Construction method for steel sheet pile cofferdam in dense sand soil stratum

Through the combination of guide frame and pressing components, the problem of verticality control of steel sheet piles in dense sandy soil formations is solved, and efficient steel sheet pile driving is achieved, ensuring construction quality and stability.

CN119021252APending Publication Date: 2024-11-26THE THIRD CONSTRUCTION CO OF CCCC SECOND HARBOR ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411091440.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the construction of steel sheet pile cofferdams with dense sand soil formations, it is difficult for the prior art to accurately control the verticality of steel sheet piles, resulting in low construction quality and poor stability.

Method used

The steel sheet pile is fixed by using guide frames to limit and press the assembly. The verticality of the steel sheet pile is ensured through the mounting ports and clamping components of the guide frame. The high-pressure water knife and vibrating hammer are used to accelerate the pile body to sink into the soil, combining with the long arm Excavators and pile pullers improve the construction efficiency.

Benefits of technology

It effectively ensures the perpendicularity of steel sheet piles, improves construction efficiency, ensures the overall construction speed and quality of the cofferdam, prevents the steel sheet piles from tilting, and improves construction stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021252A_ABST
    Figure CN119021252A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for a steel sheet pile cofferdam in a dense sand soil stratum. The construction method comprises the following steps that firstly, steel sheet piles on the two opposite sides of the cofferdam are constructed; after a guide frame is adopted for limiting when the steel sheet piles are driven, the steel sheet piles on the two sides are driven into soil; wherein the guide frame comprises a guide frame body and a pressing assembly; the whole guide frame body is of a cuboid structure, a plurality of through installation openings are formed in the top of the guide frame body, the shape and the specification of the installation openings are matched with those of steel sheet piles, the installation openings are alternately and reversely connected, arranged and communicated, and the size of the installation openings is 5-10 mm larger than that of the steel sheet piles; and mounting grooves are formed in the top of the guide frame body at intervals of one mounting hole. The pile forming structure is stable, the driving perpendicularity of the steel sheet pile is guaranteed, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of civil engineering, and more particularly to a method for constructing a steel sheet pile cofferdam in a dense sandy soil layer. Background Art

[0002] Steel sheet piles are a type of steel with a lock. There are many cross-sections of steel sheet piles, mainly straight plate type, groove type and Z type. They have the advantages of high strength and good waterproof performance. They are widely used in the construction of retaining walls, foundation pit enclosures and other fields. During the construction of steel sheet pile cofferdams, it is necessary to control the verticality of the steel sheet piles to prevent the steel sheet piles from tilting and affecting the construction quality. The current conventional practice is to use a pile driver and manual control of verticality. This construction method is not very accurate, and when installed in dense sandy soil layers, it is affected by the dense soil layer and has poor stability, which in turn affects the verticality of the steel sheet piles. Summary of the invention

[0003] The invention aims to provide a method for constructing a steel sheet pile cofferdam in a dense sandy soil layer, which has a stable pile structure, ensures the verticality of the steel sheet piles, and improves the construction efficiency.

[0004] The technical solution adopted by the present invention to solve this technical problem is: a method for constructing a steel sheet pile cofferdam in a dense sandy soil layer, comprising the following steps:

[0005] Step 1, driving steel sheet piles on opposite sides of the cofferdam; after using a guide frame to limit the position when driving the steel sheet piles, the steel sheet piles on both sides are driven into the soil; wherein, the guide frame comprises a guide frame body and a clamping assembly; the guide frame body, the guide frame body as a whole is a rectangular parallelepiped structure, and a plurality of through-going mounting openings are opened on the top, the shape and specification of the mounting openings match the steel sheet piles, the plurality of mounting openings are alternately arranged in reverse connection and connected, and the size of the mounting openings is 5 to 10 mm larger than the size of the steel sheet piles; a mounting groove is provided at every mounting hole on the top of the guide frame body, a clamping assembly is provided in the mounting groove, and the clamping assembly is used to fix the clamping assembly; the clamping assembly comprises: a mounting seat and a clamping seat, the mounting seat is fixed to the clamping assembly, the clamping seat is connected to the mounting seat, and the clamping seat is used to clamp the steel sheet piles;

[0006] Step 2: Use the guide frame to complete the placement of steel sheet piles on the remaining two sides of the cofferdam;

[0007] Step 3: Install internal supports in the cofferdam.

