Titanium alloy pipe batch heat treatment rack and method
By designing a batch heat treatment rack for titanium alloy pipes, using thermally conductive composite plates and reasonable heat treatment processes, the heat transfer unevenness and oxidation problems in the heat treatment of titanium alloy pipes are solved, and the temperature uniformity and performance are improved.
Patent Information
- Application Number
- CN202411174747.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-29
AI Technical Summary
During batch heat treatment, titanium alloy pipes have uneven heat transfer due to the radius of curvature and bending, resulting in poor uniformity in performance and easy oxidation in high-temperature environments. The prior art is difficult to effectively solve the problem of furnace temperature uniformity.
Design a batch heat treatment rack of titanium alloy pipes. By laying layered and inserting thermal composite boards between each layer, the high thermal conductivity of Cu board and the isolation characteristics of Ti board can be used to realize heat conduction from the periphery to the inward, and the combination is reasonable. The heat treatment process controls temperature uniformity.
It significantly improves the temperature uniformity during batch heat treatment, shortens the pipe to temperature time, avoids diffusion pollution between metals, and improves the performance uniformity of heat treatment and process stability.
Smart Images

Figure CN119040603A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of titanium alloy heat treatment, and in particular to a material rack and method for batch heat treatment of titanium alloy pipes. Background Art
[0002] After cold and hot processing, titanium alloys need to undergo heat treatment to regulate their structure and properties. However, since titanium is easily oxidized in high temperature environments, heat treatment of titanium alloy pipes must be carried out in a vacuum environment.
[0003] Common titanium alloy pipe heat treatment is carried out at room temperature with a vacuum degree of 3*10^ -3 The heat treatment is carried out in a vertical or horizontal vacuum furnace of Pa. During the heat treatment process, the heat transfer between the tubes is mainly heat conduction and radiation heat transfer. However, since the tubes have a certain curvature radius and curvature, and the contact between the tubes is point contact or line contact, and the thermal conductivity coefficient of titanium alloy is small, when the tubes are batch heat treated, there is a significant difference between the temperature-reaching time and temperature of the tubes in the middle of the frame and those at the edge of the frame, resulting in poor uniformity in the performance of the batch heat treated tubes. Summary of the invention
[0004] In view of the above problems, the purpose of the present invention is to provide a rack and method for batch heat treatment of titanium alloy pipes, by paving the pipes for batch heat treatment in layers, inserting Ti / Cu / Ti plates with intervals of 100-200mm in each layer through the rack of the current layer, and utilizing the high thermal conductivity of Cu and the heat transfer cross-sectional area of the plates to achieve heat conduction from the periphery of the rack to the inside, and finally achieving performance uniformity control of batch heat treatment of pipes through a reasonably designed heat treatment process.
[0005] The technical solution adopted by the present invention is as follows:
[0006] A titanium alloy pipe batch heat treatment material rack proposed in the present invention comprises a rectangular frame, a U-shaped frame, a through rod and a heat-conducting composite plate; the rectangular frames are arranged relatively to each other at a certain distance; the U-shaped frames are respectively and evenly arranged between the rectangular frames on both sides; the through rods are horizontally fixedly connected between the borders of the rectangular frame and the U-shaped frame from top to bottom in sequence, and together constitute a rectangular frame structure; the U-shaped frame divides the rectangular frame structure into multiple distribution areas along the length direction; the through rods further layer each distribution area along the height direction; the heat-conducting composite plates are respectively arranged at the bottom and front and rear sides of each layer of distribution area.
[0007] Furthermore, the thermally conductive composite plate includes a Cu plate and a Ti plate; the Ti plates are respectively coated on both side surfaces of the Cu plate.
[0008] Furthermore, a detachable cross bar is installed between the through bars on both sides of each layer of fabric area.
[0009] A method for batch heat treatment of titanium alloy pipes, the method comprising the following steps:
[0010] S1. Lay the titanium alloy pipes to be processed in the material distribution area of each layer of the material rack in the width direction of the material rack, then load the furnace and evacuate;
[0011] S2, vacuum degree reaches 3*10^ -3 After Pa, the temperature was raised to 280-320°C at a heating rate of 10-15°C / min, and then kept at this temperature for 25-35min;
[0012] S3. After the heat preservation is completed, the temperature is raised to the stress relief annealing temperature or the recrystallization annealing temperature at 5-8°C / min;
[0013] S4. Keep the temperature at the stress relief annealing temperature or the recrystallization temperature according to the process requirements. After the heat preservation is completed, the furnace is cooled to 280-320°C and then air-cooled with argon gas.
