Underground coal mine broken roof roadway anchor hanging beam supporting structure and method
Through the anchor and hanging beam support structure, the combined conduction force of anchor cable B and hanging beam C is used to solve the problems of low support strength and high cost of broken roof rails in large sections, and safe and reliable roof support is achieved, which simplifies the The construction process improves efficiency and safety.
Patent Information
- Application Number
- CN202411283087.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-11-26
AI Technical Summary
The existing Jinggong coal mine roof support technology has low support strength, high cost, complicated processes and great safety hazards in large-section and ultra-large-section broken roof rails, making it difficult to meet the support requirements of super-large-scale mines and complex geological conditions.
The anchor lifting beam support structure is adopted, and the anchor cable B passes through the hanging beam C through the anchor cable B. The anchor cable B is fixed to the top bedrock. The anchor cable B and the hanging beam C are combined through the lock D. The tension force of the anchor cable B is transmitted as The support force of the hanging beam C realizes effective support for the broken roof panel, simplifies the construction process, and improves the support strength.
It significantly improves the support strength of the roof, reduces material and labor costs, simplifies the construction process, improves construction efficiency, reduces safety hazards, and meets the support needs of broken roofs on large sections.
Smart Images

Figure CN119021731A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a coal mine roof support technology, in particular to an anchor beam support structure and method for a broken roof tunnel of an underground coal mine. Background Art
[0002] At present, in the tunneling construction of coal seam tunnels and tunnels in large-scale underground coal mines, the tunnel support of large-section broken roof is supported by anchor support + steel frame support. For large-scale comprehensive mechanized coal mining working faces, such as installation of cut-eyes, the combined support method of anchor support + steel frame support + point column or wood pile is adopted. The existing tunnel support is generally completed in three stages. The first stage: when the tunnel is excavated, the excavated tunnel is anchored and supported, that is, the round steel anchor rod with a length of L = 2.4m and Φ = 20mm is used to support the roof for the first time with steel wire warp and weft nets. The second stage: U-shaped or I-shaped steel is used to set up an arched or rectangular frame at the rear of the excavation construction. The third stage: when installing the cut-eye tunnel with a super-large section, hydraulic single point columns or wood piles are added under the rectangular steel frame. The above support technologies are discussed in "Mining Engineering" and "Coal Mine Shaft and Tunnel Engineering" published by China University of Mining and Technology Press.
[0003] With the improvement of single wellhead production capacity and well type scale of coal mines, the increase of mining area width and stratum depth, the following problems are gradually exposed in anchor support + steel frame shed combined support, anchor support + steel frame shed support + point column or wood pile combined support. First, the support strength is low and cannot meet the safety requirements of roof support. Especially for coal seam tunnels with large and super-large cross-sections and broken roofs, the support effect of anchoring is greatly reduced. The large-span steel frame shed is in a passive support state due to its low support force on the roof. At the same time, it is easy to cause horizontal bending deformation and lose its support function under the pressure of the roof. Therefore, it is necessary to add hydraulic point columns or wood piles under the beam to strengthen the support. Second, the material and construction cost investment is large. In order to ensure the safety of roof support and protect the lives of employees, it is necessary to increase the support density of anchoring and frame sheds. In addition, the cost of support materials has increased significantly due to the installation of special support of point columns and wood piles, which has also brought about a significant increase in the cost of material transportation and labor input. Third, the process is complicated, the safety hazards increase, the construction period is extended, and the efficiency is low. Since two or more support methods are required for the tunnel roof, the safety hazards of construction in the relatively narrow and closed space underground are greatly increased. The increase in construction processes also leads to low efficiency and extended construction period, which has a direct impact on production benefits. Fourth, anchor support + steel frame support, anchor support + steel frame support + point column or wood pile support have high requirements for tunnel roof conditions and low adaptability. For well scale and tunnel section with small size, good roof lithology, or well scale and tunnel section with large size but good tunnel roof integrity, the existing technology can fully meet the support requirements. However, with the improvement of my country's coal mining technology, the planning and construction of mining areas with deep burial, complex geological structure and poor coal seam roof conditions have been completed. In mining practice, it is revealed that the anchor support + steel frame joint support technology is difficult to meet the safety of super-large-scale mines and super-large-section coal seam tunnel roof support. Therefore, it is particularly urgent to adopt a safe and reliable construction process for roof support and a fast and efficient technical solution for coal seam tunnel roof support in the construction of tunnels with super-large cross-sections and relatively broken roofs in large-scale comprehensive mechanized coal mining faces.
