Observation monitoring method and system for high-position natural slope and unfavorable geological body in dam area

By constructing an automated monitoring system with wireless acquisition terminals and gateways, the problem of manual monitoring of high-altitude natural slopes and adverse geological bodies has been solved, achieving efficient, safe, and low-cost monitoring during the construction period and improving the level of automation and intelligence in monitoring.

CN119031337APending Publication Date: 2024-11-26CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410961339.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

Manual monitoring of high-altitude natural slopes and adverse geological bodies is labor-intensive and dangerous. Existing technologies are difficult to automate, and are costly and unreliable.

Method used

An automated monitoring system is built using wireless acquisition terminals and wireless gateways. Data is transmitted wirelessly via 4G, and combined with low-power devices and solar power, it enables remote transmission and centralized processing of monitoring data.

Benefits of technology

High-frequency, high-precision automated monitoring can be achieved during the construction period, reducing safety risks and labor costs, and improving the level of intelligent monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119031337A_ABST
    Figure CN119031337A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of high-position natural slope and unfavorable geologic body monitoring, and particularly discloses an internal observation monitoring method and system for a high-position natural slope and an unfavorable geologic body in a dam area. The monitoring method comprises the following steps: determining the arrangement position of a monitoring station and installing the monitoring station on site according to the distribution condition of monitoring instruments on a high-position natural slope and an unfavorable geologic body of a dam area; determining the number of the wireless acquisition terminals in each monitoring station and the accessed monitoring instruments, and additionally installing the required wireless acquisition terminals on the vertical rod type monitoring station; in combination with the distribution of communication facilities in a site hub area and the coverage range of the wireless gateways, the wireless gateways are installed at the positions adjacent to the communication facilities in the hub area; through the monitoring data acquisition and analysis system, an automatic telemetering instruction is sent to the wireless gateway and the wireless acquisition terminal equipment, and the operation state and the safety state of the high-position natural slope and the unfavorable geologic body are timely and visually mastered. The manual observation cost is reduced, and the automation and intelligence level of monitoring is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of monitoring high-position natural slopes and unfavorable geological bodies, and in particular to a method and system for visually monitoring high-position natural slopes and unfavorable geological bodies in a dam area. Background Art

[0002] The high natural slope in the dam area refers to the natural slope located above the engineering slope in the hub area. The unfavorable geological bodies mainly include landslides and dangerous rock masses. The main engineering geological problems of high natural slopes include: blocks, potentially unstable dumping rock masses, deformed bodies, local cover layer forward slopes, accumulation bodies, dangerous rocks or floating stones on the slope surface, etc. The above geological problems are "hanging" above the hub buildings. Under the action of natural factors (such as rainfall, progressive weathering, earthquakes, etc.), they may become unstable and form high-level slides, which will threaten the safety of personnel, equipment and buildings during the construction and operation periods of the hub area. In addition, the unfavorable geological bodies in the hub area (such as landslides and dangerous rock masses) are often less stable and have greater risks. Once they become unstable, they may cause heavy casualties, equipment damage and huge economic losses, posing a huge threat to the safety of the entire project.

[0003] In order to understand and grasp the operation and safety status of high-level natural slopes and unfavorable geological bodies, different types of internal observation monitoring facilities (mainly including: multi-point displacement meters, crack meters, piezometers, anchor stress meters and anchor cable dynamometers, etc.) are usually installed during the construction period. The reading instrument is mainly carried to the high-level natural slopes and unfavorable geological bodies in the dam area by manual methods. The original data of the monitoring instrument (such as frequency and resistance ratio) are read one by one by using the reading instrument. The original data read manually are recorded in the observation record table on site. After returning to the camp, the manual original data are entered into the computer and the direct physical quantities (such as rock deformation, crack opening, leakage, seepage pressure and water level, anchor stress and anchor cable anchoring force, etc.) are obtained through calculation. In this process, the method of manual inspection is supplemented to understand whether there are cracks, settlement changes, water outcropping, etc. in the high-level natural slopes and unfavorable geological bodies. Through the above-mentioned manual observation and inspection methods, the operation and safety status of high-level natural slopes and unfavorable geological bodies can be understood.

