Roof layer separation seam reserving device and construction method
By designing an adjustable filling structure, the problem of difficulty in removing the filling body of the roof layer partition joint reservation device during construction and the damaged edges and corners of the protective layer is solved, and the regular shape and construction convenience of the partition joint are achieved.
Patent Information
- Application Number
- CN202411441767.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-16
- Publication Date
- 2024-11-26
AI Technical Summary
During the construction process of the existing roof layer partition joint reservation device, it is difficult to remove the filling body and easily lead to damage to the edges and corners of the protective layer, affecting the aesthetics and performance of the partition joints.
A filling body including side plates, support rods, connecting seats and adjustment rods is designed. The side plate spacing is adjustable through the friction transmission of the adjustment rods. The width of the filling body can be adjusted according to the width of the partition joint and reduced after the protective layer is set. The width is easy to take out and the gap is filled with sealing material.
It effectively reduces the probability of damage to the protective layer, ensures regular shape of the partition joints, and is convenient to remove the filler, improving the convenience and effect of construction.
Smart Images

Figure CN119021431A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of roof construction equipment, in particular to a roof layer separation seam preserving device and a construction method. Background Art
[0002] In the field of house construction, in order to protect the roof waterproof layer and reduce the chance of damage to the roof waterproof layer, it is usually necessary to set a protective layer on the waterproof layer to achieve physical protection of the waterproof layer. The protective layer is usually constructed with cement mortar or fine stone concrete. Since the protective layer has shrinkage, it is usually necessary to set a separation joint in the protective layer to prevent the protective layer from shrinking and cracking due to temperature or structural deformation.
[0003] When constructing the partition joint, foam strips are usually installed at the planned position of the roof and fixed. After the protective layer constructed by cement mortar or fine stone concrete is constructed, the foam strips are taken out and the gaps are filled with sealing materials such as sealant and asphalt paste to complete the construction process of the partition joint. However, during the long construction process, the staff found that when the thickness of the protective layer is large, the foam strips fixed in the gap of the protective layer are not only difficult to remove, but also easily cause the corners of the protective layer constructed by cement mortar or fine stone concrete to be damaged during the removal process. Although the gaps and the damaged corners of the protective layer can be filled with sealing materials, it still affects the aesthetics of the partition joint. In severe cases, it may even affect the performance of the protective layer.
[0004] The related art discloses a device for reserving separation seams of roofing layers of construction projects and a construction method, the application number of which is CN2022114896226. The scheme includes a base body with a top opening and a cover body arranged on the top of the base body, wherein the base body is constructed as a long strip groove structure; the cover body is partially embedded in the top of the base body and convexly arranged on the top of the base body; and a plurality of flexible rods stacked along the height of the base body are also arranged in the base body. Before and after construction, the protective layer is separated by using the base body, and the sealing material is directly poured into the base body after the construction of the protective layer is completed. Since only the cover body needs to be taken out and the base body does not need to be taken out, the difficulty of opening the gap is reduced. However, it is found in actual application that, on the one hand, during the process of taking out the cover body, there is still a high probability of damage to the corners of the protective layer. On the other hand, due to the expansion and contraction performance of the base body, gaps are easily generated between the protective layer and the base body during subsequent use, thereby affecting the use effect of the protective layer.
[0005] In view of this, the present invention proposes a roof layer separation seam reservation device and a construction method to solve the above technical problems. Summary of the invention
[0006] In order to make up for the deficiencies of the prior art and solve the above-mentioned technical problems, the present invention proposes a roof layer separation seam reservation device and a construction method.