[0004] The technical support scheme for large-section broken roof tunnels in underground coal mines should solve the following three problems. First, simplify and reduce the support procedures, and transform the existing multiple combined support methods of anchoring + steel frame shed or anchoring + steel frame shed + point column or wood pile into a single support method; second, seek a new type of anchoring material to replace the existing round steel anchor rod support strength that does not meet the roof safety requirements, and solve the safety hazards of anchoring to the old top bedrock due to insufficient length, causing the upper anchor end face of the roof to delaminate and sink, and the round steel anchor rod's breaking force is small and easy to break due to the pressure of the roof. Third, change the force form of the steel frame shed beam on the roof support, change the passive support of the leg support to the active support without leg support, and at the same time take technical measures to greatly improve the load resistance of the steel beam, cancel the special support of hydraulic point column or wood pile, and create a more complete safe space environment for construction. Summary of the invention
[0005] The purpose of the present invention is to provide an anchor beam support structure for a broken roof tunnel in an underground coal mine, which can safely, reliably and effectively support the broken roof, especially the large-section broken roof, and has a simple structure and convenient construction, reduces material and labor costs, and significantly improves the roof support strength.
[0006] The purpose of the present invention is achieved through the following technical solutions.
[0007] Anchor beam support structure of broken roof tunnel in underground coal mine, anchor cable B passes through beam C and direct roof, and its upper anchoring section is fixed to basic roof by anchoring agent A; the tensioned anchor cable B extends out of the lower end of beam C to fix anchor cable lock D; anchoring agent A and the upper anchoring section of anchor cable B constitute the anchoring part, the anchor cable below the anchoring section of anchor cable B to the lower plane of beam C constitutes the pulling part, the contact area between the upper plane of beam C and the lower plane of roof constitutes the supporting part, and the contact area between anchor cable lock D and the lower plane of beam C constitutes the locking part.
[0008] In the above-mentioned underground coal mine broken roof tunnel anchor beam support structure, a mesh plate, such as a wire mesh, is laid on the beam C, and the anchor cable B passes through the mesh plate.
[0009] In the above-mentioned underground coal mine broken roof tunnel anchor beam support structure, the anchor cable B is a steel twisted anchor cable with a length of 6-8m and a diameter of 22-26mm, and the anchoring section length is 1-2m.
[0010] In the above-mentioned underground coal mine broken roof tunnel anchor beam support structure, the tensioning force of each anchor cable B after tensioning is ≥20KN.
[0011] In the above-mentioned underground coal mine broken roof tunnel anchor beam support structure, there are multiple beams C, and multiple anchor cables B pass through each beam C. Two or more anchor cables B can be matched with one beam C. The row spacing between beams C is 2-3m.
[0012] In the above-mentioned underground coal mine broken roof tunnel anchor beam support structure, the beam C is in a plane, arc, semicircular or spherical shape. The beam C can be molded into different curved shapes according to the tunnel shape, including but not limited to a plane, arc, semicircular or spherical shape.
[0013] In the above-mentioned underground coal mine broken roof tunnel anchor beam support structure, the material of the beam C is metal, alloy or reinforced concrete.
[0014] In the above-mentioned underground coal mine broken roof tunnel anchor beam support structure, the beam C is made of H-shaped steel, U-shaped steel, W-shaped steel or Π-shaped steel.
[0015] The hanging beam C can be a combination of various shapes of hanging beams formed by combining single hanging beams. The plane combination form of the hanging beam C can be combined in various shapes according to the needs of the tunnel guide plate support, including but not limited to H shape, tic-tac-toe shape, ladder shape, and T shape.