[0004] However, the high natural slope is located above the high and steep engineering slope, the terrain is steep and rugged, the manual climbing distance is long and difficult, there are no manual observation paths in many places, the measuring points are extremely scattered, the workload of manual observation is huge, there are also local stability problems such as blocks, potentially unstable dumping rock masses, deformed bodies, local cover gentle slopes, and accumulation bodies, and manual observation is extremely dangerous; unfavorable geological bodies often have a high degree of development of topography, geological environment and unfavorable geological phenomena, steep slopes, densely distributed surface cracks, scattered throughout the hub area, and monitoring instruments are also very scattered. The on-site climbing distance is long and difficult, manual observation is difficult and the workload is large, and the on-site work is highly dangerous.

[0005] In order to solve the problems of difficulty, huge workload and high risk of manual observation of high natural slopes and bad geological bodies in the prior art, it is necessary to establish an automated monitoring system for high natural slopes and bad geological bodies. The traditional method is to centrally pull the monitoring instruments of high natural slopes and bad geological bodies to the nearest monitoring station with communication cables, install data acquisition devices in the monitoring station, use 220V AC to power them, and lay optical cables between the monitoring station and the monitoring management center station to transmit the monitoring data to the monitoring management center station. However, this method is difficult to implement and has low reliability. High natural slopes and bad geological bodies are generally steep and scattered, and it is difficult to achieve stable power supply in these parts. More importantly, during the construction period, the civil construction working surface is not stable, it is difficult to lay optical cables or the optical cables are easily damaged, and reliable communication cannot be achieved; not only that, this method is costly, the monitoring instruments are scattered, and a large number of optical cables need to be laid in a harsh terrain environment. The optical cables are mostly bent and bypassed, the investment of optical cables is large, the on-site protection and manual maintenance are difficult, the labor cost is high, and the economy is poor. Summary of the invention

[0006] The purpose of the present invention is to provide a method and system for in-body visual monitoring of high natural slopes and poor geological bodies in dam areas, to realize the automated monitoring of in-body visual monitoring facilities of high natural slopes and poor geological bodies in advance during the construction period, to solve the technical problem that it is difficult to realize full-life cycle in-body visual automated monitoring in high-risk and remote areas, to avoid the safety risks of on-site manual observation and maintenance, to reduce the cost of manual observation and maintenance, and to greatly improve the automation and intelligence level of in-body visual monitoring of high natural slopes and poor geological bodies.

[0007] To achieve the above purpose, the present invention has developed a method for in-situ monitoring of high-position natural slopes and unfavorable geological bodies in dam areas, which is particularly characterized in that it includes the following steps:

[0008] According to the distribution of monitoring instruments for artificial observation of high natural slopes and unfavorable geological bodies in the dam area, determine the location of the monitoring station and install the monitoring station on site, then determine the monitoring instruments connected to the monitoring station and centrally pull the monitoring instruments to the nearest monitoring station via communication cables;

[0009] According to the total number of monitoring instruments and instruments connected to each monitoring station, combined with the number of channels of the wireless acquisition terminal, the configuration of the wireless acquisition terminal in each monitoring station is determined, and the required wireless acquisition terminal is installed on the monitoring station to form a wireless acquisition terminal monitoring station for high-position natural slopes and unfavorable geological bodies;

[0010] According to the distribution of the built wireless acquisition terminal monitoring stations and the distribution of the on-site hub area communication facilities, choose to install the wireless gateway at a location close to the hub area communication facilities;

[0011] The monitoring and management center station sends automated telemetry commands to the wireless gateway and wireless acquisition terminal equipment. The wireless acquisition terminal controls the sensor to obtain raw data. The raw data is transmitted from the wireless acquisition terminal to the wireless gateway and enters the monitoring and management center station by using long-distance wireless communication methods and the time required by the command, so as to intuitively grasp the operating status and safety status of the high natural slopes and unfavorable geological bodies in the dam area.