[0008] As a further solution of the present invention, the guide frame also includes a connecting component, which is plugged and fixed to the clamping seat, and is detachably fixed to the clamping seat by the connecting component, and the connecting component is connected to the mounting seat; a horizontal through-going internal threaded hole is provided on the mounting seat, one end of the adjusting bolt is threaded through the mounting seat and is connected to the connecting component through a bearing, and a handwheel is fixed to the other end of the adjusting bolt.

[0009] As a further solution of the present invention, in the step 1, the steel sheet piles are placed on opposite sides of the cofferdam, specifically including:

[0010] S11. First, select a suitable guide frame according to the actual size, then pass two steel sheet piles through both ends of the installation opening on the guide frame, set the guide frame at a suitable height, weld the two steel sheet piles to the inner wall of the installation opening, ensure that the guide frame is at the same height as the steel sheet piles during welding, then drive the two steel sheet piles into the dense sand layer, and use the two driven steel sheet piles as support for the guide frame;

[0011] S12, passing the remaining steel sheet piles through the installation openings on the guide frame in sequence, while ensuring the verticality of the steel sheet piles during installation;

[0012] S13, according to the actual situation, the pressing assembly is installed in the installation groove on the guide frame through the clamping assembly, and then the pressing seat is driven to press on the steel sheet pile by rotating the adjusting bolt, and then the steel sheet pile is driven;

[0013] S14. After the steel sheet piles on each side are driven, the guide frame on that side is dismantled.

[0014] As a further solution of the present invention, in the steps 1 and 2, a long-arm excavator is used in combination with a pile driver to drive the steel sheet piles;

[0015] When the steel sheet pile is driven into the soil, the high-pressure water jet generated by the high-pressure pump cuts into the dense soil layer, and the high-pressure water sprayed forms a water film along the soil and the pile body. Then, the pile is sunk into the soil by the vibrating hammer and the deadweight of the steel sheet pile.

[0016] As a further solution of the present invention, in the step S14, the demolition environment is explored during dismantling, and the places that may affect the dismantling are marked; before dismantling, professional fixing equipment and protective measures are set up to ensure sufficient firmness and safety, and then the clamping assembly on the steel sheet piles is released, and then the clamping assembly is removed from the installation groove of the guide frame. Before dismantling, the steel sheet piles at both ends of the guide frame are first cut open by cutting equipment, and then the guide frame body is withdrawn from above the steel sheet piles using lifting equipment.

[0017] As a further solution of the present invention, the step 2 uses a guide frame to complete the driving of the steel sheet piles on the remaining two sides of the cofferdam, which specifically includes:

[0018] S21, first select a suitable guide frame according to the actual size, the number of installation openings of the guide frame is the number of steel sheet piles on this side minus two, that is, the steel sheet piles at the two ends of the cofferdam on this side are not driven through the guide frame;

[0019] S22, two steel sheet piles are passed through both ends of the installation opening on the guide frame, the guide frame is set at a suitable height, the two steel sheet piles are welded to the inner wall of the installation opening, and the guide frame is ensured to be at the same height as the steel sheet piles during welding, and then the two steel sheet piles are driven into the dense sand layer, and the two driven steel sheet piles are used as supports for the guide frame; the remaining steps are the same as S12 to S13;

[0020] S23. After the steel sheet piles on the guide frame are driven, the guide frame on that side is dismantled.

[0021] S24. Complete the injection of steel sheet piles at the two ends of the remaining cofferdam and connect them with the vertical steel sheet piles on one side.