[0014] Furthermore, in step S3, the stress relief annealing temperature or the recrystallization temperature is 350-550°C.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] 1. The existing heat treatment tooling and methods for titanium alloy seamless pipes are difficult to solve the problem of uniform furnace temperature caused by batch heat treatment. The material rack design of the present invention realizes layered material distribution, enhances the direct radiation heat transfer of the furnace heating element to the core pipe of the loading, and simultaneously utilizes the Cu plate whose thermal conductivity is 20 times that of titanium to realize the transfer of heat from the periphery of the material frame to the core titanium pipe of the material rack, thereby enhancing conductive heat transfer and radiative heat transfer, which is beneficial to accelerate the time for the core of the furnace to reach the temperature after loading.
[0017] 2. The present invention can significantly improve the temperature uniformity during batch heat treatment by controlling the heating rate and holding time in different temperature ranges.
[0018] 3. The heat treatment rack proposed in the present invention has the characteristics of heat resistance, stable structural strength and convenient loading. At the same time, the designed Ti plate paving effectively isolates the titanium tube from contact with the Cu plate and the heat-resistant frame, avoiding diffusion contamination between metals. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a partial structural schematic diagram of a titanium alloy pipe batch heat treatment rack proposed by the present invention;
[0020] Figure 2 This is a schematic diagram of the material distribution effect of a titanium alloy pipe batch heat treatment rack proposed in the present invention.
[0021] Among them, the figure marks are: 1-rectangular frame; 2-U-shaped frame; 3-through rod; 4-cross rod; 5-Cu plate; 6-Ti plate; 7-titanium alloy pipe. DETAILED DESCRIPTION
[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0023] It should be noted that, in the description of the present invention, the terms "up", "down", "top", "bottom", "one side", "the other side", "left", "right", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not mean that the device or element must have a specific orientation, be constructed and operated in a specific orientation.
[0024] See attached Figure 1-2 , gives the specific structure of an embodiment of a material rack and method for batch heat treatment of titanium alloy pipes proposed by the present invention. The material rack includes a rectangular frame 1, a U-shaped frame 2, a through rod 3 and a heat-conducting composite plate.
[0025] In the present embodiment, two rectangular frames 1 are provided, which are arranged opposite to each other at a certain distance; five U-shaped frames 2 are provided, which are evenly arranged between the rectangular frames 1 on both sides respectively, so as to increase the side rigidity of the material rack; the through rods 3 are horizontally fixedly connected between the borders of the rectangular frame 1 and the U-shaped frame 2 from top to bottom in sequence, so as to maintain the shape of the material rack; the rectangular frame 1, the U-shaped frame 2 and the through rods 3 together constitute a rectangular frame structure.
[0026] The U-shaped frame 2 divides the rectangular frame structure into a plurality of distribution areas along the length direction; the through rod 3 further divides each distribution area into layers along the height direction; and the heat-conducting composite plate is respectively arranged at the bottom and front and rear sides of each layer of distribution area.
[0027] The heat-conducting composite plate includes a Cu plate 5 and a Ti plate 6; the Ti plate 6 is respectively coated on both side surfaces of the Cu plate 5 by welding, and the heat-conducting composite plate contacts the material rack and the titanium alloy pipe 7 to be processed through the Ti plate 6.
[0028] A detachable cross bar 4 is installed between the through bars 3 on both sides of each layer of the cloth area. After the cloth is laid in each layer of the cloth area, the detachable cross bar 4 can be used to realize the stratification of the material rack.
[0029] When laying the materials, the titanium alloy pipes 7 to be processed are laid in order in the laying areas of each layer of the material rack along the width direction of the material rack.
[0030] Common heat treatment processes for titanium alloy pipes include stress relief annealing, incomplete recrystallization annealing and complete recrystallization annealing. In order to improve the temperature uniformity of the pipe heat treatment process, a multi-stage heating system is designed.
[0031] The design scheme for stress relief annealing and incomplete recrystallization annealing is as follows:
[0032] S1. Lay the titanium alloy pipes to be processed in the material distribution area of each layer of the material rack in the width direction of the material rack, then load the furnace and evacuate;
[0033] S2, vacuum degree reaches 3*10^ -3 After Pa, the temperature was raised to 280-320°C at a heating rate of 10-15°C / min, and then kept at this temperature for 25-35min;
[0034] S3. After the heat preservation is completed, the temperature is raised to the stress relief annealing temperature or the recrystallization annealing temperature at a rate of 5-8°C / min; the stress relief annealing temperature or the recrystallization temperature is 350-550°C;
[0035] S4. Keep the temperature at the stress relief annealing temperature or the recrystallization temperature according to the process requirements. After the heat preservation is completed, the furnace is cooled to 280-320°C and then air-cooled with argon gas.