[0012] As a preferred solution, the original data enters the monitoring and management center station directly through the wireless gateway and through 4G wireless methods, or enters the hub area communication facilities through the wireless gateway and finally enters the monitoring and management center station through communication optical fiber transmission.

[0013] As the preferred solution, during the construction period, 4G wireless communication and data transmission are adopted; when the on-site civil construction environment gradually stabilizes or is in operation, the communication equipment of the wireless gateway is connected to the communication facilities in the hub area through a network cable, and the communication facilities in the hub area are used for relaying, and finally the communication channel is established using communication optical fiber to realize data transmission.

[0014] As a preferred solution, multiple monitoring stations including wireless acquisition terminals are respectively set up in high natural slopes and unfavorable geological bodies.

[0015] As a preferred solution, when determining the number of different wireless acquisition terminals in each monitoring station, it is necessary to satisfy that the sum of (the i-th wireless acquisition terminal × the number of channels of the i-th wireless acquisition terminal) is not less than the total number of single measuring points connected to the monitoring instrument of the monitoring station, where i=1~N, and N is a positive integer.

[0016] As the preferred solution, the wireless gateway is powered by factory electricity, solar panels or batteries. The wireless gateway can cover more than 60,000 measurement points with a maximum coverage radius of 15km.

[0017] As a preferred solution, in the monitoring and management center station, the monitoring data acquisition and analysis system of the monitoring and management center station is used to convert the original data into direct physical quantities, and display them in the system through graphics and statistics through tables, so as to intuitively grasp the operating status and safety status of the high natural slopes and unfavorable geological bodies in the dam area.

[0018] As a preferred solution, the monitoring station adopts a micro-power consumption wireless acquisition terminal, and the micro-power consumption wireless acquisition terminal is powered by a self-contained replaceable battery.

[0019] As a preferred solution, a grounding point is set up near the monitoring station, steel bars are driven into the ground, and grounding wires are used to connect the steel bars. Shielded cables are used for cables connected to the monitoring station equipment, and the shielding layer is grounded.

[0020] The present invention also develops an in-depth monitoring system for high-position natural slopes and unfavorable geological bodies in dam areas, including a monitoring instrument layout module, a wireless acquisition terminal layout module, a wireless gateway layout module, and a data monitoring module.

[0021] The monitoring instrument layout module is used to determine the location of the monitoring station and install the monitoring station on site according to the distribution of monitoring instruments for artificial observation of high-position natural slopes and unfavorable geological bodies in the dam area, and then determine the monitoring instruments connected to the monitoring station, and centrally pull the monitoring instruments to the nearest monitoring station via communication cables;

[0022] The wireless acquisition terminal arrangement module is used to determine the configuration of the wireless acquisition terminal in each monitoring station according to all monitoring instruments and the number of instruments connected to each monitoring station, combined with the number of channels of the wireless acquisition terminal, and to install the required wireless acquisition terminal on the monitoring station to form a wireless acquisition terminal monitoring station for high-position natural slopes and poor geological bodies;

[0023] The wireless gateway placement module is used to select a location adjacent to the hub area communication facilities to install the wireless gateway based on the distribution of the built wireless acquisition terminal monitoring stations and the distribution of the hub area communication facilities on site;

[0024] The data monitoring module is used for the monitoring and management center station to issue automated telemetry instructions to the wireless gateway and wireless acquisition terminal equipment. The wireless acquisition terminal controls the sensor to obtain raw data. The raw data is transmitted from the wireless acquisition terminal to the wireless gateway and enters the monitoring and management center station by using long-distance wireless communication methods and the time required by the instructions, so as to intuitively grasp the operating status and safety status of the high-level natural slopes and unfavorable geological bodies in the dam area.