[0007] The technical solution adopted by the present invention to solve the technical problem is: a roof layer separation seam reservation device described in the present invention comprises a filling body, the filling body is a long strip structure, and the filling body is used to reserve a separation seam;
[0008] The width of the filling body is adjustable, and the filling body comprises a side plate, a support rod, a connecting seat and an adjusting rod;
[0009] The side panels are symmetrically designed, and the distance between the two side panels is the same as the width of the separation seam;
[0010] At least two support rods are fixedly installed on one side of the two side panels close to each other, and the corresponding support rods on the two side panels are staggered;
[0011] A connecting seat is slidably mounted on the two corresponding support rods, and an adjustment hole is opened in the middle of the connecting seat, and the adjustment hole is located between the two support rods;
[0012] An adjusting rod is installed in the gap between the two side plates. The adjusting rod is arranged parallel to the side plates and extends into the adjusting hole. The adjusting rod and the supporting rod are both connected by friction transmission.
[0013] Preferably, an insert ring is fixedly mounted on the adjusting rod, the insert ring is a circular ring structure, the insert ring is provided with evenly distributed insert holes in the circumferential direction, and the insert holes are stepped in the depth direction.
[0014] Preferably, connecting grooves are provided at both ends of the adjusting rod, and a connecting ring is sleeved on one end of the adjusting rod. The connecting ring extends into the connecting groove, the length of the connecting ring is smaller than the length of the connecting groove, and the connecting ring is used to connect two adjacent filling bodies.
[0015] Preferably, the filling body further comprises an adsorption plate and a desorption tube, the adsorption plate is fixedly mounted on the connecting seat, the desorption tube is fixedly mounted on the adsorption plate, and the desorption tube is in a closed state in an initial state.
[0016] Preferably, a piston is elastically installed in the desorption tube through a spring, a pull rope is fixedly installed on the piston, the pull rope extends to the outside through the desorption tube opening, a round ball is fixedly installed at one end of the pull rope away from the desorption tube, and the diameter of the round ball is larger than the diameter of the desorption tube opening.
[0017] Preferably, the inner cavity of the desorption tube is designed to be stepped, and in the initial state, the piston extends to the junction of the desorption tube and the adsorption disk.
[0018] Preferably, a membrane plate is installed at the top end of the side plate, an extension membrane is installed on the membrane plate, a hook nail is fixedly installed at the bottom end of the side plate, and the end of the extension membrane bypasses the outer wall of the side plate and extends to the hook nail.
[0019] Preferably, a receiving groove is provided on the membrane plate, the extension membrane is wound in the receiving groove, a symmetrically designed elastic pad is fixedly installed at the opening of the receiving groove, and the end of the extension membrane extends from the gap of the elastic pad to the outside of the membrane plate.
[0020] Preferably, the side plate and the connecting seat are respectively fixedly mounted with a first card block and a second card block, the membrane plate is provided with a card slot, the interior of the card slot is made of elastic material, and the card slot cooperates with the first card block and the second card block.
[0021] A roof layer separation seam reservation construction method, the method comprising the following steps:
[0022] S1. Measurement and planning: After the waterproof layer is constructed, the staff will measure the area of the waterproof layer and plan the location and size of the separation joint according to the process requirements;
[0023] S2. Base fixing: Use concrete to base on both sides of the planned separation joint, and press and adsorb multiple filling bodies one by one to fix them within the separation joint range, and connect the two adjacent filling bodies end to end;
[0024] S3. Width adjustment: The staff inserts the crowbar into the jack, drives the adjusting rod to rotate, and then adjusts the width of the filling body. After the width of the filling body is consistent with the planned separation seam width, the membrane plate is combined with the second clamping block;
[0025] S4, pouring and shaping: install the mesh and pour concrete according to the planned protective layer position, and the protective layer will be formed after shaping;
[0026] S5. Dismantle the mold and fill the seams: manually move the membrane plate, and use the crowbar to drive the adjusting rod to rotate again, so that the width of the filling body is reduced, and then the filling body is taken out, and the sealing material is used to pour and cure the gap to complete the separation seam construction.