[0022] As a further solution of the present invention, the steel sheet piles at the two ends of the remaining two sides of the cofferdam in S24 are driven, specifically including:

[0023] S241, install cross braces on the remaining two sides of the cofferdam;

[0024] S242, removably install clamping components at both ends of the cross brace, the clamping components are opposite to the steel sheet piles at the two ends of the remaining two sides of the cofferdam;

[0025] S243. The steel sheet piles at the end are limited by the clamping assembly and the adjacent steel sheet piles to complete the injection of the steel sheet piles at the end, and then the cross brace and the clamping assembly are removed.

[0026] The present invention includes at least the following beneficial effects: the application applies the steel sheet pile cofferdam through the guide frame, which ensures the verticality of the steel sheet piles, speeds up the operation, and completes the overall application of the cofferdam atmosphere in three parts. The first two parts complete the rapid application of the main body of the steel sheet piles, and the last step completes the positioning and application of the steel sheet piles at the four corners by using the driven steel sheet piles and cross braces and clamping components. The entire construction method is fast and efficient, and can effectively prevent the steel sheet piles from tilting and affecting the construction quality.

[0027] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 This is a schematic diagram of the steel sheet pile placement at the two ends of the remaining cofferdam;

[0029] Figure 2 It is a structural schematic diagram of the guide frame of the present invention;

[0030] Figure 3 It is a structural schematic diagram of the steel sheet pile of the present invention being guided by a guide frame.

[0031] Among them, 1-guide frame body, 2-installation port, 3-steel sheet pile, 4-installation groove, 5-installation seat, 6-clamping seat, 7-internal threaded hole, 8-cross brace, 9-clamping assembly. DETAILED DESCRIPTION

[0032] The present invention is described in detail and completely below in conjunction with the accompanying drawings. A person of ordinary skill in the art will be able to implement the present invention based on these descriptions. Before describing the present invention in conjunction with the accompanying drawings, it should be particularly pointed out that the technical solutions and technical features provided in each part of the present invention, including the following description, can be combined with each other without conflict.

[0033] In addition, the embodiments of the present invention involved in the following description are generally only a part of the embodiments of the present invention, rather than all the embodiments. Therefore, based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0034] The present invention is further described in detail below in conjunction with the accompanying drawings and implementations, and its specific implementation process is as follows:

[0035] like Figures 1 to 3 As shown, the present invention provides a method for constructing a steel sheet pile cofferdam in a dense sandy soil layer, comprising the following steps:

[0036] Step 1: Driving steel sheet piles 3 on opposite sides of the cofferdam. In this embodiment, two rows of steel sheet piles 3 on the long sides of the cofferdam are selected; when driving the steel sheet piles 3, a guide frame is used to limit the position, and then the steel sheet piles 3 on both sides are driven into the soil; wherein, the guide frame includes a guide frame body 1 and a clamping assembly 9; the guide frame body 1, the guide frame body 1 is a rectangular parallelepiped structure as a whole, and a plurality of through installation openings 2 are opened on the top, and the shape and specifications of the installation openings 2 match the steel sheet piles 3, and the plurality of installation openings 2 are alternately connected in reverse Arranged and connected, the size of the installation port 2 is 5 to 10 mm larger than the size of the steel sheet pile 3, thereby reducing the wear between the steel sheet pile 3 and the guide frame; the top of the guide frame body 1 is provided with a mounting groove 4 for each mounting hole, and a clamping assembly is provided in the mounting groove 4, and the clamping assembly is used to fix the clamping assembly 9; the clamping assembly 9 includes: a mounting seat 5 and a clamping seat 6, the mounting seat 5 is fixed with the clamping assembly, the clamping seat 6 is connected with the mounting seat 5, and the clamping seat 6 is used to clamp the steel sheet pile 3;

[0037] Step 2: Use a guide frame to complete the placement of steel sheet piles 3 on the remaining two sides of the cofferdam;

[0038] Step 3: Install internal supports in the cofferdam.