[0025] The advantages of the present invention are:

[0026] The method and system for internal visual monitoring of high natural slopes and poor geological bodies in dam areas provided by the present invention can, on the one hand, realize automatic monitoring of internal visual monitoring facilities of high natural slopes and poor geological bodies in dam areas as early as the construction period, so that the safety status of high natural slopes and poor geological bodies can be grasped at the beginning of the construction period when the safety risk is relatively high; on the other hand, it solves the technical problem that it is difficult to realize full-life cycle internal visual automatic monitoring in high-risk and remote areas, avoids the safety risks of manual observation, reduces the cost of manual observation and maintenance, and greatly improves the automation and intelligence level of internal visual monitoring of high natural slopes and poor geological bodies.

[0027] Different from conventional monitoring methods, the present invention can realize automated monitoring in advance during the construction period while ensuring high-frequency and high-precision monitoring, realize wireless communication between the wireless acquisition terminal and the wireless gateway, and greatly reduce safety risks and monitoring costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Attached Figure 1 It is a structural principle diagram of the present invention.

[0029] Attached Figure 2 It is a schematic diagram of the communication method of the present invention.

[0030] Description of reference numerals:

[0031] Monitoring station 1, wireless data collection terminal 1.1, steel bars 1.2, grounding wire 1.3, wireless gateway 2, solar panels 2.1, batteries 2.2, 4G communication module 2.3, hub area communication facilities 3, monitoring management center station 4, monitoring data collection and analysis system 4.1, communication optical fiber 5. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] The present invention provides a method for visually monitoring high natural slopes and unfavorable geological bodies in a dam area, comprising the following steps:

[0034] Step 1), according to the distribution of monitoring instruments for artificial observation of high natural slopes and unfavorable geological bodies in the dam area, in accordance with the principle of "comprehensive coverage, traction nearby, and concentration as much as possible", determine the location of the monitoring station and install the pole-type monitoring station 1 on site; determine the monitoring instruments connected to the monitoring station in accordance with the principle of "central traction nearby", and centrally pull the monitoring instruments to the nearest monitoring station 1 via communication cables (see Figure 1 and Figure 2 ); Figure 2 The dashed arrow lines represent wireless communication, and the solid arrow lines represent wired communication;

[0035] A grounding point is set near the monitoring station 1. A Φ36mm steel bar 1.2 is driven 2m underground and connected to the steel bar with a grounding wire (grounding copper tape) 1.3. The resistance of the grounding device is less than 10Ω. The cable connected to the equipment of the monitoring station 1 is a shielded cable, and the shielding layer is reliably grounded.

[0036] Step 2), according to all monitoring instruments and the number of instruments connected to each monitoring station 1, combined with the number of channels of the wireless acquisition terminal 1.1 (1 channel, 6 channels, 8 channels, etc.), determine the configuration of the wireless acquisition terminal 1.1 in each monitoring station 1, that is, the number of different wireless acquisition terminals 1.1 and the monitoring instruments connected to the wireless acquisition terminal 1.1, and accordingly install the required wireless acquisition terminal 1.1 on the pole-type monitoring station 1 to form a wireless acquisition terminal monitoring station 1 for high-position natural slopes and poor geological bodies;

[0037] When determining the number of different wireless acquisition terminals 1.1 in each monitoring station, it is necessary to satisfy "∑(the i-th wireless acquisition terminal × the number of channels of the i-th wireless acquisition terminal)" is not less than the total number of single measuring points connected to the monitoring instrument of the monitoring station, where i=1~N, N is a positive integer, so as to ensure that each measuring point of the monitoring instrument of the monitoring station can be detected; taking the 8-channel wireless acquisition terminal 1.1 as an example, it can be connected to 8 single-point instruments (such as crack meters, piezometers or anchor stress gauges), or can be connected to 2 sets of four-point instruments (such as four-point multi-point displacement meters); the monitoring station 1 uses a micro-power consumption wireless acquisition terminal 1.1, in which the micro-power consumption wireless acquisition terminal is powered by a self-contained replaceable battery.