[0027] The beneficial effects of the present invention are as follows:
[0028] 1. The device and construction method for reserving a roofing layer separation joint described in the present invention provide a filler with adjustable width, and install the filler at the pre-planned position of the separation joint, thereby intercepting the poured fine stone concrete, so that the separation joint is reserved, and then utilizing the ability of the filler with adjustable width to separate the side panel from the concrete. Since the side panel is in a vertical separation state when separated from the concrete constituting the protective layer, the concrete constituting the protective layer is subjected to a more uniform stress, thereby effectively reducing the probability of damage to the protective layer, making the shape of the separation joint more regular, and making it easier to take out the filler after the size is reduced.
[0029] 2. The roofing layer separation seam reservation device and construction method described in the present invention selectively pushes the connecting ring to divide the filling bodies connected as a whole into multiple groups, and then adjusts the width of each group of filling bodies one by one. The setting of the connecting ring and the connecting groove allows the staff to easily form a plurality of filling bodies into a whole or divide them into individuals, which is not only convenient for adjusting the width of the filling body, but also convenient for fixing the position of the filling body, effectively enhancing the convenience of the separation seam reservation construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The present invention will be further described below in conjunction with the accompanying drawings.
[0031] Figure 1 is a stereogram of the present invention;
[0032] Figure 2 It is a stereogram of the filling body;
[0033] Figure 3 is a three-dimensional diagram of the connecting seat;
[0034] Figure 4 It is a partial stereogram of the adjustment rod;
[0035] Figure 5 is a cross-sectional view of the present application;
[0036] Figure 6 yes Figure 5 A partial enlarged view of the middle part;
[0037] Figure 7 is a cross-sectional view of the adsorption plate and the desorption tube;
[0038] Figure 8 is a flow chart of the method of the present invention;
[0039] In the figure: 1. side panel; 11. support rod; 12. connecting seat; 13. adjusting rod; 14. adjusting hole; 2. plug ring; 21. plug hole; 22. connecting groove; 23. connecting ring; 24. adsorption plate; 25. desorption tube; 26. piston; 27. pull rope; 28. round ball; 3. membrane plate; 31. extension membrane; 32. hook nail; 33. storage groove; 34. elastic pad; 4. first clamping block; 41. second clamping block; 42. clamping groove. DETAILED DESCRIPTION
[0040] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0041] like Figures 1 to 7As shown, a roofing layer separation seam reservation device according to the present invention comprises a filling body, wherein the filling body is a long strip structure, and the filling body is used to reserve a separation seam;
[0042] The width of the filling body is adjustable, and the filling body comprises a side plate 1, a support rod 11, a connecting seat 12 and an adjusting rod 13;
[0043] The side panels 1 are symmetrically designed, and the distance between the two side panels 1 is the same as the width of the separation seam;
[0044] At least two support rods 11 are fixedly installed on one side of the two side panels 1 close to each other, and the corresponding support rods 11 on the two side panels 1 are staggered;
[0045] A connecting seat 12 is slidably mounted on the two corresponding supporting rods 11, and an adjusting hole 14 is opened in the middle of the connecting seat 12, and the adjusting hole 14 is located between the two supporting rods 11;
[0046] An adjusting rod 13 is installed in the gap between the two side plates 1 . The adjusting rod 13 is arranged parallel to the side plates 1 . The adjusting rod 13 extends into the adjusting hole 14 . The adjusting rod 13 and the supporting rod 11 are both connected by friction transmission.
[0047] During the construction of the protective layer, in order to enhance the convenience of removing the filling body from the reserved separation gap and reduce the damage to the cast protective layer caused by the removal of the filling body, a special filling body is provided in the present invention. By utilizing the adjustable width of the filling body, after the protective layer is formed, the width of the filling body is reduced, thereby enhancing the convenience of removing the filling body.