[0016] In the above-mentioned underground coal mine broken roof tunnel anchor beam support structure, the material of the anchor cable B is metal, alloy, carbon fiber or synthetic material. The anchoring length of the anchor cable B can be adjusted according to actual needs.
[0017] The present invention also provides a method for supporting an anchor beam in a broken roof tunnel of an underground coal mine. The method has a simple and easy construction process, high operating efficiency, reduced material and labor costs, and can safely and effectively support a broken roof, especially a large-section broken roof.
[0018] The anchor beam support method for the broken roof of an underground coal mine of the present invention is as follows: the upper anchoring section of the anchor cable B is anchored in the bedrock of the basic roof of the tunnel through the anchoring agent A, and the lower end of the tensioned anchor cable B passes through the hanging beam C and is connected with the anchor cable lock D; during the process of supporting the roof of the tunnel, the anchor cable B and the hanging beam C complete the interaction and mutual conversion between the anchoring force of the anchor cable B and the supporting force of the hanging beam C. The lower end of the anchor cable B is connected to the hanging beam C through the anchor cable lock D; the combination of the anchor cable B and the hanging beam C enables the supporting force of the hanging beam C to actively act on the roof, thereby improving the complete effect of the hanging beam C on the support of the tunnel roof.
[0019] In the above-mentioned anchor beam support method for broken roof tunnels in underground coal mines, the anchoring agent A controls the anchoring force and working state of the anchor cable B; the anchor cable B controls the supporting force and working state of the hanging beam C; and the anchor cable lock D controls the bonding strength between the anchor cable B and the hanging beam C.
[0020] In the above-mentioned method for anchoring and hanging beams to support broken roof tunnels in underground coal mines, with the assistance of anchoring agent A and anchor lock D, anchor B completely changes the relationship between the interaction force between hanging beam C and the tunnel roof and the stress state of hanging beam C; anchor B generates a huge anchoring force through the tensioning of an external hydraulic tensioner, and the anchoring force of anchor B is transmitted to hanging beam C through the locking and transmission of anchor lock D, and hanging beam C forms a supporting force to act on the tunnel roof; when hanging beam C generates pressure on the tunnel roof, it is also transmitted to anchor B through anchor lock D, converted into a pulling force of anchor B on hanging beam C, thereby maintaining the effective support of hanging beam C on the tunnel roof.
[0021] The anchoring agent A and the anchor cable B are combined to fix the anchor cable B in the old stable bedrock above the broken roof. The anchor cable B and the hanging beam C are combined through the anchor cable lock D so that the anchoring force generated by the external tensioning of the anchor cable B is transmitted and converted into the supporting force of the hanging beam C on the roof.
[0022] The above-mentioned anchor beam support method for the broken roof roadway of the underground coal mine is that the working face is installed with a cut-out, which is 240m long and 12m wide. The height of the broken roof of the coal rock layer is 6.5m. A steel twisted anchor cable with a length of L=8.0m and a diameter of Φ=24.5mm is selected. The hanging beam is a 20# steel beam with a length of 6.0m. Each hanging beam is arranged with 5 perforations, and the perforations at both ends are 0.3m away from the end face of the hanging beam, and the center distance between two adjacent perforations is 1.35m. Through the anchor The combination of cable B and anchor A anchors cable B in the old top bedrock on the upper part of the broken roof; every 5 steel twisted anchor cables and a suspension beam form an anchor suspension beam unit; 2 suspension beams are arranged end to end in the width direction of the cut eye, and the spacing of the anchor suspension beam units in the length direction of the cut eye is 2.6m. The upper anchoring length of each steel twisted anchor cable is 1.2m, and the tension force is ≥25KN; a steel wire warp and weft mesh is laid on each suspension beam and the joint is compressed by 0.2m to protect the top.
