Liquid explosive deep hole blasting method
Through the deep hole blasting method of liquid explosives, the pump injection and exhaust pipes of liquid explosives are used to pump and charge liquid explosives, which solves the problem of discontinuous charge and time-consuming and labor-intensive charging of traditional drilling and blasting technology in traditional drilling and blasting technology, and realizes the problem of discontinuous charge and time-consuming and labor-intensive charging of artificial gun sticks. Efficient and safe ultra-deep holes and large-angle uphole holes blasting significantly improves the blasting effect and safety.
Patent Information
- Application Number
- CN202411236277.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-11-26
AI Technical Summary
When traditional drilling and blasting technology encounters ultra-deep holes or large angle tilt holes, the charge is discontinuous and cannot be loaded. The artificial cannon stick-type charge is time-consuming and labor-intensive, which violates the principle of safety and efficiency of energy development.
The deep hole blasting method of liquid explosive is used, and the injection tube and exhaust pipe with detonation cable are installed into the drill hole, and the pump injection of liquid explosive is used using a bag-type hole sealer and a mining injection pump. Achieve full mechanization continuous charge and detonate with detonation cable.
Improves the charging efficiency, significantly improves the blasting effect, reduces the probability of residual explosion, and realizes efficient charging of over 100 meters deep holes and large angle upward holes, and improves safety, suitable for directional drilling to accurately target rock formations blasting.
Smart Images

Figure CN119022739A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of engineering blasting, in particular to a liquid explosive deep hole blasting method. Background Art
[0002] With the increasing maturity of traditional drilling and blasting technology, drilling and blasting technology has gradually been promoted and applied in various fields, especially in energy development. The ultra-high pressure at the moment of explosive explosion can effectively fracture the target rock formation, which is a highly efficient physical modification method.
[0003] However, with the gradual depletion of shallow energy, the focus of energy development has gradually shifted to deep areas. The more complex mining environment has put forward higher requirements for drilling and blasting technology. Since most traditional blasting technologies use solid explosives or water gel columns, only manual cannon-stick charging methods can be used. When encountering ultra-deep holes or large-angle upward holes, there will be discontinuous charging and failure to load. Moreover, manual cannon-stick charging is time-consuming and labor-intensive, which is contrary to the principles of safe and efficient energy development. Summary of the invention
[0004] The purpose of the present invention is to solve the problems existing in the prior art:
[0005] When encountering ultra-deep holes or large-angle upward holes, traditional blasting technology will result in discontinuous charging and inability to load explosives, and manual blasting with sticks is time-consuming and labor-intensive.
[0006] A liquid explosive deep hole blasting method is proposed.
[0007] In order to achieve the above object, the present invention adopts the following technical solutions:
[0008] A liquid explosive deep hole blasting method comprises the following steps:
[0009] Step 1: Install the injection pipe and exhaust pipe with detonating cord into the drilled hole;
[0010] Step 2: Install the bag-type hole sealer into the drilled hole, then perform grouting to seal the hole, and wait for the cement slurry to completely solidify;
[0011] Step 3: Connect the air source to the exhaust pipe, blow air into the drilled hole, and drain the water in the hole through the injection pipe;
[0012] Step 4: connect the injection pipe to the liquid outlet of the mining injection pump, insert one end of the exhaust pipe into the empty container 2, connect the injection pump suction pipe to the container 2 filled with liquid explosives, connect the injection pump suction pipe to the gas source, pump liquid explosives into the borehole, and stop injecting after the exhaust pipe returns liquid;
[0013] Step 5: Connect and detonate the drilled holes after injection;
[0014] Step 6: Check whether the detonation is successful.
[0015] As a further technical solution of the present invention, in step one, a blasting stick should be used to check the quality of the drilled hole before charging. If a hole collapse occurs, charging will not be performed to avoid residual explosion.
[0016] As a further technical solution of the present invention, in step one, the inner diameter of the injection pipe must be smaller than the critical explosion diameter of the liquid explosive, and the inner diameter of the exhaust pipe is not less than 10 mm.
[0017] As a further technical solution of the present invention, in step one, the drilling is divided into two cases: an upward hole and a downward hole. The lengths and installation positions of the preset pipelines in the upward hole and the downward hole are different. In the upward hole case, the injection pipe can be passed through the sealing section of the drilled hole, and the exhaust pipe is installed to the bottom of the drilled hole. In the downward hole case, the injection pipe is installed to the bottom of the drilled hole, and the exhaust pipe can be passed through the sealing section of the drilled hole.
[0018] As a further technical solution of the present invention, in step 2, when installing the bag-type hole sealer, a distance of 50 cm must be reserved at the opening of the drilled hole.