[0048] Specifically, when constructing the protective layer of the present invention, it is first necessary to mark and plan the position and size of the reserved separation seam on the completed waterproof layer, and then arrange the filling bodies one by one on the ground according to the planned pattern on the ground. The widths of the filling bodies in the initial state are all the same. After determining the position of the filling body, the staff directly drives manually or uses tools to drive the adjustment rod 13 to rotate. Since the adjustment rod 13 extends to the adjustment holes 14 of the multiple connecting seats 12, when the adjustment rod 13 rotates, the adjustment rod 13 and the support rod 11 that also extends to the inside of the connecting seat 12 are frictionally transmitted. Therefore, the rotation of the adjustment rod 13 drives the multiple support rods 11 in contact with it to move linearly, and the multiple support rods 11 are respectively fixedly connected to the side panels 1 on both sides. Therefore, the linear movement of the support rod 11 directly makes the gap between the two side panels 1 The distance can be adjusted. When the spacing of the side panels 1 is the same as the planned width of the separation joint, the adjustment of the filling body width is completed. Subsequently, the filling body is fixed by laying a concrete base on the components on both sides of the filling body. With measures such as the elevation of long bricks, the fine stone concrete protective layer can be poured at the planned protective layer position. During pouring, the presence of the filling body blocks the position of the separation joint, and then in the process of forming the protective layer, the separation joint is reserved. After the protective layer is formed, the staff rotates the adjusting rod 13 again, causing the adjusting rod 13 to drive the supporting rod 11 to move, thereby making the two side panels 1 approach each other and reducing the width of the filling body. In this process, the side panels 1 are separated from the concrete constituting the protective layer. After the filling body is taken out, a separation joint is formed. After the separation joint is sealed with sealing materials such as sealant and asphalt paste, the construction process of the separation joint is completed.
[0049] The present invention intercepts the poured fine stone concrete by setting a filler body with adjustable width and installing the filler body at the position of the pre-planned dividing joint, so that the dividing joint is reserved. Then, the side panel 1 is separated from the concrete by utilizing the adjustable width of the filler body. Since the side panel 1 is in a vertical separation state when separated from the concrete constituting the protective layer, the concrete constituting the protective layer is subjected to a more uniform force, thereby effectively reducing the probability of damage to the protective layer, making the shape of the dividing joint more regular, and the filling body with a reduced size is easier to take out.
[0050] As a preferred embodiment of the present invention, an insert ring 2 is fixedly mounted on the adjusting rod 13. The insert ring 2 is a circular ring structure. The insert ring 2 is provided with evenly distributed insert holes 21 in the circumferential direction. The insert holes 21 are stepped in the depth direction.
[0051] In order to further enhance the convenience of adjusting the width of the filling body, in the present invention, a plug ring 2 is fixedly connected to the adjusting rod 13, a plug ring 2 is provided on the plug ring 2, and the plug hole 21 is designed in a stepped shape in the depth direction. After the protective layer is poured, a rod-shaped tool such as a crowbar is inserted into the plug hole 21, and then pressure is applied to the crowbar. Through the principle of labor-saving lever, the rotation of the adjusting rod 13 is more labor-saving, especially when the filling body is separated from the poured waterproof layer, the convenience of rotating the adjusting rod 13 can be effectively enhanced, thereby effectively enhancing the convenience of adjusting the width of the filling body.
[0052] As a preferred embodiment of the present invention, connecting grooves 22 are provided at both ends of the adjusting rod 13, and a connecting ring 23 is sleeved on one end of the adjusting rod 13. The connecting ring 23 extends into the connecting groove 22, and the length of the connecting ring 23 is less than the length of the connecting groove 22. The connecting ring 23 is used to connect two adjacent filling bodies.
[0053] Since it is necessary to adjust the width of multiple filling bodies during the process of reserving the separation seam, the adjustment rods 13 of the multiple filling bodies are aligned during the process of placing the multiple filling bodies one by one, and the staff selectively manually pushes the connecting ring 23 so that the connecting ring 23 enters the connecting grooves 22 on the two adjusting rods 13 at the same time, thereby connecting the adjustment rods 13 on the multiple filling bodies connected end to end into a whole. Subsequently, the staff uses a crowbar to drive one of the adjusting rods 13 to synchronously adjust the widths of the multiple filling bodies connected in a transmission manner. In the later process of separating the filling body from the protective layer, the staff can also selectively push the connecting ring 23 to divide the filling bodies connected as a whole into multiple groups, and then adjust the width of each group of filling bodies one by one. The setting of the connecting ring 23 and the connecting groove 22 allows the staff to conveniently form multiple filling bodies into a whole or divide them into individuals, which is not only convenient for adjusting the width of the filling body, but also convenient for fixing the position of the filling body, effectively enhancing the convenience of the construction of reserving the separation seam.