[0023] The above-mentioned anchor-beam support method for the broken roof tunnel of the underground coal mine supports the broken roof of the fault of the main water tank tunnel. The cross-section of the main water tank is 3.0m wide and 3.5m high, with a normal fault with a drop of H=4.5m and a semicircular arch roof. The anchor cable B has a length of L=6.5m, an anchoring length of 1.5m, and a diameter of Φ=24.5mm. The beam C is selected to have a length of L=4.5m, a width of H=0.2m, and a thickness of 0.05m. The beam C is molded into a semicircular arch with a diameter of R=3m according to the semicircular arch roof of the tunnel; the anchor-beam unit is composed of 4 anchor cables B and one beam C; the hole spacing of the anchor cable B passing through the beam C is 1.3m, and the distance between the side holes and the two end faces of the beam C is 0.3m; the anchor-beam unit spacing is 2m, and after accumulating the construction of multiple anchor-beam units, they are sealed with sprayed concrete mortar.
[0024] The above-mentioned anchor beam support method for the broken roof of the underground coal mine roadway supports the broken roof of the return air roadway in the syncline geological structure zone. The cross section of the return air roadway is 5.4m wide and 3.5m high, the coal thickness of the syncline axis structural zone is 4.0-5.5m, the direct roof thickness is 2.0-3.0m, the anchor cable B length L = 7.5m, Φ = 24.5mm, the beam C length L = 5.4m, the model is 11# H steel frame; 4 anchor cables B and a suspension beam C are combined to form an anchor suspension beam unit. Each suspension beam C has 4 through holes, and the center distance of the through holes is 1.6m. The two through holes close to the two ends of the suspension beam C are 0.3m away from the two end surfaces of the suspension beam C. The anchoring length of the anchor A and the anchor cable B is 1.5m; the row spacing of the anchor suspension beam unit is 2.0m, and a steel wire warp and weft grid is laid on the suspension beam; the tensioning force of the hydraulic tensioner on each anchor cable B is ≥25KN.
[0025] Beneficial effects of the invention: This technical invention has the following innovations compared to the prior art solutions.
[0026] 1. Use anchoring agent A to greatly enhance the anchoring force and improve the support strength of the broken roof.
[0027] 2. Combining the hanging beam C with the anchor cable B can effectively support the large-section broken roof tunnel.
[0028] 3. The anchor beam technical solution of the present invention replaces the round steel anchor rod with a long steel twisted anchor cable, replaces the steel frame shed with a drilled hanging beam, and replaces the anchor + steel frame shed + point column or wood pile by combining the steel twisted anchor cable and the hanging beam. The anchoring agent A and the anchor cable B are combined to fix the anchor cable B in the old stable bedrock above the broken top plate. The anchor cable B and the hanging beam C are combined through the anchor cable lock D to convert the anchoring force generated by the external tension of the anchor cable B into the supporting force of the hanging beam C on the top plate.
[0029] The present technical invention has the following advantages over the prior art solutions.
[0030] 1. After the anchor A and anchor cable B are combined, the breaking strength of anchor cable B is more than twice that of the round steel anchor rod. Because anchor cable B is flexible and bendable, the length of anchor cable B can be extended and anchored into the old top bedrock. In addition, the huge anchoring force generated by the tensioning of anchor cable B is converted into a huge supporting force for the top plate, which significantly improves the support strength of the top plate.
[0031] 2. The combination of hanging beam C and anchor cable B simplifies the support of the excavation tunnel at one time, improves the efficiency of the construction process, and greatly increases the excavation speed.
[0032] 3. The combination of hanging beam C and anchor cable B enables the steel frame shed to achieve legless support, while also eliminating the large-section installation of cut-eye tunnel point columns and wood pile support, reducing the input of materials and transportation construction labor. According to on-site construction practice, the construction of a large-scale comprehensive mechanized working face to install a cut-eye tunnel can save more than 500,000 yuan in material and labor costs.
[0033] 4. The combination of hanging beam C and anchor cable B provides safe and reliable support for the tunnel, which solves the major safety hazards of roof collapse accidents in coal mine tunnel excavation and ensures the safety of workers' lives and enterprise property. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a schematic diagram of the technical solution of the present invention.
[0035] Figure 2 It is a plan view of an embodiment of the technical solution of the present invention.
[0036] Figure 3 yes Figure 2 HH cross-section diagram.