[0019] As a further technical solution of the present invention, in step 4, the viscosity of the liquid explosive must not exceed 2000 MPa·s, and the bubble content inside the liquid explosive must not be less than 100 / ml.
[0020] As a further technical solution of the present invention, in step 4, the air source pressure used by the mining injection pump is in the range of 0.5 to 1.5 MPa.
[0021] As a further technical solution of the present invention, in step 4, the pumping rate of liquid explosives under the same conditions should be tested in advance, the charging amount should be calculated according to the borehole diameter and the charging length, and finally the time t required for charging should be calculated. During the charging process, relevant personnel must wait at a safe distance, and after waiting for time t, go to the charging location to observe the return of liquid in the exhaust pipe. If liquid returns, turn off the gas source to complete the injection. If liquid does not return, return to a safe position and wait for 5 to 10 minutes before checking the return of liquid again.
[0022] As a further technical solution of the present invention, in step four, after stopping the injection, use cable ties to seal the injection pipe and the exhaust pipe and plug them back into the reserved space at the borehole, and use gun mud to seal them.
[0023] As a further technical solution of the present invention, in step six, check whether the liquid explosive in the corresponding borehole is successfully detonated. If explosion refusal occurs, connect the exhaust pipe to the gas source, discharge the liquid explosive in the borehole through the injection pipe, and then connect the exhaust pipe to the pressurized water source to flush the residual liquid explosive in the borehole and discharge it through the injection pipe until all the water discharged from the injection pipe is clear water.
[0024] Beneficial effects of the present invention:
[0025] 1. The present invention uses a new type of low-viscosity liquid explosive to replace the solid explosive and water gel column in the traditional drilling and blasting technology. Due to the superior fluidity of the liquid explosive, it can be pumped with the help of an injection pump. The charging efficiency is greatly improved compared with the manual gun stick type, and full-coupled continuous charging can be easily achieved. The blasting effect is significantly improved while the probability of residual explosion is reduced. In addition, the present invention makes it possible to efficiently charge over 100-meter deep holes and large-angle upward holes, and can also cooperate with directional drilling to accurately blast the target rock formation.
[0026] 2. In terms of safety, liquid explosives have stable performance and low sensitivity, which is conducive to safe transportation and storage. During the charging process, the blasting container can be placed and filled with explosives after the workers evacuate, which is safer than traditional blasting technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 is a flow chart of the steps of the present invention;
[0028] Figure 2 It is a schematic diagram of the arrangement structure in the borehole in the case of an upward hole according to the present invention;
[0029] Figure 3 It is a schematic diagram of the arrangement structure inside the borehole in the case of a downward-looking borehole according to the present invention;
[0030] Figure 4 It is a schematic diagram of the connection between the injection pipe and the mining injection pump in the present invention.
[0031] In the figure: 1. injection pipe; 2. exhaust pipe; 3. injection direction; 4. exhaust direction; 5. detonating cord; 6. bag-type hole sealer; 7. cement slurry; 8. liquid explosive; 9. mining injection pump; 10. suction pipe; 11. container 2; 12. gas source; 13. liquid return direction; 14. rock layer; 15. borehole. DETAILED DESCRIPTION
[0032] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation mode, structure, characteristics and effects of the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments.
[0033] Reference Figure 1-Figure 4 , a liquid explosive deep hole blasting method, comprising the following steps:
[0034] Step 1: Use nails to poke 20 to 30 holes within 20 cm of one end of the injection pipe 1 and the exhaust pipe 2. Use waterproof tape to fix two coal mine safety detonating cords 5 on the injection pipe 1 and the exhaust pipe 2 respectively. The ends of the detonating cords 5 must be installed with moisture-proof rubber caps. Fix a mounting hook on the injection pipe 1 and the exhaust pipe 2 respectively. Use a gun stick to clamp the mounting hook and install the injection pipe 1 and the exhaust pipe 2 with the detonating cord 5 to the specified position in the drill hole 15. Then gently remove the gun stick, connect the gas source 12 to the injection pipe 1 and the exhaust pipe 2 respectively, remove impurities in the injection pipe 1 and the exhaust pipe 2, and ensure that the pipeline is unobstructed.