[0054] As a preferred embodiment of the present invention, the filling body further comprises an adsorption plate 24 and a desorption tube 25. The adsorption plate 24 is fixedly mounted on the connecting seat 12, and the desorption tube 25 is fixedly mounted on the adsorption plate 24. In the initial state, the desorption tube 25 is in a closed state.
[0055] A piston 26 is elastically installed in the desorption tube 25 through a spring, and a pull rope 27 is fixedly installed on the piston 26. The pull rope 27 extends to the outside through the opening of the desorption tube 25. A round ball 28 is fixedly installed at one end of the pull rope 27 away from the desorption tube 25, and the diameter of the round ball 28 is larger than the opening diameter of the desorption tube 25.
[0056] The inner cavity of the desorption tube 25 is designed to be stepped, and in the initial state, the piston 26 extends to the junction of the desorption tube 25 and the adsorption disk 24 .
[0057] In order to further enhance the convenience of the reserved construction of the partition seam, the filling body in the present invention also includes an adsorption plate 24. When placing the filling bodies one by one at the pre-planned location of the partition seam, the staff first cleans the location of the partition seam, and then manually presses the connecting seat 12. Since the surfaces of the waterproof coating and the waterproof membrane are relatively smooth and flat, the adsorption plate 24 at the bottom of the connecting seat 12 is adsorbed on the waterproof layer to preliminarily fix the filling body. During this process, if there is a deviation in the position of the filling body, the staff can manually pull the round ball 28, and use the connection between the round ball 28, the pull rope 27 and the piston 26 to open the desorption tube 25, so that the outside air enters the adsorption plate 24, thereby separating the adsorption plate 24 from the ground. After releasing the pull on the round ball 28, the piston 26 can be reset under the elastic action of the spring, and then the adsorption plate 24 is used again to fix it with the waterproof layer. After the preliminary fixation is completed, the width of the filling body is adjusted, and then the fixing effect of the filling body can be further enhanced by laying a primer on both sides of the filling body.
[0058] As a preferred embodiment of the present invention, a membrane plate 3 is installed at the top of the side panel 1, an extension membrane 31 is installed on the membrane plate 3, a hook nail 32 is fixedly installed at the bottom end of the side panel 1, and the end of the extension membrane 31 bypasses the outer wall of the side panel 1 and extends to the hook nail 32.
[0059] The membrane plate 3 is provided with a receiving groove 33 , in which the extension membrane 31 is wound. A symmetrically designed elastic pad 34 is fixedly installed at the opening of the receiving groove 33 , and the end of the extension membrane 31 extends from the gap of the elastic pad 34 to the outside of the membrane plate 3 .
[0060] The first clamping block 4 and the second clamping block 41 are fixedly mounted on the side plate 1 and the connecting seat 12 respectively. The membrane plate 3 is provided with a clamping groove 42 . The inside of the clamping groove 42 is made of elastic material. The clamping groove 42 cooperates with the first clamping block 4 and the second clamping block 41 .