[0037] In the figure, anchor A, anchor cable B, hanging beam C, anchor cable lock D, reinforcement steel plate E, anchor cable perforation F, basic top (old top) bedrock (hard rock layer) 1, direct top 2, coal seam 3. DETAILED DESCRIPTION
[0038] The specific embodiments of the present invention are further described below according to the accompanying drawings:
[0039] The technical feature of the technical solution of the present invention is to combine the anchor cable B with the hanger beam C. With the assistance of the anchor agent A and the anchor cable lock D, the anchoring force generated by hydraulic tensioning when the anchor cable is not installed is transmitted to the hanger beam C through the anchor cable lock D to form a supporting force for the top plate, thereby achieving safe and effective support for the tunnel.
[0040] Example 1: Using Figure 1 The technical solution shown in the figure implements the long-span tunnel support
[0041] For the installation of cutting eye in the underground fully mechanized top coal caving working face of a coal mine in Shaanxi, the length is 240m, the width is 12m, the height of the coal rock layer broken roof is 3.5+3.0=6.5m, the steel strand anchor cable B with a length of L=8.0m and a diameter of Φ=24.5mm is selected, and the hanging beam C is a 20# steel beam with a length of 6.0m. Figure 2 , 3 , the hanging beam is arranged with 5 anchor cable holes F, the distance between the two end holes and the end face of the hanging beam is 0.3m, and the center distance between two adjacent holes is 1.35m. In order to ensure the strength of the drilling hole, the same wall thickness reinforcement steel plate E is used to weld and reinforce the two sides of the hanging beam and the lower plane with the drilling hole as the center, with a length of 0.3m. The anchor cable B is anchored in the old top bedrock on the upper part of the broken top plate by the combination of anchor cable B and drug roll anchor A. Every 5 steel twist anchor cables and a hanging beam form a group of support units. After modeling, analyzing and calculating the top plate, the anchor hanging beams are arranged end to end along the working face direction, with a row spacing of 2.6m, the upper anchor length of the steel twist anchor cable is 1.2m, and the tension force is ≥25KN. A steel wire warp and weft net is laid on each group of hanging beams and the joints are pressed 0.2m to protect the top. The installation cut is supported by anchor hanging beam support technology. After on-site setting and observation, the top plate does not delaminate and sink. Practice has proved that the anchor beam support technology can fully meet the support requirements of large-section broken roof tunnels.
[0042] Embodiment 2:
[0043] The anchor-beam support technology was used to achieve safe and effective support of the broken roof of the main water tank tunnel in a coal mine in Shaanxi.
[0044] The cross section of the water tank is 3.0*3.5m (width*height). During the construction process, a normal fault with a drop of H=4.5m was encountered, which caused great pressure in the roadway. The use of anchor rod + scaffolding support did not achieve good results, and the roadway deformation was large. According to the broken roof conditions on site, the anchor beam support technical solution was adopted. The length of anchor cable B is L=6.5m, the anchoring length is 1.5m, and the diameter is Φ=24.5mm. The beam C is selected as a W-shaped steel belt with a length of L=4.5m, a width of H=0.2m, and a thickness of 0.05m. According to the semi-circular arch roof of the roadway, the beam C is molded into a semi-circular arch with a diameter of R=3m. Each group of anchor beams consists of 4 anchor cables B and beams C. The hole spacing of anchor cable B passing through beam C is 1.3m, and the distance between the side hole and the two end faces of beam C is 0.3m. The spacing of anchor beams is 2m, and a total of 10 groups have been constructed. After construction, sprayed concrete mortar is used for sealing. After the construction was completed, observation points were set up and it was found that there was no obvious deformation in the tunnel of this geological structure zone and the support effect was good.
[0045] Embodiment 3:
[0046] The anchor-beam support technology was used to support the broken roof of the syncline geological structure zone of the return air tunnel of a coal mine working face in Shaanxi.