[0035] Step 2: Fix a mounting hook at the front end of the bag-type hole sealer 6, and use a gun stick to clamp the mounting hook to install the bag-type hole sealer 6 to the specified position. Ensure that the installation position is accurate to prevent the outlets of the injection pipe 1 and the exhaust pipe 2 in the borehole 15 from being buried in the sealing section. In addition, a distance of 50 cm needs to be reserved at the mouth of the borehole 15. Prepare cement slurry 7 at a water-cement ratio of 0.5:1, calculate the amount of sealing cement according to the size of the borehole 15 and the sealing length, use a grouting pump to grout and seal the borehole 15 until the cement usage meets the standard, and wait for the cement slurry 7 to completely solidify after the grouting is completed;
[0036] Step 3: Connect the exhaust pipe 2 to the gas source 12, insert the injection pipe 1 into a water container, open the pressure reducing valve of the gas source 12 to control the air pressure below 0.6MPa, and discharge the water in the borehole 15 through the injection pipe 1 until there is no water discharged from the injection pipe 1. Then keep the gas source 12 open for 3 to 5 minutes, drain the water in the injection pipe 1, and close the gas source 12;
[0037] Step 4, connect the injection pipe 1 to the liquid outlet of the mine injection pump 9, insert the end of the exhaust pipe 2 into the empty container 11, connect the suction pipe 10 of the mine injection pump 9 to the container 11 filled with liquid explosive 8, connect the mine injection pump 9 to the air source 12, control the air pressure through the air source 12 pressure reducing valve, start pumping liquid explosive 8, turn off the air source 12 after the exhaust pipe 2 has liquid return phenomenon, stop injection, use cable ties to seal the injection pipe 1 and the exhaust pipe 2 and plug them back to the reserved space at the mouth of the borehole 15, and use cannon mud to seal it;
[0038] Step 5: tie a digital detonator to the detonating cord 5 in the borehole 15, and detonate the borehole 15 (two detonating cords 5 in the hole are connected in series, and the detonating cords 5 between the holes are connected in parallel), thereby blasting the rock layer 14;
[0039] Step 6: Check whether the liquid explosive 8 in the corresponding borehole 15 is successfully detonated. If explosion refusal occurs, connect the exhaust pipe 2 to the gas source 12, discharge the liquid explosive 8 in the borehole 15 through the injection pipe 1, and then connect the exhaust pipe 2 to the pressurized water source to flush the residual liquid explosive 8 in the borehole 15 and discharge it through the injection pipe 1 until all the water discharged from the injection pipe 1 is clear water.
[0040] In step 1, before charging, the quality of the borehole 15 should be checked with a blasting stick. If a hole collapse occurs, charging is not performed to avoid residual explosion.
[0041] In step 1, the inner diameter of the injection pipe 1 must be smaller than the critical explosion diameter of the liquid explosive 8, and the inner diameter of the exhaust pipe 2 is not less than 10 mm.
[0042] In step one, the borehole 15 is divided into two cases: an upward borehole and a downward borehole. The lengths and installation positions of the preset pipelines in the two cases are different. In the upward borehole case, the injection pipe 1 is passed through the sealing section of the borehole 15, and the exhaust pipe 2 is installed to the bottom of the borehole 15. In the downward borehole case, the injection pipe 1 is installed to the bottom of the borehole 15, and the exhaust pipe 2 is passed through the sealing section of the borehole 15.
[0043] In step 4, the viscosity of the liquid explosive 8 must not exceed 2000 MPa·s, and the bubble content inside the liquid explosive 8 must not be less than 100 / ml.
[0044] In step 4, the pressure of the gas source 12 used by the mining injection pump 9 is within the range of 0.5 to 1.5 MPa.
[0045] In step 4, the pumping rate of the liquid explosive 8 under the same conditions should be tested in advance, the charge amount should be calculated according to the diameter of the borehole 15 and the charge length, and finally the time t required for charging should be calculated. During the charging process, relevant personnel should wait at a safe distance. After waiting for time t, they should go to the charging location to observe the return of liquid from the exhaust pipe 2. If liquid returns, close the gas source 12 to complete the injection. If liquid does not return, return to a safe position and wait for 5 to 10 minutes before checking the return of liquid again.
[0046] When the present invention is used, the traditional manual stick-type charging is changed into a fully mechanized pump-type charging by means of the superior fluidity of the new low-viscosity liquid explosive 8. An injection pipe 4 and an exhaust pipe 2 with a detonating cord 5 are pre-buried inside the borehole 15. After the borehole 15 is sealed, a mining injection pump 9 is used to connect a container 11 filled with liquid explosive 8 and an air source 12. The charging section of the borehole 15 is efficiently injected through the injection pipe 1. During the injection, relevant personnel can wait at a safe distance. Compared with the traditional charging method, it is safer. After waiting for a corresponding period of time, the exhaust pipe 2 has liquid return, that is, the injection is completed, and the detonating cord 5 in the hole is connected and detonated. The pump-injected charging can better realize full-coupled continuous charging, with good blasting effect and low probability of residual explosion.