[0061] In order to further enhance the convenience of taking out the filling body, the present invention adopts an extension film 31 to shield the outside of the filling body. Specifically, before the filling body is adsorbed and fixed on the waterproof layer, the staff manually pulls the extension film 31, passes the extension film 31 around the outer wall of the side plate 1, and then hangs it on the hook nail 32, and then adsorbs and fixes the filling body on the waterproof layer, and adjusts the width of the filling body. After the width of the filling body is adjusted, the staff manually pulls the membrane plate 3 from the first clamping block 4 to the second clamping block 41, and then uses the extension film 31 and the membrane plate 3 to shield the top of the filling body. On the one hand, it can effectively prevent concrete from falling into the filling body during the pouring of the protective layer. On the other hand, the membrane plate 3 is located above the connecting seat 12 and cooperates with the side plate 1 to shield the support rod 11 and the adjustment rod 13 inside the filling body, effectively reducing the damage to the support rod 11 and the adjustment rod 13 caused by external forces, and at the same time can enhance the filling The bearing capacity of the body is improved, and when disassembling the filling body, the staff separates the membrane plate 3 from the second card block 41, and then exposes the connecting seat 12 and the adjusting rod 13 between the two side panels 1, and then adjusts the spacing between the two side panels 1. In this process, the extension membrane 31 is located between the side panels 1 and the concrete. Under the adhesion between the concrete and the extension membrane 31, the side panel 1 is automatically separated from the extension membrane 31 when it moves, which greatly reduces the difficulty of separating the filling body from the cast protective layer. After taking out the filling body, the extension membrane 31 is manually divided, and the membrane plate 3, the extension membrane 31 and the filling body can be combined again. It should be noted that when the extension membrane 31 is combined with the membrane plate 3 and the side panel 1, one end of the extension membrane 31 is fixed by the hook nail 32, and the other end is clamped by the symmetrical elastic pad 34. Therefore, it can not only make the extension membrane 31 have resistance when it moves out of the storage groove 33, but also can reduce the probability of its breakage when the extension membrane 31 is pulled by external force.
[0062] like Figure 8 As shown, a roof layer separation seam reservation construction method, the method comprises the following steps:
[0063] S1. Measurement and planning: After the waterproof layer is constructed, the staff will measure the area of the waterproof layer and plan the location and size of the separation joint according to the process requirements;
[0064] S2. Base fixing: concrete is used to base on both sides of the planned separation joint, and multiple filling bodies are pressed and adsorbed and fixed one by one within the separation joint range, and two adjacent filling bodies are connected end to end;
[0065] S3, width adjustment: the staff inserts the crowbar into the insertion hole 21, drives the adjustment rod 13 to rotate, and then adjusts the width of the filling body. After the width of the filling body is consistent with the planned separation gap width, the membrane plate 3 is combined with the second clamping block 41;
[0066] S4, pouring and shaping: install the mesh and pour concrete according to the planned protective layer position, and the protective layer will be formed after shaping;
[0067] S5, demolding and grouting: manually move the membrane plate 3, and use the crowbar to drive the adjusting rod 13 to rotate again, so that the width of the filling body is reduced, and then the filling body is taken out, and the gap is grouted and cured with sealing materials to complete the construction of the separation seam.
[0068] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A roofing layer separation seam reservation device, comprising a filling body, the filling body is a long strip structure, and the filling body is used to reserve a separation seam; Features: The filling body has an adjustable width, and comprises a side plate (1), a support rod (11), a connecting seat (12) and an adjusting rod (13); The side panels (1) are symmetrically designed, and the distance between the two side panels (1) is the same as the width of the separation seam; At least two support rods (11) are fixedly mounted on one side of the two side plates (1) close to each other, and the corresponding support rods (11) on the two side plates (1) are designed to be staggered; A connecting seat (12) is slidably mounted on the two corresponding support rods (11), an adjusting hole (14) is provided in the middle of the connecting seat (12), and the adjusting hole (14) is located between the two support rods (11); An adjustment rod (13) is installed in the gap between the two side plates (1); the adjustment rod (13) is arranged parallel to the side plates (1); the adjustment rod (13) extends into the adjustment hole (14); and the adjustment rod (13) and the support rod (11) are both connected by friction transmission.