[0038] Step 3), according to the distribution of the built wireless acquisition terminal monitoring stations 1, combined with the distribution of the on-site hub area communication facilities 3 (such as switches in the built permanent monitoring stations of hub buildings or engineering slopes), choose to install the wireless gateway 2 in a stable, safe and reliable location adjacent to the hub area communication facilities 3 for wireless communication with the monitoring management center station;

[0039] Taking a large hydropower station project as an example, according to the layout of the on-site monitoring station 1 and the coverage requirements of the gateway 2, and taking into account the possibility of the gateway 2 accessing the communication facilities in the hub area, a total of 4 sets of wireless gateways are set up in the hub area. The specific installation location of the wireless gateway 2 is shown in the table below. The wireless acquisition terminal monitoring station 1 and the wireless gateway 2 communicate through the "LORA" (Long Range Radio) method (see Figure 2 ).

[0040]

[0041] The wireless gateway 2 is powered by factory power in places where conditions permit, and is powered by solar panels 2.1 and batteries 2.2 in other places; the coverage capacity of the wireless gateway 2 can exceed 60,000 measurement points, and the coverage radius can reach up to 15km (depending on the antenna of the wireless gateway 2, the height of the wireless acquisition terminal 1.1 and the line of sight conditions).

[0042] Step 4), the communication method between the monitoring and management center station 4 and the wireless gateway 2 is different in different periods, specifically: during the construction period, 4G wireless method is mainly used for communication and data transmission; when the on-site civil construction environment gradually stabilizes or during the operation period, the hub area communication facilities 3 are used for relaying, and the wireless transmission is changed to wired transmission, and finally the communication optical fiber 5 is used to establish a communication channel and realize data transmission.

[0043] Specifically, during the construction period, when the communication optical fiber 5 is not established between the monitoring and management center station 4 and the construction site, the wireless gateway 2 can communicate and transmit data with the monitoring and management center station 4 through the 4G wireless mode with the help of the 4G communication module 2.3 (see Figure 1 );

[0044] When the on-site civil construction environment gradually stabilizes or the project enters the operation period, the hub area communication facilities 3 are established on site, and the communication optical fiber 5 is established between the central station and the site, the communication equipment of the wireless gateway 2 is connected to the hub area communication facilities 3 through the network cable, and the hub area communication facilities 3 and the monitoring management center station 4 communicate data through the communication optical fiber 5 (see Figure 1 and Figure 2 ).

[0045] Step 5), in the monitoring and management central station 4, through the monitoring data acquisition and analysis system, an automated telemetry command is issued to the wireless gateway 2 and the wireless acquisition terminal 1 equipment, the wireless acquisition terminal 1 controls the sensor to obtain the original data (such as frequency and resistance ratio), and uses the "LORA" communication method and the time required by the command to transmit the data from the wireless acquisition terminal 1 to the wireless gateway 2. The data finally enters the monitoring and management central station 4 directly through the 4G wireless method, or enters the hub area communication facility 3 and is finally transmitted to the monitoring and management central station 4 through the communication optical fiber 5.

[0046] The monitoring and management center station 4 uses 220V AC to power the equipment in the station, and is equipped with an AC uninterruptible power supply (UPS), and the battery is set to maintain the normal operation of the equipment for 48 hours; the monitoring and management center station 4 uses the lightning protection and grounding facilities of the project, and the resistance of the grounding device is less than 4Ω; the working place and protection ground of the equipment in the computer room adopt a joint grounding method to reliably connect with the public grounding network in the project area; the power supply lightning protection adopts three-level power supply lightning protection, which is mainly composed of a three-phase parallel power supply lightning arrester, an isolation transformer, a voltage-stabilized power supply, etc., and also protects against surges in the power grid; a 220V AC power supply lightning protection box and a lightning protection isolation voltage-stabilized power supply are configured in the monitoring and management center station 4; for communication lightning protection, all metal pipelines and cable metal sheaths entering the monitoring and management center station are grounded, and suitable lightning arresters are used for protection. By using the monitoring data acquisition and analysis system 4.1 of the monitoring management center station 4, the original data (such as frequency and resistance ratio) are converted into direct physical quantities, such as rock deformation, crack opening, leakage, seepage pressure and water level, anchor stress and anchor cable anchoring force, etc., and displayed in the system through graphics and statistics through tables, so as to timely, effectively and intuitively grasp the operating status and safety status of high-level natural slopes and unfavorable geological bodies in the dam area.