[0047] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A liquid explosive deep hole blasting method, characterized in that: The following steps are involved: Step 1: Install the injection pipe (1) and the exhaust pipe (2) with the detonating cord (5) into the drilled hole (15); Step 2: Install the bag-type hole sealer (6) into the drilled hole (15), then perform grouting to seal the hole, and wait for the cement slurry (7) to completely solidify; Step 3: connect the air source (12) to the exhaust pipe (2), blow air into the drilled hole (15), and drain the water in the hole through the injection pipe (1); Step 4: connect the injection pipe (1) to the liquid outlet of the mining injection pump (9), insert one end of the exhaust pipe (2) into the empty container (11), connect the suction pipe (10) of the injection pump (9) to the container (11) filled with liquid explosive (8), connect the suction pipe (10) of the injection pump (9) to the gas source (12), and pump the liquid explosive (8) into the borehole (15). Stop the injection after the exhaust pipe (2) returns liquid. Step 5, connecting and detonating the drilled hole (15) after the injection; Step 6: Check whether the detonation is successful.
2. A liquid explosive deep hole blasting method according to claim 1, characterized in that: In step 1, before charging, the quality of the borehole (15) should be checked using a blasting rod. If a hole collapse phenomenon occurs, charging is not performed to avoid residual explosion.
3. A liquid explosive deep hole blasting method according to claim 1, characterized in that: In step 1, the inner diameter of the injection pipe (1) must be smaller than the critical explosion diameter of the liquid explosive (8), and the inner diameter of the exhaust pipe (2) must not be less than 10 mm.
4. A liquid explosive deep hole blasting method according to claim 1, characterized in that: In step 1, the borehole (15) is divided into two cases: an upward borehole and a downward borehole. The lengths and installation positions of the preset pipelines in the upward borehole and the downward borehole are different. In the upward borehole case, the injection pipe (1) can be passed through the sealing section of the borehole (15), and the exhaust pipe (2) is installed to the bottom of the borehole (15). In the downward borehole case, the injection pipe (1) is installed to the bottom of the borehole (15), and the exhaust pipe (2) is passed through the sealing section of the borehole (15).
5. A liquid explosive deep hole blasting method according to claim 1, characterized in that: In step 2, when installing the bag-type hole sealer (6), a distance of 50 cm must be reserved at the opening of the drilled hole (15).
6. A liquid explosive deep hole blasting method according to claim 1, characterized in that: In step 4, the viscosity of the liquid explosive (8) must not exceed 2000 MPa·s, and the bubble content inside the liquid explosive (8) must not be less than 100 bubbles / ml.
7. A liquid explosive deep hole blasting method according to claim 1, characterized in that: In step 4, the pressure of the gas source (12) used by the mining injection pump (9) is within the range of 0.5 to 1.5 MPa.
8. A liquid explosive deep hole blasting method according to claim 1, characterized in that: In step 4, the pumping rate of the liquid explosive (8) under the same conditions should be tested in advance, the charge amount should be calculated according to the diameter of the borehole (15) and the charge length, and finally the time t required for charging should be calculated. During the charging process, the relevant personnel should wait at a safe distance. After the waiting time t, they should go to the charging location to observe the return of liquid from the exhaust pipe (2). If liquid returns, the gas source (12) should be closed to complete the injection. If liquid does not return, they should return to a safe location and wait for 5 to 10 minutes before checking the return of liquid again.
9. A liquid explosive deep hole blasting method according to claim 8, characterized in that: In step 4, after stopping the injection, the injection pipe (1) and the exhaust pipe (2) are sealed with a cable tie and plugged back into the reserved space at the opening of the drill hole (15), and then sealed with cannon mud.
10. A liquid explosive deep hole blasting method according to claim 1, characterized in that: In step six, it is checked whether the liquid explosive (8) in the corresponding borehole (15) is successfully detonated. If detonation refusal occurs, the exhaust pipe (2) is connected to the gas source (12), and the liquid explosive (8) in the borehole (15) is discharged through the injection pipe (1). Then, the exhaust pipe (2) is connected to a pressurized water source, and the liquid explosive (8) remaining in the borehole (15) is flushed and discharged through the injection pipe (1), until all the water discharged from the injection pipe (1) is clear water.
Citation Information
Patent Citations
Coal-rock blasting pre-splitting method and device based on packing blasting of liquid explosive in long hole
CN108253849A
Deep hole blasting charging hole sealing device and using method thereof
CN111322919A
Blasting hole sealing method
CN112665473A
Deep hole blasting residual explosion treatment method based on liquid explosive
CN114440718A
Downward fully-mechanized excavation hard rock roadway advance deep hole liquid explosion fracturing structure and method thereof
CN116123951A