[0047] The design section of the return air lane is a 5.4m*3.5m (width*height) rectangular coal seam laneway with an average thickness of 6.0m. The coal thickness of the syncline axis structural zone is 4.0-5.5m, and the thickness of the direct roof is 2.0-3.0m. The roof is extremely broken due to the influence of the syncline, and the laneway is severely deformed due to high pressure. In view of the geological characteristics, an H steel frame with an anchor cable B length of L=7.5m, Φ=24.5mm, a hanging beam C length of L=5.4m, and a model of 11# is selected. Four anchor cables B are combined with a hanging beam C, with a perforation center distance of 1.6m, and the perforations at both ends are 0.3m from the two end faces of the hanging beam C. The anchoring length of the anchor A and the anchor cable B is 1.5m, the anchor hanging beam row spacing is 2.0m, and a steel wire latitude and longitude net is laid on the hanging beam. The tensioning force of the hydraulic tensioner on each anchor cable B is ≥25KN. After adopting the anchor-beam support technical solution, in a tunnel with a length of more than 150 meters affected by the geological structure of the syncline axis, roof separation observation instruments were installed at intervals of 10m in the middle of the tunnel. After observation, the maximum roof subsidence in the 40m length range before and after the syncline axis was 0.2m, and the roof subsidence in the remaining structurally affected areas was only between 0.05-0.1m. The anchor-beam support technical solution is completely effective for roof support in the syncline structure belt of the coal tunnel.
[0048] In short, the invention of the anchor beam support technical solution for large-section broken roof tunnels in underground coal mines has solved the major safety hazard problem that the support of large-section broken roof tunnels is difficult to ensure coal mine production safety, especially the personal safety of employees.
[0049] The protection scope of the present invention includes but is not limited to the above embodiments. The protection scope of the present invention shall be based on the claims. Any replacement, deformation, and improvement of the technology that can be easily thought of by technicians in this field shall fall within the protection scope of the present invention.
Claims
1. The anchor beam support structure of the broken roof tunnel in the underground coal mine is characterized by: The anchor cable B passes through the hanging beam C and the direct top, and its upper anchoring section is fixed to the basic top through the anchoring agent A; the tensioned anchor cable B extends out of the lower end of the hanging beam C to fix the anchor cable lock D; Anchor A and the upper anchoring section of anchor cable B constitute the anchoring part, the anchor cable below the anchoring section of anchor cable B to the lower plane of suspension beam C constitutes the lifting part, the contact area between the upper plane of suspension beam C and the lower plane of top plate constitutes the supporting part, and the contact area between anchor cable lock D and the lower plane of suspension beam C constitutes the locking part.
2. The anchor beam support structure for the broken roof tunnel of an underground coal mine as claimed in claim 1 is characterized by: A mesh plate is laid on the hanging beam C, and the anchor cable B passes through the mesh plate.
3. The anchor beam support structure for the broken roof tunnel of an underground coal mine as claimed in claim 1 is characterized by: Anchor cable B is a steel stranded anchor cable with a length of 6-8m and a diameter of 22-26mm, and an anchoring section length of 1-2m; The tensioning force of each anchor cable B after tensioning is ≥25KN.
4. The anchor beam support structure for the broken roof tunnel of an underground coal mine as claimed in claim 1 is characterized by: There are multiple hanging beams C, and multiple anchor cables B passing through each hanging beam C; The hanging beam C is in a plane shape, an arc shape, a semicircular shape or a spherical shape; the hanging beam C is made of H-shaped steel, round-shaped steel, W-shaped steel or Π-shaped steel.
5. The anchor beam support method for the broken roof tunnel of underground coal mine is characterized by: By adopting the anchor beam support structure for the broken roof tunnel of an underground coal mine as described in any one of claims 1 to 4, the upper anchoring section of the anchor cable B is anchored in the bedrock of the basic top of the tunnel by the anchoring agent A, and the lower end of the tensioned anchor cable B passes through the hanging beam C and is connected with the anchor cable lock D; during the process of supporting the tunnel roof, the anchor cable B and the hanging beam C complete the interaction and mutual conversion between the anchoring force of the anchor cable B and the supporting force of the hanging beam C.
6. The anchor beam support method for broken roof tunnel in underground coal mine as claimed in claim 5, characterized in that: Anchor A controls the anchoring force and working status of anchor cable B; anchor cable B controls the supporting force and working status of hanging beam C; anchor cable lock D controls the bonding strength between anchor cable B and hanging beam C.