[0047] The present invention also provides a dam area high natural slope and bad geological body internal observation monitoring system, including monitoring instrument layout module, wireless acquisition terminal layout module, wireless gateway layout module, data monitoring module,

[0048] The monitoring instrument layout module is used to determine the location of the monitoring station and install the monitoring station on site according to the distribution of monitoring instruments for artificial observation of high-position natural slopes and unfavorable geological bodies in the dam area, and then determine the monitoring instruments connected to the monitoring station, and centrally pull the monitoring instruments to the nearest monitoring station via communication cables;

[0049] The wireless acquisition terminal arrangement module is used to determine the configuration of the wireless acquisition terminal in each monitoring station according to all monitoring instruments and the number of instruments connected to each monitoring station, combined with the number of channels of the wireless acquisition terminal, and to install the required wireless acquisition terminal on the monitoring station to form a wireless acquisition terminal monitoring station for high-position natural slopes and poor geological bodies;

[0050] The wireless gateway placement module is used to select a location adjacent to the hub area communication facilities to install the wireless gateway based on the distribution of the built wireless acquisition terminal monitoring stations and the distribution of the hub area communication facilities on site;

[0051] The data monitoring module is used for the monitoring and management center station to issue automated telemetry instructions to the wireless gateway and wireless acquisition terminal equipment. The wireless acquisition terminal controls the sensor to obtain raw data. The raw data is transmitted from the wireless acquisition terminal to the wireless gateway and enters the monitoring and management center station by using long-distance wireless communication methods and the time required by the instructions, so as to intuitively grasp the operating status and safety status of the high-level natural slopes and unfavorable geological bodies in the dam area.

[0052] The above step sequence is only a preferred step sequence of the present invention. If the order of each step is changed, it still falls within the protection scope of the present invention. The above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modification, equivalent replacement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for in-situ monitoring of high-level natural slopes and unfavorable geological bodies in dam areas, characterized in that: The steps include: According to the distribution of monitoring instruments for artificial observation of high natural slopes and unfavorable geological bodies in the dam area, determine the location of the monitoring station and install the monitoring station on site, then determine the monitoring instruments connected to the monitoring station and centrally pull the monitoring instruments to the nearest monitoring station via communication cables; According to the total number of monitoring instruments and instruments connected to each monitoring station, combined with the number of channels of the wireless acquisition terminal, the configuration of the wireless acquisition terminal in each monitoring station is determined, and the required wireless acquisition terminal is installed on the monitoring station to form a wireless acquisition terminal monitoring station for high-position natural slopes and unfavorable geological bodies; According to the distribution of the built wireless acquisition terminal monitoring stations and the distribution of the communication facilities in the on-site hub area, choose to install the wireless gateway in the location close to the communication facilities in the hub area; The monitoring and management center station sends automated telemetry commands to the wireless gateway and wireless acquisition terminal equipment. The wireless acquisition terminal controls the sensor to obtain raw data. The raw data is transmitted from the wireless acquisition terminal to the wireless gateway and enters the monitoring and management center station by using long-distance wireless communication methods and the time required by the command, so as to intuitively grasp the operating status and safety status of the high natural slopes and unfavorable geological bodies in the dam area.

2. The method for in-situ monitoring of high-level natural slopes and unfavorable geological conditions in a dam area according to claim 1, characterized in that: The original data enters the monitoring and management center station directly through the wireless gateway and 4G wireless method, or enters the hub area communication facilities through the wireless gateway and finally enters the monitoring and management center station through communication optical fiber transmission.