[0039] The technical scheme may also include the following technical details to better achieve the technical effect: the guide frame also includes a connecting component, the connecting component is plugged and fixed with the clamping seat 6, and the connecting component is detachably fixed with the clamping seat 6, and the connecting component is connected with the mounting seat 5; the mounting seat 5 is provided with a horizontally through-going internal threaded hole 7, one end of the adjusting bolt is screwed through the mounting seat 5 and connected with the connecting component through a bearing, and the other end of the adjusting bolt is fixed with a hand wheel, and the hand wheel is convenient for rotating the adjusting bolt, and the distance between the clamping seat 6 and the steel sheet pile 3 is adjusted by the adjusting bolt to ensure that the steel sheet pile 3 is stably installed on the guide frame. The clamping seat 6 will have a certain amount of wear due to direct contact with the steel sheet pile 3. The replacement of the clamping seat 6 can be quickly completed through the connecting component, thereby ensuring that the steel sheet pile 3 is stably installed on the guide frame. In this embodiment, the connecting component is plugged and fixed with the clamping seat 6 in the following manner: a connecting groove is provided on the clamping component 9, and a limit block is provided on the connecting component, and the limit block is inserted into the connecting groove to complete the fixation.

[0040] This technical solution may also include the following technical details to better achieve the technical effect: In the step 1, the steel sheet piles 3 are placed on the opposite sides of the cofferdam, specifically including:

[0041] S11, first select a suitable guide frame according to the actual size, then pass two steel sheet piles 3 through both ends of the installation opening 2 on the guide frame, the two steel sheet piles 3 are the steel sheet piles 3 located at the two ends of this side of the steel cofferdam, set the guide frame at a suitable height, weld the two steel sheet piles 3 to the inner wall of the installation opening 2, ensure that the guide frame is at the same height of the steel sheet piles 3 during welding, and avoid the guide frame from tilting, then drive the two steel sheet piles 3 into the dense sand layer, and use the two driven steel sheet piles 3 as support for the guide frame, that is, complete the fixation of the guide frame;

[0042] S12, passing the remaining steel sheet piles 3 through the installation openings 2 on the guide frame in sequence, while ensuring the verticality of the steel sheet piles 3 during installation;

[0043] S13, according to the actual situation, the clamping assembly 9 is installed in the mounting groove 4 on the guide frame through the clamping assembly, thereby improving the stability of the clamping assembly 9, and then the clamping seat 6 is driven to be pressed on the steel sheet pile 3 by rotating the adjusting bolt, and then the steel sheet pile 3 is driven;

[0044] S14, after the steel sheet piles 3 on each side are injected, the guide frame on that side is dismantled.

[0045] The technical solution may also include the following technical details to better achieve the technical effect: In the steps 1 and 2, a long-arm excavator is used in combination with a pile driver to drive the steel sheet pile 3;

[0046] When the steel sheet pile 3 is driven into the soil, the high-pressure water jet generated by the high-pressure pump cuts into the dense soil layer, and the high-pressure water sprayed forms a water film along the soil and the pile body, reducing the friction between the steel sheet pile 3 and the soil. Then, the pile is sunk into the soil by the vibrating hammer and the deadweight of the steel sheet pile 3.

[0047] The present technical scheme may also include the following technical details to better achieve the technical effect: in the step S14, the demolition environment is explored during dismantling, and the places that may affect the dismantling are marked; before dismantling, professional fixing equipment and protective measures are set up to ensure that they are sufficiently firm and safe, and then the clamping assembly 9 on the steel sheet pile 3 is released, and then the clamping assembly 9 is removed from the mounting groove 4 of the guide frame. Before dismantling, the steel sheet piles 3 at both ends of the guide frame are first cut open by cutting equipment, and then the guide frame body 1 is withdrawn from above the steel sheet pile 3 using lifting equipment.