7. The anchor beam support method for broken roof tunnel in underground coal mine as claimed in claim 5, characterized in that: With the assistance of anchoring agent A and anchor lock D, anchor B completely changes the relationship between the interaction force between hanging beam C and the tunnel roof and the stress state of hanging beam C; anchor B generates huge anchoring force through the external hydraulic tensioner, and the anchoring force of anchor B is transmitted to hanging beam C through the locking and transmission of anchor lock D, and hanging beam C forms a supporting force acting on the tunnel roof; when hanging beam C generates pressure on the tunnel roof, it is also transmitted to anchor B through anchor lock D, and converted into a pulling force of anchor B on hanging beam C, thereby maintaining the effective support of hanging beam C on the tunnel roof.
8. The anchor beam support method for broken roof tunnel in underground coal mine as claimed in claim 5, characterized in that: The working face is installed with a cut-eye, which is 240m long and 12m wide. The height of the broken roof of the coal rock layer is 6.5m. A steel twisted anchor cable with a length of L=8.0m and a diameter of Φ=24.5mm is selected. The hanging beam is a 20# steel beam with a length of 6.0m. Five perforations are arranged on each hanging beam, and the perforations at both ends are 0.3m away from the end face of the hanging beam, and the center distance between two adjacent perforations is 1.35m. The anchor cable B is anchored in the old top bedrock on the upper part of the broken roof by the combination of anchor cable B and anchoring agent A. Every 5 steel twisted anchor cables and a hanging beam form an anchor hanging beam unit. Two hanging beams are arranged end to end in the direction of the width of the cut-eye, and the row spacing of the anchor hanging beam unit in the direction of the length of the cut-eye is 2.6m. The upper anchoring length of each steel twisted anchor cable is 1.2m, and the tension force is ≥25KN. A steel wire warp and weft mesh is laid on each hanging beam and the joint is pressed 0.2m to protect the top.
9. The anchor beam support method for broken roof tunnel in underground coal mine as claimed in claim 5, characterized in that: The main water tank tunnel fault broken roof is supported. The cross-section of the main water tank is 3.0m wide and 3.5m high, with a normal fault of a height difference of H=4.5m and a semi-circular arch roof. The anchor cable B is L=6.5m long, 1.5m anchoring length, and Φ=24.5mm in diameter. The hanging beam C is selected as a W-shaped steel strip with a length of L=4.5m, a width of H=0.2m, and a thickness of 0.05m. The hanging beam C is molded into a semi-circular arch with a diameter of R=3m according to the semi-circular arch roof of the tunnel; the anchor hanging beam unit is composed of 4 anchor cables B and one hanging beam C; the hole spacing of the anchor cable B passing through the hanging beam C is 1.3m, and the distance between the side hole and the two end faces of the hanging beam C is 0.3m; the anchor hanging beam unit spacing is 2m, and after accumulating the construction of multiple anchor hanging beam units, the sprayed concrete mortar is used for sealing.
10. The anchor beam support method for broken roof tunnel in underground coal mine as claimed in claim 5, characterized in that: The broken roof of the return air tunnel in the syncline geological structure zone is supported. The cross-section of the return air tunnel is 5.4m wide and 3.5m high. The coal thickness of the syncline axis structural zone is 4.0-5.5m, the direct roof thickness is 2.0-3.0m, the anchor cable B is L=7.5m long, Φ=24.5mm, the hanging beam C is L=5.4m long, and the model is 11# H steel frame; 4 anchor cables B and a hanging beam C are combined to form an anchor hanging beam unit, each hanging beam C has 4 perforations, the center distance of the perforations is 1.6m, and the two perforations near the two ends of the hanging beam c are 0.3m away from the two end faces of the hanging beam C; the anchoring length of the anchor A and the anchor cable B is 1.5m; the anchor hanging beam unit spacing is 2.0m, and a steel wire warp and weft net is laid on the hanging beam; the tensioning force of the hydraulic tensioner on each anchor cable B is ≥25KN.