3. A method for in-situ monitoring of high-level natural slopes and unfavorable geological conditions in a dam area according to claim 2, characterized in that: During the construction period, 4G wireless methods are used for communication and data transmission; when the on-site civil construction environment gradually stabilizes or is in operation, the communication equipment of the wireless gateway is connected to the hub area communication facilities through a network cable, and the hub area communication facilities are used for relaying, and finally communication optical fibers are used to establish communication channels and realize data transmission.

4. The method for in-situ monitoring of high-level natural slopes and unfavorable geological conditions in a dam area according to claim 1, characterized in that: Multiple monitoring stations containing wireless acquisition terminals are set up in high natural slopes and unfavorable geological bodies.

5. The method for in-situ monitoring of high-level natural slopes and unfavorable geological conditions in a dam area according to claim 4, characterized in that: When determining the number of different wireless acquisition terminals in each monitoring station, the sum of (the i-th wireless acquisition terminal × the number of channels of the i-th wireless acquisition terminal) must not be less than the total number of single measuring points connected to the monitoring instrument of the monitoring station, where i = 1 to N, and N is a positive integer.

6. The method for in-situ monitoring of high-level natural slopes and unfavorable geological conditions in a dam area according to claim 1, characterized in that: The wireless gateway is powered by factory electricity, solar panels or batteries. The wireless gateway can cover more than 60,000 measurement points with a maximum coverage radius of 15km.

7. The method for in-situ monitoring of high-level natural slopes and unfavorable geological conditions in a dam area according to claim 1, characterized in that: In the monitoring and management center station, the monitoring data acquisition and analysis system of the monitoring and management center station is used to convert the original data into direct physical quantities, and the data are displayed in the system through graphics and statistics are made through tables, so as to intuitively grasp the operating status and safety status of the high natural slopes and unfavorable geological bodies in the dam area.

8. The method for in-situ monitoring of high-level natural slopes and unfavorable geological conditions in a dam area according to claim 1, characterized in that: The monitoring station uses a micro-power consumption wireless acquisition terminal, which is powered by a self-contained replaceable battery.

9. The method for in-situ monitoring of high-level natural slopes and unfavorable geological conditions in a dam area according to claim 1, characterized in that: A grounding point is set up near the monitoring station, steel bars are driven into the ground, and the grounding wire is used to connect the steel bars. Shielded cables are used for cables connected to the monitoring station equipment, and the shielding layer is grounded.

10. A system for visually monitoring high natural slopes and unfavorable geological bodies in dam areas, characterized in that: It includes monitoring instrument layout module, wireless acquisition terminal layout module, wireless gateway layout module and data monitoring module. The monitoring instrument layout module is used to determine the location of the monitoring station and install the monitoring station on site according to the distribution of monitoring instruments for artificial observation of high-position natural slopes and unfavorable geological bodies in the dam area, and then determine the monitoring instruments connected to the monitoring station, and centrally pull the monitoring instruments to the nearest monitoring station via communication cables; The wireless acquisition terminal arrangement module is used to determine the configuration of the wireless acquisition terminal in each monitoring station according to all monitoring instruments and the number of instruments connected to each monitoring station, combined with the number of channels of the wireless acquisition terminal, and to install the required wireless acquisition terminal on the monitoring station to form a wireless acquisition terminal monitoring station for high-position natural slopes and poor geological bodies; The wireless gateway placement module is used to select a location adjacent to the hub area communication facilities to install the wireless gateway based on the distribution of the built wireless acquisition terminal monitoring stations and the distribution of the hub area communication facilities on site; The data monitoring module is used for the monitoring and management center station to issue automated telemetry instructions to the wireless gateway and wireless acquisition terminal equipment. The wireless acquisition terminal controls the sensor to obtain raw data. The raw data is transmitted from the wireless acquisition terminal to the wireless gateway and enters the monitoring and management center station by using long-distance wireless communication methods and the time required by the instructions, so as to intuitively grasp the operating status and safety status of the high-level natural slopes and unfavorable geological bodies in the dam area.