[0048] This technical solution may also include the following technical details to better achieve the technical effect: Step 2 uses a guide frame to complete the injection of the remaining steel sheet piles 3 on both sides of the cofferdam, specifically including:

[0049] S21, first select a suitable guide frame according to the actual size, the number of installation openings 2 of the guide frame is the number of steel sheet piles 3 on this side minus two, that is, the steel sheet piles 3 at the two ends of the side cofferdam are not driven through the guide frame, and the steel sheet piles 3 at the two ends are driven last;

[0050] S22, two steel sheet piles 3 are passed through both ends of the installation opening 2 on the guide frame. The two steel sheet piles 3 are the second steel sheet piles 3 located at the port on this side of the steel cofferdam. The guide frame is set at a suitable height, and the two steel sheet piles 3 are welded to the inner wall of the installation opening 2. During welding, the guide frame is ensured to be at the same height of the steel sheet piles 3 to avoid the guide frame from tilting. The two steel sheet piles 3 are then driven into the dense sand layer, and the two driven steel sheet piles 3 are used as supports for the guide frame, thus completing the fixing of the guide frame. The remaining steps are the same as S12 to S13;

[0051] S23, after the steel sheet piles 3 on the guide frame are driven, the guide frame on that side is dismantled.

[0052] S24, complete the injection of the steel sheet piles 3 at the two ends of the remaining two sides of the cofferdam, and connect them with the vertical steel sheet piles 3 on one side.

[0053] This technical solution may also include the following technical details to better achieve the technical effect: the steel sheet piles 3 at the two ends of the remaining two sides of the cofferdam in S24 are driven, specifically including:

[0054] S241, installing a cross brace 8 on the remaining two sides of the cofferdam, wherein the length direction of the cross brace 8 is parallel to the extension direction of the steel sheet piles 3 on the remaining two sides of the cofferdam;

[0055] S242, removably installing the clamping components 9 at both ends of the cross brace 8, the clamping components 9 being opposite to the steel sheet piles 3 at the two ends of the remaining two sides of the cofferdam;

[0056] S243, the steel sheet pile 3 at the end is limited by the clamping assembly 9 and the adjacent steel sheet pile 3, the injection of the end steel sheet pile 3 is completed, and then the cross brace 8 and the clamping assembly 9 are removed.

[0057] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes. They can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the embodiments shown and described herein.

Claims

1. A method for constructing a steel sheet pile cofferdam in a dense sandy soil layer, characterized in that: The following steps are involved: Step 1, driving steel sheet piles on opposite sides of the cofferdam; after using a guide frame to limit the position when driving the steel sheet piles, the steel sheet piles on both sides are driven into the soil; wherein, the guide frame comprises a guide frame body and a clamping assembly; the guide frame body, the guide frame body as a whole is a rectangular parallelepiped structure, and a plurality of through-going mounting openings are opened on the top, the shape and specification of the mounting openings match the steel sheet piles, the plurality of mounting openings are alternately arranged in reverse connection and connected, and the size of the mounting openings is 5 to 10 mm larger than the size of the steel sheet piles; a mounting groove is provided at every mounting hole on the top of the guide frame body, a clamping assembly is provided in the mounting groove, and the clamping assembly is used to fix the clamping assembly; the clamping assembly comprises: a mounting seat and a clamping seat, the mounting seat is fixed to the clamping assembly, the clamping seat is connected to the mounting seat, and the clamping seat is used to clamp the steel sheet piles; Step 2: Use the guide frame to complete the placement of steel sheet piles on the remaining two sides of the cofferdam; Step 3: Install internal supports in the cofferdam.

2. The method for constructing a steel sheet pile cofferdam in a dense sandy soil layer as claimed in claim 1, characterized in that: The guide frame also includes a connecting component, which is plugged and fixed to the clamping seat, and is detachably fixed to the clamping seat through the connecting component, and the connecting component is connected to the mounting seat; a horizontal through-going internal threaded hole is provided on the mounting seat, one end of the adjusting bolt is threaded through the mounting seat and connected to the connecting component through a bearing, and a handwheel is fixed to the other end of the adjusting bolt.

