and times to ensure the best compaction effect;

[0060] Step 4: After the ground fasteners 5 are laid, the gaps are filled with caulking material 52 to ensure that the caulking material 52 is tightly combined with the ground fasteners 5 and the surrounding soil 1 to improve the overall stability;

[0061] Step 5: Construct the reverse steel pipe short rack 3. During this process, the formwork is accurately measured and calibrated in advance to ensure that the quality and shape of the poured concrete meet the requirements. Then the formwork is poured. During the pouring process, a soil opening 2 is reserved and the position and size of the soil opening 2 are ensured.

[0062] Step 6: After the strength reaches the standard, the steel pipe short rack 3 is dismantled in order, and the ground fasteners 5 are taken back to the ground for standard arrangement;

[0063] Step 7: Excavate the next layer of earthwork, discharge the excavated earth through the earth-taking port 2, repeat steps 1 to 6, and continue the construction strictly according to the optimized process. At the same time, strengthen the monitoring and control of the process, adjust the construction parameters in time, and ensure the construction quality and efficiency.

[0064] In some examples, the ground fixture 5 is packed in a soft linen fabric outer bag with strong tear resistance, and the filler 51 in the ground fixture 5 is slag.

[0065] Of course, in other examples, the filler 51 may also be waste concrete debris, earth or gravel, or may be lightweight and hard blocks such as foam and plastic. The disclosed embodiment does not specifically limit the material of the filler 51.

[0066] In some examples, caulking material 52 is crushed stone.

[0067] Of course, in other examples, the caulking material 52 may also be cement blocks or other items, and the disclosed embodiment does not specifically limit the material of the caulking material 52 .

[0068] It should be noted that, in this embodiment, the filler 51 is filled in the ground fastener 5, and appropriate vibration is performed during the filling process to improve the density of the filler 51, and the filled ground fastener 5 can be put into use.

[0069] Although an embodiment of the present invention has been shown and described, this specific embodiment is merely an explanation of the present invention and is not a limitation of the invention. The specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions and variations to the embodiments without creative contributions as needed without departing from the principles and purpose of the present invention. However, as long as they are within the scope of the claims of the present invention, they are protected by patent law.

Claims

1. A construction system for a reversible cushion layer using a reverse construction method, characterized in that: It comprises a soil body (1), a soil taking opening (2) and a short steel pipe rack (3) arranged above the soil body (1); A ground fixture (5) is provided on the surface of the soil body (1), the ground fixture (5) is used to support the steel pipe short rack (3), and a positioning mechanism for limiting the steel pipe short rack (3) is provided on the top of the ground fixture (5); The positioning mechanism comprises a docking groove (4), a support plate (53) and a limit block (54); the docking groove (4) is provided at the bottom of the steel pipe short rack (3); the support plate (53) is fixedly mounted on the top of the ground fastener (5); and a limit block (54) corresponding to the docking groove (4) is mounted at the end of the support plate (53); the limit block (54) is clamped in the docking groove (4); The bottom of the ground fixture (5) is in contact with the soil (1), and a limit block (54) provided at the bottom of the ground fixture (5) is inserted into the soil (1); A drainage mechanism is provided on the top of the ground fixture (5).

2. A construction system for a reversible cushion layer using a reverse construction method according to claim 1, characterized in that: A plurality of ground fixing members (5) are laid on the working surface of the soil body (1), and a caulking material (52) is arranged between two adjacent groups of ground fixing members (5).

3. A construction system for a reversible cushion layer using a reverse construction method according to claim 2, characterized in that: The drainage mechanism comprises a drainage frame (6), the drainage frame (6) being installed at the corners of the ground fixture (5), and the outer walls on both sides of the drainage frame (6) being connected to a group of corners of the ground fixture (5), and the bottom of the drainage frame (6) being in contact with the caulking material (52).

4. A construction system for a reversible cushion layer using a reverse construction method according to claim 3, characterized in that: The drainage frame (6) is arranged between a plurality of adjacent groups of the ground fixing members (5), and a baffle (61) is installed at one end of the drainage frame (6).

5. A construction method of a reverse-construction turnable cushion layer, applied to a construction system of a reverse-construction turnable cushion layer according to any one of claims 1 to 4, characterized in that: The following steps are involved: Step 1: Leveling the surface of the soil (1) to form a working surface; Step 2: transporting the ground fixture (5) filled with filler (51) to the laying position on the surface of the soil (1) and starting to lay the ground fixture (5); Step 3: compacting the ground fastener (5); Step 4: After the ground fasteners (5) are laid, fill the gaps; Step 5: construct a reverse steel pipe short rack (3), support the formwork and cast, and reserve a soil taking port (2); Step 6: After the strength reaches the standard, the short steel pipe rack (3) is removed and the ground fasteners (5) are taken back to the ground for arrangement; Step 7: Excavate the next layer of earthwork, repeat steps 1 to 6, and continue construction.

6. The construction method of a reversible cushion layer according to claim 5, characterized in that: The ground fixture (5) is made of a soft hemp fabric outer packaging bag with strong tear resistance, and the filler (51) is slag.

7. The construction method of a reversible cushion layer according to claim 5, characterized in that: The gaps in step 4 are filled with a filling material (52), wherein the filling material (52) is crushed stone.