2. A roofing layer separation seam reservation device according to claim 1, characterized in that: An insert ring (2) is fixedly mounted on the adjusting rod (13); the insert ring (2) is a circular ring-shaped structure; the insert ring (2) is provided with evenly distributed insert holes (21) in the circumferential direction; and the insert holes (21) are stepped in the depth direction.
3. A roofing layer separation seam reservation device according to claim 2, characterized in that: Both ends of the adjusting rod (13) are provided with connecting grooves (22); one end of the adjusting rod (13) is sleeved with a connecting ring (23); the connecting ring (23) extends into the connecting groove (22); the length of the connecting ring (23) is less than the length of the connecting groove (22); and the connecting ring (23) is used to connect two adjacent filling bodies.
4. A roofing layer separation seam reservation device according to claim 3, characterized in that: The filling body further comprises an adsorption plate (24) and a desorption tube (25); the adsorption plate (24) is fixedly mounted on the connection seat (12); the desorption tube (25) is fixedly mounted on the adsorption plate (24); and the desorption tube (25) is in a closed state in an initial state.
5. A roofing layer separation seam reservation device according to claim 4, characterized in that: A piston (26) is elastically mounted in the desorption tube (25) by means of a spring, a pull rope (27) is fixedly mounted on the piston (26), the pull rope (27) extends to the outside through the opening of the desorption tube (25), a round ball (28) is fixedly mounted on one end of the pull rope (27) away from the desorption tube (25), and the diameter of the round ball (28) is larger than the diameter of the opening of the desorption tube (25).
6. A roofing layer separation seam reservation device according to claim 5, characterized in that: The inner cavity of the desorption tube (25) is designed in a step-shaped manner, and in an initial state, the piston (26) extends to the junction of the desorption tube (25) and the adsorption disk (24).
7. A roofing layer separation seam reservation device according to claim 6, characterized in that: A membrane plate (3) is installed at the top end of the side plate (1), an extension membrane (31) is installed on the membrane plate (3), a hook nail (32) is fixedly installed at the bottom end of the side plate (1), and the end of the extension membrane (31) bypasses the outer wall of the side plate (1) and extends to the hook nail (32).
8. A roofing layer separation seam reservation device according to claim 7, characterized in that: The membrane plate (3) is provided with a receiving groove (33), the extension membrane (31) is wound in the receiving groove (33), a symmetrically designed elastic pad (34) is fixedly installed at the opening of the receiving groove (33), and the end of the extension membrane (31) extends from the gap of the elastic pad (34) to the outside of the membrane plate (3).
9. A roofing layer separation seam reservation device according to claim 8, characterized in that: A first clamping block (4) and a second clamping block (41) are fixedly mounted on the side plate (1) and the connecting seat (12) respectively. A clamping groove (42) is provided on the membrane plate (3). The interior of the clamping groove (42) is made of elastic material. The clamping groove (42) cooperates with the first clamping block (4) and the second clamping block (41).
10. A construction method for reserving a roofing layer separation seam, characterized in that: The construction method adopts a roofing layer separation seam reservation device according to claim 9, and the method comprises the following steps: S1. Measurement and planning: After the waterproof layer is constructed, the staff will measure the area of the waterproof layer and plan the location and size of the separation joint according to the process requirements; S2. Base fixing: Use concrete to base on both sides of the planned separation joint, and press and adsorb multiple filling bodies one by one to fix them within the separation joint range, and connect the two adjacent filling bodies end to end; S3, width adjustment: the staff inserts the crowbar into the insertion hole (21), drives the adjustment rod (13) to rotate, and then adjusts the width of the filling body. After the width of the filling body is consistent with the planned separation gap width, the membrane plate (3) is combined with the second clamping block (41); S4, pouring and shaping: install the mesh and pour concrete according to the planned protective layer position, and the protective layer will be formed after shaping; S5, demoulding and grouting: manually move the membrane plate (3), and use the crowbar to drive the adjusting rod (13) to rotate again, so that the width of the filling body is reduced, and then the filling body is taken out, and the gap is grouted and cured with sealing material to complete the construction of the separation joint.