3. The method for constructing a steel sheet pile cofferdam in a dense sandy soil layer as claimed in claim 1, characterized in that: In the step 1, the steel sheet piles are placed on opposite sides of the cofferdam, specifically including: S11. First, select a suitable guide frame according to the actual size, then pass two steel sheet piles through both ends of the installation opening on the guide frame, set the guide frame at a suitable height, weld the two steel sheet piles to the inner wall of the installation opening, ensure that the guide frame is at the same height as the steel sheet piles during welding, then drive the two steel sheet piles into the dense sand layer, and use the two driven steel sheet piles as support for the guide frame; S12, passing the remaining steel sheet piles through the installation openings on the guide frame in sequence, while ensuring the verticality of the steel sheet piles during installation; S13, according to the actual situation, the pressing assembly is installed in the installation groove on the guide frame through the clamping assembly, and then the pressing seat is driven to press on the steel sheet pile by rotating the adjusting bolt, and then the steel sheet pile is driven; S14. After the steel sheet piles on each side are driven, the guide frame on that side is dismantled.

4. The method for constructing a steel sheet pile cofferdam in a dense sandy soil layer as claimed in claim 3, characterized in that: In the steps 1 and 2, a long-arm excavator is used in combination with a pile driver to drive steel sheet piles; During the process of driving the steel sheet pile into the soil, a high-pressure water jet generated by a high-pressure pump cuts into the dense soil layer, and the sprayed high-pressure water forms a water film along the soil and the pile body. Then the pile is sunk into the soil using a vibrating hammer and the steel sheet pile's own weight.

5. The method for constructing a steel sheet pile cofferdam in a dense sandy soil layer as claimed in claim 3, characterized in that: In the step S14, the demolition environment is explored during disassembly, and the places that may affect the disassembly are marked; before disassembly, professional fixing equipment and protective measures are set up to ensure sufficient firmness and safety, and then the clamping assembly on the steel sheet piles is released, and then the clamping assembly is removed from the installation groove of the guide frame. Before disassembly, the steel sheet piles at both ends of the guide frame are first cut open by cutting equipment, and then the guide frame body is withdrawn from above the steel sheet piles using lifting equipment.

6. The method for constructing a steel sheet pile cofferdam in a dense sandy soil layer as claimed in claim 3, characterized in that: The second step uses a guide frame to complete the placement of steel sheet piles on the remaining two sides of the cofferdam, specifically including: S21, first select a suitable guide frame according to the actual size, the number of installation openings of the guide frame is the number of steel sheet piles on this side minus two, that is, the steel sheet piles at the two ends of the cofferdam on this side are not driven through the guide frame; S22, two steel sheet piles are passed through both ends of the installation opening on the guide frame, the guide frame is set at a suitable height, the two steel sheet piles are welded to the inner wall of the installation opening, and the guide frame is ensured to be at the same height as the steel sheet piles during welding, and then the two steel sheet piles are driven into the dense sand layer, and the two driven steel sheet piles are used as supports for the guide frame; the remaining steps are the same as S12 to S13; S23, after the steel sheet piles on the guide frame are driven, the guide frame on that side is dismantled; S24. Complete the injection of steel sheet piles at the two ends of the remaining cofferdam and connect them with the vertical steel sheet piles on one side.

7. The method for constructing a steel sheet pile cofferdam in a dense sandy soil layer as claimed in claim 6, characterized in that: The steel sheet piles at the two ends of the remaining cofferdam in S24 are driven in specifically including: S241, install cross braces on the remaining two sides of the cofferdam; S242, removably install clamping components at both ends of the cross brace, the clamping components are opposite to the steel sheet piles at the two ends of the remaining two sides of the cofferdam; S243. The steel sheet piles at the end are limited by the clamping assembly and the adjacent steel sheet piles to complete the injection of the steel sheet piles at the end, and then the cross brace and the clamping assembly are removed.