[0036] The design scheme for complete recrystallization annealing is as follows:
[0037] S1, loading the titanium alloy pipe 7 to be processed into the furnace according to the above method, and evacuating the furnace;
[0038] S2, vacuum degree reaches 3*10^ -3 After Pa, the temperature was raised to 280-320°C at a heating rate of 10-20°C / min, and then kept at this temperature for 25-35min;
[0039] S3. After the heat preservation is completed, the temperature is raised to 480-520℃ at a rate of 5-8℃ / min, and then kept at this temperature for 25-35min;
[0040] S4. After the insulation is completed, the temperature is raised to the complete recrystallization temperature of 650-750℃ at 2-5℃ / min. After the insulation is completed, the furnace is cooled to 280-320℃, and then air-cooled with argon.
[0041] At present, after vacuum heat treatment is loaded, the part close to the heating element reaches the temperature quickly, while the part in the middle of the material reaches the temperature slowly, resulting in large fluctuations in the performance of pipes in the same heat treatment furnace batch. Due to the small thermal conductivity of titanium alloy, the performance fluctuations are more obvious.
[0042] The present invention layers the material by designing the rack structure, and the intervals between the layers are conducive to the transmission of radiated or reflected electromagnetic waves. Taking advantage of the large thermal conductivity of copper, a copper plate is passed through the material in the form of a titanium-copper composite plate, so that external heat is quickly transferred into the core of the material by conduction heat transfer, shortening the time it takes for the core of the material to reach temperature. At the same time, combined with the stress relief and recrystallization temperature range of the titanium alloy, the temperature difference between the core and the outside of the material in this temperature range is reduced by keeping the alloy below the stress relief temperature, and the heating rate is reduced in the range from the stress relief temperature to the recrystallization temperature, and the insulation time is extended to ensure the temperature uniformity of the stress relief annealing process. In addition, for the recrystallization annealing process, the heating rate is further reduced, thereby shortening the difference in the time it takes for the material to reach temperature in various distribution areas.
[0043] Matters not described in detail in the present invention are known in the art.
[0044] The embodiments described above are merely descriptions of preferred implementation modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A titanium alloy pipe batch heat treatment rack, characterized in that: The material rack includes a rectangular frame, a U-shaped frame, a through rod and a heat-conducting composite plate; the rectangular frames are arranged relatively at a certain distance; the U-shaped frames are evenly arranged between the rectangular frames on both sides; the through rods are horizontally fixedly connected between the borders of the rectangular frame and the U-shaped frame from top to bottom in sequence, and together form a rectangular frame structure; the U-shaped frame divides the rectangular frame structure into multiple distribution areas along the length direction; the through rods further layer each distribution area along the height direction; the heat-conducting composite plates are respectively arranged at the bottom and front and rear sides of each layer of the distribution area.
2. A titanium alloy pipe batch heat treatment rack according to claim 1, characterized in that: The heat-conducting composite plate comprises a Cu plate and a Ti plate; the Ti plates are respectively coated on both side surfaces of the Cu plate.
3. A titanium alloy pipe batch heat treatment rack according to claim 2, characterized in that: A detachable crossbar is installed between the through-bars on both sides of each layer of fabric area.
4. The heat treatment method for a titanium alloy pipe batch heat treatment rack according to claim 2, characterized in that: The method comprises the following steps: S1. Lay the titanium alloy pipes to be processed in the material distribution area of each layer of the material rack along the width direction of the material rack, then load the furnace and evacuate; S2, vacuum degree reaches 3*10^ -3 After Pa, the temperature was raised to 280-320°C at a heating rate of 10-15°C / min, and then kept at this temperature for 25-35min; S3. After the heat preservation is completed, the temperature is raised to the stress relief annealing temperature or the recrystallization annealing temperature at 5-8°C / min; S4. Keep the temperature at the stress relief annealing temperature or the recrystallization temperature according to the process requirements. After the heat preservation is completed, the furnace is cooled to 280-320°C and then air-cooled with argon gas.
5. The heat treatment method according to claim 4, characterized in that: In the step S3, the stress relief annealing temperature or the recrystallization temperature is 350-550°C.
Citation Information
Cited By
Adjustable titanium alloy plate heat treatment material frame
CN224450755U